Click here to load reader
Date post: | 08-Nov-2014 |
Category: |
Documents |
Upload: | tejinder-ammla |
View: | 171 times |
Download: | 13 times |
Click here to load reader
Company Profilewww.vikramsolar.c om
ContentsCompany Profile Vikram Solar - Vision Ahead Vikram Solar - Product Range Our Commissioned Projects Certifications EHS
Proprietary & Confidential
www.vikramsolar.com
2
Vikram Group & Vikram Solar - Company Profile
Proprietary & Confidential
www.vikramsolar.com
3
Vikram Group - Business InterestsTextile Tea Manufacturing Equipments Solar Power Education
Proprietary & Confidential
www.vikramsolar.com
4
Group CompaniesFrom a single line of business, Vikram Group has transformed itself into a well-diversified group with a strong foothold in Tea Machineries, Textiles, Solar Photovoltaic and Educational Institutes.
Vikram India Limited Worlds largest manufacturer of entire range of Tea Processing Machineries and Turnkey Tea Factory installations.
VIKRAM
Vikram Polyester Pvt Ltd Modern Textile Processing Plant in Surat.
Pioneer Syntex Pvt Ltd A state of art Textile Processing plant in Surat.
Gujrat Hiflow Yarn Limited A state of the art Textile Processing plant in Surat Vikram Solar Pvt Ltd Manufacturer of Photovoltaic Solar Modules and EPC provider.Proprietary & Confidential www.vikramsolar.com
Ballaram Hanumandas Charitable Trust A network of Boarding Day schools and post graduate engineering college.
Hari Krishna Chaudhary Foundation Running a reputed Degree College.
5
Vikram Group - 37 years of excellenceVikram Group
5,000 People 29 Countries Textiles Engineering Education Tea Manufacturing Machineries Solar Photovoltaic
Vikram Solar
600 people More than 12 Countries Module Manufacturing EPC Power Project Installation
Proprietary & Confidential
www.vikramsolar.com
6
Vikram Solar - Business Interest
Proprietary & Confidential
www.vikramsolar.com
7
Vikram Solar - An OverviewCompany Profile
Established in the year 2006 Started with a base capacity of 12 MW and increased its capacity to 70 MW in a span of six months Solar Power plant developers Increasing capacity by 70 MW: Total capacity-140 MW by August2012 ISO 9001:2008 & ISO 14001 certified
Technology
Using Technology from SPIRE and NPC, leading Solar Photovoltaic Equipment providers from US and Japan respectively
Products
Designs and manufactures PV Solar Modules EPC Turnkey Solutions - Grid Connected - Off Grid
Global Presence
Europe
Asia
Germany Italy Spain United Kingdom
India Bangladesh Nepal
USA Australia Middle East
Africa
South Africa Kenya
Proprietary & Confidential
www.vikramsolar.com
8
Our Extensive Presence in India
Delhi
Jaipur
Ahmedabad Mumbai Raipur
Kolkata
Pune
Bangalore
Proprietary & Confidential
www.vikramsolar.com
9
Our Significant Global PresenceEuropeAm Exerzierplatz 68167 Mannheim Germany Email: [email protected]
EuropeC/ Zurbano 29. 28010 Madrid Espa
North America1064 Van Buren Ave Suit 7- Indian Trail NC 28079, USA Email: [email protected]
AsiaAfricaPO Box No. 17831-00500 Nairobi Kenya Email: [email protected] Tobacco House 1, Old Court House Corner Kolkata, West Bengal - 700001 Email: [email protected]
Proprietary & Confidential
www.vikramsolar.com
10
Technology
Annual, Current, Capacity of 70 MW, increasing to 140MW by August 2012 Technology Partner from Spire Incorporation, USA and NPC Industries, Japan High Efficiency Cells from Motech Industries, Taiwan
Modules in the Power class of 10 wp to 365 wp with 240wp family for 60 cells Modules and 280wp family for 72 cells Modules and 350 wp family panels with the 88 cells.The only company in India to use Electroluminescence Test for Cells before using in the Modules, to ensure micro cracks free Modules. Current module efficiency around & excess of 15% Well positioned to produce mono-crystalline modules as well Manufacturing process follows the best International Industry Standards and Practiceswww.vikramsolar.com 11
Proprietary & Confidential
Board MembersH K Chaudhary, Chairman - Vikram GroupMr. Hari Krishna Chaudhary is the Chairman and Managing Director of Vikram Group of Industries. Under his able guidance and charismatic leadership, Vikram group has achieved unprecedented success in business and philanthropy. By establishing Vikram Solar Pvt Ltd, Sri H K Chaudhary has ventured into Renewable energy sector to explore and fulfil the growing energy needs of the our country.
