24
Village of Lions Bay Harvey Tank Replacement Project Contract Documents Issued for Tender Volume 2 of 3 Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 www.aecom.com Prepared for: Village of Lions Bay 400 Centre Road Lions Bay, BC. V0N 2E0 Project Number: 60546407 Date: September 2018
Transcript
Page 1: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

Village of Lions BayHarvey Tank Replacement Project

Contract DocumentsIssued for Tender

Volume 2 of 3Design Drawings

Prepared by:AECOM Canada Ltd.3292 Production Way, Suite 330Burnaby, BC V5A 4R4T 604.444.6400 F 604.294.8597 www.aecom.com

Prepared for:Village of Lions Bay400 Centre RoadLions Bay, BC. V0N 2E0

Project Number:60546407

Date:September 2018

Page 2: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

Village of Lions Bay AECOM Canada Ltd.

Village of Lions Bay

Harvey Tank Replacement Project

AECOM Canada Ltd. 330 – 3292 Production WayBurnaby, British Columbia

September 2018

TABLE OF CONTENTS

SPECIFICATION INDEX

VOLUME 1

DIVISION 0 – FRONT END DOCUMENTS

Instructions to Tenderers Section 00 21 13Tender Checklist Section 00 21 15

Tender Form Section 00 41 00Tender Price Breakdown Section 00 41 01Schedule of Quantities and Prices Section 00 41 05

CCDC Bond FormsBid Bond CCDC 220Performance Bond CCDC 221Labour and Material Payment Bond CCDC 222

Statement “B” – Tenderer’s Senior Supervisory Staff Section 00 43 32Statement “D” – Sub-Contractors and Suppliers Section 00 43 36Statement “G” – Schedule of Alternatives Section 00 43 37

Agreement to Bond Section 00 61 10Form for Certificate of Insurance Section 00 61 16

Stipulated Price Contract CCDC2

Supplementary General Conditions Section 00 73 00

DIVISION 1 - GENERAL REQUIREMENTS

Summary of Work Section 01 11 10Work Sequences and Tie-Ins Section 01 12 16

Measurement and Payment Section 01 20 01

Project Meetings Section 01 31 19Site Conditions Section 01 31 19.12Schedules and Progress Reports Section 01 32 14Construction Photographs Section 01 32 16Submittals Section 01 32 19Site Progress Records Section 01 32 26Environmental Protection Section 01 35 35

Page 3: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

Village of Lions BayHarvey Tank Replacement Project Page 2 of 3Project No. 60546407 September 2018

Table of Contents

Village of Lions Bay AECOM Canada Ltd.

Regulatory Requirements Section 01 41 10Quality Control Section 01 45 10

Temporary Facilities Section 01 52 01Traffic Control, Vehicle Access Section 01 55 01

Mobilization and Demobilization Section 01 71 13Field Engineering Section 01 71 23Close Out Procedures Section 01 77 00Operation & Maintenance Data Section 01 78 19

Commissioning and Handover Section 01 91 10

DIVISION 2 - CIVIL

Vibration Monitoring Section 02 22 14

Site Work Demolition and Removal Section 02 41 01

DIVISION 3 - CONCRETE

Concrete Formwork and Falsework Section 03 10 00

Concrete Reinforcement Section 03 20 00Concrete Accessories Section 03 25 00

Cast-in-Place Concrete Section 03 30 00Concrete Floor Finishes Section 03 35 05

Grouting Section 03 60 00

DIVISION 5 – METALS

Miscellaneous Metals Section 05 50 00

DIVISION 13 - SPECIAL CONSTRUCTION

Glass Fused Bolted Steel Tank Section 13 34 30

DIVISION 31 - EARTHWORKS

Site Restoration Section 31 01 05Aggregates and Granular Materials Section 31 05 15Geotextiles Section 31 05 19

Clearing and Grubbing Section 31 11 01Site Grading Section 31 22 00Excavating, Trenching and Backfilling Section 31 23 01Blasting Section 31 23 15Rock Removal Section 31 23 16.26Rock Scaling Section 31 23 17.10Dewatering Section 31 23 19Compaction Control and Testing Section 31 24 14

Page 4: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

Village of Lions BayHarvey Tank Replacement Project Page 3 of 3Project No. 60546407 September 2018

Table of Contents

Village of Lions Bay AECOM Canada Ltd.

DIVISION 32 - SITE IMPROVEMENTS

Granular Base and Sub-base Section 32 11 10

Chain Link Fences and Gates Section 32 31 13Retaining Walls Section 32 32 00

Site Restoration Section 32 92 24

DIVISION 33 - UTILITIES

Waterworks Section 33 11 13

Carbon Steel Pipe Welding Section 33 20 17Stainless Steel Pipe Welding Section 33 20 18Stainless Steel Piping – Detailed Specification Sheet Section 33 20 18A

Manholes, Catch Basins and Valve Chambers Section 33 49 15

DESIGN DRAWINGS (VOLUME 2)

APPENDICES (VOLUME 3)

Appendix A Geotechnical Investigation

Appendix B Archaeological Investigation

Appendix C Reference Drawings

Appendix D Reference Reports

Page 5: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

DESIGN DRAWINGS

Page 6: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

HARVEY TANK (TO BE REPLACED)

AND PRV 200 CHAMBER

(TO BE UPGRADED)

SE

A T

O S

KY

H

WY

M

O

U

N

T

A

IN

D

R

H

A

R

V

E

Y

C

R

E

E

K

A

L

B

E

R

T

A

C

R

E

E

K

HO

WE

S

OU

ND

VILLAGE OF LIONS

BAY

O

C

E

A

N

V

I

E

W

B

A

Y

V

I

E

W

R

D

T

I

M

B

E

R

T

O

P

R

D

BA

YV

IE

W R

D

U

P

P

E

R

R

D

HARVEY CREEK

WATERSHED

ACCESS ROAD

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's client and m

ay n

ot be used, reprod

uced o

r relied upon by third p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd

its clie

nt, a

s re

qu

ire

d b

y la

w o

r fo

r u

se

b

y g

ove

rn

me

nta

l re

vie

win

g a

ge

ncie

s. A

EC

OM

a

cce

pts n

o re

sp

onsibility, an

d d

en

ies a

ny lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t m

od

ifie

s th

is dra

wing

w

ith

ou

t A

EC

OM

's exp

ress w

ritten

con

sen

t. D

o n

ot scale this d

ocum

ent. A

ll m

easure

men

ts m

ust be

o

bta

in

ed

fro

m stated

dim

en

sio

ns.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-20

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

COVER SHEET

SHEET NUMBER

G-01-000

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\G

\605

46407

-S

HT

-00-G

-01-000-C

OV

ER

P

LA

N.D

WG

N

0 125 250

1:5000

m

PLAN

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

DRAWING LIST

GENERAL

G-01-000 COVER SHEET

G-01-001 GENERAL NOTES

G-01-002 CONSTRUCTION LAYDOWN AREA SITE PLAN

CIVIL

C-01-101 HARVEY TANK DEMOLITION PLAN

C-01-102 HARVEY TANK SITE PLAN - STEEL TANK OPTION

C-01-103 HARVEY TANK OPTION SECTIONS AND TYPICAL DETAILS - STEEL OPTION

C-01-104 STANDARD DETAILS

C-01-105 STANDARD DETAILS

P-01-000 INSTRUMENTATION LEGEND AND SYMBOLS

P-01-001 EXISTING HARVEY TANK PRV 200 AND DISINFECTION FACILITY

PROCESS AND INSTRUMENTATION DIAGRAM

P-01-002 HARVEY TANK PROCESS AND INSTRUMENTATION DIAGRAM

M-01-001 HARVEY TANK PRV 200 ACCESS MODIFICATIONS

E-01-000 ELECTRICAL SPECIFICATIONS 1 OF 2

E-01-001 ELECTRICAL SPECIFICATIONS 2 OF 2

E-01-200 HARVEY TANK SERVICING PLAN

STRUCTURAL

S-01-001 GENERAL NOTES

S-01-002 STANDARD DETAILS SHEET 1

S-01-100 HARVEY TANK PRV CHAMBER MODIFICATION PLANS AND SECTIONS

S-01-101 HARVEY TANK PRV CHAMBER MODIFICATION REINFORCEMENT DETAIL

ELECTRICAL

MECHANICAL

PROCESS

Page 7: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

WATERMAIN NOTES:

1. ALL DUCTILE IRON WATERMAINS SHALL BE CLASS 50 DUCTILE IRON PIPE, SATISFYING AWWA C104

AND NSF-61 SPECIFICATION WITH CEMENT MORTAR LINING. ALL DUCTILE IRON PIPES AND

COMPONENTS TO BE POLYETHYLENE WRAPPED/BAGGED AS PER AWWA C105.

2. ALL STEEL PIPES AND COMPONENTS (INTERIOR AND EXTERIOR TO CHAMBERS) INSIDE WETTED

SURFACES TO BE SANDBLASTED AND COATED TO AWWA C-210 AND NSF-61 SPECIFICATION. FINISH

COATING TO BE BLUE ENAMEL. ALL STEEL WATERMAINS SHALL BE 3/8" WALL UNLESS NOTE

OTHERWISE.

3. MAXIMUM PIPE DEFLECTION AT JOINT TO BE 2.5 DEGREES OR 1/2 MANUFACTURERS

RECOMMENDATION, WHICHEVER IS LESS.

4. CATHODIC ISOLATION T0 BE PROVIDED AT STEEL TO DUCTILE IRON TRANSITION POINTS.

5. TRANSITION COUPLINGS DI TO SS TO BE GEORG FISCHER WAGA N.V MULTI/JOINT 3000 PLUS

MODEL 3007 OR ENGINEER APPROVED EQUIVALENT WITH EPOXY COATING AND STAINLESS STEEL

HARDWARE.

6. FITTINGS: COMPACT DUCTILE IRON FITTINGS TO AWWA C153 SUITABLE FOR PRESSURE RATINGS

OF 2145 KpA, FUSION-BONDED EPOXY COATING TO AWWA C116.

7. RESTRAINTS: RESTRAIN ALL (MJ) BENDS, JOINTS AND FITTINGS WITH MECHANICAL JOINT ON

FITTING AND WEDGE RESTRAINERS. (TYT) FITTINGS AND JOINTS TO RESTRAINED WITH TIE RODS

AND THRUST BLOCKS. RESTRAINTS TO BE RATED FOR MINIMUM 225 psi WORKING PRESSURE.

8. ALL VALVES SHALL INCLUDE ALL APPURTENANCES WITH STAINLESS STEEL BOLTS AND NUTS.

9. ALL OTHER GATE VALVES (OTHER THAN ABOVE VALVES) TO BE IRON BODY RESILIENT SEAT

VALVES SUITABLE TO 1380kPa OPERATING PRESSURE AND MEET AWWA C509. APPROVED

MANUFACTURERS: TERMINAL CITY AND CLOW. ALL DIRECT BURY GATE VALVES C/W VALVE BOX

ASSEMBLY.

10. COUPLERS: AWWA C219 COUPLERS SHALL BE EPOXY COATED WITH STAINLESS STEEL NUTS AND

BOLTS.

11. CONTRACTOR SHALL PROVIDE 48 HOURS NOTICE TO THE CONTRACT ADMINISTRATOR PRIOR TO

DISINFECTING AND CONDUCTING PRESSURE TESTING OF THE WATERMAIN. TESTING TO CONFORM

TO VILLAGE OF LIONS BAY AND AWWA REQUIREMENTS.

12. ALL BURIED UNCOATED FITTINGS AND FASTENERS TO BE COATED WITH PRIMER AND PETROLATUM

TAPE TO AWWA C217.

13. ALL BOLTS AND NUTS TO ASTM A307, GRADE BSTEEL HEX HEAD. PROTECT ALL BURIED NUTS AND

BOLTS WITH DENSO TAPE (TYP.)

14. ALL WATER MAINS SHALL HAVE A MINIMUM DEPTH OF COVER OF 1.5m TO OBVERT.

15. CATHODIC PROTECTION SHALL BE REQUIRED FOR ALL BURIED METAL PIPES, VALVES, HYDRANTS

AND APPURTENANCES.

GENERAL NOTES:

1. THE GENERAL REQUIREMENTS, INSTRUCTIONS TO BIDDERS, SPECIFICATIONS AND DRAWINGS

FORM PART OF THE CONTRACT DOCUMENTS AND SHALL BE READ IN CONJUNCTION WITH THEM.

WORK SHALL INCLUDE THE FURNISHING OF ALL LABOUR AND MATERIALS UNLESS SPECIFICALLY

NOTED OTHERWISE TO COMPLETE AND PUT INTO OPERATING CONDITION. ALL ELECTRICAL AND

INSTRUMENTATION AND CONTROL SYSTEMS AS INDICATED ON THE DRAWINGS AND

SPECIFICATIONS HEREIN.

2. WORD "SUPPLY" SHALL MEAN THAT SO NOTED EQUIPMENT IS TO BE PURCHASED, ASSEMBLED,

AND SHIPPED UNDAMAGED TO THE SITE. WHERE AN ITEM IS SUPPLIED BY THE OWNER, BY

OTHERS OR BY ANOTHER DIVISION, THE WORK OF MOUNTING, CONNECTING AND

COMMISSIONING THE ITEM.

3. WORD "PROVIDE" SHALL MEAN THAT SO NOTED EQUIPMENT IS TO BE SUPPLIED, INSTALLED,

CONNECTED, ADJUSTED, CALIBRATED, TUNED, CLEANED, COMMISSIONED, AND PLACED INTO

FULL SERVICE.

4. WORD "INSTALL" SHALL MEAN TO PUT THE SPECIFIED ITEM INTO FULL OPERATION, SECURELY

FASTENED AND CONNECTED TO THE SYSTEM. THE CONTRACTOR SHALL PROVIDE ALL WORK

AND MATERIAL WHICH IS NECESSARY TO SECURELY FASTEN AND GIVE A PRESENTABLE

FINISHED APPEARANCE INCLUDING ALL NECESSARY CONNECTIONS AND CONDUCTORS. SUCH

NOTED EQUIPMENT MUST BE FULLY CALIBRATED AND TESTED.

5. CONTRACTOR TO MAKE BC ONE CALL TO CONFIRM LOCATION OF EXISTING UTILITIES AND PROVE

ALL EXISTING UTILITIES AND CONNECTIONS BY TRIAL EXCAVATION PRIOR TO CONSTRUCTION.

CONTRACTOR TO ADVISE ENGINEER OF ANY OF ANY POTENTIAL CONFLICTS MINIMUM 48 HOURS

IN ADVANCE OF ANY WORK .

6. SEDIMENT AND EROSION CONTROL WORKS TO REMAIN DURING THE ENTIRE DURATION OF

CONSTRUCTION, AND UNTIL SUCH TIME THAT THE LANDSCAPING AND SURFACE VEGETATION

IS RESTORED TO EXISTING CONDITIONS.

7. PRIOR TO CONSTRUCTION, CONTRACTOR TO PROVIDE CONTRACT ADMINISTRATOR WITH

SIEVE ANALYSIS (INCLUDING COMPARISON TO SPECIFICATIONS) AND PROCTORS OF ALL IMPORT

MATERIALS. SIEVES AND PROCTORS MUST BE RECENT AND SAMPLED WITHIN THE PREVIOUS

WEEK.

8. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING WATER DISTRIBUTION SERVICE TO VILLAGE OF

LIONS BAY DURING DECOMMISSIONING AND CONSTRUCTION OF HARVEY TANK.

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-20

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

GENERAL NOTES

SHEET NUMBER

G-01-001

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\G

\605

46407

-S

HT

-00-G

-01-001-G

EN

ER

AL N

OT

ES

.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

DRAIN

DRAIN MANHOLE

SWALE

TOP OF BANK

CULVERT

CHAIN LINK FENCE

WATER MAIN

WATER VALVE

FIRE HYDRANT

WATER REDUCER

PROPERTY BOUNDARY

UEUNDERGROUND ELECTRICAL LINE

ELECTRICAL POLE

WATER TEE

WATER CAP

WATER ROBAR COUPLING

WATER BEND FITTING

RETAINING WALL

EDGE OF GRAVEL

EXISTING PROPOSED

TREE - CONIFEROUS

WATER MAIN BLOWOFF

TREE - DECIDUOUS

LEGEND

SEED

X X X

CONCRETE PAD

EX GRAVEL

PROPOSED GRAVEL

TANK/STUCTURE REMOVAL

PIPE/FITTING REMOVAL

VEGATATION LINE

WATER THRUST BLOCK

BOTTOM OF BANK

ROAD BARRIER

WATER VENT

SURVEY MONUMENT CONTROL

DRAIN DITCH

Page 8: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

VILLAGE BOUNDARY

7.3m

3.0m

12.2m

3.0m

12.2m

45.7m

9.1m

EX. ROAD

EX. ROAD

LAYDOWN

AREA

LAYDOWN

AREA

CONCRETE DISPOSAL AREA

30.5mOCEANVIEW ROAD

61.9

m

HARVEY

TANK

LAYDOWN

AREA

5.6

APPROX. EX.

