Vill.- Salap, P.s.-Domjur,
Howrah , W.B, 711409
WORKING PRFILE
Survey at optimal quality whether it is Road or river, Rail or Canal, Mines or Plant we are ahead of others.
Deserve the best position in view of employees and client not by paper but by successful completion of
commitments to client. Drive innovative processes and systems, aided by technology to provide overall clarity
in both survey systems and construction Systems including maintenance of plant.
Precision Survey Consultancy a journey to find the new horizon in the system of survey since 2004. A fewemployees and with a few instruments. After 4 years it is going to become a milestone in the way of survey,whether it is the Road or River, Rail or Canal, Mines or Plants with the 60 family members and utilization ofmodern technologies. As the Quality of work is mature day by day, affects the growing list of prideful clients.
Our group is committed to delivering specialized services, intelligent solutions and logical approaches toeffectively assist employer /client in the areas of operational compliance and services reliability as well assupport the optimal use of investment across their project.
The combined team consists of building services Engineers, Company Directors, Facilities Managers andConstruction Project Managers.
The group can expand and contract to meet customer and project demands via our own internal establishmentof dedicated
OUR VISION
OVERVIEW
C
O
M
P
A
N
Y
D
I
A
G
R
A
M
Playing and important and pivotal role in the industry with continually up gradation of knowledge in a motive toexceed the expectations of our valued customers by offering a variety of professional services with a very competitivecosts, with timely execution and deliveries. :-
Proprietor
Project / Admin Manager
HR Manager
Asst. HR
HR Executive
Works Manager
(Billing/Tender Submission )
Office Asst.
Accounts Manager
Account Officer
Trainee Accountant
Head Of Drawing
Sr. Draftsman
Draftsman
Project Engineer
Project Executive
Office Executive
(Tendering)
Trainee Office Exe.
Survey Manager
Sr. Surveyors
Surveyors
Asst. Surveyor
S
E
R
V
I
C
E
S
Precision Survey Consultancy have been actively engaged in offering all kinds of Survey Services whichincludes Topographic Survey, Hydrographic Survey, Road Survey, Engineering Survey, Pipeline Survey, Mining Survey, RailSurvey, Transmission Line Survey & GPS Survey. With the outstanding and effective quality services offered, we have aniche in the market.
SERVICE
Hydrographic Survey
Land Survey
Transmission Line
Road Survey
Rail Survey
Engineering Survey
Surface and volume
Measurement and detail
design
Mining Project
Constitution work and building
Surface and volume
measurement and detail
design
Topographic Survey
2,98,39,304.00
2,47,90,622.00
2,05,70,672.10
1,56,92,483.00
1,55,55,348.00
0.00
50,00,000.00
1,00,00,000.00
1,50,00,000.00
2,00,00,000.00
2,50,00,000.00
3,00,00,000.00
3,50,00,000.00
2015-2016 2014-2015 2013-2014 2012-2013 2011-2012
TRUN OVER DETAILS LAST 5 YEARS
2015-2016
2014-2015
2013-2014
2012-2013
2011-2012
The following standalone yearly statements gives a clear information about company’s financial capacity:-
O
U
R
R
E
S
O
U
R
C
E
S
Backed by a team of experts and diligent personnel in-house, we are engaged in variousprojects. A sufficient numbers of effective engineers with other dedicated staffs along withmodern machineries and updated software are tabulated below:-
Civil Engineer - 05 nos
Surveyor - 30 nos.
Asst. Surveyor - 35 nos.
Admin/Accountant - 04 nos.
Office Assistant - 04 nos.
Works Manager - 03 nos.
Auto CAD Draftsman - 09 nos.
OUR RESOURCES- MACHINERY & SOFTWARE
RTK/DGPS – 12 nos.
Total Station – 30 nos.
Echo – Sounder – 03 nos.
Auto Level – 40 nos.
Hand GPS – 04 nos.
Water Current Meter 02 nos.
Water Sampler 01 no.