Anil Chaudhary, Vice Chairman - Vikram GroupAn exemplary leader and visionary at Vikram Group, he also holds a 1st class Degree in BE (Electrical) from Bangalore University and MBA from Jadavpur University. He is presently managing the Group's textile division and power projects.
Gyanesh Chaudhary, Managing DirectorHe is a dynamic leader and the key driving force of Vikram Solar. A Business Graduate from University of Wales, UK coupled with a Diploma in Marketing & International trade from the Harvard Business School and an executive program in marketing from the University of Boston, his experience and advanced vision provides a strong backbone for Vikram Solar.
Manoj Kumar Sharma, DirectorHe is one of the chief architects behind the success of Vikram Solar. A Chartered Accountant with an experience of 18 years in all major sectors of business operation, his expertise and knowledge has given a new meaning and perspective of carrying the company to new heights.
Proprietary & Confidential
www.vikramsolar.com
12
Management TeamFernando Arroyo Villuendas, Managing Director - Vikram Proener Projects Pvt. Ltd.Fernando has a total experience of over 16 years in various companies like Geocontrol, Construcciones Navarro Piquer, Repsol. His work experience includes 2 years as COO in Constructions Navarro Piquer, 6 years as Maintenance Chief in Repsol. For the last 7 years, he is working at Proener as Managing Director.
Shaibal Ghosh, President - International Business DivisionShaibal Ghosh, a significantly experienced Operations and P&L leader with specialization in Sales & Marketing. Has held top management profit center head responsibilities for the last 17 years, with a total work experience of 22 years. Have had comprehensive professional corporate exposures in dynamic industries such as IT, Telecom, Publishing & core manufacturing, as in Solar Glass & Solar PV modules and has worked globally since 1997 having been posted in various countries.
K K Maskara, Director - Finance & Strategic InitiativesKishan Kumar Maskara, a hardworking and enthusiastic upright attitude personnel with innovative nature and ability to dominate work with confidence to achieve targets, having an experience of more than 8 years in accounts, finance and commercial matters.
Manoranjan Khuntia, Vice President - ProductionManoranjan Khuntia, a professional expert in Solar Photovoltaic field having an enrich experience of 18 years in production. He has made a commendable contribution towards setting up of Solar PV module factory at Falta Special Economic Zone and thereafter is responsible of our products strictly in accordance with the quality parameters.Proprietary & Confidential www.vikramsolar.com 13
Management TeamPartha Debnath, General Manager - Accounts & FinancePartha Debnath, a result oriented, multi-faceted finance personnel with an overall experience of over 15 years. He is been involved in making strategic decision in multi functional and multi cultural environment in international companies like IT, real estate development, manufacturing, trading, service, agriculture both in India and abroad. He is a Chartered Accountant from The Institute of Chartered Accountant of India. He has also qualified for Certify Public Accountancy examination by California Board of Accountancy, USA.
N. Venkateshwaran Raju, General Manager - Corporate FinanceN. Venkateshwaran Raju, a commerce graduate having more than three decades of experience in the field of finance, accounts and administration. Been finance head of a paper mill having its own co generation power plant in Uttar Pradesh.
Susmita Banerjee, Deputy General Manager - Human ResourceShe is a dynamic professional with over 14 years of experience in HRM broadly recruitment, performance appraisal, compensation, industrial relations, policies & procedures and general administration. She is an expert in planning, strategising and implementing HR and IR issues as well as related administrative matters. She has done her MBA from MIM and M. Sc from University of Calcutta. Her association to Vikram Solar extends the improvement in Manpower Resource Management.