ACCESS ROAD

ALIGNMENT

OCEANVIEW

TANK

NOTE:CONTRACTOR TO ENSURE LAYDOWN AREASDO NOT OBSTRUCT USE OF ACCESS ROAD

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's client and m

ay n

ot be used, reprod

uced o

r relied upon by third p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd

its clie

nt, a

s re

qu

ire

d b

y la

w o

r fo

r u

se

b

y g

ove

rn

me

nta

l re

vie

win

g a

ge

ncie

s. A

EC

OM

a

cce

pts n

o re

sp

onsibility, an

d d

en

ies a

ny lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t m

od

ifie

s th

is dra

wing

w

ith

ou

t A

EC

OM

's exp

ress w

ritten

con

sen

t. D

o n

ot scale this d

ocum

ent. A

ll m

easure

men

ts m

ust be

o

bta

in

ed

fro

m stated

dim

en

sio

ns.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-13

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

CONSTRUCTION LAYDOWN AREAS

SITE PLAN

SHEET NUMBER

G-01-002

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\G

\605

46407

-S

HT

-00-G

-01-002-C

ON

ST

RU

CT

IO

N L

AY

DO

WN

.D

WG

N

0 12.5 25

1:500

m

PLAN

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's client and m

ay n

ot be used, reprod

uced o

r relied upon by third p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd

its clie

nt, a

s re

qu

ire

d b

y la

w o

r fo

r u

se

b

y g

ove

rn

me

nta

l re

vie

win

g a

ge

ncie

s. A

EC

OM

a

cce

pts n

o re

sp

onsibility, an

d d

en

ies a

ny lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t m

od

ifie

s th

is dra

wing

w

ith

ou

t A

EC

OM

's exp

ress w

ritten

con

sen

t. D

o n

ot scale this d

ocum

ent. A

ll m

easure

men

ts m

ust be

o

bta

in

ed

fro

m stated

dim

en

sio

ns.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

Page 9: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

W

G

P

G

P

GPG

P

105

1

0

1

.

0

1

0

2

.

0

1

0

3

.

0

1

0

3

.0

1

0

3

.0

1

0

4

.

0

EX. HARVEY TANK (400,000 I. GAL.) POST

TENSION CONCRETE STRUCTURE

CONSTRUCTED IN 1984 (16.764 x 9.9m DIA)

DEMOLISH AND REMOVE EXISTING TANK,

PIPING AND APPURTENANCES

EXCAVATE TO SUB

GRADE ELEVATION

EX. LOCK BLOCK WALL TO REMAIN

EX. PRV 200 CHAMBER TO

REMAIN

EX. 250Ø HARVEY CREEK

INTAKE

EX. 250Ø

DISTRIBUTION MAIN

EX. U.V TREATMENT

BUILDING TO REMAIN

EX. CHLORINATION

BUILDING TO REMAIN

TEMPORARY

CAP

REMOVE OVERFLOW

PIPE AND FITTINGS

TO EXTENT SHOWN

TO

O

CE

AN

V

IE

W R

OA

D

T

O

H

A

R

V

E

Y

C

R

E

E

K

I

N

T

A

K

E

LOCAL BENCHMARK

X=1000.012

Y=2000.005

Z=100.001

APPROX. GEODETIC

ELEV: 100.00m (±1.0m)

EXISTING SITE

ENTRANCE GATE

EX. SPILL

CONTAINMENT

MANHOLE TO REMAIN

EX. ELECTRICAL

ROOM TO REMAIN

EX. PAD MOUNTED

GENERATOR TO REMAIN

EX. MAIN GATE

EX. DRAINAGE ROCK

PIT

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

EXISTING 200Ø DI DRAIN

x

x

x

x

EX. SITE PERIMETER FENCE

T

O

V

I

L

L

A

G

E

D

I

S

T

R

I

B

U

T

I

O

N

REMOVE EX. 10m± AND 3.3m± OF

PIPE FROM EX. GATE VALVES. CAP

WITH TEMPORARY BLIND FLANGE

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-13

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

HARVEY TANK

DEMOLITION PLAN

SHEET NUMBER

C-01-101

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\C

\605

46407

-S

HT

-0

0-C

-01-1

01-H

AR

VE

Y T

AN

K - D

EM

O P

LA

N.D

WG

N

0 2.5 5

1:100

m

PLAN

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

NOTE:

TOPOGRAPHIC SURVEY BY AECOM JUNE 20-21, 2017.

· CO-ORDINATE SYSTEM: LOCAL

· DATUM: LOCAL

AUTOCAD FILE REFERENCED TO THE LOCAL DATUM WILL

BE PROVIDED TO THE SUCCESSFUL CONTRACTORS.

Page 10: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

100.457

99.845

99.590

99.918

100.744

100.510100.510100.510

98.562

98.307

97.967

97.763

97.270

96.511

96.075

95.211

99.992

100.375

100.455

100.506

100.060

100.041

W

100.959

100.913

96.306

99.976

1

0

1

.

0

1

0

2

.

0

1

0

3

.

0

1

0

3

.0

1

0

3

.0

1

0

4

.

0

TP17-04

TP17-03

D

D

W

W

W

D

DD

D

DD

D

D

D

D

EXISTING U.V TREATMENT BUILDING

(PROTECT DURING CONSTRUCTION)

PRV CHAMBER UPGRADE

EXISTING 250Ø HARVEY

CREEK INTAKE

NEW HARVEY POTABLE

STEEL WATER TANK

250Ø SS

WATER INLET

EXISTING

CHLORINATION

BUILDING

EXISTING

BUILDING PAD

EXISTING LOCK

BLOCK WALL

250Ø SS

OVERFLOW

TO

O

CE

AN

V

IE

W R

OA

D

LOCAL BENCHMARK

X=1000.012

Y=2000.005

Z=100.001

APPROX. GEODETIC

ELEV: 100.00m (±1.0m)

NEW SWALE

APRON

ELEVATION 270m

EXISTING GRAVEL

SURFACING

EXTEND LOCK BLOCK WALL

DETAIL 9 ON SHEET C-01-104

EXTEND FENCE.

CHAINLINK FENCE

TO MATCH EXISTING

1

%

1

%

EXISTING GATE

EXISTING PAD

MOUNTED

GENERATOR

250Ø SS

WATER OUTET

GRADE AND EXTEND

GRAVEL SURFACE

BLEND TO MATCH

EXISTING DITCH

1200Ø

DECHLORINATION

MANHOLE

EXISTING 250Ø DI

WATER DISTRIBUTION

MAIN TO LIONS BAY

CONNECT TO EXISTING

200Ø DI DRAIN

200Ø AWWA C219

RESTRAINED FLEXIBLE

COUPLING

150Ø PERFORATED

DR 28 PVC

PERIMETER DRAIN

REFER TO DETAIL 6

ON C-01-106

150Ø CLEANOUTS

DETAIL 7 ON SHEET

C-01-106

150Ø CLEANOUTS

AS PER DETAIL 7

ON SHEET

C-01-106

PROVIDE TEMPORARY

SHORING AS REQUIRED TO

PROTECT EXISTING BUILDING

250Ø SS

DRAIN OUTLET

LIMITS OF

EXCAVATION

PROTECT ROAD DURING

CONSTRUCTION

TIDEFLEX MIXING

SYSTEM

GLASS COATED BOLTED

STEEL TANK

FO

UN

DA

TIO

N S

LA

B

ACCESS

LADDER

BOTTOM ACCESS

DOOR

T

O

E

X

IS

T

IN

G

D

IT

C

H

T

O

H

A

R

V

E

Y

C

R

E

E

K

I

N

T

A

K

E

T

O

V

I

L

L

A

G

E

D

I

S

T

R

I

B

U

T

I

O

N

SUMP

MANHOLE

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

VOLB_LOGO.png

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-20

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

HARVEY TANK - STEEL OPTION

SITE PLAN

SHEET NUMBER

C-01-102

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\C

\605

46407

-S

HT

-0

0-C

-01-1

02-H

AR

VE

Y T

AN

K S

TE

EL - S

IT

E P

LA

N.D

WG

N

0 2.5 5

1:100

m

PLAN

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

NOTE:

1. TOPOGRAPHIC SURVEY BY AECOM JUNE 20-21, 2017.

CO-ORDINATE SYSTEM: LOCAL

DATUM: LOCAL

2. TIDEFLEX MIXING SYSTEM CONSISTS OF THREE VARIABLE

ORFICE INLET NOZZLES. A MINIMUM DRAW DOWN OF 1.0m IS

REQUIRED DAILY IN ORDER TO ACHIEVE A COMPLETE MIXING

ON THE FILL CYCLE. THE REPRESENTATIVE VOLUME OF THE

DRAW DOWN IS 0.2 ML OR APPROXIMATELY 8.5% OF THE

TOTAL STORAGE CAPACITY.

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

VOLB_LOGO.png

1

C-01-107

A

C-01-105

2

C-01-107

Page 11: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

0+015.004

92

94

96

98

100

102

104

106

108

110

112

114

92

94

96

98

100

102

104

106

108

110

112

114

-25 -20 -15 -10 -5 0 5 10 15 20 25

SLAB

EL 100.84m

EX. GROUND

DECHLORINATION

MANHOLE 1200Ø

250Ø x 200Ø H

REDUCER

APPROXIMATE LOCATION OF

EX. DRAIN. CONTRACTOR TO

CONFIRM ELEVATION

CONNECT TO EX. 200Ø DI

DRAIN WITH 200Ø AWWA

C219 RESTRAINED

FLEXIBLE COUPLING

250Ø INLET PIPE

150Ø PVC PERIMETER DRAIN

250Ø 316L SCH

10 SS DRAIN

CONCRETE

ENCASED

250Ø EBAA MEGAFLANGE

SERIES 2100 RESTRAINED

FLANGE ADAPTER

250Ø AWWA C219

FLEXIBLE TRANSITION

COUPLING DI TO DI

250Ø OUTLET PIPE

INV ELEV: 98.55

TIE INTO 250Ø DRAIN

EX. ROAD

SHORING

AS REQUIRED

1

1

BACKFILL WITH 75mm PIT RUN

IN 300mm LIFTS COMPACTED

AT MIN 95% MPMDD

EDGE OF EX. ROAD

ELEV: 105.46±

250Ø GATE VALVE

EX. UNDISTURBED

SUBGRADE

250Ø AWWA C219

FLEXIBLE TRANSITION

COUPLING DI TO SS

0.5m GRANULAR STRUCTURAL FILL

COMPACTED TO 95% (MPMDD)

NOTE:

DETAILED DESIGN OF TANK AND PIPING, MOUNTING HARDWARE, FOUNDATION

SLAB BETWEEN CONNECTION POINTS TO BE PROVIDED BY TANK SUPPLIER

116116

16.00m

12

.0

00

250Ø 316L SCH 10

SS OVERFLOW

HIGH LEVEL FLOAT

LOW LEVEL FLOAT

PRESSURE REDUCER

PIPE MOUNTING

BRACKETS (TYP.)

PRESSURE TRANSDUCER

CONTROLS

150Ø PVC PERIMETER DRAIN

0.50

0

1600Ø X 12m HIGH

GLASS-FUSED-TO

STEEL BOLTED

STEEL TANK

FLOAT LEVEL SENSOR

CONTROLS

0.1

50

0+015

95

96

98

100

102

104

106

108

110

112

114

95

96

98

100

102

104

106

108

110

112

114

-25 -20 -15 -10 -5 0 5 10 15 20 25

EX. GROUND

EX. GROUND

250Ø EX. GATE VALVE

250Ø SS INLET

TIDEFLEX VARIABLE

ORIFICE INLET NOZZLE

SS(TYP. OF 3)

250Ø AWWA C219 FLEXIBLE

TRANSITION COUPLING DI TO SS

250Ø SS OUTLET

0.450

1

1

EX. UNDISTURBED

SUBGRADE

250Ø 316L SCH

10 SS DRAIN

EDGE OF EX. ROAD

ELEV: 103.06m

0.5m GRANULAR

STRUCTURAL FILL

COMPACTED TO 95%

(MPMDD)

2.770

116116

EX. BUILDING

(PROTECT DURING

CONSTRUCTION)

12.000

SS DRAIN OUTLET

ACCESS

LADDER

PIPE MOUNTING

BRACKET SS (TYP.)

TMS SS MANIFOLD

BACKFILL WITH 75mm PIT RUN

IN 300mm LIFTS COMPACTED

AT MIN 95% MPMDD

16.00m

DRAIN OVERFLOW

FLOAT LEVEL

SENSOR CONTROLSHIGH LEVEL FLOAT

PRESSURE TRANSDUCER

CONTROLS

0.500

SLAB

EL 100.84m

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-13

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

HARVEY TANK - STEEL OPTION

SECTIONS AND TYPICAL DETAILS

SHEET NUMBER

C-01-103

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\C

\605

46407

-S

HT

-0

0-C

-01-1

03-H

AR

VE

Y T

AN

K - S

EC

TIO

NS

.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

B SECTION

C-102

Scale 1:100

A SECTION

C-102

Scale 1:100

NOTE:

1. TOPOGRAPHIC SURVEY BY AECOM JUNE 20-21, 2017.

CO-ORDINATE SYSTEM: LOCAL

DATUM: LOCAL

DUE TO DISTANCE TO MONUMENT & POOR GPS SIGNAL LOCAL CONTROL ESTABLISHED.

2. TIDEFLEX MIXING SYSTEM CONSISTS OF THREE VARIABLE ORFICE INLET NOZZLES. A

MINIMUM DRAW DOWN OF 1.0m IS REQUIRED DAILY IN ORDER TO ACHIEVE A COMPLETE

MIXING ON THE FILL CYCLE. THE REPRESENTATIVE VOLUME OF THE DRAW DOWN IS 0.2 ML

OR APPROXIMATELY 8.5% OF THE TOTAL STORAGE CAPACITY.

Page 12: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

MIN. THRUST AREA BASED ON WATER PRESSURE OF 1380 KPa

AND SOIL BEARING CAPACITY OF 50 KPa

FITTING

PIPE DIAMETER

IN MILLIMETRES

MIN. THRUST AREA

IN SQ. METRES IN SQ. METRES

MIN. THRUST AREA

IN MILLIMETRES

PIPE DIAMETER

FITTING

90°

BEND

45°

BEND

OR WYE

22 1/2°

BEND

CAPPED

END OR

TEE

100

150

200

250

300

300

250

200

150

100 100

150

200

250

300

300

250

200

150

1000.4

0.8

1.4

2.2

3.2

0.4

0.6

0.8

1.2

1.8

0.2

0.4

.04

0.6

1.0

0.4

0.6

1.0

1.6

2.2

90° BEND 45° & 22 1/2° BEND VERTICAL BEND 45° WYE

REDUCER PLUGGED TEE PLUGGED CROSS CAPPED END OR TEE

300mm x 300mm x

100mm PRECAST

CONCRETE BLOCK

20M TIE BARS

NOTE:

1. VALUES GIVEN IN TABLE ARE BASED ON A SOIL BEARING CAPACITY OF 50KPa. FOR SOFT CLAY

AND SATURATED SAND-CLAY SOILS IN AN UNDISTURBED STATE.

2. FOR FIRM DRY CLAY OR COMPACT SAND OR GRAVEL, DIVIDE THRUST AREAS BY 2.0

3. FOR CROSSES USE 45° BEND VALUE IN EACH QUADRANT.

4. WHERE PIPE SIZE DIFFERS IN ANY ONE FITTING, USE THE VALUE FOR THE MAX. SIZE.

5. THRUST BLOCKS OF 15 MPa CONCRETE.

6. THRUST BLOCK CONCRETE SHALL NOT ENCROACH ON THE PIPE, BUT SHALL BEAR ON THE

FITTING ONLY.

