VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND INFORMATICS DEPARTMENT OF SOFTWARE ENGINEERING Test and configuration management plans 2 nd assignment Made by: Rita Birgelytė Daina Dirmaitė Andriy Voitenko Tadej Rola Kristina Naudžiūnaitė Vilnius – 2018
Transcript
Page 1: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

VILNIUS UNIVERSITY

FACULTY OF MATHEMATICS AND INFORMATICS

DEPARTMENT OF SOFTWARE ENGINEERING

Test and configuration management plans

2nd assignment

Made by: Rita Birgelytė

Daina Dirmaitė

Andriy Voitenko

Tadej Rola

Kristina Naudžiūnaitė

Vilnius – 2018

Page 2: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

2

CONTENT

1. TEST PLAN OBJECTIVE ........................................................................................................................................ 4

2. SCOPE ................................................................................................................................................................ 4

3. TEST STRATEGY .................................................................................................................................................. 4

TEST TYPES ............................................................................................................................................................ 5

3.1.1. Functional testing ...................................................................................................................................... 5 3.1.1.1. Unit testing ........................................................................................................................................................... 5 3.1.1.2. Integration testing ................................................................................................................................................ 5 3.1.1.3. System testing ...................................................................................................................................................... 6 3.1.1.4. Regression testing ................................................................................................................................................ 6 3.1.1.5. Acceptance testing ............................................................................................................................................... 6

3.1.2. Non-functional testing ............................................................................................................................... 6 3.1.2.1. Performance testing ............................................................................................................................................. 6 3.1.2.2. Load testing .......................................................................................................................................................... 6 3.1.2.3. Stress testing ........................................................................................................................................................ 7 3.1.2.4. Security testing ..................................................................................................................................................... 7 3.1.2.5. Configuration testing ............................................................................................................................................ 7 3.1.2.6. Recovery testing ................................................................................................................................................... 7

3.1.3. Static testing .............................................................................................................................................. 8

3.1.4. Data migration testing ............................................................................................................................... 8 3.1.4.1. Database integrity testing .................................................................................................................................... 8 3.1.4.2. Data flow correctness testing ............................................................................................................................... 9 3.1.4.3. Test data generation ............................................................................................................................................ 9

GENERAL RULES .................................................................................................................................................... 10

4. CRITERIA .......................................................................................................................................................... 10

5. TOOLS .............................................................................................................................................................. 10

6. HUMAN RESOURCES ........................................................................................................................................ 12

7. MILESTONES .................................................................................................................................................... 15

8. DELIVERABLES .................................................................................................................................................. 17

9. RISKS ................................................................................................................................................................ 18

10. INTRODUCTION TO CONFIGURATION MANAGEMENT ................................................................................... 20

11. REFERENCE DOCUMENTS ............................................................................................................................... 20

12. MANAGEMENT .............................................................................................................................................. 20

ORGANIZATION .................................................................................................................................................. 20

RESPONSIBILITIES ................................................................................................................................................ 21

Page 3: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

3

13. ACTIVITIES ...................................................................................................................................................... 22

CONFIGURATION IDENTIFICATION ........................................................................................................................... 22

13.1.1. Documents ............................................................................................................................................. 22

13.1.2. Software executables ............................................................................................................................. 23

13.1.3. Source code items .................................................................................................................................. 23

CONFIGURATION CHANGE CONTROL........................................................................................................................ 23

CONFIGURATION STORAGE .................................................................................................................................... 24

13.3.1. Archive items .......................................................................................................................................... 24

13.3.2. Evolving items ........................................................................................................................................ 24

13.3.3. Source code items .................................................................................................................................. 25

CONFIGURATION AUDITS AND REVIEWS ................................................................................................................... 25

14. RESOURCES .................................................................................................................................................... 26

Page 4: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

4

1. TEST PLAN OBJECTIVE

This document describes testing plan for the new payment hub configuration and integration

with internal VIRBank Systems. Document supports following objectives:

1. Prepare data migration testing strategy;

2. Prepare testing requirements and define testing acceptance criteria;

3. List the deliverable elements of the test activities;

4. Identify the required resources;

5. Identify testing process risks.

2. SCOPE

The overall testing process is divided into 2 different streams: functional/non-functional testing

and data migration testing.

