Page 1: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

.< /•

'J\ # / ' • ' - <>

: > . / < ''/

I' 7 s;-;Rfi

INGEKOMEN 6 SEP. 1988

n..^.. Q<*~), Pcv.':' aw:*'/ Moratu'A.-i. Sri Lan^a. \4: 505255 .

VILLAGE TECHNOLOGY RESEARCH

5ARY0DAYA SHRAMADANA MOVEMENT

ROPE PUMP RESEARCH PRQ3ECT

2nd PROGRESS REPORT 010388 - 310788

23Z2 -mo-fyii )

Page 2: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

CONTENTS

O b j e c t i v e "- '""*"

Pi•••j.lect I::i:ilen^nt. -Atiori i*?n»

L o c a t i o n of t h » P r o j e c t

P r o j e c t He^^arch ^es.!".

P r o j e c t Asnoci-Hte P a r t r i ^ r n

3u.Ti'nary of o r e v i o u e o r o ^ r r s s up t o 290283

7.0. Progress .from 3103'P-o to H ^ ~ °

1. findings and results of construction £ t * s t i n /»•

2. Designs of pump models and tk<*ir construction costs

3. >ieapuretnnnt results

8. Progress from 010688 to 31073S

•J

Page 3: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

'"his is the second oro^ress renort on the Rope Pump

Research Project.

Objectives

1. The short'term'awn of the research project is to •

.•rain practical experience in the construction

and introduction of a simole water-lifting device

(the rone pump) for the extraction of water from

.shallow /veils, both for the 9urr>ose of drinking

as for small-scale home garden irrigation:

A water-lifting ievice of sufficient capacity,

which is cheap, durable, comprehensible, convenient

to operate, easy to maintain and locally manufac—

turable.

2. In the longer term it is expected that this re­

search exn^rience can be shared with other rural .

development organisations in developing countries,

and be utilized by them to facilitate the satis-

.faction, of an important need of many rural families;

that is, improved access to well water.

Project Implementation ^jme

The jlan is ' to implement the research oroject within

a oeriod of one year, from 1st January to 31at Decem­

ber 1988. . ' .

^he implementation period is divided into four ihases:

- a 2-months orepatory ohase

- a 3-months construction & testing nhase

- a 3-months field introduction ohase

- a 4-months usafce/monitorin,?: ohase

Page 4: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

I

3. Location of the Project ,

The research activities (co»stru«ti»m tc testing) >

are undertaken at' the Sarvodaya Regional Develop­

ment education Centre in the rjampaha District in

3ri Lanka. »

In the premises of t h i s Centre a workshop has

been e s t a b l i s h e d .

^he n r o j e c t f i e l d a c t i v i t i e s ' t o i n t r o d u c e the

.rone iump take place i» tke ./Jampahn. d i s t r i c t ( f o r

d r i a k i a § w a t e r ) and a r e planned in the Pu t t a l am

d i s t r i c t ( fo r i r r i g a t i o n . v a t e r ) .

L. P r o j e c t Research Team

The r e s e a r c h team c o n s i s t s of * w o r k e r s :

- Inir. ?Ioali i'ickrrmasin«:'he ( t e c h n i c i a n ) - i-'s. C h i t r a '?odri ro (draughtsman) - I r . "'homas H.J . P i e t e r s ( c o o r d i n a t o r / i n i t i a t o r )

5 . P r o j e c t A3a'joiAte P a r t n e r s

- Jarvodaya Rural Techn i ca l S e r v i c e s (SRTS), Sr i Lanka

I r . Han Heynen °c Mr. Tunaoala danne^ama.

Sarvodaya R^S gran ted a fund of Rs. 9 9 f 9 4 0 / - fo r

the implementa t ion of the r i r o i e c t .

- Delft U n i v e r s i t y of mechnblo/:y (OUT), vhe tfptherlandf

I r . ' i lLem Oi.jk & I r . -Villem R i e d i j k .