7. FOR VOLUME OF ANCHOR BLOCKS FOR THE VERTICAL BEND, REFER TO PIPELINE DRAWINGS.

USE 2-20m BAR PER m3 CONCRETE.

MAX. D + 600mm

MIN D + 450mm

D

30

0m

mD

/4

MIN

1

50

mm

200mm THICK 75mm MINUS GRANULAR

SUBBASE COMPACTED TO MIN 95% MPMDD

TYPE 1 GRANULAR PIPE BEDDING.

100mm THICK 19mm MINUS GRANULAR

BASE COMPACTED TO MIN 95% MPMDD

REINSTATE ASPHALT WITH MMCD TYPE 2

UPPER COURSE MIX TO MATCH EXISTING

THICKNESS. 75mm MIN. IN 2 LIFTS

WHERE THICKNESS OF EXISTING

AC PERMITS, MILL TO 35mm

DEPTH, TACK COAT AND OVERLAY.

MAX D + 1000

75mm MINUS PIT RUN SAND

AND GRAVEL PLACED IN

300mm LIFTS AND

COMPACTED TO MIN 95%

MPMDD

100mm MIN THICK TOPSOIL &

SEED SURFACE.

BOULEVARDS AND EASMENTS ROAD AND LANEWAYS

300mm

IMPORTED 75mm MINUS GRANULAR

BACKFILL COMPACTED TO MIN 95% MPMDD

15

00

mm

M

IN

C

OV

ER

Ø1200mm PRECAST CONCRETE MANHOLE

C/W LADDER RUNGS @ 300mm CENTRES,

AS PER MMCD DETAIL S1

(RUNGS NOT SHOWN FOR CLARITY)

150Ø DRESSER

COUPLING C/W

RESTRAINED PIPE

HARNESS

COOPER B-LINE PIPE

SUPPORT C/W SADDLE

Ø150 90° FxF BEND

STANDARD PIPE

SUPPORT

ASHTO HS-20

LOADING CONCRETE

LID.

FEMALE N.T.P "KAMLOK"

CAP C/W "KAMLOK" CAP AND

SAFETY CHAIN. (REMOVE

CAM)

INSTALL TYPE C-2 MANHOLE

CASTING (Ø700mm OPENING),

CENTRE OVER VALVES

150Ø BLOWDOWN LEAD

ALIGNED OVER VALVE OPERATING NUT

1.8m

1.05

m

300mm

900m

m

3.0m MAX.

750m

m

252mm

600m

mj

TIE WIRE MESH AT

350mm MAX SPACING TO

LINE POSTS

TROWEL FINISH &

SLOPE ALL AROUND

HOG RING CLIP MESH AT

450mm MAX. SPACING

TO TENSION WIRE

TIRE WIRE MESH @ 450mm MAX. SPACING TO

TOP RAIL, COLOURED GREEN.

42mmØ TOP RAIL

TENSION BANDS AT 400mm

MAX. SPACING. POST TO BAR

SPACING 20-40mm

TENSION BAR THROUGH EVERY

MESH LOOP TO TERMINAL &

STRAINING POSTS

73mmØ END POST

60mm Ø LINE POST

BOTTOM TENSION WIRE

42mm Ø BRACE RAIL

EQ

EQ

CONCRETE FOOTING

FOR LINE POSTS MIN

18 MPA.

300mm X 100mm CONCRETE MOW STRIP

300m

m

3 STRAND

BARBED WIRE

POST CAP

150Ø PERFORATED

SDR28 PVC DRAIN PIPE

(PERFORATIONS

POINTED DOWN)

PEA GRAVEL

CONCRETE

FOUNDATION SLAB

WRAP IN MEDIUM

WEIGHT NON WOVEN

GEO TEXTILE WITH MIN

400 LAPS

MIN 150 SURROUND OF

19mm MINUS CLEAR

CRUSH GRAVEL

ROAD PAVEMENT

NELSON TYPE VALVE BOX WITH 50mm

THICK 1000mm DIA. ASPHALTIC

CONCRETE SURROUND WHEN VALVE BOX

IS NOT IN ASPHALT OR CONCRETE

150 DIA. PVC PIPE

ROUND GUIDE TYPE BUSHING

20 DIA. EXTENSION RODWHERE REQUIRED

GRANULAR PIPE

BEDDING

1500

MA

X.

CU

T T

O S

UIT

150

STANDARD 1200Ø

PRECAST MANHOLE

SODIUM

THIOSULFATE CAGE

SODIUM

THIOSULFATE CAGE

INSTALL 1200Ø

PRECAST MANHOLE

PROVIDE REINFORCED EYE

SPLICE AND 6m OF 12mm

NYLON ROPE EACH SIDE

10Ø LIFTING "U" BOLT BEND

TO 100Ø AND DOUBLE NUT

TO GRATING BANDING

HEAVY DUTY SS HINGES

WELDED TO GRATING AND

BANDING (3 REQ'D)

BAND ALL EXPOSED

EDGES (TYP.)

NOTCH FOR

LIFTING BOLT

FABRICATED CAGE WITH

BANDED SECTIONS OF 15mm X

3.2mm SS GRATING (304L OR

APPROVED EQUAL)

10mm SS J HOOK FOR

LIFTING CABLE

BENCHING BEHIND PIPE

OUTLET

PLAN

SECTION

SODIUM THIOSULFATE CAGE SECTION

BENCHING

DRAIN FROM RESERVOIR

600m

m

SU

MP

AIR GAP

150Ø SDR 28 PERFORATED PVC

IPS DRAIN (PERFORATIONS

POINTED DOWN)

150Ø 45° BEND

C/W CAP

150Ø WYE FITTING

INSTALL CLEANOUTS IN #37 BROOKS

SERIES IN CONC. INSPECTION BOX

C/W CAST IRON COVER

700mm

150mm

INSTALL VERTICAL RISER

150Ø SDR 28 PVC PIPE

(AS REQUIRED)

BACKFILL WITH PITRUN GRAVEL TO

GRADUATION DETAILED ON THIS

SHEET. BACKFILL TO BE PLACED IN

LOOSE LIFTS NO GREATER THAN

300mm AND COMPACTED TO MPD.

EX. GROUND

MIN 150mm THICK 20mm MINUS

BEDDING COURSE, COMAPTED TO

95% MPD.

PRECAST LOCK

BLOCK RETAINING

WALL

150Ø PERFORATED DRAIN AT BASE

OF WALL. SURROUND WITH 20mm

CLEAR DRAIN ROCK WRAPPED IN

NON-WOVEN GEO-FABRIC.

1:4 MAX

150mm MIN GRAVEL

SURFACE

CHAIN LINK FENCE

(AS REQUIRED)

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's client and m

ay n

ot be used, reprod

uced o

r relied upon by third p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd

its clie

nt, a

s re

qu

ire

d b

y la

w o

r fo

r u

se

b

y g

ove

rn

me

nta

l re

vie

win

g a

ge

ncie

s. A

EC

OM

a

cce

pts n

o re

sp

onsibility, an

d d

en

ies a

ny lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t m

od

ifie

s th

is dra

wing

w

ith

ou

t A

EC

OM

's exp

ress w

ritten

con

sen

t. D

o n

ot scale this d

ocum

ent. A

ll m

easure

men

ts m

ust be

o

bta

in

ed

fro

m stated

dim

en

sio

ns.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

VOLB_LOGO.png

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-13

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

STANDARD DETAILS

SHEET NUMBER

C-01-104

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\C

\605

46407

-S

HT

-0

0-C

-01-1

04-D

ET

AILS

.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

Scale: 1:25

TYPICAL TRENCH DETAIL 1

-

Scale: N.T.S

THRUST BLOCK DETAILS3

-

Scale: N.T.S

DECHLORINATION MANHOLE DETAILS4

-

Scale: N.T.S

BLOWDOWN DETAIL 5

-

Scale: N.T.S

GATE VALVE BOX DETAIL 8

-

Scale: N.T.S

HARVEY - PERFORATED PERIMETER DRAIN DETAIL6

C-102

Scale: 1:25

HARVEY TANK CLEANOUT DRAIN DETAIL7

C-102

Scale: 1:50

LOCK BLOCK WALL DETAIL9

-

Scale: 1:25

HARVEY SITE FENCE DETAIL2

-

Page 13: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

250Ø EBAA MEGAFLANGE

SERIES 2100 RESTRAINED

FLANGE ADAPTER

250Ø 316L SCH 10 SS

DRAIN OUTLET

250Ø 45° DI BEND

C/W THRUST

BLOCK

1200Ø DECHLORINATION

MANHOLE AS PER DETAIL 4

ON DRAWING C-01-104

150Ø PVC PERIMETER DRAIN

150Ø PVC DRAIN

250Ø TO 200Ø

REDUCER C/W

THRUST

BLOCKS

250Ø 316L SCH

10 SS DRAIN

250Ø AWWA

C219 TRANSITION

COUPLING DI TO SS

NEW HARVEY TANK

NEW HARVEY TANK

FOUNDATION

INV ELEV: 98.11m

INV ELEV: 98.11m

250Ø GATE VALVE

250Ø AWWA C219

FLEXIBLE TRANSITION

COUPLING DI TO DI

0

.5

m

(T

Y

P

.)

250Ø CL350 DI BYPASS

EXISTING

TREATMENT

BUILDING

NEW HARVEY TANK

E

X

I

S

T

I

N

G

2

5

0

Ø

W

A

T

E

R

O

U

T

L

E

T

E

X

I

S

T

I

N

G

2

5

0

Ø

W

A

T

E

R

I

N

L

E

T

EXISTING 250Ø TEE

250Ø GATE VALVE

EXISTING 250Ø TEE

EXISTNG 250Ø GATE VALVE

250Ø VERTICAL 90° BENDS

250Ø AWWA C219

FLEXIBLE TRANSITION

COUPLING DI TO SS

NEW HARVEY TANK

FOUNDATION

150Ø PVC

PERIMETER DRAIN

B

U

I

L

D

I

N

G

TIE IN TO EXISTING 250Ø

WATER OUTLET

EBAA MEGAFLANGE

SERIES 2100 RESTRAINED

EXISTING 250Ø

GATE VALVE

TIE IN TO EXISTING 250Ø

WATER INLET

EBAA MEGAFLANGE SERIES

2100 RESTRAINED

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's client and m

ay n

ot be used, reprod

uced o

r relied upon by third p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd

its clie

nt, a

s re

qu

ire

d b

y la

w o

r fo

r u

se

b

y g

ove

rn

me

nta

l re

vie

win

g a

ge

ncie

s. A

EC

OM

a

cce

pts n

o re

sp

onsibility, an

d d

en

ies a

ny lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t m

od

ifie

s th

is dra

wing

w

ith

ou

t A

EC

OM

's exp

ress w

ritten

con

sen

t. D

o n

ot scale this d

ocum

ent. A

ll m

easure

men

ts m

ust be

o

bta

in

ed

fro

m stated

dim

en

sio

ns.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-13

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

STANDARD DETAILS

SHEET NUMBER

C-01-105

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\C

\605

46407

-S

HT

-0

0-C

-01-1

05-D

ET

AILS

.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

DRAIN CONNECTION DETAIL 2

Scale 1:50

DRAIN CONNECTION DETAIL 1

Scale 1:50

Page 14: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

EQUIPMENT SYMBOLS

PUMP, CENTRIFUGAL

PUMP, DIAPHRAGM

PUMP, GEAR

PUMP, METERING

PUMP, ROTARY LOBE

PUMP, SUBMERSIBLE

STOP LOG

PUMP, VERTICAL

LEVEL CONTROL GATE

SLUICE GATE

SLIDE GATE

FLAP GATE

WEIR GATE

PUMP, PERISTALTIC

GATE VALVE

GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE, CLOSED

PLUG VALVE

DIAPHRAGM VALVE

FLOAT VALVE

PINCH VALVE

KNIFE GATE VALVE

NEEDLE VALVE

CHECK VALVE

CHECK VALVE, DOUBLE LEAF

BALL CHECK VALVE

BACKFLOW PREVENTER

MUD VALVE

PRIMARY PROCESS LINE

SECONDARY PROCESS LINE

FUTURE PROCESS LINE

VENDOR PACKAGE BOUNDARY

EXISTING PIPING AND EQUIPMENT

EXISTING PIPING AND EQUIPMENT

ENCLOSURE BOUNDARY

TO BE REMOVED

FOOT VALVE

TELESCOPIC VALVE

ANGLE VALVE

3 WAY VALVE

4 WAY VALVE

PRESSURE RELIEF VALVE

AIR GAP

SEPARATOR, AIR

CAP OR PLUG

STRAINER, BASKET

CALIBRATION CHAMBER

CONNECTION, PURGE

DRAIN

EXPANSION JOINT

FLEXIBLE CONNECTION

HARD PIPE

SEPARATOR, LIQUID

SIGHT GLASS

VENT, AIR

SPECTACLE BLIND

TRAP

VENT, STEAM

VENTURI

BLIND FLANGE

WEIR

REDUCER

UTILITY CONNECTION,

FLAME ARRESTER

FLUME

FLOW STRAIGHTENING

VANES

PULSATION DAMPENER

STRAINER

UTILITY STATION

SAMPLE POINT,

MANUAL

SAMPLER, AUTOMATIC

CONNECTOR, QUICK

OR FLUSHING

DIFFUSER OR

SPRAY NOZZLE

EYE WASH/SHOWER STATION

ANNUBAR

INJECTOR

NOMINAL DIAMETER (mm)

COMMODITY

EQUIPMENT

ABBREVIATION

EQUIPMENT NUMBER

SOLENOID

DIAPHRAGM (SPRING)

DIAPHRAGM (PRESSURE)

PISTON

MOTOR

INSULATION AND HEAT TRACING

COMMODITY

SOURCE OR DESTINATION

DRAWING No.

DIGITAL

PUMP, PROGRESSING CAVITY

PROCESS LEGEND SHEET FOLLOWS ISA 5.1 (R1992) INSTRUMENTATION SYMBOLS AND

IDENTIFICATION. ALL EQUIPMENT SHOWN ON THIS LEGEND SHEET ISN'T NECESSARILY USED FOR

THIS PROJECT.

COMPRESSOR

CHILLER

DIFFUSER HEADER

HEAT EXCHANGER

SILENCER

SCREENING CONVEYOR

GRINDER/MACERATOR

MOTOR

BOILER

BURNER, WASTE GAS

DISTILLATION TOWER

TANK

VESSEL

BIN

VESSEL (PRESSURE)

ROTARY SEPARATOR

SLUDGE SKIMMER

CYCLONE

GRIT CLASSIFIER

SCREENING WASHER/

ROTARY SCREEN

CENTRIFUGE

COMPACTOR

BLOWER OR FAN

PUMP, SUBMERSIBLE

PROPELLER

CHECK VALVE, DUCKBILL

AS ADJUSTABLE SPEED

CS-1 CONSTANT SPEED (SINGLE SPEED)

CS-2 CONSTANT SPEED (TWO SPEED)

CS-RCONSTANT SPEED (REVERSIBLE)

B.O.P.A. BOTTOM OF PUMP

C/L CENTRE LINE

EL. ELEVATION

HWL HIGH WATER LEVEL

INV. INVERT

LWL LOW WATER LEVEL

MAX. MAXIMUM

MIN. MINIMUM

N.T.S.A. NOT TO SCALE

T.O.C. TOP OF CONCRETE

PIPE LINE DEVICES VALVE SYMBOLS PIPE IDENTIFICATION

EQUIPMENT IDENTIFICATION

PROCESS LINE IDENTIFICATION

PROCESS LINE CODES

PUMP SYMBOLS

GENERAL ABBREVIATIONS

VALVE ACTUATORS/OPERATOR

GATE SYMBOLS

PROCESS FLOW ARROW

AREA BOUNDARY

WAS BOX

VESSEL, JACKETED

MIXER, PROPELLER

SCREEN, BAR

SCREEN, MANUAL

MIXER, INLINE

BACK PRESSURE REGULATOR

VALVE - EXTERNAL PRESSURE

TAP

BACK PRESSURE REGULATOR

VALVE - SELF CONTAINED

BALANCING DAMPER, CIRCULAR

PRESSURE REDUCING

REGULATOR VALVE - EXTERNAL

PRESSURE TAP

PRESSURE REDUCING

REGULATOR VALVE - SELF

CONTAINED

PRESSURE AND VACUUM

RELIEF VALVE

RUPTURE DISC PRESSURE

RELIEF VALVE

RUPTURE DISC VACUUM

RELIEF VALVE

BALL VALVE, OPEN

M

SCRUBBER

P

D

E

S

S

T

ORIFACE PLATE

LEVEL

K

D

M

S

GENERATOR

SCUM COLLECTOR

XXX-YYY

XX

ZZZ

XX1

XX2

XXXX

LIN1

LIN2

XX1

XX2

XXXX

LIN1

LIN2

XX

VACUUM RELIEF VALVE

AIR RELEASE VALVE

PUMP, PLUNGER

IN-PIPE DIFFUSER W/ QUILL

RW RAW WATER

TW TREATED WATER

SHC SODIUM HYPOCHLORITE

DR DRAIN

LCP LOCAL CONTROL PANEL

P PUMP

UV UV REACTOR

XXX-ZZZ

VALVE ABBREVIATION

PRV PRESSURE REDUCING VALVE

VALVE

NUMBER

NOTES:

1 REFER TO DRAWING I-00 FOR INSTRUMENTATION SYMBOLS

AND ABBREVIATIONS.