Motorized Boat 02 nos.
We offer a wide assortment of high quality Surveying Instruments that is in huge demand in themarket. We are well reckoned as one of the overruling Surveying Instruments user based inBengal.
Hypack (Hydrographic)
Hydaspro! (Hydrographic)
SDE 28 (Hydrographic)
Auto CAD Civil 3D – 2010, 11, 13
C-Soft Wise image Pro ver12.x
Power Navigation
E – Survey CAD
Terramodel & Spectrum
Auto CAD LT - 2012
Map Source
P
R
I
D
E
F
U
L
C
L
I
E
N
T
S
The latest equipments and accessories used help us to deliver the quality and timely services to ourclient’s. Further, we have been successful in maintaining cordial relationships with our client’s duringexecution survey work . The following are some of our enviable client’s:-
SURVEY REACH (RECENT PROJECTS)
The arrays of services we are recently engaged at under various Department are enumerated below:-
ONGOING PROJECTS
The latest software and instruments employed helps us in the effective execution of the projects. Further,which we are acknowledged by our client’s for the effectiveness and accuracy. Some of the running projects weare engaged in are:
Project Site
Bihar
Arunachal Pradesh
Sikkim
Bihar
TOPOGRPAHICAL SURVEY UNDER NWDA
Backed by a team of experts and professionals, since our establishment, we have been successful in providingeffective and quality services to our client’s. The arrays of services we are engaged at under NWDA areenumerated below:-
NWDA
Gwalior (MP)
“Topographical survey ofSubmergence areaincluding river area ofproposed Kotha Barrageon Betwa river forinclusion in the DetailedProject Report ofproposed Ken-Betwalink project (phase – II).
8085 Hectors
NWDA Jaipur, Rajasthan
“Topographical surveyfor preparation ofSample command areaplans (about 3500 ha.)of proposed Lower OrrDam Project forinclusion in the DetailedProject Report of Ken-Betwa link project(Phase –II) – reg.
3500 hectors
NWDA,
Bhopal (MP)
Topographical survey of Kotha barrage left bank canal and kotha barrage sample command area by DGPS under Ken-Betwa link phase-II.
3644 Hectors
HYDROGRAPHIC AND TOPO SERVICE PORTFOLIO UNDER IWAI , NOIDA
INLAND WATERWAYS AUTHORITY OF INDIA, IWAI
NOIDA, UTTAR PRADESH
Project 1 -Completed
“Detail hydrographic Survey in NW-4 (South
Buckingham Canal) from Kalpakkam to Puducherry
(75 kms.).
TAMIL NADU & PUDDUCHERRY
Value:- Rs. 32,89,920.00
Project 2 -Completed
“Detailed hydrographic survey in North
Buckingham Canal (160 kms) from Peddaganjam to Krishnapatnam (NW-
4).
ANDHRA PRADESH (A.P.)
Value:- Rs. 25,97,331.00
Project 3 -Completed
Detailed Hydrographic Survey in Tizu river over a length of 35 Kms. River
stretch.
Mizoram, Nagaland
Value:- Rs. 5,19,103.00
Project 4 -Ongoing
“Detail hydrographic Survey and their
feasibility report in REGION –II of proposed
new waterways.
Assam, Guwahati
Value: Rs. 44,41,531.00
Project 5 -Ongoing
“Detailed Hydrographic Survey and their
feasibility report in REGION –IX of proposed
new waterways.
Meghalaya
Value: Rs. 34,13,434.00
HYDROGRPAHIC SURVEY UNDER - UNDER VARIOUS DEPARTMENT
Carrying out cross sectionalsurvey works at Ganga RiverFrom Rishikesh to KachalaBridge as detail in surveyreach.
Completed
Rs. 10,93,600.00
NATIONAL INSTITUTE OF HYDROLOGY,
ROORKEE Carrying out cross sectionalsurvey works in Brahmaputrariver as per site as detail insurvey reach.