Two s t u d e n t s of the DtJT, Ma. Mar ie t Lohman and

" s . Annemarie^A Mooijman, havp ^ome t o Sr i Lanka to

•oar t ic i oaf e- in the r e s e a r c h d u r i n g the 2nd' nhnse.

- V i l l a g e ^"c'^olo/rv :'pp«>srcb (V^R), io.rvodava/')'1"1

c o o p e r a t i o n , J r i Lanka. -

I r . ^nomas H.J . P i e t e r * .

- Dian Oesa,, Indones ia - i»"s. ' C h r i s t i n a A r i s t a n t i

- In termedin te ^e rhno lo^y Jeve losmrnt '"roup (ITiT^),

c'nflHtid - ;'-.r. Prank ..vl'nond

Page 5: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

- Demo ^ech, Phe Netherlands - Itfr. Si.indert van ?ii«n.

- International development Seaearcn Centre (IDRC),

Cianada, )r. Donald 3har^.

D. Summary of previous progress UTO to 29Q28B .

During the prefatory ohase, covered in the first

oro^reas report, arrange Tie nts were made to start

and organise the research oroject:

Tke budget was aa»r»vea a*d financial administrative

procedures were agreed uopn. ""he r^parch team was

formed. A workfihor was established at the . Sarvoda/a

Re/rional Jevelonment Sducation Centre, .-"here the

research activities' were to be 'undertaken and direc­

ted. • '

Otker gr»u»a aae ias1;itu"ti«m» iav»lved in rope Dump

construction activities were contacted to send in­

formation im order t« learn from their experiences.

The information received was however very brief.

Some devices designed by others were either very

simple, not very durable, requiring a. lot of

•aimteaftnae, or were teeka$le^i«*illy too advanced

a&d ««stly.

Tk«u*Jr use full for reflection, the research team

as a result kaa to do a lot of discovery work on

its own to develop a fu««ti»«al drviee tkat Would

be cheae, durable, comoreiaensible and easy to main­

tain.

Some possible construction desiras and their estima-

ted construction costs were presented in. the first

oro- ress re»ort.

Page 6: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

70. yro'ffre33 from 0103-"3-c to 31-35'3-'3

Vnrier review are the achievements made during the

construction \ testing nhase covering a period

tf 3 iuvi lis.

/. I. findings and results of construction & testing

""he ironosed construction designs, wkiak were pre-

ic;:tod in th* first ?ro.rreso report, have been

further adjusted and refined while, construction

work progressed.

ie have looked into the anroiiatfriess of different

designs '."or the construction narts t, uat make uo the

rone r)urrif» device, '.Jsinr different materials:

- tne at-.o..: .lfivc--wh**'!

/ h e e l s were <:iade ou t of wood u:\a i r o n , ' ' i t p s i z e s

ran.^in^: from 1 f o o t t o 2 f e e t d i a m e t e r .

Smal l w h e e l s up t o 1 f o o t can be made o u t of hard

wood ( b o i l e d i n o i l ) . Birder w h e e l s can be b e t t e r

made of i r o n , .s ince wood of t h a t s i z e can e a s i l y

d w a r p .

V o r a. s u f f i c i e n t e x t r a c t i o n of w a t e r a c e r t a i n

st ieed of t h e rooe i s r e q u i r e d ( r i s e r p i p e A l ^ m e t e r ,

ro'^e k n o t d i a m e t e r and denth . of g round w a t e r t a b l e

a r e a l s o im-oor tan t p a r a m e t e r s i n t i l s r e s p e e t ) .

S m a l l e r w h e e l s have s m a l l e r c i r c u l a r r o t a t i o n e n e e d s

a t t h e i r c i r c u i n f e n c e s t h a n b i / : ^ e r w h e e l s , b u t t h e

a c c e p t a b l e sneed f o r humans t o t u r n a w h e e l l i e s

bPtween 6 0 - 9 0 r o u n s oe r n i n u t e i

S m a l l e r w h e e l s have b i r r e r t c u r v e s a l l o w i a * t h e e n v e ­

l o p e d rone t o have a b e t t e r <crin on t h e w h e e l t r e a d .

