Vinh Son Cement visit &
Cemtech International Experience
Presented by : Dr. Surapich Phuvoravan
Date: 2 March 2016 Rev 1
Vietnam
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 1© Copyright : 2 Mar. 2016
Cemtech International Co. Ltd.
83/33, Soi Shinaket 2, Ngamwongwan Road,
Tungsonghong, Lak Si,Bangkok, 10210 Thailand
+66 954 7232
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Agenda
1. Cemtech International Introduction
2. Selected Experience of Cemtech in UPGRADING Clinker production
3. Selected Experience of Cemtech in UPGRADING Cement Production
4. Selected Experience of Cemtech in Waste Heat Power Generation (WHG) system – Generate Elect. Power
5. Next Steps and Potential Co-operation
6. Site Visit
2© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Agenda
1. Cemtech International Introduction
2. Selected Experience of Cemtech in UPGRADING Clinker production
3. Selected Experience of Cemtech in UPGRADING Cement Production
4. Selected Experience of Cemtech in Waste Heat Power Generation (WHG) system – Generate Elect. Power
5. Next Steps and Potential Co-operation
6. Site Visit
3© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Cemtech International Co., Ltd.
• Cemtech International was founded by experts in the cement and related fields.
• Main activities: Engineering, Consulting, Project Management, Local
representation of Owners.
• Main fields: Cement, Paper, Power, Waste to Power (with Wehrle Umwelt GmbH),
Alternative Fuel and Raw Materials for various industries (AFR), Waste Heat
Recovery system in various industries, Fuel storage and feeding systems for
various industries.
4© Copyright : 2 Mar. 2016
Value Customers in South East Asia Region
PT Semen Bosawa Corporation
Phonesack Group
United Pulp and Paper Co.,Inc.Electricity Generating
Authority of Thailand
Siam City Cement Plc.
Siam Kraft Industry Co., Ltd.
TPI Polene Plc.
Holcim (Lanka) Ltd.Conwood Co., Ltd. Holcim (Vietnam) Ltd.
PT Bintang Cement
Mandiri
Indonesia Cement and
Concrete Institute
PT Semen TonasaThai Pride Cement
CEMEX (Thailand) Ltd.
PT Holcim Indonesia Tbk.
Ferro (Thailand) Co., Ltd.
Siam Cement Group
Geocycle Co., Ltd.
IRPC Plc.
BANPU Plc.
Double A (1991) Plc.
PT Indocement Tunggal Prakarsa Tbk.
Asia Cement Plc. Jalaprathan Cement Plc.
© Copyright : 2 Mar. 2016 5CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Kampot Cement
Metso Plc.
LPC
What do we do?
Complete Cement Plant: EPC & Consulting
Plant Operation Optimization & Improvement
Kiln Upgrade
Mill Design and Mill upgrade
Terminal and Packing Plant
Innovative projects – Kiln Shell Replacement
Spare Parts, Supply and Logistic
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 6© Copyright : 2 Mar. 2016
Complete Cement Plant : EPC & Consulting
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 7© Copyright : 2 Mar. 2016
KCC 2 – Clinker Production 2,500 TPD in Cambodia
Complete Cement Plant : EPC & Consulting
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 8© Copyright : 2 Mar. 2016
MCL 1 – Clinker Production 5,000 TPD in Myanmar – Preheater Engineering
Complete Cement Plant : EPC & Consulting
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 9© Copyright : 2 Mar. 2016
Laos Pattana– Clinker Production 5,000 TPD in Laos
Phonesak Group– Clinker Production 5,000 TPD in Laos
1. Raw material pre blending
area
2. Raw material feed bin
3. Raw material grinding
4. Blending silo and kiln feed
system
5. Clinker Manufacture
6. Clinker storage
7. Cement grinding
8. Cement storage
9 Packing and dispatch
10 Coal Grinding
11 Control room (CCR)
12 Workshop and
warehouse
13 Weight bridge
14 Canteen
15 Customer service
16 Parking area
1
2
34
1
05
6
8
9
7
1
1