COMMODITY ABBREVIATIONS

DR DRAIN

RW

TW

O/F

RAW WATER

TREATED WATER

OVERFLOW

M

ELECTRICAL ACTUATED

BUTTERFLY VALVE

LS

-

FLOAT LEVEL SWITCH

XX

-

ULTRA SONIC LEVEL

SENSOR

PRESSURE SENSOR,

IN-LINE

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-12

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

INSTRUMENTATION LEGEND

AND SYMBOLS

SHEET NUMBER

P-01-000

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

SS

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\P

\6

05464

07-S

HT

-00-P

-01-00

0.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

Page 15: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

HARVEY CREEK

INTAKE

TO P-002M

PIT

201A

PI

202A

PI

202B

PIT

201B

VENDOR SUPPLY

PRV-201A

PRV-202A

AE

210A

TURB

LCP

200

AIT

210A

TURB

AI

210A

AI

TU

RB

ID

IT

Y

PI

201A

AI

PR

ES

SU

RE

IN

DIC

AT

IO

N

PI

201B

AI

PR

ES

SU

RE

IN

DIC

AT

IO

N

FE

230A

S

S

EXISTING BUILDING

150x250250x150

200-RW

15

0-R

W

100-RW

15

0-R

W

(EXISTING)

(EXISTING)

MN

201A

DO

PR

V

CLO

SE

CO

MM

AN

D

MN

202A

DO

PR

V

CLO

SE

CO

MM

AN

D

FIT

230A

FI

230A

AI

FLO

W

IN

DIC

AT

IO

N

AI

230B

AI

CH

LO

RIN

E

RE

SID

UA

L

AE

230B

CHLORINE RESIDUAL

AIT

230B

CHLORINE RESIDUAL

ZSC

202A

DI

VA

LV

E

CLO

SE

D

ZSC

201A

DI

VA

LV

E

CLO

SE

D

ZSC

201A

ZSC

202A

250x200

200x250

EXISTING PRESSURE

REDUCING VALVE STATION

UV

210

UV

220

FV

210A

O/O

FV

220A

O/O

20

0-R

W

LCP

101

LCP

102

UV EQUIPMENT

VENDOR PACKAGE

200x300

300x200

300x200

M

M

P

225

P

215

EXISTING DISINFECTION FACILITY

BULK

HYPO-CHLORITE

TOTE

M

M

REFER TO

P-215

CHLORINE SYSTEM VENDOR PACKAGE

ES

BULK

HYPO-CHLORITE

TOTE

CALIBRATION

COLUMN

ES

UA

215

DI

GE

NE

RA

L

FA

ULT

FM

215

AO

DO

SE

RA

TE

MM

215

DI

PU

MP

PU

LS

E

CHLORINE ROOM

20

0-R

W

25

-S

HC

ES

ES

ES

ZSC

202A

ZSC

201A

ES

ES

SV

201A

SV

202A

ZSC

202A

ZSC

201A

ROCK PIT

75-DR

D

D

F/C

F/C

FQ

230A

DI

FLO

W

TO

TA

LIZ

E

(PRV-200)

SPILL

CONTAINMENT

VAULT

TRENCH

DRAIN

100 - DR

LSH

210A

LAH

210A

DI

VA

ULT

HIG

H

LE

VE

L

TO P-002

(EXISTING)

ROCK PIT

75-DR

10

0-R

W

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-12

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

EXISTING HARVEY PRV 200 AND

DISINFECTION FACILITY PROCESS

AND INSTRUMENTATION DIAGRAM

SHEET NUMBER

P-01-001

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

SS

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\P

\6

05464

07-S

HT

-00-P

-01-00

1.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PRESSURE REDUCING VALVE STATION

EQUIP No. PRV-200

SPEC: 11300

TYPE: PRESSURE REDUCING

SIZE: 3.25ML/d (MAX. FLOW)

Page 16: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

TW

P-001

FROM EX. WATER

TREATMENT BUILDING

250-01

LSLL

230C1

LYLL

230C1

LAL

230C1

(EXISTING)

LE

230A1

LIT

230A1

LAH

230B

LI

230A

EXISTING NEW

250-SS

LSHH

230B1

LYHH

230B1

250-SS 200-DI

250-SS

HARVEY TANK

TK

230

DECHLORINATION

CHAMBER

DR

TO ENVIROMENT

(DRAWN TO DITCH)

TW

TO LIONS BAY

DISTRIBUTION

TW

DR

AIR

BREAK

O/F

TW

P-001

TO EX. WATER

TREATMENT BUILDING

50-TW

LCP

200

250

-D

I

250-DI

(EXISTING BYPASS)

250-SS

200

DI

250-DI

250x200

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-20

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

HARVEY TANK

PROCESS AND INSTRUMENTATION

DIAGRAM

SHEET NUMBER

P-01-002

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

SS

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\P

\6

05464

07-S

HT

-00-P

-01-00

2.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

NOTE:

LCP 200 IS LOCATED WITHIN EXISTING TREATMENT BUILDING.

REFER TO ELECTRICAL DRAWING

Page 17: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

GROUND

EL. 100.46m±

EL. 101.18m±

EL. 100.84m

1500x300x300 DEEP SUMP

C/W SUMP GRATING &

SS SCREEN

150x125 K/O FOR SUMP

REINFORCED CONCRETE

THRUSTS BLOCK

THRUST-SEAL PLATE

C/W BOLTS (TYP.)

TIE ROD LUGS

(TYP. 4)

150Ø

150Ø

250Ø

OUTLET

(50Ø BY-PASS REMOVED FOR CLARITY)

0.300

0.914

1.810

0.305

EL. 101.18m±

2.000

0.125

2.600

1.850

1.050

SAWCUT AND DEMOLISH EXISTING

WALL AND ROOF TO SUIT CHAMBER

EXTENSION

DEMOLISH EXISTING THRUST BLOCK

REMOVE EXISTINIG TRANSITION

COUPLING. SALVAGE FOR REUSE

REMOVE EXISTING Ø150 SPOOL

BETWEEN VICTAULIC AND

TRANSITION COUPLING

REMOVE EXISTING DI AND

INSTALL 150Ø STEEL MAIN

FORM AND CAST IN PLACE

CHAMBER EXTENSION

Ø150mm AWWA C219

TRANSITION

COUPLING. (REUSE

EXISTING IF POSSIBLE)

CONSTRUCT

THRUST BLOCK

EXISTING HARVEY

TANK PRV

RELOCATE BYPASS PIPE AS

SHOWN ON THIS DRAWING

PIPE PENETRATION

DETAIL SEE STRUCTURAL

SHEET S-002 DETAIL K

EL. 101.18m±

EL. 100.84m

250Ø

0.300

2.000

150Ø

OUTLET

0.125

2.600

MSU TYPE MG SS HATCH -

SERVICE STAIR ACCESS

FORM AND CAST IN PLACE

CHAMBER EXTENSION

150mm CWS ADJUSTABLE

GALVANIZED SADDLE.

STEEL PIPE SUPPORT

150mm LINK SEAL

CONSTRUCT

THRUST BLOCK

REPLACE EX. 250Ø PIPE

3 33

3 3

1

1

2

2

2

4

4

6

6

1500x300x300 DEEP SUMP

C/W SUMP GRATING &

SS SCREEN

150x125 K/O FOR SUMP

MSU TYPE MG SS HATCH -

SERVICE STAIR ACCESS

FORM AND CAST IN PLACE

CHAMBER EXTENSION

150mm CWS ADJUSTABLE

GALVANIZED SADDLE.

STEEL PIPE SUPPORT

150mm LINK SEAL

CONSTRUCT

THRUST BLOCK

REPLACE EX. 250Ø PIPE

3

REINSTALL

EXISTING BY-PASS

7

7

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

VOLB_LOGO.png

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-12

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

HARVEY TANK

PRV 200 ACCESS MODIFICATIONS

SHEET NUMBER

M-01-001

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

GW

GW

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\M

\6054

6407-S

HT

-00

-M

-0

1-001

.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

PLAN

Scale 1:20

DEMOLITION AND REMOVALS PLAN

Scale 1:20

A SECTION

-

Scale 1:20

B SECTION

-

Scale 1;20

A

-

B

-

C

-

C SECTION

-

Scale 1:20

NOTES:

1. ALL 75mm DIA. AND LARGER PIPE, INSIDE WETTED SURFACES TO BE

SANDBLASTED, EPOXY LINED AND COATED TO AWWA C-210 AND NSF-61

SPECIFICATION. FINISH COATING WILL BE BLUE ENAMEL.

2. FABRICATED STEEL PIPEE AND FITTINGS TO BE SCHEDULE NO. 40

STEEL PIPE FOR SIZES TO 250mm DIA.

3. LOADING: H2O STATIC LOAD RATES

MATERIALS LIST

ITEM QTYDESCRIPTION

1 1

100 CLA-VAL 90 - 01 BSYKC PRESSURE REDUCING VALVE

C/W CLOSE POSITION INDICATOR, 120V SOLENOID

VALVE AND 120V AC CONTACTOR - THREADED

2 2

100 MUELLER A2360-6W41 NRS GATE VALVE

C/W HANDWHEEL - THREADED

3 3 GALVANIZED STEEL ADJUSTABLE PIPE SUPPORTS

4 1

275 VICTAULIC #07 ZERO FLEX COUPLING

5 1

100 MUELLER 11m CAST IRON Y STRAINER

C/W BLOWDOWN VALVE - THREADED

6 1

75mm "H" STRAINER W/ EPOXY COATING AND

BLOWDOWN VALVES.

CLA-VAL, SINGER OR APPROVED ALTERNATIVE

MSU TYPE MG SS HATCH AND SERVICE STAIR

ACCESS

7 1

Page 18: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

1

S1001

A

S1001

1 SECTION

S1002

Scale 1:50

A DETAIL

S1002

Scale 1:50

REINFORCING BAR DEVELOPMENT AND SPLICE LENGTH

SCHEDULE

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 - 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: R

