Vill.- Salap, P.s.-Domjur,

Howrah , W.B, 711409

WORKING PRFILE

Page 2: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

Survey at optimal quality whether it is Road or river, Rail or Canal, Mines or Plant we are ahead of others.

Deserve the best position in view of employees and client not by paper but by successful completion of

commitments to client. Drive innovative processes and systems, aided by technology to provide overall clarity

in both survey systems and construction Systems including maintenance of plant.

Precision Survey Consultancy a journey to find the new horizon in the system of survey since 2004. A fewemployees and with a few instruments. After 4 years it is going to become a milestone in the way of survey,whether it is the Road or River, Rail or Canal, Mines or Plants with the 60 family members and utilization ofmodern technologies. As the Quality of work is mature day by day, affects the growing list of prideful clients.

Our group is committed to delivering specialized services, intelligent solutions and logical approaches toeffectively assist employer /client in the areas of operational compliance and services reliability as well assupport the optimal use of investment across their project.

The combined team consists of building services Engineers, Company Directors, Facilities Managers andConstruction Project Managers.

The group can expand and contract to meet customer and project demands via our own internal establishmentof dedicated

OUR VISION

OVERVIEW

Page 3: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

C

O

M

P

A

N

Y

D

I

A

G

R

A

M

Playing and important and pivotal role in the industry with continually up gradation of knowledge in a motive toexceed the expectations of our valued customers by offering a variety of professional services with a very competitivecosts, with timely execution and deliveries. :-

Proprietor

Project / Admin Manager

HR Manager

Asst. HR

HR Executive

Works Manager

(Billing/Tender Submission )

Office Asst.

Accounts Manager

Account Officer

Trainee Accountant

Head Of Drawing

Sr. Draftsman

Draftsman

Project Engineer

Project Executive

Office Executive

(Tendering)

Trainee Office Exe.

Survey Manager

Sr. Surveyors

Surveyors

Asst. Surveyor

Page 4: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

S

E

R

V

I

C

E

S

Precision Survey Consultancy have been actively engaged in offering all kinds of Survey Services whichincludes Topographic Survey, Hydrographic Survey, Road Survey, Engineering Survey, Pipeline Survey, Mining Survey, RailSurvey, Transmission Line Survey & GPS Survey. With the outstanding and effective quality services offered, we have aniche in the market.

SERVICE

Hydrographic Survey

Land Survey

Transmission Line

Road Survey

Rail Survey

Engineering Survey

Surface and volume

Measurement and detail

design

Mining Project

Constitution work and building

Surface and volume

measurement and detail

design

Topographic Survey

Page 5: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

2,98,39,304.00

2,47,90,622.00

2,05,70,672.10

1,56,92,483.00

1,55,55,348.00

0.00

50,00,000.00

1,00,00,000.00

1,50,00,000.00

2,00,00,000.00

2,50,00,000.00

3,00,00,000.00

3,50,00,000.00

2015-2016 2014-2015 2013-2014 2012-2013 2011-2012

TRUN OVER DETAILS LAST 5 YEARS

2015-2016

2014-2015

2013-2014

2012-2013

2011-2012

The following standalone yearly statements gives a clear information about company’s financial capacity:-

Page 6: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

O

U

R

R

E

S

O

U

R

C

E

S

Backed by a team of experts and diligent personnel in-house, we are engaged in variousprojects. A sufficient numbers of effective engineers with other dedicated staffs along withmodern machineries and updated software are tabulated below:-

Civil Engineer - 05 nos

Surveyor - 30 nos.

Asst. Surveyor - 35 nos.

Admin/Accountant - 04 nos.

Office Assistant - 04 nos.

Works Manager - 03 nos.

Auto CAD Draftsman - 09 nos.

Page 7: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

OUR RESOURCES- MACHINERY & SOFTWARE

RTK/DGPS – 12 nos.

Total Station – 30 nos.

Echo – Sounder – 03 nos.

Auto Level – 40 nos.

Hand GPS – 04 nos.

Water Current Meter 02 nos.