1
2
1
4
1
3
1
51
6
Owner Consultants and Feasibility Study
Phonesack Group
LPC
Kiln Upgrade
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 10© Copyright : 2 Mar. 2016
Upgrade compare with build new line
Suitable for heavy AFR usage
Capacity increase up to 40%For example : Upgrade capacity
from 5000 to 7000 TPD.Mixing Chamberallow good mix between
Fuel and raw meal
Fast Return of Investment
Faster Execution
Build New production line
Cost: ≈ 5X-7X
Upgrade
Cost: ≈ X
Build New production line
Time: ≈ 2-3 years
Upgrade
Time: ≈ 1 year
CTI Precalciner
Kiln Upgrade
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 11© Copyright : 2 Mar. 2016
June 2011 – Sept 2012 ( Completed)
Client: PT SEMEN BOSOWA MAROS / SOUTH SULAWESI - Indonesia
Project: Bosowa Upgrade Project from 5,000 to 7,000 TPD Clinker Production
CTI’s scope of works : Process, Mechanical and Civil Engineering
Project Management consultancy and Commissioning
BOSOWA Upgrade 5,000 to 7,000 tpd in Indonesia
12
1 Sept 11
5000 tpd
EXECUTION PHASES BEFORE AND AFTER
© Copyright : 2 Mar. 2016
1 May 12
7365 tpd
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Value Proposition & Investment Justification
Fast Return of Investment
Return of Investment within 1 year.
Faster Execution
13© Copyright : 2 Mar. 2016
Build New2000 tpd production line
Cost: > 100 mil USD
This upgrade (50007000 tpd)
Cost: 8-15 mil USD
Build New2000 tpd production line
Time: 2-3 years
This upgrade (50007000 tpd)
Time: < 1 year
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
The upgrade also enable the system to be
Suitable for AFR usagewith special design caliner and related systems
Feasibility Study:
Upgrade 2000 tpd toward 4000 tpd with Mininum Investment
L/S Hammer Crusher
500 t/h (exist.)
Clay Roller Crusher
200 t/h (replace)
Raw Mill
150 t/h (exist.)
180 t/h (new)
Homogenizing Silo
2x1,668 m3
2x3,365 m3
Rotary Kiln
4,000 t/h
(replace gear)
Clinker Silo
1 x 15,000 t. (exist.)
1 x 30,000 t. (new)
New Cement Ball Mill
2 x 125 t/h
Coal Mill
15 t/h (exist.)
20 t/h (new)Quarry
(outsourcing)
Joint work with Indonesian Cement Institution
FOR
Preheater
1 2 string, 4th stage
New precalciner
New Cement Silo
3 x 12,000 t
New Packing Plant
3 x 120 t/h
© Copyright : 2 Mar. 2016 CTI's experience in Plant UPGRADE for Vinh Son Cement visit 14
Plant Operation Optimization & Improvement
Assessment: Go in Detail Equipment to inspect – Semen Tonasa
© Copyright : 2 Mar. 2016 CTI's experience in Plant UPGRADE for Vinh Son Cement visit 15
Plant Operation Optimization & Improvement:
For example, Previous quality issues in Semen Kupang
Source: Kupang Quality Monthly report – Oct 2010
Raw Mix Kiln feed Clinker%Oxide %Oxide %Oxide %Oxide
SD. LSF. 12.5 11.25 9.1% F.Cao 0.93
C3S 44.02C2S 28.29C3A 9.98C4AF 12.72
© Copyright : 2 Mar. 2016 CTI's experience in Plant UPGRADE for Vinh Son Cement visit 16
Standard Assessment Approach
(for Operation Improvement)
17© Copyright : 2 Mar. 2016
Project
Definition
& Planning
Data
analysisReporting
30 days
Summary
meeting
Plan for
Next phase
Next plan
Performance
assessment
ConclusionSite
visit
Project
Kick-off
3 days 30 days 1 day
Improvement
potential
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Activities during Site visit in Assessment
18© Copyright : 2 Mar. 2016
Operation Investigation of every sections
Inside inspection of main equipments
Detail assessment by gas Measurement in Raw Mill,
Preheater and Cooler sections
Mutual agreement between plant and Cemtech team
about improvement potential (technical) and
measures
During 3 day assessment, Cemtech and
Owner team members conducted:
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Example of result from Analysis from Assessment