Completed
Rs. 9,06,100.00
NATIONAL INSTITUTE OF HYDROLOGY,
ROORKEE
WAPCOSGurgaon
"Conducting Cross Sectional Survey of a reach of Ganga River in Sahibganj, Jharkhand"
Completed Rs. 8,83,585.00
Cross sectional survey of Ganga River at the confluence of Karamnasa River with River Ganga for the proposed intake location of 2X 660 MW Buxar Thermal Power Plant of SJVN
Thermal Private Limited, Bihar”.
Completed Rs. 530,400.00
Hydrographic Survey of Pond of River GangaIcluding Topographic Survey of char lands,slopes and banks), 50 km in upstream(including 15 km upstream of confluence ofriver Fulhar & Ganga) and 15 km in thedownstream of Farakka Barrage as perdirection of Engineer in Charge.
Hydrographic Survey of Pond of River GangaIncluding Topographic Survey of char lands,slopes and banks, 5 km in upstream and 3km downstream of Farakka Barrage as perdirection of Engineer in Charge
“Hydrographic Survey of Pond of RiverGanga (Including Topographic Survey of charlands, slopes and banks), 07 Km of DownStream of Farakka Barrage as per directionof Engineer-In-Charge.
• Completed
• Farakka Barrage, Murshidabad, WB
• Rs. 27,49,448.00
• Completed
• Farakka Barrage, Murshidabad, WB
• Rs. 5,11,500.00
• Completed
• Farakka Barrage, Murshidabad, WB
• Rs. 477,000.00
HYDROGRAPHIC AND TOPOGRPAHIC SURVEY - FARAKKA BARRAGE PROJECT, W.B
NEEPCO – Topographic, Hydro & Feasibility Report
Hydrographic & Topographical survey of RANGANADI Reservoir at Arunachal
Pradesh :Year 12-13
Completed
Value: Rs. 4,94,000.00
Hydrographic & Topographical survey of RANGANADI Reservoir at Arunachal
Pradesh :Year 14-15
Completed
Value: Rs. 4,94,000.00
- “Preparation of a feasibility report on alternate water transport for the public
reservoir of Turial H.E. Project, Mizoram.
Completed
Value: Rs. 12,04,980.00
NHPC
• “Hydrographic Survey of River Teesta from 75 D/s of TLD-III PS Barrage up to TLDP-IV Dam site”.
• Completed
• Rs. 14,53,376.00
Nadia Irrigation
• “Conducting Bathymetric Survey of River Jalangi with help of echo-sounder
• Completed
• Rs. 2,05,000.00
WBFCL
• “Conducting Bathymatric Survey work for improvement of navigability of Dubda Canal with Bay of Bengal, Block: Egra II, Pubra Medinipur. Phase – I (Excavation Portion)” Approx. length = 4 Sq. Km.
• Completed
• Rs. 5,00,000.00
ROAD SURVEY PORTFOLIO
Sl.
No.Description of Work Location Principal Client
Year of
Starting
Pattern of
WorkRemarks
1 "Detailed Alignment Survey of Raw water rising Main, Clear water Rising
Main and Contour Survey of GLR areas in connection with Habra-Gaighata
Water Supply Scheme in the district of North 24 Parganas in West Bengal
WB WAPCOS 2015 Road Survey Site not
delivered by
the client
2 “Road Network and Contour Survey work for Water Supply scheme within
Chakdaha Municipality under UIDSSMT programe. Road length -206 Km.
WB Chakdaha Municipality 2014 Road Survey Completed
3 Preparation of Detailed Project Report (DPR) of roads under 250+New
Connectivity in respect of normal PMGSY road works in different Blocks in
the District of Bankura.