Subhendu Roy, Senior VP & Head - EPC SalesSubhendu, a BE & MBA with an overall experience of 23 years in assisting functional heads in strategic areas of the power plant operation an d the power distribution business. Also, working with Group Heads on various aspects of the companys future projects and business development activities.Proprietary & Confidential www.vikramsolar.com 14
Vikram Solar - Vision Ahead
Joint Venture Committed Towards Excellence
Proprietary & Confidential
www.vikramsolar.com
16
Vikram Solar - Long Term Plan300 MW of Photovoltaic capacity across value chain in different phases (except Poly Silicon)Poly Silicon Silicon Wafer PV Cell Module EPC
100MW
100MW
140MW
350MW
Wafering
Cell/Modules
Module
EPC
Proprietary & Confidential
www.vikramsolar.com
17
Vikram Solar - Backward Integration StrategyValue Chain Crystalline Solar Cell
Silicon Fab Engineering Key Equipment Consulting
Ingot & Wafer
Cell
Module
Turnkey Line Key Equipment Consulting
Turnkey Line Key Equipment Consulting
Turnkey Line Key Equipment Consulting
Vikram Solar Photovoltaic
Service
Service
Service
Service
Proprietary & Confidential
www.vikramsolar.com
18
Photovoltaic Value ChainPoly-Silicon Silicon Wafers PV Cell Module
Growing a block/ingot
Cropping
Cutting a block
Grinding edges
Slicing Wafers
The intentions are twofold - control the value chain and create space for technology development
Proprietary & Confidential
www.vikramsolar.com
19
Road Map - Expansion ProjectionYear 2012 2013 2014 Wafering (MW) 0 0 0 0 Cells (MW) 100 100 +100 200 Modules (MW) 140 (Expanded) 140 +70 210 IPPs(MW) 20 70 70 160
250200 150 100 50 wafering (MW) Cells (MW) Modules (MW) IPP's (MW)
02012Proprietary & Confidential
2013
201420
www.vikramsolar.com
Vikram Solar - Product Range
Proprietary & Confidential
www.vikramsolar.com
21
PV ModulesELDORA 140POLY-CRYSTALLINE SOLAR PV MODULE
ELDORA 210POLY-CRYSTALLINE SOLAR PV MODULE
Features
High conversion efficiency based on leading innovative photovoltaic technologies High reliability with guaranteed 0~+4.99 Wp power output tolerance, ensuring ROI Withstands high wind-pressure and snow load (passed 5400Pa mechanical loading test), and extreme temperature variations Optimal output over decades, with very good low light response
Proprietary & Confidential
www.vikramsolar.com
22
PV Modules (Contd)ELDORA 240POLY-CRYSTALLINE SOLAR PV MODULE
ELDORA 280POLY-CRYSTALLINE SOLAR PV MODULE
Features
High conversion efficiency based on leading innovative photovoltaic technologies High reliability with guaranteed 0~+4.99 Wp power output tolerance, ensuring ROI Withstands high wind-pressure and snow load (passed 5400Pa mechanical loading test), and extreme temperature variations Optimal output over decades, with very good low light responsewww.vikramsolar.com 23
Proprietary & Confidential
The Latest offering ELDORA 350POLY-CRYSTALLINE SOLAR PV MODULE
The BIG One
Features
High conversion efficiency based on leading innovative photovoltaic technologies High reliability with guaranteed 0~+4.99 Wp power output tolerance, ensuring ROI Withstands high wind-pressure and snow load (passed 5400Pa mechanical loading test), and extreme temperature variations Optimal output over decades, with very good low light response 88 Cell, cell efficiencies of 16.60% with ARC Glass & higher thickness Ribbons The dimensions of the Module 1800 MM X 1300 MM X 36 MM. 4 MM Glass & 4 Diode JB in 350 Wp glass
Quality and Safety
Electrical insulation values for this 350 wp panel (in Mega Ohm per panel) will be more than 50 Mega Ohms.Per Pallet 350 wp panels - 28 modules Per 40 Container - 12 pallets/336 Moduleswww.vikramsolar.com