: Find Process Bottlenecks (in current operating condition)
5,000 t/d 7,000 t/d
© Copyright : 2 Mar. 2016 19CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Example of Assessment result:Operational Recommendation from inside inspection
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 20© Copyright : 2 Mar. 2016
3.) Enlarging the reject cone of
classifier
As-is: Worn hole of reject cone + too narrow
Impact: reduced grinding efficiency , high
recirculation inside mill
To do: Install additional cone, which extend all the
way to the grinding table + design to
accelerating velocity inside mill to avoid pre-
separation of particle inside mill body
Reject cone too small
Example of Assessment Result:Operational Recommendation from inside inspection
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 21© Copyright : 2 Mar. 2016
2.) Reduce gap between inner sealing ring
and rotor <10mm
As-is: Gap is too wide at 15-20mm
Impact: Coarse particle bypass through rotor then give
high % residue of 200 µm and high speed of rotor
lead fine particle return to reject material
To do: Gap Adjustment
following Operational
criteria and Fine tune.
Mill Design
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 22© Copyright : 2 Mar. 2016
Cemtech Dynamic
SeparatorRoller Press
Tube Mill
V-Separator
KCC Cement mill in Cambodia
Mill upgrade
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 23© Copyright : 2 Mar. 2016
Install part of CT Separator for coal mill
BOSOWA Coal mill upgrade 35 tph to 50 tph
in Indonesia
Cement mill upgrade
Increase Capacity from 120tph to 210 tph
Value Proposition of Mill upgrade v.s. New Mill
Fast Return of Investment
Faster Execution
24© Copyright : 2 Mar. 2016
Build New Mill (210 tph)
Cost: > 30 mil USD
Mill upgrade (120->210 tph)
Cost: 6-9 mil USD
Build New Mill (210 tph)
Time: 12-18 months
Mill upgrade (120-> 210 tph)
Time: ≈ 6-9 month
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
The upgrade also has
No Production Losswith tie-in only 5-10 days during yearly maintenance shutdown
Terminal and Packing Plant
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 25
© Copyright : 2 Mar. 2016Cement SiloIs a structure for storing materials
for transport
Inverted coneGive more space under silo
Hence , We can put machine
to reduce footprint
Aeration systemThe aeration system is
designed using concept of
material discharge prevent
dead stock inside silo.
Section of Cement silo
Small footprint
less space for expensive
area near seaport.
© Copyright : 2014
CTI Design
Small footprint
HOLCIM - Indonesia
BOSOWA - Indonesia
Innovative Project - Kiln Shell Replacement
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 26© Copyright : 2 Mar. 2016
Cemtech - Kiln Shell ReplacementThe project of Tarjun the factory of Indonesia
in 2010 , Under our design.
Kiln Shell Replacement- Reduce time from 60 to 25 days
Normal kiln high : 50 m.
- Convention technic: Crane 500 ton can lift up kiln shell 62 ton. (at boom 14 m.)- Our technic : we concept use the lift jack , so can
be up to 600 ton
Spare Parts, Supply and Logistic
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 27© Copyright : 2 Mar. 2016
Support roller
Transmission gear
Truss roller
Kiln tyreSpare Parts
Spare part for
Roller Press
Spare Pasts, Supply and Logistic
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 28© Copyright : 2 Mar. 2016
Gypsum Akali or Alumina – Raw Material
CementClinker
Spare Pasts, Supply and Logistic
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 29© Copyright : 2 Mar. 2016
Fluorine - Additive
Alternative Fuel
Any material for adjust cement quality
Logistic
What do we do?