Water Sampler 01 no.

Motorized Boat 02 nos.

We offer a wide assortment of high quality Surveying Instruments that is in huge demand in themarket. We are well reckoned as one of the overruling Surveying Instruments user based inBengal.

Hypack (Hydrographic)

Hydaspro! (Hydrographic)

SDE 28 (Hydrographic)

Auto CAD Civil 3D – 2010, 11, 13

C-Soft Wise image Pro ver12.x

Power Navigation

E – Survey CAD

Terramodel & Spectrum

Auto CAD LT - 2012

Map Source

Page 8: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

P

R

I

D

E

F

U

L

C

L

I

E

N

T

S

The latest equipments and accessories used help us to deliver the quality and timely services to ourclient’s. Further, we have been successful in maintaining cordial relationships with our client’s duringexecution survey work . The following are some of our enviable client’s:-

Page 9: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

SURVEY REACH (RECENT PROJECTS)

The arrays of services we are recently engaged at under various Department are enumerated below:-

Page 10: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

ONGOING PROJECTS

The latest software and instruments employed helps us in the effective execution of the projects. Further,which we are acknowledged by our client’s for the effectiveness and accuracy. Some of the running projects weare engaged in are:

Project Site

Bihar

Arunachal Pradesh

Sikkim

Bihar

Page 11: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

TOPOGRPAHICAL SURVEY UNDER NWDA

Backed by a team of experts and professionals, since our establishment, we have been successful in providingeffective and quality services to our client’s. The arrays of services we are engaged at under NWDA areenumerated below:-

NWDA

Gwalior (MP)

“Topographical survey ofSubmergence areaincluding river area ofproposed Kotha Barrageon Betwa river forinclusion in the DetailedProject Report ofproposed Ken-Betwalink project (phase – II).

8085 Hectors

NWDA Jaipur, Rajasthan

“Topographical surveyfor preparation ofSample command areaplans (about 3500 ha.)of proposed Lower OrrDam Project forinclusion in the DetailedProject Report of Ken-Betwa link project(Phase –II) – reg.

3500 hectors

NWDA,

Bhopal (MP)

Topographical survey of Kotha barrage left bank canal and kotha barrage sample command area by DGPS under Ken-Betwa link phase-II.

3644 Hectors

Page 12: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

HYDROGRAPHIC AND TOPO SERVICE PORTFOLIO UNDER IWAI , NOIDA

INLAND WATERWAYS AUTHORITY OF INDIA, IWAI

NOIDA, UTTAR PRADESH

Project 1 -Completed

“Detail hydrographic Survey in NW-4 (South

Buckingham Canal) from Kalpakkam to Puducherry

(75 kms.).

TAMIL NADU & PUDDUCHERRY

Value:- Rs. 32,89,920.00

Project 2 -Completed

“Detailed hydrographic survey in North

Buckingham Canal (160 kms) from Peddaganjam to Krishnapatnam (NW-

4).

ANDHRA PRADESH (A.P.)

Value:- Rs. 25,97,331.00

Project 3 -Completed

Detailed Hydrographic Survey in Tizu river over a length of 35 Kms. River

stretch.

Mizoram, Nagaland

Value:- Rs. 5,19,103.00

Project 4 -Ongoing

“Detail hydrographic Survey and their

feasibility report in REGION –II of proposed

new waterways.

Assam, Guwahati

Value: Rs. 44,41,531.00

Project 5 -Ongoing

“Detailed Hydrographic Survey and their

feasibility report in REGION –IX of proposed

new waterways.

Meghalaya

Value: Rs. 34,13,434.00

Page 13: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

HYDROGRPAHIC SURVEY UNDER - UNDER VARIOUS DEPARTMENT

Carrying out cross sectionalsurvey works at Ganga RiverFrom Rishikesh to KachalaBridge as detail in surveyreach.

Completed

Rs. 10,93,600.00

NATIONAL INSTITUTE OF HYDROLOGY,

ROORKEE Carrying out cross sectionalsurvey works in Brahmaputrariver as per site as detail insurvey reach.