During testing phase we are going to run these tests:

1. Functional: each configured functionality and process orchestration, internal and

external integration testing, regression, acceptance;

2. Non-functional: security, performance, load, stress, configuration, recovery.

Data migration testing scope:

1. Database integrity testing;

2. Data flow correctness testing.

During testing phase we are not going to test:

1. UI of the new payment hub (not going to be used widely);

2. COTS product functionality (it is assumed that COTS product functionality was

already tested by software provider).

3. TEST STRATEGY

This section describes how the system will be tested. The main considerations for the test

strategy are the techniques going to be used and the criterion for knowing when the testing is

completed.

In the project 4 different environments are used. For testing purposes (integration / system /

regression / non – functional / database testing) testing environment is used, while unit testing is

Page 5: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

5

done in development environment and acceptance, performance and recovery testing in staging

area.

Due to importance of some non-functional testing types, staging environment should be created

as close to the production environment as it can.

Test types

This section lists out the types of testing that will be performed during testing.

3.1.1. Functional testing

3.1.1.1. Unit testing

Unit tests are written by developers when it is considered that story / task is done from

development point of view. Unit tests have to be automated. Unit tests are ran by developer and

every time when building application.

3.1.1.2. Integration testing

Integration tests should not be run together with unit tests.

Integration testing can be performed when unit test have passed by 90 % of success rate.

For integration testing bottom-up approach is used, meaning that bottom level units are tested

first and upper-level units step by step afterwards.

Integration tests should be automated whenever it is possible.

Page 6: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

6

As part of integration testing also should be done API testing to check if requests and responses

of payment hub’s and external systems’ webservices match specification and if those two parts

work correctly together. Testing is done using mocks and stubs where necessary.

3.1.1.3. System testing

When independent payment hub component is developed and integrated with related external

systems, system testing could be started.

3.1.1.4. Regression testing

Regression testing should be automatized.

Regression tests are executed in the following cases:

1. When new functionality is added to the application;

2. When there is a change in requirements;

3. When there is a defect fix;

4. When there is a performance issue fix;

5. When there is a change in environment used.

3.1.1.5. Acceptance testing

Acceptance tests always have to pass.

Acceptance testing is done each time new component is successfully completed and integrated

with one of the external systems.

Acceptance testing is done based on prepared testing scenarios. Those scenarios are prepared

prior to acceptance testing.

3.1.2. Non-functional testing

3.1.2.1. Performance testing

Performance testing measures response time, transaction rates, and other time sensitive

requirements.

Performance testing should be completed in staging environment before acceptance testing.

Performance test is done using different “background loads”: normal and peak.

3.1.2.2. Load testing

Load testing should be used for API endpoints – either as a mix or perhaps even individually.

Page 7: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

7

3.1.2.3. Stress testing

Stress testing is done each time new component is successfully completed and integrated with

one of the external systems.

Testing is done in these scenarios:

1. Maximum number of users (defined during load testing) performing the critical

operations at the same time;

2. There are some hardware issues such as database server down.

3.1.2.4. Security testing

Security testing is done based on prepared taxonomy which includes most common security

issues. Most common security issues:

1. Access to Application (authentication, authorisation);

2. Data protection;

3. Brute-Force Attack (using tool);

4. SQL Injection and Cross-Site Scripting (XSS);

5. Session Management.

Security testing should be done after major changes to the system.

3.1.2.5. Configuration testing

Configuration testing steps:

1. Creation of matrix which consists of various combinations of software and hardware

configurations;

2. Prioritizing the configurations as its difficult to test all the configurations;

3. Testing every configuration based on prioritization.

Software configuration testing begins when:

1. Configurability requirements to be tested are specified;

2. Test environment is ready;

3. Unit and integration test passed.

3.1.2.6. Recovery testing

Tests should be done on the hardware that is restoring to whenever possible and in staging

environment.