'31i o^in, ' of *:hp r o p e i s inore l i v e l y t o o c c u r on

• i i - r p r w h e f i s , v. n i c h h a v j a i l e r c u r v e s .

•r-j-cr_rr,r t r a c t i v e "OWPT ^n *'ne r o i " w i l l ' ' » c i l i t n t e

" > 1 i i i »i'r

Page 7: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

"o use old rubbe r t j r a a ( w i t k « u t » r o f i l e ) as * t r ead

for the ro se nrovea to be v e r y * o o d . mke t r e a d should

have a V-shaoe in o rder t o line- the r o n e .

Tae V~sh.*.v« should not be t©« deeu, o the rwi se t h e

ro-se v / i l l *et stuck, and the wheel b locked .

- b e a r i n g s :-'or a c e n t e r e d f i x a t i o n .of t h e d r i v e wheel , b a l l

b e a r i n g 0 ^ nm »*T* u"pci and ror an off-ren*«?rert

s u s a e n s i c n .:>*.' v'ne wheel b? . l l .bearifc£S 0 50 mi)'.

- Qga-rin/; house T{ard wood (oalu), boiled in oil, is used as

material to lock un and fix the ball bearing,

because of greater durability, it is more suitable

to make the bearing house out of one niece, than

to make the house out of two connected equal narts.

- radius of the wheel handle

""he lifting of water causes a tractive force on

to the rcoe. This force touches u^on the drive

wheel on its circumfence and works ux>on the whee].

as a Moment Force, It is this Moment which has to

be surmounted continuously by human effort.

For & wheel of 1 foot, si handle radius of 15 cm

> is found suitable,, For a wheel of 1,5- to 2 feet,

the iiandle radius can bo ?0 cm.

- fixatioa of device superstructure flhe lininr up and fixation of the bearing house-

drive wheel composition has been designed in two

ways:

* by buildinjr up an iron frame, •vhich can be attached

to a concrete substructure (waielr- •artljr cover? a

well head). The iron frame should have sufficient

base and be strong in two directions,•or

* by building u» a eoaerete substructure to which the

bearing houses can be fixed directly.

Page 8: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

- rooe and ri*>:r »»i»e

It proves to be suitable to use nylon rone and ovc

for the r ieer joipe. mhe amplication of e lec t r ic i ty-

wire conduit T9i»es, which are very cheap, i s current

be in/5 tested. •

The rone and Dioe diameters used are as follows:

rone diameter 7mm 5mm A.5nun k n o t d i a m e t e r 26ram 19mm 16 am I n n e r pi oe d ia .mete i 23mm 22mm 1 7 . 5mr

- iVater outlet

"'he too of tue ri*er oi oe is fitted in a 3:-r.all

storage'tank. The -vater lifted 'jy the rope .viH

tflov.- into the tank, towhicn an outlet u oe is

l i t tea l'rorr. «hich t ie water can be collected.

- Bott'o;:. '-ntr&nce of L'IVVC \»i **

A'Staci*'! to "he 3t»:-aie tank, r.he ri**r

han.-rs freely down in the well.shaft.

.-»t tne bottom of the r i ser oioe'a shaoed hard

wood block is fit ted to allow a smooth entering

of the rope.

The block, wnich is under water, should he heavy

triioUjTh to keep the pipe straight a,?alast tha ao«vr,rd

pressure caused by the water.

-. Maintenance

Through i t s simplicity i t is exoected that a re-je

pump device under use can function problem free for

a Ion,? time, pi •••ably v/ell ov<-r 5 years.

To .test the durability art electr ical nowefed motor

has oeen connected which drive? the oum* nine hours

oer day. The results of this testing will be -ir*--sen-

ted in the next oro^reaa report.

Maintenance in required, but is confined to re.rular

.-j;re&.3in£ of the ball bearing and .»rip of the handle,

meckin,r oi a few boLts and connection of the row

ends and reoaintin,? of the iron.