25 year limited power output warranty Rigorous quality control meeting the highest International Standards ISO 14001 (Environment Health & Safety) Certified Factory ISO 9001:2008 (Quality Management System) Certified Factory TUV: IEC 61215, IEC 61730, IEC 61701, CE, UL 1703, MCS Strict adherence to Electroluminesence Testing ensuring micro-crack free Modules24
Proprietary & Confidential
Vikram Solar - Commissioned Projects
Proprietary & Confidential
www.vikramsolar.com
25
Few Power Plant Installation at a GlanceCapacity 29 MWp 10 MWp 3 MWp 2.5 MWp 1 MWp 800 KWp 300 KWp 250 KWp 100 KWp 42 KWp 30 KWp 53 KWp 74 KWp 67 KWp Type Grid Tied Grid Tied Roof Top Grid Tied Grid Tied Grid Tied Telecom Application Grid Tied Grid Tied with Battery Back Up Telecom Application Grid Tied Rooftop Rooftop Rooftop Project Location France Spain Spain Germany Germany Italy India Italy India India India India Italy Spain Commissioned On Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned
Proprietary & Confidential
www.vikramsolar.com
26
Few Power Plant Installation at a GlanceCapacity 7 KWp 6 KWp 5 KWp 5 KWp 5 KWp 11 MWp 5.8MWp 5.8MWp 5 MWp 5 MWp 5 MWp Type Stand Alone Grid Tied with Battery Back Up Stand Alone Grid Tied with Battery Back Up Grid Tied with Battery Back Up Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Project Location India India India India India Spain Spain Spain Spain Spain Spain Commissioned On Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned
4.5 MWp160 KWp 116 KWp
Grid TiedRooftop Rooftop
SpainFrance Spain
CommissionedCommissioned Commissioned
Proprietary & Confidential
www.vikramsolar.com
27
Few Power Plant Installation at a GlanceCapacity 4.4 MWp 4 MWp 3.8 MWp 2 MWp 1.9 MWp 1.8 MWp 1.5 MWp 1.5 MWp 1.2 MWp 1.1 MWp 1 MWp 0.9 MWp 0.8 MWp 167 KWp 130 KWpProprietary & Confidential
Type Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied
Project Sponsor Spain Spain Spain Spain Spain Spain Spain Spain Spain Spain Solaria Spain Spain France Spainwww.vikramsolar.com
Commissioned On Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned28
Grid Tied ( 0.4 MWp CSP & 0.5 MWp PV)Grid Tied Rooftop Rooftop
Few Power Plant Installation at a GlanceCapacity 0.8 MWp 0.6 MWp 0.5 MWp 0.5 MWp 0.3 MWp 3.6 MWp 3 MWp 10 MWp 2 MWp 1.1 MWp 536 KWp Type Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Rooftop Rooftop Rooftop Rooftop Rooftop Project Sponsor Spain Spain Spain Spain Italy Italia Spain France Spain Spain Spain Project Status Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned
232 KWp250 KWp 500 KWp
RooftopRooftop Rooftop
SpainSpain Spain
CommissionedCommissioned Commissioned
Proprietary & Confidential
www.vikramproener.com
29
Few Power Plant Installation at a GlanceCapacity 2MW 1 MW 5MW 2 MW 1 MW 2MW 5MW Type Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Project Sponsor India India India India India India India Place Commissioned Commissioned Commissioned Roorkee, Uttarakhand Rourkela, Orissa Lucknow, Uttar Pradesh Jodhpur, Rajasthan
Proprietary & Confidential
www.vikramsolar.com
30
Our Commissioned ProjectsArgamasilla I (Ciudad Real)Type Place Project Status Size Grid Tied Argamasilla I (Ciudad Real) Commissioned 29 MWp
Villanueva De La SerenaType Place Project Status Size Grid Tied Villanueva De La Serena Commissioned 10 MWp
Proprietary & Confidential
www.vikramsolar.com
31
Our Commissioned ProjectsMAGACELA (BADAJOZ)Type Place Project Status Size Grid Tied MAGACELA (BADAJOZ) Commissioned 10 MWp
TRUJILLO 3 (CACERES)Type Place Project Status Size Grid Tied TRUJILLO 3 (CACERES) Commissioned 10 MWp
Proprietary & Confidential
www.vikramsolar.com
32
Our Commissioned ProjectsSpainType Place Project Status Size Roof top Spain Commissioned 3MWp
Karlstadt ,GermanyType Place Project Status Size Grid Tied Karlstadt ,Germany Commissioned 2.5 MWp
Proprietary & Confidential