Page 8: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

8

Interfaces, hardware, and code should be a replica to the live system.

Recovery tests should be conducted on a regularly scheduled basis – at the end of the sprint.

Recovery tests should also be scheduled whenever major technology changes are implemented,

including physical upgrades, new installations, and related re-configurations.

Back up should not be present at one location but multiple locations.

3.1.3. Static testing

Reviews are performed to find and eliminate errors in test cases.

Tools and code reviews are used for static analysis to find:

1. A variable with an undefined value;

2. Inconsistent interface between modules and components;

3. Variables that are declared but never used;

4. Unreachable code (or) Dead Code;

5. Programming standards violations;

6. Security vulnerabilities;

7. Syntax violations.

3.1.4. Data migration testing

3.1.4.1. Database integrity testing

Testing is done in order to:

1. Ensure the correct data mapping between the front end and database, such that all the

operations performed at the front end are correctly and consistently reflected in the

database and vice-versa;

2. Ensure the data integrity such that changes in the data after the CRUD operation, are

reflected correctly and consistently everywhere, wherever the data is stored or present.

The integrity of a database has to be evaluated by testing two different types of integrity:

1. Domain Integrity: It ensures that all the fields or columns used in the database are

declared and defined under a specific and valid domain. It has to be tested using null,

default and invalid values;

2. Entity Integrity: It mainly concerns with the non-duplication of the records and

ensures that each row of a table has a non-null primary key, where each of these keys

Page 9: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

9

should be unique and different to each other. It has to be tested by providing similar /

duplicate or null values.

3.1.4.2. Data flow correctness testing

Testing is done in order to:

1. Ensure if the legacy database is not updated during tests after database migration is

completed;

2. Ensure whether the mapping at field and table levels do not change the output logic;

3. Ensuring if data is migrated accurately and completely.

Data flow correctness testing has to be evaluated by:

1. Verifying if the queries executed in the new database yield same results as in the older

one;

2. Verifying if the number of records in the old database and new database is the same;

3. Verifying that there are no redundancies and new database provides exactly the same

result as the older one;

4. Verifying the query performance (time-taken to execute complex queries) of the new

database;

5. Verifying completeness of data: row count, min / max, avg, sum checks, row by row

comparison, job run times and etc.

3.1.4.3. Test data generation

Jobs that automatically copy production data to testing environment or third party automated test

data generation tools are used for the test data generation. General process to produce test data

from production environment should be followed by these steps:

1. Set up production jobs to copy the data to a common test environment (data should not

be generated manually);

2. All PII (Personally Identifiable Information) is modified along with other sensitive

data. The PII is replaced with logically correct, but non-personal data;

3. Remove data that is irrelevant;

4. After the data is copied, testers or developers can copy this data to their individual test

environment. They can modify it as per their requirement.

Generated test data should be used just for the testing purposes and should be constantly

updated.

Page 10: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

10

General rules

Code contribution:

1. Contributed code should be reviewed and accepted by at least 2 senior developers;

2. Before contributing, unit tests should be executed.

Test coverage:

1. Unit test coverage should be at least 80%;

2. Integration test coverage should be at least 90%;

3. Test cases should cover 100% of the requirements.

4. CRITERIA

ENTRY criteria

Testing can be started when all entry criteria are met:

1. All the necessary documentation should be available;

2. All the standard software tools including the testing tools must have been successfully;

installed and functioning properly;

3. The test environment should be ready (in some cases also staging);

4. Proper test data is available;

5. QA resources have completely understood the requirements;

6. Test scenarios, test cases are reviewed.

EXIT criteria

Testing can be finished when all exit criteria are met:

1. 100% requirements coverage has been achieved;

2. Less than 6 minor, 3 medium and 0 major faults are left outstanding;

3. All high-risk areas have been fully tested, with only minor residual risks left outstanding.

5. TOOLS

This section will describe the testing tools necessary to conduct the tests.