OD

ER

IC

K.C

AS

TILLO

(20

18-09

-20

) La

st P

lotted: 2018-09-20

SHEET TITLE

GENERAL NOTES

SHEET NUMBER

S-01-001

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

SZ

WH

MG

W

File

nam

e: P

:\6054

6407

\90

0-C

AD

_G

IS

\91

0-C

AD

\2

0-S

HE

ET

S\S

\60546

407 S

-01-001.D

WG

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

AutoCAD SHX Text
GENERAL NOTES 1.ALL WORK SHALL MEET OR EXCEED MINIMUM REQUIREMENTS OF ALL WORK SHALL MEET OR EXCEED MINIMUM REQUIREMENTS OF THE CURRENT EDITION OF THE BRITISH COLUMBIA BUILDING CODE 2012, ASSOCIATED STANDARDS REFERENCED IN THAT CODE, ACI 350 OR AWWA D110 AND LOCAL STANDARDS AND BYLAWS AS APPLICABLE. 2.CONFIRM SIZE AND LOCATIONS OF OPENINGS WITH MECHANICAL AND CONFIRM SIZE AND LOCATIONS OF OPENINGS WITH MECHANICAL AND ELECTRICAL CONTRACTORS. REPORT ANY DISCREPANCIES TO CONSULTANT BEFORE PROCEEDING WITH WORK.
AutoCAD SHX Text
DESIGN CRITERIA 1.DESIGN STANDARDS: DESIGN STANDARDS: GENERAL:BRITISH COLUMBIA BUILDING CODE, 2012 BRITISH COLUMBIA BUILDING CODE, 2012 CONCRETE: ACI 350M-06 AC1 350.3-06 CAN/CSA A23.1, A23.2 AND A23.3 STEELCAN/CSA S16 CAN/CSA S16 2.DESIGN LOADS: DESIGN LOADS: IMPORTANCE CATEGORY:POST-DISASTER POST-DISASTER LOCATION:SQUAMISH, BC. SQUAMISH, BC. DEAD LOADS:WEIGHT OF MATERIALS OF CONSTRUCTION WEIGHT OF MATERIALS OF CONSTRUCTION SNOW LOADS:IMPORTANCE FACTOR:Is = 1.25 (ULS) IMPORTANCE FACTOR:Is = 1.25 (ULS) Is = 1.25 (ULS) Is = 0.9 (SLS)GROUND SNOW LOAD:Ss = 2.8 KPa Ss = 2.8 KPa ASSOCIATED RAIN LOAD:Sr = 0.7 KPa Sr = 0.7 KPa WIND LOADS:IMPORTANCE FACTOR:Iw = 1.25 (ULS) IMPORTANCE FACTOR:Iw = 1.25 (ULS) Iw = 1.25 (ULS) Iw = 0.75 (SLS) REFERENCE WIND PRESSURE:q(1/50) = 0.5 KPa q(1/50) = 0.5 KPa q(1/10) = 0.39 KPa SEISMIC LOADS:LOCATION:LIONS BAY, BC LOCATION:LIONS BAY, BC LIONS BAY, BC SITE CLASS:C C IMPORTANCE FACTOR:Ie = 1.5 Ie = 1.5 SPECTRAL ACCELERATION:Sa (0.2) = 0.83 Sa (0.2) = 0.83 Sa (0.5) = 0.59Sa (1.0) = 0.32 Sa (2.0) = 0.17PEAK GROUND ACCELERATION:PGA = 0.4 PGA = 0.4 RESERVOIR ROOF LIVE LOADS:LL = 1.0 kPa LL = 1.0 kPa UNIT WEIGHT OF SOIL: 20.0 kN/m3 20.0 kN/m3 20.0 kN/m3 3.SOIL BEARING CAPACITY: SLS 150 kPa, ULS 225 kPaSOIL BEARING CAPACITY: SLS 150 kPa, ULS 225 kPa
AutoCAD SHX Text
EXCAVATION AND BACKFILL 1.REFER TO SPECIFICATION 31 23 02 - EXCAVATION AND BACKFILL REFER TO SPECIFICATION 31 23 02 - EXCAVATION AND BACKFILL FOR STRUCTURES. 2.EXCAVATIONS SHALL BE IN ACCORDANCE WITH WORKSAFE B.C. EXCAVATIONS SHALL BE IN ACCORDANCE WITH WORKSAFE B.C. GUIDELINES BY EITHER SLOPING OR USE OF TEMPORARY SHORING MATERIALS OR A COMBINATION OF BOTH. THE DESIGN OF THE TEMPORARY EXCAVATION WORK IS THE RESPONSIBILITY OF THE CONTRACTOR. 3.ALL EXCAVATIONS GREATER THAN 1.5 METRES IN DEPTH SHALL BE ALL EXCAVATIONS GREATER THAN 1.5 METRES IN DEPTH SHALL BE SLOPED OR SHORED. 4.SHALLOW EXCAVATIONS UP TO 3.0 METRES IN DEPTH SHALL BE SHALLOW EXCAVATIONS UP TO 3.0 METRES IN DEPTH SHALL BE CUT BACK WITH SIDE SLOPES OF 1 HORIZONTAL TO 1 VERTICAL. A FLATTER SLOPE OF 2:1 SHOULD BE USED IF GROUND WATER IS ENCOUNTERED. 5.THE EXPOSED SUBGRADE SHALL BE PROTECTED FROM WETTING AND THE EXPOSED SUBGRADE SHALL BE PROTECTED FROM WETTING AND DISTURBANCE. TEMPORARY PROTECTION MAY COMPRISE OF A THIN LAYER, 50mm MINIMUM THICKNESS MUD SLAB. ALTERNATIVELY, A NON-WOVEN GEOTEXTILE (NILEX 4545 OR EQUIVALENT) SHALL BE PLACED ON THE EXPOSED SUBGRADE AND COVERED WITH AT LEAST 150mm OF MINUS 19mm CLEAR CRUSH GRAVEL COMPACTED WITH SUITABLE EQUIPMENT. 6.MAINTAIN SITE DRAINAGE THROUGHOUT ALL STAGES OF MAINTAIN SITE DRAINAGE THROUGHOUT ALL STAGES OF CONSTRUCTION. 7.KEEP CONSTRUCTION MATERIAL AND EXCAVATED SOIL 3.0 METRES KEEP CONSTRUCTION MATERIAL AND EXCAVATED SOIL 3.0 METRES BACK FROM EDGE OF SLOPE. 8.DO NOT BACKFILL AGAINST RESERVOIR UNTIL THE RESERVOIR ROOF DO NOT BACKFILL AGAINST RESERVOIR UNTIL THE RESERVOIR ROOF CONCRETE SLAB HAS BEEN CAST AND CURED FOR 14 DAYS AND TANK HAS BEEN TESTED FOR LEAKAGE. 9.BACKFILL AGAINST RESERVOIR WALLS TO CONSIST OF FREE BACKFILL AGAINST RESERVOIR WALLS TO CONSIST OF FREE DRAINAGE GRAVEL FILL LIGHTLY COMPACTED IN LOOSE LIFTS NOT EXCEEDING 200mm IN THICKNESS.
AutoCAD SHX Text
SYMBOLS
AutoCAD SHX Text
ON SMALL SCALE PLANS
AutoCAD SHX Text
CONCRETE WALL IN SECTION
AutoCAD SHX Text
TOP OF CONCRETE WALL OR STRUCTURAL STUD WALL
AutoCAD SHX Text
TOP OF CONCRETE ELEVATION (PLAN)
AutoCAD SHX Text
ANTICIPATED TOP OF FOUNDATION ELEVATION (PLAN)
AutoCAD SHX Text
TOP OF CONCRETE ELEVATION
AutoCAD SHX Text
EL.356.458
AutoCAD SHX Text
[79.585]
AutoCAD SHX Text
MAIN FLOOR EL.
AutoCAD SHX Text
INDICATES EXTENT OF BARS
AutoCAD SHX Text
TOP REINFORCING
AutoCAD SHX Text
BOTTOM REINFORCING
AutoCAD SHX Text
INDICATES BARS TO CONTINUE TO EXTENTS OF ELEMENT
AutoCAD SHX Text
SECTION NUMBER
AutoCAD SHX Text
DRAWING WHERE SECTION IS LOCATED
AutoCAD SHX Text
DETAIL LETTER
AutoCAD SHX Text
DRAWING WHERE DETAIL IS LOCATED
AutoCAD SHX Text
SECTION NUMBER
AutoCAD SHX Text
DRAWING WHERE SECTION TAKEN FROM
AutoCAD SHX Text
DETAIL LETTER
AutoCAD SHX Text
DRAWING WHERE DETAIL TAKEN FROM
AutoCAD SHX Text
CAST-IN-PLACE CONCRETE 1.REFER TO SPECIFICATION SECTION 03 30 00 - CAST-IN-PLACE REFER TO SPECIFICATION SECTION 03 30 00 - CAST-IN-PLACE CONCRETE 2.CAST-IN-PLACE CONCRETE WORK SHALL BE IN ACCORDANCE WITH CAST-IN-PLACE CONCRETE WORK SHALL BE IN ACCORDANCE WITH CAN/CSA A23.1. 3.GROUT TO BE PREMIXED, NON-SHRINK, NON-METALLIC GROUT WITH GROUT TO BE PREMIXED, NON-SHRINK, NON-METALLIC GROUT WITH MINIMUM STRENGTH AT 4 DAYS OF 20MPA AND AT 28 DAYS OF 40 20MPA AND AT 28 DAYS OF 40 MPA. 4.PORTLAND CEMENT SHALL CONFORM TO THE REQUIREMENTS OF PORTLAND CEMENT SHALL CONFORM TO THE REQUIREMENTS OF CSA CAN3-A5 "PORTLAND CEMENTS". CEMENTS". 5.HOT AND COLD WEATHER REQUIREMENTS SHALL BE CARRIED OUT IN HOT AND COLD WEATHER REQUIREMENTS SHALL BE CARRIED OUT IN ACCORDANCE WITH CAN/CSA A23.1. 6.CONCRETE FINISHING, PLACING, CURING AND PROTECTION SHALL BE CONCRETE FINISHING, PLACING, CURING AND PROTECTION SHALL BE CARRIED OUT IN ACCORDANCE WITH CAN/CSA A23.1. 7.UNLESS OTHERWISE NOTED, CONSTRUCTION JOINTS SHOWN ARE UNLESS OTHERWISE NOTED, CONSTRUCTION JOINTS SHOWN ARE OPTIONAL. CONSTRUCTION JOINTS NOT SHOWN ON THE DRAWINGS SHALL BE APPROVEDBY ENGINEER. BY ENGINEER. 8.BEFORE CONCRETE IS PLACED, CONSTRUCTION JOINTS SHALL BE BEFORE CONCRETE IS PLACED, CONSTRUCTION JOINTS SHALL BE ROUGHENED TO -5mm, CLEANED AND LAITANCE REMOVED AND SURFACE WETTED. STANDING WATER SHALL BE REMOVED. 9.CONCRETE MIXES SHALL BE DESIGNED TO MEET THE FOLLOWING CONCRETE MIXES SHALL BE DESIGNED TO MEET THE FOLLOWING PERFORMANCE CRITERIA IN ACCORDANCE WITH CAN/CSA-A23.1.
AutoCAD SHX Text
TYPE A: CONCRETE, CHAMBER WALLS, SLABS AND ROOFS EXPOSURE CLASSIFICATION: F2 F2 MIN. 28 DAY COMPRESSIVE STRENGTH: 35 MPa AT 28 DAYS 35 MPa AT 28 DAYS W/C RATIO: 0.4
AutoCAD SHX Text
10. CONCRETE TESTING SHALL BE PERFORMED BY AN INDEPENDENT TESTING AGENCY ACCEPTABLE TO THE CONSULTANT AND APPOINTED AND PAID FOR BY THE CONTRACTOR. 11. NOTIFY THE CONSULTANT AND TESTING AGENCY AT LEAST 24 HOURS PRIOR TO EACH CONCRETE POUR.
AutoCAD SHX Text
CONCRETE REINFORCING 1.REFER TO SPECIFICATION SECTION 03 20 00 - CONCRETE REFER TO SPECIFICATION SECTION 03 20 00 - CONCRETE REINFORCING. 2.CONCRETE REINFORCING WORK SHALL BE IN ACCORDANCE WITH CONCRETE REINFORCING WORK SHALL BE IN ACCORDANCE WITH CAN/CSA A23.1, CAN/CSA A23.3. ACI315 AND THE RISC REINFORCING STEEL MANUAL OF STANDARD PRACTICE. 3.ALL REINFORCING TO BE CONTINUOUS. SPLICE ONLY AS DETAILED ALL REINFORCING TO BE CONTINUOUS. SPLICE ONLY AS DETAILED OR APPROVED BY THE ENGINEER. ALL LAP SPLICES SHALL BE CLASS B TENSION SPLICES UNLESS DETAILED OTHERWISE. SEE TABLE BELOW FOR DEVELOPMENT AND SPLICE LENGTH FOR COMPRESSIVE STRENGTH OF CONCRETE f'c = 35mPa. LENGTH IN mm. 4.REINFORCING STEEL SHALL, WHERE NOT OTHERWISE SHOWN, BE REINFORCING STEEL SHALL, WHERE NOT OTHERWISE SHOWN, BE PROTECTED BY CONCRETE COVER AS FOLLOWS: CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 75mm 75mm OTHERWISE : 50mm 50mm 5.MATERIAL SHALL CONFORM TO THE FOLLOWING: MATERIAL SHALL CONFORM TO THE FOLLOWING: REINFORCING STEEL : CAN/CSA G30.18, GRADE 400, PLAIN FINISH, DEFORMED BARS 6.SHOP DRAWINGS SHALL BE PREPARED BY THE CONTRACTOR AND SHOP DRAWINGS SHALL BE PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE CONSULTANT FOR REVIEW PRIOR TO FABRICATION. 7.ALL HOOKED BARS TO BE STANDARD HOOKS IN ACCORDANCE WITH ALL HOOKED BARS TO BE STANDARD HOOKS IN ACCORDANCE WITH CAN/CSA A23.3 UNLESS NOTED OTHERWISE.
AutoCAD SHX Text
MISCELLANEOUS METALS 1.REFER TO SPECIFICATION SECTION 05 50 00 - METAL FABRICATION. REFER TO SPECIFICATION SECTION 05 50 00 - METAL FABRICATION. 2.FABRICATION AND ERECTION SHALL BE IN ACCORDANCE WITH FABRICATION AND ERECTION SHALL BE IN ACCORDANCE WITH CAN/CSA S16. 3.MATERIALS SHALL CONFORM TO THE FOLLOWING: MATERIALS SHALL CONFORM TO THE FOLLOWING: ALUMINUM SHAPES AND PLATES:ALLOY 6061-T6 OR 6063-T6 ALLOY 6061-T6 OR 6063-T6 STAINLESS STEEL SHAPES: INTERIOR SUBMERGED:AISI, TYPE 316 AISI, TYPE 316 FOR WELDING:AISI, TYPE 316 AISI, TYPE 316 SHAPES AND BARS:ASTM A276 ASTM A276 PLATE, SHEET AND STRIP:ASTM A240 ASTM A240 CONNECTION BOLTS: STAINLESS STEEL MEMBERS:AISI, TYPE 316 AISI, TYPE 316 ANCHOR BOLTS: INTERIOR SUBMERGED:AISI, TYPE 316 AISI, TYPE 316 4.WELDING SHALL BE IN ACCORDANCE WITH CAN/CSA W59 & W47.1 WELDING SHALL BE IN ACCORDANCE WITH CAN/CSA W59 & W47.1 AND WITH AWS D1.6 FOR STAINLESS STEEL. STEEL. 5.ALL METALS INSIDE OF THE WATER RETAINING STRUCTURES ALL METALS INSIDE OF THE WATER RETAINING STRUCTURES INCLUDING LADDERS, STAIRS, THREADS, HANDRAILS, PLATFORM FRAMES AND GRATINGS SHALL BE STAINLESS STEEL CONSTRUCTION. 6. ALL METALS IN EXTERIOR USE OR INSIDE OF NON-WATER RETAINING ALL METALS IN EXTERIOR USE OR INSIDE OF NON-WATER RETAINING STRUCTURES INCLUDING LADDERS, STAIRS, TREADS, HANDRAILS, GRATINGS SHALL BE ALUMINUM CONSTRUCTION.
AutoCAD SHX Text
TOP BARS : HORIZONTAL REINFORCEMENT PLACED IN SUCH A WAY MORE THAN 300mm OF FRESH CONCRETE IS CAST IN THE MEMBER BELOW THE DEVELOPMENT LENGTH OR SPLICE.
AutoCAD SHX Text
BARS IN COMPRESSION
AutoCAD SHX Text
DEVELOPMENT LENGTH
AutoCAD SHX Text
SPLICE LENGTH
AutoCAD SHX Text
BARS IN TENSION
AutoCAD SHX Text
TOP BARS
AutoCAD SHX Text
OTHER BARS
AutoCAD SHX Text
TOP BARS
AutoCAD SHX Text
OTHER BARS
AutoCAD SHX Text
BAR SIZE
AutoCAD SHX Text
SPLICE LENGTH
AutoCAD SHX Text
DEVELOPMENT LENGTH
AutoCAD SHX Text
10M
AutoCAD SHX Text
15M
AutoCAD SHX Text
20M
AutoCAD SHX Text
25M
AutoCAD SHX Text
30M
AutoCAD SHX Text
35M
AutoCAD SHX Text
200
AutoCAD SHX Text
280
AutoCAD SHX Text
360
AutoCAD SHX Text
450
AutoCAD SHX Text
540
AutoCAD SHX Text
630
AutoCAD SHX Text
330
AutoCAD SHX Text
470
AutoCAD SHX Text
590
AutoCAD SHX Text
740
AutoCAD SHX Text
880
AutoCAD SHX Text
1040
AutoCAD SHX Text
390
AutoCAD SHX Text
550
AutoCAD SHX Text
680
AutoCAD SHX Text
1080
AutoCAD SHX Text
1280
AutoCAD SHX Text
1530
AutoCAD SHX Text
300
AutoCAD SHX Text
420
AutoCAD SHX Text
530
AutoCAD SHX Text
830
AutoCAD SHX Text
990
AutoCAD SHX Text
1170
AutoCAD SHX Text
500
AutoCAD SHX Text
710
AutoCAD SHX Text
890
AutoCAD SHX Text
1400
AutoCAD SHX Text
1670
AutoCAD SHX Text
1980
AutoCAD SHX Text
390
AutoCAD SHX Text
550
AutoCAD SHX Text
680
AutoCAD SHX Text
1080
AutoCAD SHX Text
1280
AutoCAD SHX Text
1530
AutoCAD SHX Text
GRATING 1.ALL GRATING TO BE DESIGNED FOR LIVE LOAD OF 4.8 kPa, UNLESS ALL GRATING TO BE DESIGNED FOR LIVE LOAD OF 4.8 kPa, UNLESS NOTED OTHERWISE. 2.GRATING MATERIAL SHALL BE STAINLESS STEEL ALLOY TYPE 316 GRATING MATERIAL SHALL BE STAINLESS STEEL ALLOY TYPE 316 WITHIN WATER RETAINING STRUCTURES AND ALUMINUM 6061-T6 ANYWHERE ELSE.
AutoCAD SHX Text
HANDRAIL
Page 19: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

C TYPICAL WALL CONSTRUCTION JOINTS

STD.

Scale NTS

G WALL AND SLAB OPENINGS

STD

Scale NTS

TYP. REINFORCEMENT AT

PLAN VIEW

A TYPICAL CONCRETE WALL CORNER

STD.

Scale NTS

D BELOW SLAB PIPE ENCASEMENT DETAIL

STD.

Scale NTS

E CONCRETE ROOF SLAB

STD.

Scale NTS

TYPICAL PIPE THROUGH

TYPICAL PIPE SLEEVE

F THROUGH CONCRETE FLOOR

STD.