www.vikramsolar.com
33
Our Commissioned ProjectsKottenheim, GermanyType Place Project Status Size Grid Tied Kottenheim, Germany Commissioned 1.05 MWp
Chhattisgarh, IndiaType Place Year of Commissioning Size Grid Tied Chhattisgarh, India August 2011 2 MWp
Proprietary & Confidential
www.vikramsolar.com
34
Our Commissioned ProjectsGujarat, IndiaType Place Project Status Size Grid Tied Gujarat, India Commissioned 5 MWp
Orissa, IndiaType Place Project Status Size Grid Tied Orissa, India Commissioned 1 MWp
Proprietary & Confidential
www.vikramsolar.com
35
Our Commissioned ProjectsTorano Nuovo - ItalyType Place Project Status Grid Tied Torano Nuovo - Italy Commissioned
Size
800 KWp
Uttar Pradesh, IndiaType Place Stand Alone Hybrid Uttar Pradesh, India
Project StatusSize
Commissioned10 KWp x 30
Proprietary & Confidential
www.vikramsolar.com
36
Our Commissioned ProjectsParma, ItalyType Place Project Status Size Stand Alone Hybrid Parma, Italy Commissioned 250 KWp
HIT, Kolkata, IndiaType Place Project Status Size Grid Connected with Battery Backup HIT, Kolkata, India Commissioned 100KWp
Proprietary & Confidential
www.vikramsolar.com
37
Our Commissioned ProjectsUttar Pradesh & Haryana, IndiaType Place Project Status Size Hybrid System for Telecom Towers Uttar Pradesh & Haryana, India Commissioned 4.2KWp x 10
Salt Lake, West Bengal, IndiaType Place Project Status Size Grid Connected Salt Lake ,West Bengal India Commissioned 30KWp
Proprietary & Confidential
www.vikramsolar.com
38
Our Commissioned ProjectsUttarakhand, IndiaType Place Project Status Project Sponsor Size Stand Alone ITI Building, Uttarkhand, India Commissioned UREDA 3.5KWp * 2 Nos
Uttarpradesh, IndiaType Place Project Status Project Sponsor Size Grid connected with Battery back up Energy Park , U.P, India Commissioned NEDA, U.P 6KWp
Proprietary & Confidential
www.vikramsolar.com
39
Our Commissioned ProjectsWest Bengal, IndiaType Place Project Status Project Sponsor Size Grid Connected with Battery back up Gurudas College, West Bengal, India Commissioned WBGEDCL 5KWp
Haryana, IndiaType Grid Connected with Battery back up
PlaceProject Status Project Sponsor SizeProprietary & Confidential www.vikramsolar.com
Bahal, Haryana, IndiaCommissioned BRCM Public School 5KWp40
4.5 MW Solar power plant in France Awarded Mounting
one of the most difficult power plant installation system installed by hand over surface with average 25 %
steep
Proprietary & Confidential
www.vikramsolar.com
41
Photo Gallery
5MW for MONTEBALITO
5MW for MONTEBALITO
4.5MW for ALDESAProprietary & Confidential
5MW for GMFwww.vikramsolar.com 42
Certificate of CommissioningDetails of SPV Modules and Inverters:Type of Solar photovoltaic modules Make of Solar Photovoltaic Modules Model of PV Modules Capacity of each PV Modules Total No. of PV Modules Type of Inverters Make of Inverters Poly Crystalline Eldora, Vikram Solar Pvt. Ltd. Eldora 200 200 W 6480 Central AEG Eldora 205 205 W 9076 Eldora 210 210 W 8976
Capacity of each InverterTotal no. of Inverters Total Capacity of Solar Power Project
500 kW10 5.0414
Details of Site Location:VillageShivlakha
TalukaBhaehau
DistrictKutch
Revenue survey numbers526/C, 526/P1, 527/B, 527/C, 528/B1, 531, 537/B1, 538/A
Proprietary & Confidential
www.vikramsolar.com
43
Project Pipeline in IndiaSl. No. 1 2 Capacity 10 MW 10 MW Type Solar Power Plant under JNNSM Solar Power Plant under JNNSM Solar Power Plant for Telecom Application Stand Alone Solar Power Plant with Battery Back up Stand Alone Solar Power Plant with Battery Back up Grid Connected Solar Power Plant with Battery Back up Grid Connected Solar Power Plant with Battery Back up Stand Alone Solar Power Plant with Battery Back up Project Sponsor Lexicon Vanijya Pvt. Ltd. Symphony Vyapaar Pvt. Ltd.