Completed

Rs. 9,06,100.00

NATIONAL INSTITUTE OF HYDROLOGY,

ROORKEE

WAPCOSGurgaon

"Conducting Cross Sectional Survey of a reach of Ganga River in Sahibganj, Jharkhand"

Completed Rs. 8,83,585.00

Cross sectional survey of Ganga River at the confluence of Karamnasa River with River Ganga for the proposed intake location of 2X 660 MW Buxar Thermal Power Plant of SJVN

Thermal Private Limited, Bihar”.

Completed Rs. 530,400.00

Page 14: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

Hydrographic Survey of Pond of River GangaIcluding Topographic Survey of char lands,slopes and banks), 50 km in upstream(including 15 km upstream of confluence ofriver Fulhar & Ganga) and 15 km in thedownstream of Farakka Barrage as perdirection of Engineer in Charge.

Hydrographic Survey of Pond of River GangaIncluding Topographic Survey of char lands,slopes and banks, 5 km in upstream and 3km downstream of Farakka Barrage as perdirection of Engineer in Charge

“Hydrographic Survey of Pond of RiverGanga (Including Topographic Survey of charlands, slopes and banks), 07 Km of DownStream of Farakka Barrage as per directionof Engineer-In-Charge.

• Completed

• Farakka Barrage, Murshidabad, WB

• Rs. 27,49,448.00

• Completed

• Farakka Barrage, Murshidabad, WB

• Rs. 5,11,500.00

• Completed

• Farakka Barrage, Murshidabad, WB

• Rs. 477,000.00

HYDROGRAPHIC AND TOPOGRPAHIC SURVEY - FARAKKA BARRAGE PROJECT, W.B

Page 15: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

NEEPCO – Topographic, Hydro & Feasibility Report

Hydrographic & Topographical survey of RANGANADI Reservoir at Arunachal

Pradesh :Year 12-13

Completed

Value: Rs. 4,94,000.00

Hydrographic & Topographical survey of RANGANADI Reservoir at Arunachal

Pradesh :Year 14-15

Completed

Value: Rs. 4,94,000.00

- “Preparation of a feasibility report on alternate water transport for the public

reservoir of Turial H.E. Project, Mizoram.

Completed

Value: Rs. 12,04,980.00

NHPC

• “Hydrographic Survey of River Teesta from 75 D/s of TLD-III PS Barrage up to TLDP-IV Dam site”.

• Completed

• Rs. 14,53,376.00

Nadia Irrigation

• “Conducting Bathymetric Survey of River Jalangi with help of echo-sounder

• Completed

• Rs. 2,05,000.00

WBFCL

• “Conducting Bathymatric Survey work for improvement of navigability of Dubda Canal with Bay of Bengal, Block: Egra II, Pubra Medinipur. Phase – I (Excavation Portion)” Approx. length = 4 Sq. Km.

• Completed

• Rs. 5,00,000.00

Page 16: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

ROAD SURVEY PORTFOLIO

Sl.

No.Description of Work Location Principal Client

Year of

Starting

Pattern of

WorkRemarks

1 "Detailed Alignment Survey of Raw water rising Main, Clear water Rising

Main and Contour Survey of GLR areas in connection with Habra-Gaighata

Water Supply Scheme in the district of North 24 Parganas in West Bengal

WB WAPCOS 2015 Road Survey Site not

delivered by

the client

2 “Road Network and Contour Survey work for Water Supply scheme within

Chakdaha Municipality under UIDSSMT programe. Road length -206 Km.

WB Chakdaha Municipality 2014 Road Survey Completed

3 Preparation of Detailed Project Report (DPR) of roads under 250+New

Connectivity in respect of normal PMGSY road works in different Blocks in

the District of Bankura.