Page 9: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

MODEL 1 iron {rdroe on well.head cover. (Cenherecl drive wheel)

PUMP FRAME

MATPRIAI IRON Fi * T IRON

Page 10: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

MATERIAL : TVEf. , 3 0 L T t . I N U T S .

M

BEARING S E T

WASHER | BEARING BAR

NUT , *

t •Q

NUT & BOIX

.* WHEEL

BEARING

lAl

- ' I I - « a

JMP FRAME

-

>UTLET PIPE

-

• 250

*

• *

. 2 8 6

375

— n -... ..:

r 50 .1

100

4 *0

• \ (

•»==0

* ^

« • 0

9 mm x SOnm BOLTS

^ J

SIDE ELEVATION OF WHEEL

725 I

1625

n 600

Page 11: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

SIDE ELEVATION

B . M

1 i <w>

«?o

i

500

4*

a$ w B -J

PLAN

m

w . . ^ , . - _

— .§P.Q-_-•£-

SECTION A-A

_x HEP DRIVE WHEEL Material: tyer. bolt , flat iron.and nuts ROPE PUMP PROJECT

"SccxTe"":"v"75 ™~ All dimensions mm

Page 12: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

CU LIS

- -20-10 70'

-<

ROUND IRON

18

100 - 1 -

55

ill

5 20

Hef—

o

• 90

O I ) JL h-2 5^

MODEL

BEARING BAR & HANDLE 1,2.3 Material •. round steel, flat iron, G I pipe , washer & nut

ROPE PUMP PROJECT

Scale • 1 2 0

All dimensions mm

FLAT IRON

L. :xr

- 2 5 0 - • - * t

FIGURE

Page 13: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

0

150

r-'-i 125

T: • - - • • " - - 3 - - '

L _ .1.. .. - — 1 5 0 — 3 5 - ' — 1 5 0 -

SIDE ELEVATION

J . ! . K-100- •-*

SECTION A-A

PLAN

&

1

&

^ \ \-

BLOCK (ENTRANS THE ROPE)

Material : wood ROPE PUMP PROJECT

Scale : 1 -50 All dimensions mm

•I 1

^f

I

-O i

-^>-

>

0

FIGURE 10

Page 14: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

CONSTRUCTION C03T2

L. Fumo : rame .

L iron u"x Lk'x $' J'x SR. I'Y- ^ :,p- 16- •

fU* iron l" x i' 7'x Rs. 10./- = 7Q.

borin/r costs = ^O.CC

eldinjc costs = 60.00

312.00

Head Dr ive - /geel

f l a t i r o n , l " x $•" 6% x HB€ 1 0 / - = ** Rs. " 6 0 . 0 0

tyer 50.00 •i it

nuts Jfc bolts A x 2 18 x Rs. 2/- = 36.00

nuts £ bolts * $•"x l" 2 X'RS. 1/- = 2,00

boring costs = 35.00

welding costs = 15.00

3. Bearings, Bearing House 4 3ar

wood

198.CO

1 x Rs. 25/- = Rs. 25.0

ball bearings (no. 620.*) 2 * R«. 57. SO = 115.0r

round bar /> 22 mm x 280 m^ = 100.0r:

boring * weldin.r costs • = 40,0^

230.OC

4. Handle ii

flat iron l£ x i x 8 = Rs. 10.00

G.I. pipe ±'x 8' =• *.00 »t II

round bar £ x 6 = 6.00 boring & welding costs „ •• = 20.00

44.00

5. Riser Pi»«

p.v.c. pipe 3/4 i 32 (well depth 35 r) 32x6/- = Rs. 192.00

p.v.c. cement liquid = 20.00

212.00

6. Rope ..

n y l o n r o p e 0 5mm x 5 0 m t r s 50 * R*< 2 / - . = Rs . 1 0 0 . 0 0

7 . O u t l e t P i n e

p . v . c . n ine 0 ?" l± x ' R s . 1 2 / - - Rs. 1 8 . 0 0

Page 15: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

31oc-c (ro';>e e n t r a n c e ) ,—„. n 1.