Bankura WBSRDA 2013 Road Survey
& DPR
Completed
4 Topographical, hydraulic and Land Acquisition survey for a stretch of NH-
117 (from Ch.1.000 Km. to Ch. 5.500 Km) Kona Expressway
Kolkata PWD
(NH SURVEY DIV. NO -
II)
2012 Road Survey Completed
5 Topographical, hydraulic and Land Acquisition survey for a stretch of NH-
31C (from Ch.224.500 Km. to Ch. 226.500 Km), around the existing bridge
over river Gadadhar at Alipurduar, in the district of Jalpaiguri,W.B
Alipurduar PWD
(NH SURVEY DIV. NO -
II)
2012 Road Survey Completed
6 Topographical, hydraulic and Land Acquisition survey for preparation of
Land Schedule, Land Acquisition Cost Estimate along with L.A.Drawing as
per the format prescribed by the MORT&H regarding Improvement of the
length of NH-80, Falling in the district of Murshidabad W.B.
Murshidaba
d
PWD
(NH SURVEY DIV. NO -
II)
2012 Road Survey Completed
7 Topographical Survey of Rural Road under PMGSY Scheme of Govt of India. Malda IL&FS Infrastructure
Development Corporation
LTd
2012 Road Survey Completed
8 Topographical Survey of Rural Road under PMGSY Scheme of Govt of India. Siliguri &
Paschim
Midnapur
IL&FS Infrastructure
Development Corporation
LTd
2012 Road Survey Completed
9 Gantak Road Project Sikkim Brahmaputra
Infrastructure Ltd.
2011 Road Survey Completed
10 Topographical Surveys showing existing infrastructure features along the
Right of Way (ROW) on EM Bypass from Ultadanga to Garia for a Length of
15.5 Km.
Kolkata IL&FS Infrastructure
Development Corporation
LTd
2010 Road Survey Completed
ROAD SURVEY PORTFOLIO UNDER VARIOUS DEPARTMENT
Sl.
No
.
Description of Work Location Principal ClientYear of
Starting
Pattern of
WorkRemarks
11
Topographical Survey for the stretch of Farraka to Raiganj Section Ch+295.00
Kms to 398.00 Kms. For NH-34 Project in all respect in the state of West
Bengal.
NH-34Hindustan Construction Co
Ltd (HCC)2010 Road Survey Completed
12
Topographical Survey along identified road corridors in Durgapur City for
development of a Bus Rapid Transit System in Asansol Urban Area under
JNNURM.
Durgapur
Bengal Urban
Infrastructure Development
Private Limited (BUIDPL)
2009 Road Survey Completed
13
Proposed Trafffic Easing / Management Measures for de-congestion of
Benachetty Nachan Road from Bhiringi More (on NH-2) to Prantika in
Durgapur and enhancing of urban mobility within Durgapur City in Asansol
Urban Area under JNNURM
Durgapur
Bengal Urban
Infrastructure Development
Private Limited (BUIDPL)
2009 Road Survey Completed
14 Survey & Demarcation of Land area of Martin Railway with Howrah District Howrah Howrah Zilla Parishad 2009 Road Survey Completed
15
Traffic Easing / Management Measures for de-congestion of OLD G.T. Road
and enhancing of Urban mobility within Asansol City in Asansol Urban Area
in Asansol Urban Area under JNNURM
Asansol
Bengal Urban
Infrastructure Development
Private Limited (BUIDPL)
2009 Road Survey Completed
16Proposed widening of EM Bypass from Ultadanga to Kamal Gazi for
development of a Bus Rapid Transit System (BRTS) under JNNURM SchemeKolkata
Bengal Urban
Infrastructure Development
Private Limited (BUIDPL)
2008 Road Survey Completed
17Proposed Elevated road on Budge Budge Trunk Road from Zhinjira Bazar to
Batanagar More in South 24 Parganas District in KMA area of PPP Basis
Budge
Budge
Bengal Urban
Infrastructure Development
Private Limited (BUIDPL)
2008 Road Survey Completed
18 125 Sq. Km. Road Survey at Panagarh Nadiha PanagarhCES Technologies Private
Limited2008 Road Survey Completed
19Detailed and quantitative survey with Pre and Post Level with Total Station
of about 20Km. Road and around D.S.P. TownshipDurgapur M/s Decon India 2006 Road Survey Completed
RAILWAY SURVEY PORTFOLIO UNDER VARIOUS DEPARTMENT
Sl.