Bankura WBSRDA 2013 Road Survey

& DPR

Completed

4 Topographical, hydraulic and Land Acquisition survey for a stretch of NH-

117 (from Ch.1.000 Km. to Ch. 5.500 Km) Kona Expressway

Kolkata PWD

(NH SURVEY DIV. NO -

II)

2012 Road Survey Completed

5 Topographical, hydraulic and Land Acquisition survey for a stretch of NH-

31C (from Ch.224.500 Km. to Ch. 226.500 Km), around the existing bridge

over river Gadadhar at Alipurduar, in the district of Jalpaiguri,W.B

Alipurduar PWD

(NH SURVEY DIV. NO -

II)

2012 Road Survey Completed

6 Topographical, hydraulic and Land Acquisition survey for preparation of

Land Schedule, Land Acquisition Cost Estimate along with L.A.Drawing as

per the format prescribed by the MORT&H regarding Improvement of the

length of NH-80, Falling in the district of Murshidabad W.B.

Murshidaba

d

PWD

(NH SURVEY DIV. NO -

II)

2012 Road Survey Completed

7 Topographical Survey of Rural Road under PMGSY Scheme of Govt of India. Malda IL&FS Infrastructure

Development Corporation

LTd

2012 Road Survey Completed

8 Topographical Survey of Rural Road under PMGSY Scheme of Govt of India. Siliguri &

Paschim

Midnapur

IL&FS Infrastructure

Development Corporation

LTd

2012 Road Survey Completed

9 Gantak Road Project Sikkim Brahmaputra

Infrastructure Ltd.

2011 Road Survey Completed

10 Topographical Surveys showing existing infrastructure features along the

Right of Way (ROW) on EM Bypass from Ultadanga to Garia for a Length of

15.5 Km.

Kolkata IL&FS Infrastructure

Development Corporation

LTd

2010 Road Survey Completed

Page 17: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

ROAD SURVEY PORTFOLIO UNDER VARIOUS DEPARTMENT

Sl.

No

.

Description of Work Location Principal ClientYear of

Starting

Pattern of

WorkRemarks

11

Topographical Survey for the stretch of Farraka to Raiganj Section Ch+295.00

Kms to 398.00 Kms. For NH-34 Project in all respect in the state of West

Bengal.

NH-34Hindustan Construction Co

Ltd (HCC)2010 Road Survey Completed

12

Topographical Survey along identified road corridors in Durgapur City for

development of a Bus Rapid Transit System in Asansol Urban Area under

JNNURM.

Durgapur

Bengal Urban

Infrastructure Development

Private Limited (BUIDPL)

2009 Road Survey Completed

13

Proposed Trafffic Easing / Management Measures for de-congestion of

Benachetty Nachan Road from Bhiringi More (on NH-2) to Prantika in

Durgapur and enhancing of urban mobility within Durgapur City in Asansol

Urban Area under JNNURM

Durgapur

Bengal Urban

Infrastructure Development

Private Limited (BUIDPL)

2009 Road Survey Completed

14 Survey & Demarcation of Land area of Martin Railway with Howrah District Howrah Howrah Zilla Parishad 2009 Road Survey Completed

15

Traffic Easing / Management Measures for de-congestion of OLD G.T. Road

and enhancing of Urban mobility within Asansol City in Asansol Urban Area

in Asansol Urban Area under JNNURM

Asansol

Bengal Urban

Infrastructure Development

Private Limited (BUIDPL)

2009 Road Survey Completed

16Proposed widening of EM Bypass from Ultadanga to Kamal Gazi for

development of a Bus Rapid Transit System (BRTS) under JNNURM SchemeKolkata

Bengal Urban

Infrastructure Development

Private Limited (BUIDPL)

2008 Road Survey Completed

17Proposed Elevated road on Budge Budge Trunk Road from Zhinjira Bazar to

Batanagar More in South 24 Parganas District in KMA area of PPP Basis

Budge

Budge

Bengal Urban

Infrastructure Development

Private Limited (BUIDPL)

2008 Road Survey Completed

18 125 Sq. Km. Road Survey at Panagarh Nadiha PanagarhCES Technologies Private

Limited2008 Road Survey Completed

19Detailed and quantitative survey with Pre and Post Level with Total Station

of about 20Km. Road and around D.S.P. TownshipDurgapur M/s Decon India 2006 Road Survey Completed

Page 18: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

RAILWAY SURVEY PORTFOLIO UNDER VARIOUS DEPARTMENT

Sl.