wood . 3. x 4 x 1-? l a b o r cj :=t3 ' ( s h a p i n g )

i t i i

lint's '<• b o i x s 2 x 6 X ' ? < S . (),'-

I s . }7.5r>

2 0 . Or 1 2 . 00

?s, ; o ^ T

t o t a l c o n s t r u c t i o n cost.-? of ou/no d e v i c e ( m a t e r i a l c o s t )

?U.T.-: f r a n e ' Ra. ; 1.2. ")0

<•:. i,.°ru: i r i v e ^ae^l I o~< „Oi"

3 . b>ar ins r s , b e a r i n g .house *. b a r 2>'-"'.?0

4.. .na'nrile 4 4 . 0<

5. r i s e r p i » e ' ?• 1 2 . 0 0

5, . ro->e 100o 00

7. ->utl«t --n ->e 16 . 00

bloc'< ( r o p e - - e n t r a n c e ) o9> 50 o.

KB. 1 2 33^50 (ITS 8 42)

construction casts of a simple well head, drainage asron,

and foundation olate for iron frame

cedent

fired bricks

sand

m. tal stone

rour.ci bar

mason labor transport

10 ba^s

'lOOO ' .

3/4 ,cube

3 / 4 " 10 nan8

0 l o Tim x 12 '

4* d a y s

a s . 1 , 1 5 0 . 0 c

"650.00

2 2 0 . 0 0

in.00

4 } . - > "

4 0 0 . 0 0

2 1 5 . 00

; ? J?- • £J .7 I2 ' I ;2Q '

Page 16: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

M O D E L JL o Concrete, sfcand, on w/eLL - .bead cover (centered cinv'e wheel) u_ j

f

^

it: +

3.

Ifh*

1 t . ' fr r I ' * r

© •*ZLL±LZ+Z2*CZ-.

FRONT ELEVATION SIDE ELEVATION

\ PLAN

ROPE PUMP

2

3

4

5

6

7

8

9

in

PUMP 5TANDE

HANDLE

BEAMING BAR

HEAD DRIVE WEEL

OUTLET PIPE

'BEARING SET

WATER STOCK TANK

RAZER PIPE 3/+'

ROPE

Page 17: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

I

FIGURE O'l

PUMP_ STAND _ ( CONCRETE SLAB)

Material : L' i ron, PVC PIPE cement t sAnd,metal . rebar :

ROPE PUMP PROJECJT q r -» I n V 1 n

Page 18: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

-¥ \ TT

11 too no

.F3?r

X G! L;r T

I

FRONT ELEVATION

i$:ir#3, HHI

SIDE ELEVATION

-qaa- -£R^-

. . l — _ l - o: T ^ -

• ^ -M

PLAN

. • ^ • o

•^v

/v

BEARING COVER

40*40*6 mm L IRON

®

BEARING HOUSEJNG

SET

'FIGUER 06

BEARING SET WITH COVER

Material L'fron.wood nut & bolt

• n n n r n>|jMr> n n n i f " r T

Page 19: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

MODEL O c concrete sband oa oil z. slab (CenberedL dnVc. Wheel) . .[.

'v.7.

1 , : r A

: J : • • • 5

MAIN HOLL

~~L

G)\

W-.ti"-; -riS*.

T. * i

r-i—

.1

ib-^^'^-T

1

- - — u

®

FRONT ELEVATION

© /

\

/

/ ;

\

^ & _ ^ - n /

PLAN

SIDE ELEVATION •

ROPE PUMP , / 7 .

1

2

3

A

5

6 ! 7

8

9

i • • • - .

PUMP STANDE

HANDLE

BEAMING BAR

HEAD DRIVE WE EL

OUTLET PIPE

'BEARING SET ;

WATER STOCK TANK j

RAZER PIPE W

ROPE

In h i n / ^ i ' I r~ • IT

Page 20: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

~ — 350*1-

FRONT ELEVATION

f=

,*250-*r • ' T

k-25<^

nr i i i1

it ii H ' I I i I i U

1

A 50—*

SIDE ELEVATION

f\

PLAN

PUMP STANDE (CONCRETE SLAB)

Material : L iron, PVC pipe, cement, sand , metal',,rebar

ROPE PUMP PROJECT

Scale : V. 20

FIGURE 01

Page 21: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

1

I ..