34 5 6 7 8
30 X 10 KW1 x 25 KW 1 x 25 KW 100 KW 30 KW 20 KW
Global Towers Ltd.Zoram Energy Development Agency Zoram Energy Development Agency Ballaram Hanumandas Charitable Trust Tapti Valley Education Foundation , Gujarat Directorate of New and Renewable Energy, Nagaland, Kohima
Proprietary & Confidential
www.vikramsolar.com
44
Project Pipeline in IndiaSl. No. 9 Capacity 50 KW Type Stand Alone Solar Power Plant with Battery Back up Stand Alone Solar Power Plant with Battery Back up Grid Connected Solar Power Plant with Battery Back up Grid Connected Solar Power Plant with Battery Back up Project Sponsor Directorate of New and Renewable Energy, Nagaland, Kohima Directorate of New and Renewable Energy, Nagaland, Kohima Vikram Green Tech Pune Signotron India Pvt. Ltd.
1011 12
100 KW30 KW 10 KW
Proprietary & Confidential
www.vikramsolar.com
45
Vikram Solar EPC Installation Film
Vikram Solar EPC Installation Film
Proprietary & Confidential
www.vikramsolar.com
46
Our InfrastructureHighly automated, state-of-the-art facilities
Proprietary & Confidential
www.vikramsolar.com
47
Module Assembly Service
Proprietary & Confidential
www.vikramsolar.com
48
Module Assembly ServiceThe process includes the following steps:Assembler Bussing Module Lay Up Laminator
Cleaning
Testing
JB Fixing
Framing
Packaging
Our multiple lines are from Spire USA , NPC Japan
Proprietary & Confidential
www.vikramsolar.com
49
Manufacturing Process
GLASS WASHING
STRINGING
BUSSING
SHEET CUTTING
FRAMING
TRIMING
LAMINATION
LAY UP
JB FIXINGProprietary & Confidential
CLEANINGwww.vikramsolar.com
PACKING50
Testing Equipment
CELL TESTING
VISUAL INSPECTION
IV TEST
LAMINATED QC
FINAL Q.C.