For what? Tool Comment

Testing deliverables creation TESTFLO for JIRA Used for test cases creation

and management, test reports.

Page 11: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

11

Data migration testing Tricentis Used for database integrity

and data flow correctness

testing

Data generation DTM Data Generator Used to create data values

and optional schema objects

such as views, procedures,

tables and triggers.

Static analysis SonarQube SonarQube is used to measure

and analyse the source code

quality.

Crucible code review Crucible code review is used

by programmer to review

code.

System testing Selenium webdriver Current UI automation tests.

Will be run during regression

testing.

Integration testing SoapUI

Postman

Used for testing SOAP

services / REST API

manually.

Karate

REST Assured

Framework used for SOAP /

REST API integration

automated testing.

Unit testing JUnit

NUnit

Used to write unit tests for

components written in Java /

C#.

tSQLt Used to run unit tests for SQL

Server databases.

Performance / load / stress testing Apache JMeter Used to load test functional

Page 12: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

12

The Grinder behaviour and measure

performance.

HammerDB Used for database load

testing.

Security testing Fiddler Used to monitor, manipulate,

and reuse HTTP requests

Wireshark Used for protocol analysis.

Metasploit Framework

Wapiti

Used for penetration testing.

IBM Security AppScan Used to test Web applications

for security vulnerabilities

during the development

process.

Incident reporting JIRA Used to report all kind of

incidents and anomalies.

6. HUMAN RESOURCES

Role Resources Specific Responsibilities / Comments

Developer Junior 4 Develops and tests units.

Responsibilities:

1. Develop units;

2. Design and create unit tests;

3. Run unit tests.

Regular 6

Senior 5 Develops and tests units.

Responsibilities:

1. Develop units;

2. Design and create unit tests;

Page 13: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

13

3. Run unit tests;

4. Integrate units;

5. Consults testers about implementation details.

Project Manager 2 Provides oversight of testing on the project.

Responsibilities:

1. Interact with business people;

2. Set testing strategy;

3. Provide business requirements for testing to test

managers (high level testing plan);

4. Define the processes used to ensure the quality of

the deliverable;

5. Coordinate test managers, system analysts,

security specialists;

6. Ensure that deadlines are met;

7. Decide the test budget and schedule;

8. Management reporting;

9. Approve testing results.

Test Manager 3 Provides management oversight in a team.

Responsibilities:

1. Help to set testing strategy;

2. Generate and take care of functional test plan;

3. Identifies, prioritizes, and implements test cases;

4. Prepare test metrics;

5. Provide technical direction;

6. Acquire appropriate resources;

7. Management reporting (test summary report and

etc.);

8. Share updates on testing with project manager.

Page 14: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

14

Test Engineers 6 Executes on the test plan.

Responsibilities:

1. Some participate in test case creation;

2. Execute tests;

3. Automate test (integration, regression).;

4. Log results (prepare reports);

5. Document defects;

6. Prepares tasks for developers.

4 (higher

level test

engineers)

Ensures test data (database) environment, related

processes and assets are managed and maintained.

Responsibilities:

1. Prepare test data;

2. Administer test data;

3. Prepare data integrity testing plan.

4. Prepare data flow correctness testing plan;

5. Execute prepared plans;

6. Provide other teams with test data;

7. Document defects.

Software Architects 3 Plans and designs software solutions and advice non-

functional test scenarios.

Responsibilities:

1. Envision, model and provide initial models and

designs that can be built for development;

2. Lead the technical implementation in a team;

3. Advice project members of any software related

questions;

4. Participate in requirements analysis and design of

non-functional test scenarios.

System Analyst 3 Plans system non-functional testing and leads its

execution.

Page 15: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

15

Ensures test environment and assets are managed and

maintained.

Working directly with security specialists.