No

.

Description of WorkLocatio

nPrincipal Client

Year of

Starting

Pattern of

WorkRemarks

1Topographical Survey in connecting with

preparation of Feasibility Report for JSPL.GUA

Balaji Rail Road Systems

Limited (BARSYL)2012 Railway Survey Completed

2Execution of Survey Work for our joka BBD

Bag Metro Railway Project Site.Kolkata

McNally Bharat

Engineering Company

Limited

2012Metro Railway

SurveyCompleted

3Survey of platforms in between Bandel-Katwa

StationKatwa

Mesa Narula-GCC(JV)

(MNG)2011 Railway Survey Completed

4

Traversing & Traversing Calculation from

Phoolbagan to Central Metro Station (Total

Legnth of 6Km. Approx) including Drawing

Submission for KMRC:UG2

KolkataITD - ITD Cementation

India Limited2010 Railway Survey Completed

5

Detailed survey with the help of Total Station

between Tamluk (Junction cabin) and Rajgoda

Railway Station in Kharagpur Division of

South Eastern Railway for a Total length of

13.5Km

Tamluk KEC International Limited 2010 Railway Survey Completed

6

Topographical Survey for preparing

Engineering Plan of the proposed Private siding

of M/s Raigarh Coal Benification Pvt. Ltd. near

Robertson Railway Station, S.E.C. Railway

Raigarh,

Chattrishg

ar

MBB Consultancy

Services Pvt. Ltd.2009 Railway Survey Completed

7 Detailed Survey at Patratu by Total StationBalaji Rail Road Systems

Limited2009 Railway Survey Completed

8 Railway siding SurveyBalaghat,

MPSova Ispat Limited 2008 Railway Survey Completed

R

A

I

L

W

A

Y

S

U

R

V

E

Y

Page 19: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

Sl.

No.Description of Work Location Principal Client

Year of

StartingPattern of Work Remarks

9Detail Survey of Railway Siding by total

Station at Gamharia site

Tatanagar,

Jharkand

Balaji Rail Road

Systems Limited2008 Railway Survey Completed

10

Detailed Survey for Chattibariatu &

Kerandari Coal Mines Railway siding project

of NTPC Ltd.

Dehri On

Sone,Bihar

Balaji Rail Road

Systems Limited2008 Railway Survey Completed

11

Layout Survey and taking x-section of a pvt.

Railwar siding taking off from Tapsi-Barbani

line of Asansol Division of ER by Total

Station.

AsansolBalaji Rail Road

Systems Limited2008 Railway Survey Completed

12Detailed Survey at GUA Railway station yard

by Total StationGUA

Balaji Rail Road

Systems Limited2008 Railway Survey Completed

13Detailed Survey at ACC, Madhukunda Plant

by Total Station

Madhukund

a

Balaji Rail Road

Systems Limited2008 Railway Survey Completed

14 Detailed Survey at Borojamda Site BorojamdaBalaji Rail Road

Systems Limited2007 Railway Survey Completed

15Deatiled Survey at Barada Railway Yard by

Total StationBarada

Balaji Rail Road

Systems Limited2007 Railway Survey Completed

16Deatiled Survey at Bolani Railway Yard by

Total StationBolani

Balaji Rail Road

Systems Limited2007 Railway Survey Completed

17 Railway siding by Total Station Purulia,WB Haldia Steels Ltd. 2006 Railway Survey Completed

18

Layout of Proposed Railway Track from take

off point to Buffer end of Shri Ramrupai

Balaji Steel Ltd. At Banskopa Durgapur

Durgapur Jai Balaji Group 2006 Railway Survey Completed

R

A

I

L

W

A

Y

S

U

R

V

E

Y

Page 20: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

GPS SURVEY PORTFOLIO UNDER VARIOOUS DEPARTMENT

SlDescription of Work Location Principal Client

Year of

Starting

Pattern of

WorkRemarks

1 20 nos of DGPS points fixing. Nagaland Zymax Technologies 2012 DGPS Survey Completed