No
.
Description of WorkLocatio
nPrincipal Client
Year of
Starting
Pattern of
WorkRemarks
1Topographical Survey in connecting with
preparation of Feasibility Report for JSPL.GUA
Balaji Rail Road Systems
Limited (BARSYL)2012 Railway Survey Completed
2Execution of Survey Work for our joka BBD
Bag Metro Railway Project Site.Kolkata
McNally Bharat
Engineering Company
Limited
2012Metro Railway
SurveyCompleted
3Survey of platforms in between Bandel-Katwa
StationKatwa
Mesa Narula-GCC(JV)
(MNG)2011 Railway Survey Completed
4
Traversing & Traversing Calculation from
Phoolbagan to Central Metro Station (Total
Legnth of 6Km. Approx) including Drawing
Submission for KMRC:UG2
KolkataITD - ITD Cementation
India Limited2010 Railway Survey Completed
5
Detailed survey with the help of Total Station
between Tamluk (Junction cabin) and Rajgoda
Railway Station in Kharagpur Division of
South Eastern Railway for a Total length of
13.5Km
Tamluk KEC International Limited 2010 Railway Survey Completed
6
Topographical Survey for preparing
Engineering Plan of the proposed Private siding
of M/s Raigarh Coal Benification Pvt. Ltd. near
Robertson Railway Station, S.E.C. Railway
Raigarh,
Chattrishg
ar
MBB Consultancy
Services Pvt. Ltd.2009 Railway Survey Completed
7 Detailed Survey at Patratu by Total StationBalaji Rail Road Systems
Limited2009 Railway Survey Completed
8 Railway siding SurveyBalaghat,
MPSova Ispat Limited 2008 Railway Survey Completed
R
A
I
L
W
A
Y
S
U
R
V
E
Y
Sl.
No.Description of Work Location Principal Client
Year of
StartingPattern of Work Remarks
9Detail Survey of Railway Siding by total
Station at Gamharia site
Tatanagar,
Jharkand
Balaji Rail Road
Systems Limited2008 Railway Survey Completed
10
Detailed Survey for Chattibariatu &
Kerandari Coal Mines Railway siding project
of NTPC Ltd.
Dehri On
Sone,Bihar
Balaji Rail Road
Systems Limited2008 Railway Survey Completed
11
Layout Survey and taking x-section of a pvt.
Railwar siding taking off from Tapsi-Barbani
line of Asansol Division of ER by Total
Station.
AsansolBalaji Rail Road
Systems Limited2008 Railway Survey Completed
12Detailed Survey at GUA Railway station yard
by Total StationGUA
Balaji Rail Road
Systems Limited2008 Railway Survey Completed
13Detailed Survey at ACC, Madhukunda Plant
by Total Station
Madhukund
a
Balaji Rail Road
Systems Limited2008 Railway Survey Completed
14 Detailed Survey at Borojamda Site BorojamdaBalaji Rail Road
Systems Limited2007 Railway Survey Completed
15Deatiled Survey at Barada Railway Yard by
Total StationBarada
Balaji Rail Road
Systems Limited2007 Railway Survey Completed
16Deatiled Survey at Bolani Railway Yard by
Total StationBolani
Balaji Rail Road
Systems Limited2007 Railway Survey Completed
17 Railway siding by Total Station Purulia,WB Haldia Steels Ltd. 2006 Railway Survey Completed
18
Layout of Proposed Railway Track from take
off point to Buffer end of Shri Ramrupai
Balaji Steel Ltd. At Banskopa Durgapur
Durgapur Jai Balaji Group 2006 Railway Survey Completed
R
A
I
L
W
A
Y
S
U
R
V
E
Y
GPS SURVEY PORTFOLIO UNDER VARIOOUS DEPARTMENT
SlDescription of Work Location Principal Client
Year of
Starting