Responsibilities:

1. Analyse requirements and design of non-

functional test scenarios;

2. Administer test environment;

3. Install and manage worker access to test systems;

4. Develop and conduct performance, load, stress

and configuration test designs, cases and

procedures;

5. Ensure access and usability of tools used for

testing.

Security Specialist 4 Plans security and recovery testing and leads its

execution.

Working directly with system analysts.

Responsibilities:

1. Analyse requirements and design of non-

functional test scenarios;

2. Develop and conduct recovery test designs, cases

and procedures;

3. Test taxonomy for security testing which contains

most common security issues.

7. MILESTONES

Taking into account that 40 employees from IT department will participate in the project

implementation (including 3 architects, 15 developers, 3 test managers, 10 test engineers) and

that teams are going to work applying scrum framework, it was decided to have 3 different

scrum component teams over feature teams made of developers and testers because of:

1. Diverse technology stack;

2. Will of developers to specialize;

Page 16: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

16

3. Balanced workload;

4. Component ownership.

In total we are going to have 5 different scrum teams:

1. Team 1 / Team 2 / Team 3: 1 architect, 5 developers, 1 test manager, 2 test engineers;

2. Team 4: 4 test engineers;

3. Team 5: 4 security specialists and 3 system analyst.

Each of scrum team is going to be made of 1 architect, 5 developers, 1 test manager, 2 test

engineers. Each scrum team is going to be responsible for developing one component at a time

and successfully integrating it with one of the external systems.

Another scrum team made of 4 test engineers will be formed for database testing. Security

specialists and system analyst are going to work together in another scrum team taking care of

non-functional testing.

Each sprint is planned to take 3 weeks. Before each sprint so called “Firefighters” team is going

to be formed of 3 employees (1 – full time, 2 – on demand): 2 developers and 1 tester, which will

be responsible for fixing production environment bugs.

TECHNICAL BACKLOG

BA/SECURITY SPECIALISTS

Input

In review In progress Done Blocked Testing

In review In progress Done Blocked Testing

In review In progress Done Blocked Testing

3 te

ams m

ade

of 1

arc

hite

ct, 5

dev

elop

ers,

1 te

st m

anag

er, 2

test

eng

inee

rs

FIREFIGHTERS

Before each sprint 3 architects gather

together to discuss next steps

BACKLOG

Taking into account that teams will be working using sprints, most of the activities listed below

will be repeated in each sprint or after an independent payment hub component is developed and

integrated with related external systems.

Page 17: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

17

No. Milestone task When it is done? Effort

1. Test plan Each sprint 2 days per sprint

2. Test scenarios & test cases Each sprint 1 days per sprint

3. Testing taxonomies After integration with

external system

3 days per sprint

4. Test development -

5. Test data Each sprint 1-2 days per sprint

6. Unit / integration /

regression / system

testing

Each sprint 4 days per sprint

7. Acceptance testing After integration with

external system

10 days per sprint

8. Non – functional testing Each sprint 5 days per sprint

9. Data migration testing After integration with

external system

15 days per sprint

10. Test metrics After integration with

external system

1 days per sprint

11. Incident report Each sprint 1 days per sprint

12. Test summary report After integration with

external system

2 days per sprint

8. DELIVERABLES

Deliverable Responsible Comments

Test plan Project manager

Test manager

Document which contains the

plan for all the testing

activities to be done to

deliver a quality product.

Test scenarios & test cases Test manager and test

engineers

Document which determines

test conditions that contains

high-level and low-level test

Page 18: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

18

cases.

Testing taxonomies Security specialists Testing taxonomy for

security testing which

contains most common

security issues.

Test data Test engineers Prepare and test data which

will be used by the testers to

run the test cases.

Test metrics Test manager Prepared to estimate the

progress, quality and health

of a software testing effort.

Incident report Test engineers Defects found during test

execution are reported in

JIRA. Incident report is

generated using the same

tool.

Test summary report Test manager It contains the final test

results and the summary of

test activities.