2 DGPS Control Point survry workSalt Lake

(Kolkata)

Consulting Engineering

Services (INDIA) Private

Limited

2012 GPS Survey Completed

3 DGPS Point Process Howrah Geosmart Technology 2011 DGPS Survey Completed

4

GPS Point & Control Point fixing at entire

area of Kolkata Metro Railway Project

(East - West) between subhas sarovar and

Central Station Based for KMRC:UG2

KolkataITD - ITD Cementation

India Limited2010 GPS Survey Completed

5GPS Survey of Slum in Uttarpara - Kotrang

Municipality AreaUttarpara

IL&FS Infrastructure

Development Corporation

LTd

2006 GPS Survey Completed

6Gps Survey of Slum in Kalyani

Municipality areaKalyani

IL&FS Infrastructure

Development Corporation

LTd

2006 GPS Survey Completed

Page 21: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

HIGH TENSION SURVEY PORTFOLIO UNDER VARIOUS DEPARTMENT

Sl.

No.Description of Work Location

Area/

LengthPrincipal Client

Year of

StartingPattern of Work Remarks

1

Detail Survey of existing 132kv D/C

Transmission Line of DVC from

Kalipahari to BALCO including

submission of Route Alignment

Drawing,Profile Drawing & Tower

Scheduling.

Durgapur 6.5 km. DPSC Limited. 2013Transmission

Line SurveyCompleted

2 Route Alignment Survey Ranchi20.863

km.

Hindalco

Industries Limited2012

Transmission

Line SurveyCompleted

3

Survey and soil investigation for

400kV D/C transmission line for

2x660MW STPP at Banka ,Bihar

Bihar 29 km L&T Construction 2012Transmission

Line SurveyCompleted

4

400 KV D/C Tower Packages-A3

under Transmission System

associated with Pallatana GBPP

and Bongaigaon TPS in North

Eastern Region.

Bonga 15 km

IVRCL

Infrastructures &

Projects Ltd.

2010Transmission

Line SurveyCompleted

Page 22: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

MINING SURVEY PORTFOLIO UNDER VARIOUS DEPARTMENT

Sl.

No.Description of Work Location Principal Client

Year of

Starting

Pattern of

WorkRemarks

1Preparation of plans for Oting coal Mine of

Black Gold Excavators Pvt.LtdNagaland

Black Gold

Excavators Pvt.Ltd2012

Mining

SurveyCompleted

2Contour / Grid Survey at Sharda OC Mine,

Sohagpur area SECLMP

Cuprum Bagrodia

Limited2010

Mining

SurveyCompleted

3 Topographical Survey work Nagaland Tirucoal Project 2008Mining

SurveyCompleted

4

Topographical Survey of about 3.83 Sq.Km.

(383 Hectors) in respect of Dumri Coal

Block, Dist. - Hazaribagh, Jharkhand State.

JharkhandMahacol Trexim

Private Limited2008

Mining

SurveyCompleted

5Topographical Survey of Tiru Area (Upper

and Lower) in NagalandNagaland NCP Oting (JV) 2007

Mining

SurveyCompleted

Page 23: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

SURVEY PICTURES: -The succeeding field images were captured during execution of survey work at various sites :-

Page 24: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to
Page 25: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

REACH US (LOCATION MAP)-Kindly feel us with the following links and we reach to you just a click away to service you in a professionalmanners:-

PRECISION SURVEY CONSULTANCYP.S. –Domjur, Dist. –Howrah, Pin – 711 409

Nearest Land Mark: - Near Salap Bridge, NH6 (Bombay Road Crossing)

Page 26: Vill.- Salap, P.s.-Domjur, Howrah , W.B, 711409precisionsurvey.co.in/wp-content/uploads/2019/02/Precision.pdf · Construction Project Managers. The group can expand and contract to

CONCLUSION-