Scale NTS

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 - 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: R

OD

ER

IC

K.C

AS

TILLO

(20

18-09

-20

) La

st P

lotted: 2018-09-20

SHEET TITLE

STANDARD DETAILS

SHEET 1

SHEET NUMBER

S-01-002

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

SZ

WH

MG

W

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\S

\6

05464

07 S

-01-0

02.D

WG

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

AutoCAD SHX Text
SECTION - HORZ JOINT
AutoCAD SHX Text
ROUGHEN SURFACE - 6mm MIN.
AutoCAD SHX Text
PLAN - VERT JOINT
AutoCAD SHX Text
150 PVC WATERSTOP
AutoCAD SHX Text
INTERIOR
AutoCAD SHX Text
EXTERIOR
AutoCAD SHX Text
20mm CHAMFER
AutoCAD SHX Text
CONSTRUCTION JOINT WITH JOINT SEALANT IN ACCORDANCE WITH WATERPROOF ADMIXTURE MFR RECOMMENDED DETAIL
AutoCAD SHX Text
ROUGHEN SURFACE - 6mm MIN.
AutoCAD SHX Text
150 PVC WATERSTOP
AutoCAD SHX Text
CONSTRUCTION JOINT WITH JOINT SEALANT E.F. IN ACCORDANCE WITH WATERPROOF ADMIXTURE MFR RECOMMENDED DETAIL
AutoCAD SHX Text
REINFORCEMENT SEE DRAWINGS
AutoCAD SHX Text
EXTERIOR
AutoCAD SHX Text
INTERIOR WATER
AutoCAD SHX Text
2-15M x 1200 LG EA CORNER AT 100 oc EA. FACE (OR T&B)
AutoCAD SHX Text
EXTRA REINF. EQUIVALENT IN AREA TO REINF. CUT BY HOLE PLUS 50%
AutoCAD SHX Text
ONLY REQD FOR OPG 150Ø OR LARGER
AutoCAD SHX Text
750
AutoCAD SHX Text
750
AutoCAD SHX Text
EXTRA REINF. EQUIVALENT IN AREA TO REINF. CUT BY HOLE PLUS 50%
AutoCAD SHX Text
ADDITIONAL REINF ALSO APPLICABLE AROUND PIPE SLEEVES
AutoCAD SHX Text
MAX.
AutoCAD SHX Text
MAX.
AutoCAD SHX Text
NOTE: : WHEN HORIZONTAL REINFORCEMENT IS SHOWN INSIDE THE VERTICAL REINFORCEMENT, CORNER VERTICALS TO REMAIN INSIDE THE CORNER BARS
AutoCAD SHX Text
CORNER BARS TO MATCH SIZE AND SPACING OF HORIZONTAL REINFORCEMENT, UNO
AutoCAD SHX Text
TOP BAR TENSION SPLICE LENGTH
AutoCAD SHX Text
UNO
AutoCAD SHX Text
TOP BAR TENSION SPLICE LENGTH
AutoCAD SHX Text
UNO
AutoCAD SHX Text
HORIZONTAL REINFORCEMENT
AutoCAD SHX Text
WALL
AutoCAD SHX Text
THICKNESS
AutoCAD SHX Text
300
AutoCAD SHX Text
300
AutoCAD SHX Text
50mm SKIM COAT
AutoCAD SHX Text
MECH. PIPES ENCASED IN LEAN MIX CONCRETE
AutoCAD SHX Text
RESERVOIR SLAB
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
PIPE. REFER TO PROCESS
AutoCAD SHX Text
CONCRETE FLOOR SLAB
AutoCAD SHX Text
CONCRETE CURB R/W 15M DWLS @ 300 VERT. AND 1-10M HORIZ. CONT.
AutoCAD SHX Text
150
AutoCAD SHX Text
150
AutoCAD SHX Text
CAST IN PLACE OPTION
AutoCAD SHX Text
PL 6 FLANGED SLEEVE TYPE 316 SS OR GROOVED TO INT. PIPING REQUIREMENTS
AutoCAD SHX Text
CONCRETE WALL
AutoCAD SHX Text
PL. 6x50 WEEP RING TYPE 316 SS LOCATE AT MID DEPTH
AutoCAD SHX Text
6
Page 20: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

DEMOLITION PLAN

Scale 1:20

T.O.C .

EL. 100.84

T.O.C .

EL. 101.18±

EXIST GRADE

EL. 100.46±

EXISTING HAVEY

TANK PRV

1 SECTION

-

Scale 1:20

1

-

SAWCUT AND DEMOLISH

EXISTING WALL AND ROOF TO

SUIT CHAMBER EXTENSION

3310

1500

2000

150

125

155

155 155

155

155

SAWCUT AND DEMOLISH

EXISTING WALL AND ROOF TO

SUIT CHAMBER EXTENSION

150Ø PIPE ℄

150Ø PIPE ℄

1850 3155

MODIFICATION FLOOR PLAN

Scale 1:20

FORM AND CAST IN PLACE

CHAMBER EXTENSION

200

T.O.C .

EL. 100.84

T.O.C .

EL. 101.18±

EXIST GRADE

EL. 100.46±

2 SECTION

-

Scale 1:20

2000

150

125

200 1375

OPENING

2477

300

300

SQ

150

300

1

1

200

2

-

1500

200

200

1500

155

155

ALUMINUM

C230x20

STRINGER

MSU TYPE MG

HATCH

3

0

°

8

3

0

SEE NOTE 3

SEE NOTE 4

SEE NOTE 2

150Ø PIPE ℄

150Ø PIPE ℄

2%

SLOPE

DN

2% SLOPE

950

2%

SLO

PE

SUMP

150

SEE STD

DETAIL

NOTES:

1. ALUMINUM SHIP'S LADDER WITH HANDRAILS.

2. ALUMINUM L89x89x9.5x90mm LONG C/W 19Ø S.S. HILTI HIT

HY200 ANCHOR WITH 150 EMBEDMENT.

3. ALUMINUM L89x89x9.5x90mm LONG TYP. C/W 22x40 HORIZ.

SLOTTED HOLE FOR 19Ø S.S. HILTI HIT HY200 ANCHOR WITH

150 EMBEDMENT.

4. ALUMINUM HANDRAIL, SEE STANDARD DETAIL.

MODIFICATION - PARTIAL ROOF PLAN

Scale 1:20

1375

OPENING

76

0

OP

EN

IN

G

1715

11

00

MSU TYPE MG

S.S. HATCH

EDGE OF

CONCRETE

EXISTING CHAMBER1850

19

00 17

0

TY

P

170

TYP.

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 - 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: R

OD

ER

IC

K.C

AS

TILLO

(20

18-09

-20

) La

st P

lotted: 2018-09-20

SHEET TITLE

HARVEY TANK

PRV CHAMBER MODIFICATION

PLANS AND SECTIONS

SHEET NUMBER

S-01-100

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

SZ

WH

MG

W

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\S

\6

05464

07 S

-01-1

00.D

WG

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

N

Page 21: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

1850

CHAMBER MODIFICATION FLOOR & WALL REINFORCING PLAN

Scale 1:20

15M CORNER

BAR @ 300

550

TYP

T.O.C .

EL. 100.84

T.O.C .

EL. 101.18±

EXIST GRADE

EL. 100.46±

1 SECTION

-

Scale 1:20

2000

150

125

200 1375

OPENING

2477

300

300

SQ

150

390

11

200

1510

200

200

1500

155

155

MSU TYPE MG

S.S. HATCH

10M @ 125

VERT, TYP

50 CLR

TYP.

10M @ 300

HORI, TYP

A

-10M DOWELS

@ 300 W/ HILTI HIT

HY200 115 EMD.

500 PROJ. TYP.

1

-

10M VERT

10M HORI

300

10M DOWELS

TO MATCH VERT

10M @ 125

10M @ 300

10M @ 125

GASKET

WATERSTOP TYP

SEE PLAN

150Ø PIPE ℄

150Ø PIPE ℄

2% SLOPE

EXISTING CHAMBER

10M @ 300

10M @ 125

10M

D

OW

ELS

@ 300

2

-

FIELD ADJUST BARS TO

FIT W/ ADD. REINF.

SEE STD. DETAIL

SEE ROOF

REINF. PLAN

EXISTING CHAMBER

75

ROUGHEN

SURFACE

A DETAIL

-

Scale 1:10

EXISTING CHAMBER

550

15

0

200

10M CORNER BAR

TO MATCH WALL

VERT. BARS

SEE WALL REINF. PLAN

SEE ROOF REINF. PLAN

2 SECTION

-

Scale 1:10

GASKET

WATERSTOP

TYP.

CHAMBER MODIFICATION ROOF REINF. PLAN

Scale 1:20

1375

OPENING

76

0

OP

EN

IN

G

EXISTING CHAMBER1850

19

00

10

M D

OW

EL

S

@ 3

00

ADDITIONAL

2-10M TYP.

1-10M

ADDITIONAL

1-10M

6

0

0

10

M D

OW

EL

S

@ 3

00

2-10M

10

M @

3

00

MID

-D

EP

TH

10

M @

3

00

MID

-D

EP

TH

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 - 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: R

OD

ER

IC

K.C

AS

TILLO

(20

18-09

-20

) La

st P

lotted: 2018-09-20

SHEET TITLE

HARVEY TANK

PRV CHAMBER MODIFICATION

REINFORCEMENT DETAIL

SHEET NUMBER

S-01-101

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

SZ

WH

MG

W

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\S

\6

05464

07 S

-01-1

01.D

WG

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

N

Page 22: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-13

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

ELECTRICAL SPECIFICATIONS

SHEET 1 OF 2

SHEET NUMBER

E-01-000

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

KB

LC

S_

___

_

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\E

\6

05464

07-S

HT

-E

-01-000.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

1.0 GENERAL CLAUSES

.1 THE GENERAL REQUIREMENTS, INSTRUCTIONS TO BIDDERS, SPECIFICATIONS AND DRAWINGS FORM

PART OF THE CONTRACT DOCUMENTS AND SHALL BE READ IN CONJUNCTION WITH THEM. WORK SHALL

INCLUDE THE FURNISHING OF ALL LABOUR AND MATERIALS UNLESS SPECIFICALLY NOTED OTHERWISE

TO COMPLETE AND PUT INTO OPERATING CONDITION ALL ELECTRICAL AND INSTRUMENTATION AND

CONTROL SYSTEMS AS INDICATED ON THE DRAWINGS AND SPECIFICATIONS HEREIN.

.2 WORD “SUPPLY” SHALL MEAN THAT SO NOTED EQUIPMENT IS TO BE PURCHASED, ASSEMBLED, AND

SHIPPED UNDAMAGED TO THE SITE. WHERE AN ITEM IS SUPPLIED BY THE OWNER, BY OTHERS OR BY

ANOTHER DIVISION, THE WORK OF MOUNTING, CONNECTING AND COMMISSIONING THE ITEM SHALL BE

INCLUDED IN THE CONTRACT UNLESS SPECIFICALLY NOTED OTHERWISE.

.3 WORD “PROVIDE” SHALL MEAN THAT THE SO NOTED EQUIPMENT IS TO BE SUPPLIED, INSTALLED,

CONNECTED, ADJUSTED, CALIBRATED, TUNED, CLEANED, COMMISSIONED, AND PLACED INTO FULL

SERVICE.

.4 WORD “INSTALL” SHALL MEAN TO PUT THE SPECIFIED ITEM INTO FULL OPERATION, SECURELY

FASTENED AND CONNECTED TO THE SYSTEM. THE CONTRACTOR SHALL PROVIDE ALL WORK AND

MATERIAL WHICH IS NECESSARY TO SECURELY FASTEN AND GIVE A PRESENTABLE FINISHED

APPEARANCE INCLUDING ALL NECESSARY CONNECTIONS AND CONDUCTORS. SUCH NOTED

EQUIPMENT MUST BE FULLY CALIBRATED AND TESTED.

.5 THE DRAWINGS AND SPECIFICATIONS ARE ALL INCLUSIVE.

.6 RESPONSIBILITY AS TO WHICH TRADE PROVIDES REQUIRED ARTICLES OR MATERIALS RESTS SOLELY

WITH THE GENERAL CONTRACT TRADE. EXTRAS WILL NOT BE CONSIDERED BASED ON GROUNDS OF

DIFFERENCE OF INTERPRETATION OF SPECIFICATIONS AS TO WHICH TRADE INVOLVED SHALL PROVIDE

CERTAIN SPECIALTIES OR MATERIALS.

.7 PRIOR TO SUBMITTING TENDER, ELECTRICAL TRADE TO CAREFULLY EXAMINE THE SITE AND

ASCERTAIN ALL CONDITIONS WHICH MAY AFFECT HIS TRADE. NO EXTRAS WILL BE ALLOWED FOR

WORK RESULTING FROM CONDITIONS THAT WOULD HAVE BEEN EVIDENT UPON A THOROUGH

EXAMINATION OF SITE.

.8 DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY EACH TO THE OTHER AND WHAT IS CALLED

FOR BY ONE TO BE BINDING AS IF CALLED FOR BY BOTH.

.9 SHOULD ANY DISCREPANCY APPEAR BETWEEN DRAWINGS AND SPECIFICATIONS WHICH LEAVES

ELECTRICAL TRADE IN DOUBT AS TO TRUE INTENT AND MEANING, OBTAIN RULING BEFORE SUBMITTING

TENDER. IF THIS IS NOT DONE, IT WILL BE ASSUMED THAT THE MOST EXPENSIVE ALTERNATE HAS

BEEN FIGURED.

.10 THIS CONTRACTOR TO EXAMINE CAREFULLY ALL DRAWINGS AND WORK OF OTHER TRADES AND BE

SATISFIED THAT THE WORK UNDER THIS CONTRACT CAN BE SATISFACTORILY CARRIED OUT WITHOUT

CHANGES. SHOULD ANY DIFFICULTY ARISE SHOWING CONFLICT WITH, OR REQUIRING ADDITIONAL

WORK BEYOND THE WORK OF THESE DRAWINGS, BRING THIS MATTER TO THE ATTENTION OF THE

ENGINEER BEFORE SUBMITTING TENDER.

1.1 SCOPE

.1 PROVIDE ALL ITEMS, MATERIALS, EQUIPMENT AND LABOUR AS REQUIRED FOR A COMPLETE AND AN

OPERATIONAL SYSTEMS AS MENTIONED HEREIN, OR INDICATED ON THE DRAWINGS.

.2 THE WORK SHALL INCLUDE BUT NOT BE LIMITED TO:

.1 PROVIDE A NEW 78mm RPVC DBII UNDERGROUND CONDUIT FROM THE RESERVOIR

ELECTRICAL ROOM TO TELUS POINT OF INTERFACE NEAR THE ACCESS GATE AT

OCEANVIEW ROAD. PROVIDE A NEW CAT5E CABLE FROM THE RESERVOIR CONTROL ROOM

THROUGH THE NEW CONDUIT TO THE TELUS POINT OF INTERFACE. INSTALL CAT5E CABLE

RETERMINATE TO RE-ESTABLISH COMMUNICATIONS APPROX. 300m. 450mm (min.) NATIVE

COVER

.2 OBTAIN FROM EXISTING LEVEL TRANSMITTER ANY AND ALL PARAMETERS CONFIGURED

FROM DEFAULT. SURVEY EXISTING INSTALLATION LEVEL SWITCH ELEVATIONS. REMOVE

THE EXISTING INSTRUMENTS FROM THE EXISTING HARVEY RESERVOIR AND TURN OVER TO

OWNER.

.3 PROVIDE A NEW LEVEL INDICATING TRANSMITTER AND LEVEL FLOAT SWITCHES. INSTALL

NEW LEVEL TRANSMITTER IN UV BUILDING (REPLACE EXISTING). CONNECT NEW LEVEL

INSTRUMENTS TO THE EXISTING PLC IN THE UV BUILDING ELECTRICAL ROOM CONTROL

PANEL. INSTALL ULTRASONIC TRANSDUCER AND FLOAT SWITCH (AND HANGER) IN

RESERVOIR IN CLOSE PROXIMITY TO ACCESS HATCH AND LADDER FOR MAINTENANCE

PURPOSES.

.4 PROVIDE LIMIT SWITCH FOR EACH RESERVOIR ACCESS HATCH. CONNECT NEW LIMIT

SWITCH TO EXISTING PLC SPARE DIGITAL INPUT IN THE UV BUILDING. PROGRAM SECURITY

ALARM POINT INTO STATION PLC AND WORKS YARD SCADA STATION (FACTORYTALK VIEW

SE). CONFIGURE WORKS YARD PLC TO COMMUNICATE WITH ALARM DIALOUT MODEM FOR

"HARVEY RESERVOIR SECURITY BREACH"

.5 PROVIDE 4C-#14 TECK90 FROM UV BUILDING CONTROL PANEL TO RESERVOIR ACCESS

HATCH JUNCTION BOX FOR LEVEL SWITCH & LIMIT SWITCH.

.6 PROVIDE FIELD COMMISSIONING, ADJUSTMENT AND CERTIFIED MANUFACTURERS

ACCEPTANCE REPORTS FOR ALL ELECTRICAL AND CONTROL AND INSTRUMENTATION

EQUIPMENT AND SYSTEMS.

.7 PROVIDE SHOP DRAWINGS FOR PULL BOXES, LEVEL TRANSMITTER, LEVEL FLOAT SWITCH.