FLASH TESTING
H.V. TESTING
Proprietary & Confidential
www.vikramsolar.com
51
Storage of Cells, Materials and Modules
Proprietary & Confidential
www.vikramsolar.com
52
Storage Capacity at Our Plant
Cells - 7 Mw EVA - 150000 sq metre Backsheet - 75000 sq metre Fibre Glass - 10000sq metre Glasses - 70000 Pieces (each of measurement 1.64m*.982m) AL Frames - 120 Tonne Flux - 500 Litres Ribbons - 6000 Kgs of Interconnect Ribbon and 2000 Kgs of Bussing Ribbon Sealant of 7000 Cartridges Module Storage Capacity of 3.5 Mw
Proprietary & Confidential
www.vikramsolar.com
53
Placing RFID on Modules (JNSM Requirement)
Proprietary & Confidential
www.vikramsolar.com
54
Placing RFID on Modules (JNSM)Each PV module used in any solar power project must use a RF identification tag. The following information must be mentioned in the RFID used on each module (This can be inside or outside the laminate, but must be able to withstand harsh environmental conditions) Name of the manufacturer of PV Module Name of the Manufacturer of Solar cells Month and year of the manufacture (separately for solar cells and module) Country of origin (separately for solar cells and module) I-V curve for the module Wattage, Im, Vm and FF for the module Unique Serial No and Model No of the module Date and year of obtaining IEC PV module qualification certificate Name of the test lab issuing IEC certificate Other relevant information on traceability of solar cells and module as per ISO 9000Proprietary & Confidential www.vikramsolar.com 55
Placing RFID on Modules (JNSM)
Proprietary & Confidential
www.vikramsolar.com
56
Report Generated after Tag Writing
Proprietary & Confidential
www.vikramsolar.com
57
Generated IV Curve after Tag Writing
Proprietary & Confidential
www.vikramsolar.com
58
Certifications
Proprietary & Confidential
www.vikramsolar.com
59
Certifications
Modules from Vikram Solar are certified with TUV IEC61215, IEC61730 , IEC 61701,CEC, MNRE, MCS, UL1703 During the OEM process - Modules require co-certification from TUV Rhineland and will take 3 months processing time For Domestic sales Modules require TUV IEC61215, MNRE Certificate ISO 9001:2008 and ISO14001 :2004 Certified
Proprietary & Confidential
www.vikramsolar.com
60
Certificates
Proprietary & Confidential
www.vikramsolar.com
61
Certification - ISO 140001:2004Vikram Solar is committed to manufacture and sale of Solar Photovoltaic Modules and Systems that can produce clean & green energy leading to sustainable environmental development, continually improve environmental performance and develop systems by:
Managing environmental matters as legal parts of the business, which is also prime corporate responsibility
Complying with all applicable environmental Legislations & Regulations and commitment to environmental protection through prevention of pollutionStriving hard towards conservation of natural resources/Emerge by their responsible and efficient use Providing appropriate training to employees to enhance their awareness on environmental aspects and commitment to Environment Protection by adhering suitable methods and Operational control procedures Being committed to communicate the Environmental policy to all persons working for or on behalf of our organization Providing a framework for setting & reviewing Environmental Objectives & Targets, develop Environmental programs & Initiate Action towards Continual Improvement.
Proprietary & Confidential
www.vikramsolar.com
62
ICRA Credit RatingInstrumentTerm Loan Fund Based Limits
Amount RatedRs 23.39 crore (Reduced from Rs 27.00 crore) Rs. 58.61 crore (Enhanced from Rs 38.00 crore) Rs 41.00 crore (Enhanced from Rs. 21.00 crore)
Rating ActionICRA]BB (Stable) revised upwards from [ICRA]BB- (Stable) [ICRA]BB (Stable) revised upwards from [ICRA]BB- (Stable) [ICRA]BB (Stable) revised upwards from [ICRA]BB- (Stable)/[ICRA]A4 reaffirmed
Non Fund Based Limits*
*The rated limits are interchangeable between short term and long term scale
Proprietary & Confidential
www.vikramsolar.com
63
EHSWhat EHS is: (Environment, Health, Safety)EnvironmentConserving Air, Water, Soil, Plants, Animals, Wildlife, Our Community (causing no damage)
HealthPreserving Human Health both Chronic and Acute (preventing illness)
SafetyPreserving Human and Community Safety/ Well Being (preventing injury)Proprietary & Confidential www.vikramsolar.com 64
EHS Different
types of Fire extinguishers installed in different location in factory Safety during work used PPEs
ERT team
for emergency is defined.the assembly area is defined.
For emergency case Smoke detector
, Beam Detectors and Response Indicators installed with a monitoring system . class room Training and Mock drill for all employees working. Saplings and Trees are planted for going green.
Timely
Several 4
First aid boxes are in place at different location.
3 emergency Exits for evacuation is Regular monitoring
defined.
of the Environmental Aspects viz. Air, Water, Noise, etc.