18

D -no —

'•C o

so; ;'((fO ^

! I' O

1 I

15

95

WASHER

NUT

n> __IDI L

-*++* 3 0 ^

j^ FLAT 1-RQN

0 5 O — 1 — H

T • I I'

:-.\

BEARING

Material •

ROPE P Scale :

BAR & HANDLE

round steel , flat G I pipe

UMP PROJECT

1 ; 20

All dimensions mm

MODEL A,5

iron

i

aoo

J f— AO—H

FIGURE 0 2 - 0 3

Page 22: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

MODEL b Concrete, Stand on p*b slab (v^ieeL off-Centred)

© .js

MAIN HOLL

—® .

Ar—®

SIDE ELEVATION

FRONT ELEVATION

ROPE PUMP PUMP FRAME

HANDLE

BEARING BAR

HED DRIVE WEEL

OUTLET PIPE

BEARING SET »

WATER STOCK TANK

RAZER PIPE

ROPE BLOCK ENTRANS THF

Page 23: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

T i i

70

J_

M - 3 5 —

r-f

k30-t j FT

r -

r • i I

o.-

60

r y

•2

•'.<; IOO

^

- ^J _L

FRONT ELEVATION

r—n

- 2 5 -rr

h--—45 — *?

SIDE ELEVATION

t \ ,

/ i rt -U,

x. \

PLAN

PUMP STANDE (CONCRETE SLAB)

Material : L iron , PVC pipe , cement, sand , meta l , rebar

ROPE PUMP PROJECT

Scale : T.20 r^ t » J ' i i

FIGURE 01

Page 24: VILLAGE TECHNOLOGY RESEARCH 5ARY0DAYA SHRAMADANA … · 2014-03-07 · 70. yro'ffre33 from 0103-"3-c to 31-35'3-'3 Vnrier review are the achievements made during the construction

CONSTRUCTION C0JT3

1. Head Drive Wheel (not altered) Is. 19':. 00

2. Bearings, 3earing House & Bar

L iron U x U x J * l£*x Rs. 18/-

flat iron If x * £ x Rs. 16/-»

wood bearing house • 1 x Rs. 25/-

ball bearings. ' ' 2 x Rs. 57.50

round bar (with lathe costs) 0 22mra x 2B0mrv.

nuts & bolts ' ^"x 4" 2 x Rs. 2050

nuts 4 bolts 3/8 x 6 4 x Rs. 6/-

boring & welding' costs •• Rs. 20/-

3..Handle (not altered)

(not altered )

(not altered)

(not altered)

7. 31ock (rope entrance) (not altered)

total construction, eosta of pump device (material cost)

4 .

5 .

6 .

R a i s e r P i u e

Rorje

O u t l e t P i u e

= Rs .

: l s .

Rs .

Re.

Hs.

R s .

Rs .

2 7 . 0 0

8 . 0 0

2 5 . 0 0

1 1 5 . 0 0

1^0 .00

5 . 0 0

2 4 . 00

2 0 . 0 0

3 2 4 . 0 0

4 4 . 0 0

2 1 2 . 0 0

1 0 0 . 0 0

I S . 00

6 9 , 5 0

9 6 5 . 5 0

construction costs for a gjm»lg well keaa, drainage mron,

and foundation elate with small oump stand

Rs. 2^718^00

or

construction costs for drainage apron, pit slab and tower

ouratj stand

cement 7 bags Ra' 850.00

fired bricks 750 490.00

sand 3/4 cube • 220.00

metal stone 3/4* 30 pans 120.00

round bar 3/8 10* (binding wire 15/-) 815.00

mason labor 6 iaye 600.00

transport 200.00