.8 PROVIDE O&M MANUALS FOR THE COMPLETE ELECTRICAL SYSTEM. O&M MANUAL WILL

INCLUDE, BUT NOT LIMITED TO, ALL MAINTENANCE MANUALS, DETAILED LIST OF ANY

COMPONENT PARAMETER(S) THAT HAS BEEN CONFIGURED FROM DEFAULT.

.9 THE CONTRACTOR SHALL BE FULLY QUALIFIED AND EQUIPPED TO CARRY OUT THE TESTING

OF ALL ELECTRICAL, CONTROL AND INSTRUMENTATION EQUIPMENT AND SYSTEMS OR AS

AN ALTERNATIVE, SHALL PROVIDE THE SERVICES OF A QUALIFIED MANUFACTURER'S

REPRESENTATIVE TO CARRY OUT TESTING.

.10 THE CONTRACTOR SHALL COORDINATE WITH THE VENDOR TO INSTALL ANY ELECTRICAL

ITEMS SHIPPED LOOSE.

.11 CONTRACTOR SHALL CONDUCT A 4 HOUR (minimum) ON-SITE TRAINING SESSIONS FOR

OWNER.

.12 CONTRACTOR (OR SUBCONTRACTOR) HAS EXPERIENCE WITH AND IS PROFICIENT WITH

ROCKWELL SOFTWARE LOGIX5000 (STUDIO 5000) AND FACTORYTALK VIEW.

1.2 DISCREPANCY

.1 VIEW PLANS, VISIT SITE AND CHECK PLANS AGAINST EXISTING CONDITIONS. SHOULD ANY

DISCREPANCY EXIST BETWEEN THE SPECIFICATION AND DRAWINGS FOR THE ACTUAL CONDITIONS

ON JOB SITE, A RULING SHALL BE OBTAINED FROM THE ENGINEER BEFORE THE FINAL PRICE IS

SUBMITTED.

1.3 CODE, PERMITS AND INSPECTION

.1 ELECTRICAL TRADE TO OBTAIN ALL PERMITS REQUIRED AND AFTER COMPLETION OF THE WORK

FURNISH TO THE ENGINEER A CERTIFICATE OF FINAL INSPECTION AND APPROVAL FROM THE

ELECTRICAL INSPECTION DEPARTMENT.

.2 ALL WORK SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE CANADIAN ELECTRICAL

CODE AND LOCAL BUILDING BYLAW, AS AMENDED AND ADAPTED BY THE LOCAL AUTHORITY. OBTAIN

ALL NECESSARY PERMITS AND LICENSES AND PAY ALL FEES IN CONNECTIONS WITH THE WORK.

1.4 DAMAGES

.1 MAKE GOOD ANY DAMAGES TO EXISTING STRUCTURES AND EQUIPMENT CAUSED BY WORK UNDER

THIS CONTRACT, AT NO EXTRA COST TO THE OWNER, EMPLOY QUALIFIED PERSONNEL ONLY.

1.5 IDENTIFICATION

.1 IDENTIFY ALL EQUIPMENT WITH LAMICOID NAME PLATES. IDENTIFY FEEDERS AND CIRCUIT WIRES AS

PER CODE AND CONTRACT REQUIREMENTS.

.2 PROVIDE LAMICOID NAME PLATE ON THE PANEL COVER TO IDENTIFY THE VOLTAGE AND PANEL

NUMBER.

1.6 RECORD DRAWINGS (AS-BUILT)

.1 OBTAIN A COPY OF CLEAN FULL SIZE DRAWING AND MAKE ALL AS BUILT CHANGES ON CLEAN DRAWING.

PROVIDE A COPY OF AS BUILT DRAWINGS TO ENGINEER FOR THE RECORD FILES SUBMIT ALL

DRAWINGS TO PROJECT MANAGER AT TIME OF COMPLETION.

.2 ELECTRICAL TRADE TO PRODUCE AT THEIR OWN EXPENSE A SET OF PROJECT RECORD DOCUMENTS IN

ELECTRONIC AND 3 SETS OF HARD COPY PRINTS INCLUDING ALL CHANGES TO THE ORIGINAL TENDER

DRAWINGS COVERED BY ADDENDA, CHANGE ORDERS, FIELD CHANGES, JOB CONDITIONS, ETC. AND

TURN THESE OVER TO THE ENGINEER. COMPLETED RECORD DRAWINGS TO BE CLEARLY MARKED

"RECORD DRAWINGS".

.3 ALL RECORD DRAWINGS SHALL BE DONE IN AUTOCAD 2014 FORMAT OR NEWER. PROVIDE A CD ROM OF

ALL RECORD DRAWINGS TO THE OWNER.

.4 SHOW ALL MAJOR PULL BOXES, JUNCTION BOXES, CONDUITS AND CIRCUIT NUMBERS ON

RECORD DRAWINGS.

1.7 MATERIALS AND INSTALLATION

.1 ALL MATERIALS SHALL BE NEW.

.2 ALL MATERIALS SHALL BE CSA APPROVED WITH CSA STAMP.

.3 ALL INSTALLATION SHALL BE CONSISTENT WITH EXISTING FACILITY INSTALLATION

STANDARDS. UTILIZE SAME GRADE OF MATERIALS AS PER EXISTING INSTALLATION.

.4 PROVIDE SHOP DRAWINGS FOR ALL NEW EQUIPMENT INSTALLED.

.5 EXTEND ALL CONDUITS AND TECK CABLES TO ACCESSIBLE SPACE AS REQUIRED. DO NOT

SPLICE NEW CABLES.

.6 UNLESS OTHERWISE SPECIFIED, UNIFORMITY OF MANUFACTURE TO BE MAINTAINED FOR ANY

PARTICULAR ITEM THROUGHOUT.

.7 ONLY CORROSION RESISTANT HARDWARE IS PERMITTED FOR MOUNTING IN THE RESERVOIR.

1.8 SETTING OUT OF THE WORK

.1 ELECTRICAL TRADE TO BE RESPONSIBLE FOR CORRECTING ALL WORK COMPLETED CONTRARY TO

INTENT OF DRAWINGS AND SPECIFICATIONS AND BEAR ALL COST FOR SAME. WHERE INTENT OF

DRAWINGS AND SPECIFICATIONS IS NOT CLEAR, OBTAIN CLARIFICATION BEFORE PROCEEDING WITH

WORK.

.2 ELECTRICAL TRADE TO GIVE WORK HIS PERSONAL SUPERVISION, LAY OUT HIS OWN WORK, DO ALL

NECESSARY LEVELING AND MEASURING OR EMPLOY A COMPETENT ENGINEER TO DO SO. FIGURES,

FULL SIZE AND DETAIL DRAWINGS TO TAKE PRECEDENCE OVER SCALE MEASUREMENTS.

.3 WHERE ANY EQUIPMENT SUPPLIED BY ELECTRICAL TRADE MUST BE BUILT IN WITH WORK OF OTHER

CONTRACTORS, THIS CONTRACTOR TO BE RESPONSIBLE FOR SUPPLYING OF EQUIPMENT TO BE BUILT

IN OR MEASUREMENTS TO ALLOW NECESSARY OPENINGS TO BE LEFT SO AS NOT TO HOLD UP WORK.

.4 ELECTRICAL TRADE TO BE RESPONSIBLE FOR ANY DAMAGE CAUSED OWNER OR ANY OTHER TRADE BY

IMPROPER LOCATION OR CARRYING OUT OF HIS WORK.

.5 ELECTRICAL TRADE, IN SETTING OUT OF HIS WORK, TO MAKE REFERENCE TO ARCHITECTURAL,

STRUCTURAL AND MECHANICAL DRAWINGS. CONSULT WITH RESPECTIVE TRADES IN SETTING OUT

LOCATIONS FOR CONDUIT RUNS, LIGHTING FIXTURES, PANEL ASSEMBLIES, ETC., SO THAT CONFLICTS

ARE AVOIDED AND SYMMETRICAL SPACING IS MAINTAINED.

CONDUIT PLANSCALE N.T.S

NEMA 4X

JB

NEMA 4X

LOCKABLE

JB

NEMA 4X

LOCKABLE

JB

2-53mm RPVC DBII

MINIMUM 450mm COVER

2-53mm RPVC DBII

CAST IN STRUCTURE

(1-CONTROL SIGNALS

1-TRANSDUCER CABLE)

RESERVOIRCHEMICAL ROOMELECTRICAL ROOM

CONTROL

PANEL

LEVEL

TRANSMITTER

4C-#14 TECK90

RESERVOIR

ACCESS HATCH

SECURITY SWITCH

(IN SERIES WHERE MULTIPLE HATCHES ARE INSTALLED)

RESERVOIR

LEVEL

SWITCH

NEMA 4X LOCKABLE

JB c/w TERMINALS

ULTRASONIC

LEVEL

TRANSDUCER

FINISHED

GRADE

53mm RPVC DBII

LEVEL TRANSDUCER CABLE

1PR #18TPSH ACIC

CORE AND SEAL

CORE AND

SEAL

Page 23: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

Printed on ___% Post-Consumer

Recycled Content Paper

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's client and m

ay n

ot be used, reprod

uced o

r relied upon by third p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

a

nd

its clie

nt, a

s re

qu

ire

d b

y la

w o

r fo

r u

se

b

y g

ove

rn

me

nta

l re

vie

win

g a

ge

ncie

s. A

EC

OM

a

cce

pts n

o re

sp

onsibility, an

d d

en

ies a

ny lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t m

od

ifie

s th

is dra

wing

w

ith

ou

t A

EC

OM

's exp

ress w

ritten

con

sen

t. D

o n

ot scale this d

ocum

ent. A

ll m

easure

men

ts m

ust be

o

bta

in

ed

fro

m stated

dim

en

sio

ns.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-13

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

ELECTRICAL SPECIFICATIONS

SHEET 2 OF 2

SHEET NUMBER

E-01-001

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

KB

LC

S_

___

_

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\E

\6

05464

07-S

HT

-E

-01-001.D

WG

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

2. GROUNDING

.1 SUPPLY AND INSTALL COMPLETE GROUNDING SYSTEM AS INDICATED ON DRAWINGS, AND AS

REQUIRED BY CANADIAN ELECTRICAL CODE AND ELECTRICAL INSPECTION DEPARTMENT. ALL

COMPONENTS TO BE SECURELY AND ADEQUATELY GROUNDED AND WHERE REQUIRED TO

ACCOMPLISH THIS, GROUNDING JUMPERS, GROUNDING STUDS AND BUSHINGS TO BE USED.

.2 PROVIDE A DEDICATED ISOLATED GROUND CONDUCTOR FOR EACH ISOLATED GROUND CIRCUIT.

.3 PROVIDE ALL BONDING TO NON-ELECTRICAL METALLIC ITEMS AS REQUIRED. BONDING SHALL BE

PROVIDED TO ALL ACCESS HATCHES, FENCING, GUARD RAILS, ETC. RELATED TO THE RESERVOIR.

.4 UNLESS NOTED OTHERWISE, MINIMUM BONDING CONDUCTOR TO BE #6 AWG BARE COPPER.

.5 UNLESS NOTED OTHERWISE, MINIMUM GROUNDING CONDUCTOR TO BE 2/0 AWG.

.6 PROVIDE A CONTINUITY TEST FOR BONDING AND GROUNDING CONDUCTORS TO EXISTING MAIN

GROUND BUS.

3. SPECIFIC CLAUSES

.1 POWER AND CABLES

.1 ALL INSTALLATION TO BE IN CONDUIT OR TECK90 CABLE AS NOTED.

.2 CONDUCTORS USED TO BE COPPER TECK90 600V, MINIMUM #12AWG, EXCEPTION;

CONTROL WIRING MINIMUM SIZE #14 TECK90 XLPE

.3 ANALOG CABLES SHALL BE TPSH #18 MIN. AND ACIC

.4 ALL SENSOR CABLES SHALL BE CONTINUOUS BETWEEN THE SENSOR AND THE KIOSK.

CONTRACTOR TO FIELD VERIFY ALL CABLE LENGTHS.

.5 PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH I.G. POWER CIRCUIT.

.6 PROVIDE A DEDICATED GROUND CONDUCTOR FOR EACH CIRCUIT.

.2 SUPPLY AND INSTALL POWER FEEDERS AND CONTROL WIRING TO ACHIEVE THE WIRING CONNECTION

SHOWN ON DRAWINGS AND PROVIDE ALL CONNECTORS, JUNCTION BOXES, CABLE SUPPORTS AND

ALL ACCESSORIES AS REQUIRED.

.3 PROVIDE IDENTIFICATION TAG WITH CABLE AND CIRCUIT NUMBER FOR FEEDERS, JUNCTION BOXES

AND PANELS. USE P-TOUCH MACHINE TO LABEL WIRING DEVICES AND TERMINATIONS ASSEMBLIES.

.4 EXACT ROUTING FOR ALL CABLES, CONDUITS AND FEEDERS TO BE CONFIRMED ONSITE TO SUIT SITE

CONDITIONS.

.5 APPROVED TECK 90 CONNECTORS SHALL BE UTILIZED.

4. EQUIPMENT INSTALLATION

.1 SUPPLY AND INSTALLATION OF PIPING AND EQUIPMENT ANCHORING BY GENERAL CONTRACTOR.

.2 MAINTAIN MINIMUM WORKING SPACE AROUND COMPONENTS ACCORDING TO MANUFACTURER'S

RECOMMENDATION AND CEC.

.3 CONTRACTOR SHALL COORDINATE AND CONDUCT, IN CONJUNCTION WITH ENGINEER AND OWNER THE

SITE ACCEPTANCE TESTING. THIS TESTING SHALL CONSIST OF FUNCTIONAL AND OPERATIONAL

TESTS, AND COMMISSIONING OF THE OVERALL SYSTEM.

.4 CONTRACTOR SHALL ENSURE PROPER INSTALLATION AND DEMONSTRATION OF PROPER OPERATION

OF EQUIPMENT.

.5 SHOULD SYSTEM FAIL TO MEET TEST REQUIREMENTS, MAKE NECESSARY REPAIRS WITH

HELP/ASSISTANCE FROM EQUIPMENT SUPPLIER, AND REPEAT SITE TEST FOR AT LEAST 24 HOUR

DURATION.

.6 CONTRACTOR SHALL MAINTAIN SITE TEST RECORD LOG/SHEETS WHICH RECORD TEST CONDITIONS AND

LOGGED DATA. RECORDING AND TEST RECORDING FORMAT TO BE SUPPLIED BY MANUFACTURER.

5. INSTRUMENTS

.1 LEVEL INDICATING TRANSMITTER

.1 PROVIDE A LEVEL INSTRUMENT SUITABLE FOR DRINKING WATER

.2 INSTRUMENT IS SIEMENS MULTIRANGER 200

.3 INSTRUMENT SHALL BE PROVIDED WITH 4-20mA SIGNAL

.4 INSTRUMENT SHALL HAVE LOCAL INTEGRAL DISPLAY

.5 INSTRUMENT SHALL BE PROVIDED WITH REMOTE PROGRAMMING UNIT AND

CONFIGURATION SOFTWARE.

.2 LEVEL SWITCHES

.1 PROVIDE LEVEL SWITCHES SUITABLE FOR DRINKING WATER

.2 INSTRUMENT IS XYLEM ENM-10

.3 PROVIDE FLOAT SWITCH HANGER FOR MAINTENANCE AND EASE OF ACCESS.

.3 LIMIT SWITCH

.1 PROVIDE LIMIT SWITCH ON ACCESS HATCH TO RESERVOIR. WHERE THERE ARE MULTIPLE

ACCESS POINTS TO RESERVOIR, PROVIDE LIMIT SWITCH ON EACH ACCESS POINTS,

SIGNALS TO BE WIRED IN SERIES.

.2 LIMIT SWITCH TO BE ALLEN-BRADLEY 802MC-AY5 C/W STAINLESS STEEL ROD LEVER.

7. SHOP DRAWINGS & MANUALS

.1 ELECTRICAL TRADE TO SUBMIT TO THE ENGINEER FOR REVIEW, SHOP DRAWINGS OF ELECTRICAL

COMPONENTS AS INDICATED.

.2 ALL DRAWINGS TO BE SUBMITTED IN QUANTITIES OF 5 WITH THREE COPIES WILL BE RETURNED TO THE

ELECTRICAL TRADE. SUBMIT ADDITIONAL COPIES FOR APPROVAL AS MAY BE REQUIRED.