Pattern of
WorkRemarks
1 20 nos of DGPS points fixing. Nagaland Zymax Technologies 2012 DGPS Survey Completed
2 DGPS Control Point survry workSalt Lake
(Kolkata)
Consulting Engineering
Services (INDIA) Private
Limited
2012 GPS Survey Completed
3 DGPS Point Process Howrah Geosmart Technology 2011 DGPS Survey Completed
4
GPS Point & Control Point fixing at entire
area of Kolkata Metro Railway Project
(East - West) between subhas sarovar and
Central Station Based for KMRC:UG2
KolkataITD - ITD Cementation
India Limited2010 GPS Survey Completed
5GPS Survey of Slum in Uttarpara - Kotrang
Municipality AreaUttarpara
IL&FS Infrastructure
Development Corporation
LTd
2006 GPS Survey Completed
6Gps Survey of Slum in Kalyani
Municipality areaKalyani
IL&FS Infrastructure
Development Corporation
LTd
2006 GPS Survey Completed
HIGH TENSION SURVEY PORTFOLIO UNDER VARIOUS DEPARTMENT
Sl.
No.Description of Work Location
Area/
LengthPrincipal Client
Year of
StartingPattern of Work Remarks
1
Detail Survey of existing 132kv D/C
Transmission Line of DVC from
Kalipahari to BALCO including
submission of Route Alignment
Drawing,Profile Drawing & Tower
Scheduling.
Durgapur 6.5 km. DPSC Limited. 2013Transmission
Line SurveyCompleted
2 Route Alignment Survey Ranchi20.863
km.
Hindalco
Industries Limited2012
Transmission
Line SurveyCompleted
3
Survey and soil investigation for
400kV D/C transmission line for
2x660MW STPP at Banka ,Bihar
Bihar 29 km L&T Construction 2012Transmission
Line SurveyCompleted
4
400 KV D/C Tower Packages-A3
under Transmission System
associated with Pallatana GBPP
and Bongaigaon TPS in North
Eastern Region.
Bonga 15 km
IVRCL
Infrastructures &
Projects Ltd.
2010Transmission
Line SurveyCompleted
MINING SURVEY PORTFOLIO UNDER VARIOUS DEPARTMENT
Sl.
No.Description of Work Location Principal Client
Year of
Starting
Pattern of
WorkRemarks
1Preparation of plans for Oting coal Mine of
Black Gold Excavators Pvt.LtdNagaland
Black Gold
Excavators Pvt.Ltd2012
Mining
SurveyCompleted
2Contour / Grid Survey at Sharda OC Mine,
Sohagpur area SECLMP
Cuprum Bagrodia
Limited2010
Mining
SurveyCompleted
3 Topographical Survey work Nagaland Tirucoal Project 2008Mining
SurveyCompleted
4
Topographical Survey of about 3.83 Sq.Km.
(383 Hectors) in respect of Dumri Coal
Block, Dist. - Hazaribagh, Jharkhand State.
JharkhandMahacol Trexim
Private Limited2008
Mining
SurveyCompleted
5Topographical Survey of Tiru Area (Upper
and Lower) in NagalandNagaland NCP Oting (JV) 2007
Mining
SurveyCompleted
SURVEY PICTURES: -The succeeding field images were captured during execution of survey work at various sites :-
REACH US (LOCATION MAP)-Kindly feel us with the following links and we reach to you just a click away to service you in a professionalmanners:-
PRECISION SURVEY CONSULTANCYP.S. –Domjur, Dist. –Howrah, Pin – 711 409
Nearest Land Mark: - Near Salap Bridge, NH6 (Bombay Road Crossing)
CONCLUSION-
The list of client along with the work volume is increasing day to day. Simultaneously the quality of work reflectsby the satisfaction of client. Precision Survey consultancy commit to the client to provide the best service atall time.