9. RISKS

1. For testing purposes data uploaded into third party products / tools will cause data leakage;

2. During testing phase will be compromised customers’ data;

3. Data migration testing will take a lot of time and therefore will require repetitive work and

too many resources to produce fake / testing data;

4. Production environment data may be not fully usable for testing based on the developed

business scenarios;

5. The testers spend more time than required for communicating with architects, database

administrators and BAs for gathering data;

Page 19: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

19

6. Testers will not be able to properly test process orchestration because of the payment hub

product in-build functionality;

7. Testers will not be able to set up an integration between testing tools and payment hub;

8. Testers will not understand how payment hub works and will not have proper subject

training;

9. At the beginning of each sprint testers will not have what to do.

Page 20: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

20

10. INTRODUCTION TO CONFIGURATION MANAGEMENT

This part of document contains the software configuration management plan of implementation

of a new Payments Hub to core banking systems replacing legacy payments processing

components.

This part of document represents the Software Configuration Management Plan. Configuration

Management (CM) is essentially the process of identifying and assuring retention and control of

all the various artefacts (documents, source code, executables, e-mail, etc.) generated during the

software development life cycle.

The primary objective of the Configuration Management process is to establish and manage

baselines of product releases.

Configuration Management for software engineering is defined as: “A set of requirements,

design, source code files and the associated executable code, build files, and user documentation

(associated entities) that have been assigned a unique identifier can be considered to be a

baseline”.

11. REFERENCE DOCUMENTS

In our software configuration management plan, we reference on various standards and policies.

They are provided by The Institute of Electrical and Electronics Engineers (IEEE).

1. IEEE 828 - Standard for Software Configuration Management Plans

1.1. minimum required content of SCMP are established;

1.2. which activities are required;

1.3. requirements for any part of product’s life cycle.

2. IEEE 1042 - Guide to Software Configuration Management

2.1. provides basic guidelines in planning SCMP;

2.2. guidelines are compatible with IEEE 828.

12. MANAGEMENT

Organization

Since we did not provide special workplaces for configuration management roles, we will

allocate time required for it to few people from developers, test managers and test engineers

groups.

For this purpose, we will introduce some new informal roles in our team. We augment with:

Page 21: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

21

1. configuration manager - from test managers section;

2. development lead (team lead) - from developers section;

3. release manager - from developers section;

4. QA manager - from test engineers section.

Responsibilities

Role Responsibilities

Configuration

Manager

1. Educates project team members in SCM “best practices”;

2. Establishes, promotes, and releases baselines;

3. Validates final builds;

4. Prepares release package and version description documents.

Project Manager 1. Ensures correct we are following IEEE standard;

2. Check on the SCM process;

3. Evaluates all other change requests;

4. Identify dependent projects.

Development Lead

1. Develops and maintains artefacts following proper version

control procedures using the SCM plan;

2. Submits build / release requests;

3. Coordinates development activities and assigns task,

4. Ensures all developers are following the SCM plan;

5. Ensures all SCM procedures are implemented and followed.

Release Manager 1. Coordinates the release and deployment of software;

2. Assures products meet all exit criteria prior to release;

3. Assures change control and SCM processes have been followed

as defined.

Developers 1. Develops and maintains artefacts following proper version

control procedures using the SCM plan;

2. Maintain accurate, detailed information for all assigned change

Page 22: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

22

request, in the change request database;

3. Documentation of build, release, and installation instructions.

Quality Assurance

manager

1. Responsible for testing installed releases, as SCM provides

releases from development;

2. Update change requests assigned to them according to test

activity results;

3. Determines Pass / Fail for each change request scheduled for a

release (and opens new change requests).

13. ACTIVITIES

Configuration identification

We have identified two main components that are going to be altering during the project

execution.

They are documents and software executables.

13.1.1. Documents

Document items are assigned with unique identifiers that represent only one project component,

along with current revision level.

The identifier consists of at least one, to maximum three parts:

1. Acronym;

2. Acronym-class;

3. Acronym-component-class.

• Documents, such as policies, standards, process descriptions or guidance are defined with

“acronym”. An example is SCMP.