.3 ENGINEER'S REVIEW OF SHOP DRAWINGS TO BE FOR GENERAL DESIGN ONLY AND WILL NOT RELIEVE

ELECTRICAL TRADE OR SUPPLIERS FROM RESPONSIBILITY FOR ERRORS, PROPER FITTING,

CONSTRUCTION OF WORK AND FURNISHING OF MATERIALS. REVIEW WILL NOT BE CONSTRUED AS

APPROVING DEPARTURES FROM CONTRACT DOCUMENT REQUIREMENTS IF SUCH DEPARTURES ARE

NOT SPECIFICALLY NOTED. ELECTRICAL TRADE TO BE RESPONSIBLE FOR VERIFYING ALL DIMENSIONS

.

.4 UPON COMPLETION OF PROJECT, THREE (3) MAINTENANCE MANUALS SHALL BE SUBMITTED IN 3-RING

BINDERS. THE MANUAL SHALL CONSIST OF THE FOLLOWING INFORMATION: DESCRIPTION OF

OPERATIONS, SHOP DRAWING OF ALL EQUIPMENT, EXTENDED WARRANTIES, MAINTENANCE AND

OPERATION INSTRUCTIONS, LIST OF MANUFACTURER CONTACTS, COPIES OF AS-BUILT DRAWINGS,

INSPECTION REPORTS, SEISMIC LETTERS AND APPLICABLE FIRE ALARM VERIFICATION REPORTS.

8. BOXES

.1 SUPPLY AND INSTALL PULLBOXES AS REQUIRED TO SUIT JOB CONDITIONS. PULLBOXES TO CONFORM

TO CANADIAN ELECTRICAL CODE REQUIREMENTS AND BE FINISHED IN ENAMEL OVER CORROSION-

RESISTANT PRIMER WITH SCREW-ON OR HINGED COVER. IN REMOVABLE CEILING AREAS, PULLBOXES

ARE TO BE INSTALLED ABOVE THE CEILING.

.2 PROVIDE JUNCTION BOXES AS REQUIRED. PROVIDE TWO NEMA 4X NON-METALLIC JUNCTION BOXES IN

RESERVOIR CHAMBER IN CLOSE PROXIMITY TO ACCESS HATCH, BUT NOT IN A LOCATION THAT WILL

RESTRICT ACCESS. JUNCTION BOX COVER WILL NOT ATTACH TO BOX WITH SCREWS. THE COVER WILL

BE CONNECTED TO THE BOX IN SUCH A WAY THAT, WHEN OPEN, CANNOT FALL INTO RESERVOIR.

9. CONDUIT

.1 CONDUIT TO BE RIGID THREADED GALVANIZED STEEL, OR WHERE PERMITTED BY CODE AND

ELECTRICAL INSPECTION DEPARTMENT, ELECTRIC METALLIC TUBING. UTILIZE RIGID GALVANIZED

STEEL CONDUIT FOR ALL EXPOSED RUNS BELOW 7 FEET OF FLOOR. WHERE IN JUDGEMENT BY THE

ELECTRICAL INSPECTION AUTHORITY IS SUBJECT TO MECHANICAL DAMAGE.

.2 SURFACE MOUNTED CONDUITS TO BE INSTALLED PARALLEL TO STRUCTURAL LINES AND WHERE

BENDS OCCUR IN PARALLEL RUNS, THEY SHALL BE CONCENTRIC.

.3 CONDUITS TO BE INSTALLED FREE FROM DENTS AND BRUISES AND HAVE ENDS PLUGGED TO PREVENT

ENTRANCE OF DIRT OR MOISTURE.

.4 ALL CONDUITS, EXCEPT WHERE OTHERWISE TO BE SIZED IN ACCORDANCE WITH CANADIAN

ELECTRICAL CODE.

.5 FLEXIBLE CONDUIT CONNECTIONS TO MOTORS, CONTROL, ETC., TO BE FLEXIBLE PLASTIC JACKETED,

SEAL TIGHT OR APPROVED EQUAL. FLEXIBLE CONDUIT CONNECTIONS ARE REQUIRED TO ALL MOTORS

FROM STUB-UPS OR JUNCTION BOXES.

13. TESTS

.1 ALL PORTIONS OF ELECTRICAL WORK TO BE TESTED AND CHECKED FOR SATISFACTORY OPERATION.

.2 BEFORE ENERGIZING ANY PORTION OF ELECTRICAL SYSTEM, PERFORM MEGGER TESTS ON ALL

FEEDERS AND BRANCH CIRCUITS. RESULTS OF SUCH TESTS TO CONFORM TO REQUIREMENTS OF

CANADIAN ELECTRICAL CODE AND BE TO SATISFACTION OF AUTHORIZED INSPECTION AGENCY AND

THE ENGINEER.

.3 CONTRACTOR TO PROVIDE RESISTANCE TO EARTH MEASUREMENT.

14. DEMOLITION

.1 CONTRACTOR TO PROVIDE DEMOLITION OF EXISTING ELECTRICAL SERVICES IN WORK AREA.

CONTRACTOR TO TURN OVER TO BUILDING OWNER MATERIALS AS NOTED.

.2 IN AREAS WHERE DEMOLITION OCCURS AND EXISTING ELECTRICAL SERVICES ARE SHOWN TO REMAIN

OR ARE REQUIRED FOR SERVICING OF ADJACENT AREAS, CONTRACTOR TO REROUTE AND REFEED AS

REQUIRED TO RECONNECT.

.3 CONTRACTOR SHALL REMOVE ALL EXISTING UNUSED CONDUIT AND WIRING BACK TO SOURCE.

.4 CONTRACTOR SHALL REMOVE ALL EXISTING ALL ELECTRICAL DEVICES ON WALLS SLATED FOR

DEMOLITION. REFER TO ARCHITECTURAL DEMOLITION DWGS. FOR THE SCOPE OF DEMOLITION.

16. STANDARDS OF MATERIAL AND WORKMANSHIP

.1 ALL MATERIALS TO BE NEW AND OF THE QUALITY SPECIFIED AND CONFORM TO THE STANDARDS OF

CSA. WHERE EQUIPMENT OR MATERIALS ARE SPECIFIED BY TECHNICAL DESCRIPTION ONLY, THEY

SHALL BE OF THE BEST COMMERCIAL QUALITY OBTAINABLE FOR THE PURPOSE.

.2 ALL WORK TO BE EXECUTED IN A NEAT AND WORKMANLIKE MANNER BY QUALIFIED TRADESMEN.

ELECTRICAL TRADE TO KEEP A COMPETENT FOREMAN AND NECESSARY ASSISTANTS ON THE JOB

DURING THE PROGRESS OF THE WORK.

17. GENERAL

.1 COORDINATE AND GET APPROVAL FROM BUILDING OWNER FOR ALL CORING AND CUTTING OF

BUILDING STRUCTURE. FIRE STOPPED OPENINGS AFTER INSTALLATION. COORDINATE LOCATION ON

SITE PRIOR TO CORING.

.2 CLEAN UP AND REMOVE ALL UNUSED WIRING AND CONDUITS.

.3 REWIRE EXISTING LIGHTING AND POWER THAT ARE AFFECTED BY THIS CONSTRUCTION.

.4 CORE, DRILL AND SAWCUT AS REQUIRED. EXERCISE CARE IN ALL CORING, DRILLING AND SAWCUTTING

IN ORDER NOT TO DAMAGE THE STRUCTURAL COMPONENTS IN THE SLAB. X-RAY FOR ALL SUCH WORK

AND OBTAIN CONSULTANT'S APPROVAL. WHERE THE SIZE OF SLOTS CANNOT BE ACCOMODATED DUE

TO STRUCTURAL REASONS CUT SMALLER SLOTS WITH AT LEAST SAME AREA. PAY ALL ASSOCIATED

FEES.

.5 ELECTRICAL TRADE AND HIS SUBTRADES TO AT ALL TIMES DURING CONSTRUCTION, KEEP SITE FREE

OF ALL DEBRIS, BOXES, PACKING, ETC., RESULTING FROM WORK OF THIS TRADE.

.6 UPON COMPLETION OF WORK, ELECTRICAL INSTALLATION TO BE LEFT IN A CLEAN AND FINISHED

CONDITION TO SATISFACTION OF THE ENGINEER.

18. GUARANTEE WARRANTY

.1 FURNISH A WRITTEN GUARANTEE WARRANTY COUNTERSIGNED AND GUARANTEED BY GENERAL

CONTRACT TRADE STATING:

.1 THAT ALL WORK EXECUTED UNDER THIS CONTRACT WILL BE FREE FROM DEFECTS OF

MATERIAL AND WORKMANSHIP FOR A PERIOD OF 1 YEAR FROM DATE OF FINAL

ACCEPTANCE.

.2 THE ABOVE PARTIES FURTHER AGREE TO, AT THEIR OWN EXPENSE, REPAIR AND REPLACE

ALL SUCH DEFECTIVE WORK AND OTHER WORK DAMAGED THEREBY WHICH FAILS OR

BECOMES DEFECTIVE DURING THE TERM OF THE GUARANTEE WARRANTY PROVIDED THAT

SUCH FAILURE IS NOT DUE TO IMPROPER USAGE.

.3 PERIOD OF THE GUARANTEE SPECIFIED TO IN NO WAY SUPPLANT ANY OTHER GUARANTEE

OF A LONGER PERIOD BUT BE BINDING ON WORK NOT OTHERWISE COVERED.

GROUND ROD DETAIL AND TEST/INSPECTION PITSCALE N.T.S

GROUND ELECTRODE

SLACAN BOX 22109 OR

EQUAL. SIZE 250mm

DIAMETER X 300mm DEEP

FINISHED GRADE

COMPRESSION FITTING TO

BE SPRAYED WITH TWO

COATS GALVANIZING

COMPOUND

FILL WITH GRAVEL BUT

LEAVE WELD EXPOSED

#6 BARE STRANDED COPPER

CONDUCTOR

23.2mm X 3000mm COPPER

CLAD STEEL GROUND ROD

WITH TOP OF ROD 150mm

BELOW FINISHED GRADE

Page 24: Village of Lions Bay...2018/09/21  · Design Drawings Prepared by: AECOM Canada Ltd. 3292 Production Way, Suite 330 Burnaby, BC V5A 4R4 T 604.444.6400 F 604.294.8597 Prepared for:

W

G

P

G

P

GP

GP

1

%

1

%

TP

17-04

TP

17-03

D

D

HYDRO DISTRIBUTION

JOINT USE POLE

HYDRO DISTRIBUTION

SERVICE GATE

SERVICE ROAD

EX. WATER

TANK

EX. WATER

FACILITIES

END OF EX.

TELECOMMUNICATION

SYSTEM

O

C

E

A

N

V

I

E

W

R

O

A

D

OCEAN VIE

W R

OAD

EX. POWERLINE

FEATURE

EX. WATER PIPE

PROPOSED UNDERGROUND DUCT ROUTE

PROVIDE DEDICATED 78mm RPVC DBII UNDERGROUND

CONDUIT FROM RESERVOIR ELECTRICAL ROOM TO TELUS

POINT OF INTERFACE POLE

INSTALL CAT5E CABLE RETERMINATE TO

RE-ESTABLISH COMMUNICATIONS

APPROX. 300m

450mm (min.) NATIVE COVER

EX. WATER PIPE

395

380

360

350

340

330

320

310

300

290

335

345

325

315

305

295

HARVEY TANK

EX. WATER PIPE

PRV CHAMBER

EX. WATER PIPE

ABANDONED

WATER PIPE

TELUS INTERFACE POLE

UV BUILDING ELECTRICAL ROOM

(CONTROL PANEL, LEVEL TRANSMITTER)

ACCESS HATCH

(LEVEL SENSOR, LEVEL FLOAT SWITCH, SECURITY LIMIT SWITCH)

G

P

G

P

GP

GP

B

U

R

I

E

D

P

O

W

E

R

C

A

B

L

E

(

I

N

C

O

M

M

O

N

T

R

E

N

C

H

)

W

2

5

0

Ø

W

2

5

0

Ø

TP

17-04

TP

17-03

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

I/R DATE DESCRIPTION

ISSUE/REVISION

0 09/21/2018 ISSUED FOR TENDER

Last saved by: S

US

AN

.A

.P

OW

EL

L(201

8-09-13

) L

ast P

lotted: 201

8-09-20

SHEET TITLE

HARVEY TANK

SERVICING PLAN

SHEET NUMBER

E-01-200

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

AI

PT

____

_

File

nam

e: P

:\6054

64

07

\90

0-C

AD

_G

IS

\910

-C

AD

\2

0-S

HE

ET

S\E

\6

05464

07-S

HT

-E

-01-200.D

WG

N

0 12.5 25

1:500

m

PLAN

NOTICE:

THE EXISTENCE, LOCATION AND ELEVATION OF

UTILITIES AND/OR CONCEALED STRUCTURES AT

THE PROJECT SITE ARE NOT GUARANTEED BY

AECOM CANADA LTD.

THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE EXISTENCE, LOCATION AND

ELEVATION OF ALL SUCH UTILITIES AND/OR

STRUCTURES AND IS RESPONSIBLE FOR

NOTIFYING THE APPROPRIATE COMPANY,

DEPARTMENT OR PERSON(S) OF ITS INTENTION

TO CARRY OUT ITS OPERATIONS.

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

Printed on ___% Post-Consumer

Recycled Content Paper

This draw

ing has been prepared for the use of A

EC

OM

's client and m

ay not be used, reproduced or relied upon by third parties, except as agreed by A

EC

OM

and its client, as required by law

or for use by governm

ental review

ing agencies. A

EC

OM

accepts no responsibility, and denies any liability w

hatsoever, to any party that m

odifies this draw

ing w

ithout A

EC

OM

's express w

ritten consent. D

o not scale this docum

ent. A

ll m

easurem

ents m

ust be obtained from

stated dim

ensions.

IS

O A

1 59

4m

m x 8

41m

m

KEY PLAN

REGISTRATION

CONSULTANT

AECOM

3292 Production Way, Floor 4

Burnaby, BC, V5A 4R4

604.444.6400 tel 604.294.8597 fax

www.aecom.com

CLIENT

VILLAGE OF

LIONS BAY

Village of Lions Bay Municipal Hall

PO Box 141 – 400 Centre Rd

Lions Bay, BC V0N 2E0

(604) 921-9333

www.lionsbay.ca

PROJECT

HARVEY TANK

REPLACEMENT

PROJECT

PROJECT NUMBER

60546407

NOTE:

1. MINIMUM HORIZONTAL SEPERATION 300mm FROM ALL OTHER

UNDERGROUND PIPEWORK.

GROUND ROD

c/w INSPECTION PIT

NEMA 4X JUNCTION BOX.

LOCKABLE, c/w TERMINALS

GROUND ROD

c/w INSPECTION PIT

(REFER TO E-01-001 FOR TYPICAL DETAIL)

GROUND ROD

c/w INSPECTION PIT

GROUND ROD

c/w INSPECTION PIT

NOTES:

1. INTERCEPT EXISTING CONDUITS FROM ELECTRICAL ROOM WITH

A TYPE 37 WATER METER BOX.

2. PROVIDE TWO RESERVOIR ROOF MOUNTED NEMA 4X JUNCTION

BOXES. PROVIDE TWO DEDICATED 53mm RPVC CONDUITS

BETWEEN THE NEMA 4X JUNCTION BOXES AND THE TYPE 37

WATER METER BOX. STRAP CONDUITS TO RESERVOIR WALL.

3. BOND GUARD RAILS AND ACCESS LADDERS TO PERIMETER

GROUND.

ELECTRICAL ROOM

VALVE/UV ROOM

CHEMICAL ROOM

UFER GROUND TO FOOTING

OF RESERVOIR 2/0 BARE CU

UFER GROUND TO FOOTING

OF RESERVOIR 2/0 AWG BARE

CU

UFER GROUND TO FOOTING

OF RESERVOIR

2/0 AWG BARE CU

REFER TO INSET

2/0 AWG BARE CU

300mm OFFSET FROM BASE

OF RESERVOIR.

900mm MIN. COVER.

0

m

6.25 12.5

1:250

PLAN

N

RESERVOIR ACCESS

LADDER

ACCESS LADDER

GROUND CONNECTION TO

ELECTRICAL ROOM MAIN

GROUND BUS


Recommended