Complete Cement Plant: EPC & Consulting
Plant Operation Optimization & Improvement
Kiln Upgrade
Mill Design and Mill upgrade
Terminal and Packing Plant
Innovative projects – Kiln Shell Replacement
Spare Parts, Supply and Logistic
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 30© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Agenda
1. Cemtech International Introduction
2. Selected Experience of Cemtech in UPGRADING Clinker production
3. Selected Experience of Cemtech in UPGRADING Cement Production
4. Next Steps and Potential Co-operation
5. Site Visit
31© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
2. Experience of Cemtech in UPGRADING
Clinker Production
See separate slides for
Bosowa upgrade 50007400 tpd Project
32© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Agenda
1. Cemtech International Introduction
2. Selected Experience of Cemtech in UPGRADING Clinker production
3. Selected Experience of Cemtech in UPGRADING Cement Production
4. Selected Experience of Cemtech in Waste Heat Power Generation (WHG) system – Generate Elect. Power
5. Next Steps and Potential Co-operation
6. Site Visit
33© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
3. Experience of Cemtech in UPGRADING
Cement Production
See separate slides for
Cement Mill upgrade 90175 tph Project
34© Copyright : 2 Mar. 2016
Value Proposition of Mill upgrade v.s. New Mill
Fast Return of Investment
Faster Execution
35© Copyright : 2 Mar. 2016
Build New Mill (210 tph)
Cost: > 30 mil USD
Mill upgrade (120->210 tph)
Cost: 6-9 mil USD
Build New Mill (210 tph)
Time: 12-18 months
Mill upgrade (120-> 210 tph)
Time: ≈ 6-9 month
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
The upgrade also has
No Production Losswith tie-in only 5-10 days during yearly maintenance shutdown
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Agenda
1. Cemtech International Introduction
2. Selected Experience of Cemtech in UPGRADING Clinker production
3. Selected Experience of Cemtech in UPGRADING Cement Production
4. Selected Experience of Cemtech in Waste Heat Power Generation (WHG) system – Generate Elect. Power
5. Next Steps and Potential Co-operation
6. Site Visit
36© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
4. Experience of Cemtech in Waste Heat Elect.
Power Generation (WHG) for Cement plant
Not yet presented
37© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Agenda
1. Cemtech International Introduction
2. Selected Experience of Cemtech in UPGRADING Clinker production
3. Selected Experience of Cemtech in UPGRADING Cement Production
4. Selected Experience of Cemtech in Waste Heat Power Generation (WHG) system – Generate Elect. Power
5. Next Steps and Potential Co-operation
6. Site Visit
38© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
5. Next Steps & Potential Co-operation
Protential Projects from discussion
►Clinker upgrade project - Cemtech has prelim site visit today
- Cemtech will send Questionnaire/checklist to request plant
information to Mr. Duong
- After getting information, Cemtech will come to discuss upgrade idea.
►Cement mill upgrade project - Cemtech has prelim site visit today
- Cemtech will send Questionnaire/checklist to request plant
information to Mr. Duong
- After getting information, Cemtech will come to discuss upgrade idea.
39© Copyright : 2 Mar. 2016
CTI's experience in Plant UPGRADE for Vinh Son Cement visit
Agenda
1. Cemtech International Introduction
2. Selected Experience of Cemtech in UPGRADING Clinker production
3. Selected Experience of Cemtech in UPGRADING Cement Production
4. Selected Experience of Cemtech in Waste Heat Power Generation (WHG) system – Generate Elect. Power
5. Next Steps and Potential Co-operation
6. Site Visit
40© Copyright : 2 Mar. 2016
Vinh Son Cement visit &
Cemtech International Experience
Presented by : Dr. Surapich Phuvoravan
Date: 2 March 2016 Rev 1
Vietnam
CTI's experience in Plant UPGRADE for Vinh Son Cement visit 41© Copyright : 2 Mar. 2016