Proprietary & Confidential
www.vikramsolar.com
65
The EHS Development ProcessSustainability: Involve Executives, Engineers, Administration and Employees in EHS-MS Systems Design to Ensure Client Satisfaction, Utility, Widespread Ownership
Organization Direction
Leadership and Oversight Committee on Environmental, Health, and SafetyAd Hoc Subcommittee Overseeing the EHS Management System Development
Work Production Working CommitteeEHS Management System Design and Implementation
Vice President-works HR & Administration Manager
Project Team
VP
Senior Administration
QC Mgr
Employees
Rep. Researchers, Administration
Project Manager
Projects
Proprietary & Confidential
www.vikramsolar.com
66
EMS Policy - Vikram Solar
Vikram Solar is committed to manufacture and sale of Solar Photovoltaic Modules and Systems that can produce clean & green energy leading to sustainable environmental development, continually improve environmental performance and develop systems by: Managing environmental matters as legal parts of the business, which is also prime corporate responsibility, Complying with all applicable environmental Legislations & Regulations and commitment to environmental protection through prevention of pollution,
Striving hard towards conservation of natural resources/Emerge by their responsible and efficient use,Providing appropriate training to employees to enhance their awareness on environmental aspects and commitment to Environment Protection by adhering suitable methods and Operational control procedures Being committed to communicate the Environmental policy to all persons working for or on behalf of our organization, Providing a framework for setting & reviewing Environmental Objectives & Targets, develop Environmental programs & Initiate Action towards Continual Improvement.
Proprietary & Confidential
www.vikramsolar.com
67
Workers Training Program Provide safety
orientation, and train workers on
the basics
When you hire new and young workers, its essential to include safety issues as part of their orientation to the worksite on the first day of work, before they start working. Using a checklist can make the orientation easier and more thorough, and you can keep the checklist on file as a record of employee training.Everyone has the right to a safe work environment. Employers, supervisors, and workers all have responsibilities to make sure work is performed safely.
Rights and Responsibilities
Proprietary & Confidential
www.vikramsolar.com
68
Workers Training Program Train
young and new workers for their specific
tasks
All workers - especially young workers - need supervised, hands-on training in the tasks they will perform. For example, if a worker is required to operate a tool or machine, that worker has to be properly trained in using the equipment safely. Workers must be properly trained before they start a job.
General
training procedure
Heres a general procedure you can follow when training new and young workers. Provide an overview Demonstrate and describe Observe the new worker on the job and check progress
Proprietary & Confidential
www.vikramsolar.com
69
Workers Training Program Safe
work procedures
Some tasks require workers to follow a specific safe work procedure to eliminate or minimize risks. For example, in your workplace you may have developed procedures for locking out machinery or picking up discarded needles. Workers must be trained to follow your step-by-step safe work procedures.
Provide supervision and ongoing training for
workers
The most important part of training is the follow-up supervision. Adequate supervision includes the following: Ensure proper instruction and training of workers. Follow up training with regularly scheduled observation to ensure that workers continue to follow safe work procedures. Document this observation.
Proprietary & Confidential
www.vikramsolar.com
70
Workers Training Program Training records
Maintain records of the education, training, and supervision for each worker, listing dates and topics covered. Review training records regularly to ensure that training is up-todate and that it meets health and safety requirements. Young and new workers are often in situations where they are supervising their co-workers, even though they may not have the title of supervisor or assistant manager. Before promoting workers to supervisory roles or asking them to take on supervisory tasks, ensure that they have been trained on their responsibilities for health and safety as a supervisor.
Supervisor training
Make information inspections on a daily basis to ensure that workers understand and are following safe work procedures, including proper lifting techniques and the use of protective equipment, devices, and clothing.
Proprietary & Confidential
www.vikramsolar.com
71
Proprietary & Confidential
www.vikramsolar.com
72
Vikram Solar Production Process Film
Vikram Solar Production Process Flow
Proprietary & Confidential
www.vikramsolar.com
73
Proprietary & Confidential
www.vikramsolar.com
74
Thank Youwww.vikramsolar.c om