• Components that are project specific but not associated with any other component in the

software are defined with “acronym-class”. An Example of COTSIntegration-SPMP that

represents project management plan for project COTS integration

• Further, documents, regarding for specific component inside project are defined as

“acronym-component-class”. So, the required definition for payment component, would be

COTS-PAYM-REQD

We also provide version control for each document. It consists of two numbers.

Page 23: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

23

For example, 2.1, where:

1. Version number changes only when the core architecture of the item changes;

2. Revision number changes when existing content is changed, but overall structure and

flow remains the same.

13.1.2. Software executables

Software executables are identified by name and version number. The name convention for each

software item is defined by the development team.

The version consists of 3 components, for example 2.1 a, where:

1. Version number changes when core architecture of the software item or user interface

changes;

2. Revision number is changed when a new feature is added, e.g. additional functionality or

any other kind of content to executable file;

3. Update character is added when software item is fixed from any defects, without adding

new functionalities / modules.

13.1.3. Source code items

Identification of these items is in control of configuration management tool we will be using for

this project. Tools are described in the last section (Resources). Because of this, numbering /

identification of source code items is in domain of the tool.

Configuration change control

Throughout change control process we are dealing with verification, approval and execution of

identified issues, during development or production operations.

This process is comprised of 4 stages:

1. Discovery (when new issues are identified during production or development lifecycle

and are entered in the workflow and validated);

2. Analysis (when development team create or modifies the documentation or code to fix

the issue);

3. Authorization (when the configuration manager assigns the verified issue to specific

iteration in software development cycle);

4. Iteration (when actually the fix is solved during the software development iteration.

Includes documentation modifying).

Page 24: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

24

Configuration storage

For each configuration item that we mention there are different storage requirements.

Management of archive items is usually an easy deal. Differently, evolving items and source

code items.

13.3.1. Archive items

Items that are suitable for archiving are stored in appropriate directories for the project.

Directories are available on a central file server. These items are later on divided into more

topical subdirectories.

13.3.2. Evolving items

A copy of each item is usually stored on the project web server with link from project home page

to the item. If a new item is a revision or an update of existing item, this item is replaced on web

server under the same URL.

Page 25: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

25

With such control, we can keep being confident that each project member has an access to the

latest item version.

All versions of each item are also stored in the configuration management tool. It is described in

section 14.

13.3.3. Source code items

This kind of items is usually created by the development team and directly connected with

configuration management tool. The tool handles:

1. Storage;

2. Identification;

3. Versioning;

4. Check in / check out operations.

Each member of our team can add new file to our source code management tool.

Configuration audits and reviews

The revision management process manages creation or changing any configuration item, as well

as build of one or many configuration items. Builds that passes all the reviews (tests) become

new baseline.

The process is separated in 3 stages:

1. Informal iteration process (when new configuration items are created and checked in to

our configuration management tool);

2. Formal iteration process (where configuration items are finalized for review and

prepared for release build for the stage);

3. In-stage assessment process (where review is done, and the build is conducted -> that is

rejected (for re-work) or accepted and becomes a new baseline).

Page 26: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

26

14. RESOURCES

Items Management tool

Documents and software code GitLab

Builds Jenkins

Deploying the product to the next environment after build Jenkins

Tasks and errors Jira

Page 27: VILNIUS UNIVERSITY FACULTY OF MATHEMATICS AND …adamonis/tikv/1819r/nd/VirBank_2.pdfVILNIUS UNIVERSITY . FACULTY OF MATHEMATICS AND INFORMATICS . DEPARTMENT OF SOFTWARE ENGINEERING

27

When a change is made, it is placed separately from the published code.

When a release is made, the changes will be added to the general database structure code.

The configuration of the environment will be done through the database scripts, using different

data for each environment.

The system will use different configuration files at start-up (for example, app.config).

GitLab, a single application for the whole DevOps lifecycle that includes not only configuration

management, but also capabilities for project management, source code management, CI/CD,

and monitoring.