+ All Categories
Home > Health & Medicine > Vision ppt presentation

Vision ppt presentation

Date post: 23-Jan-2018
Category:
Upload: arvind-shrivastava
View: 83 times
Download: 0 times
Share this document with a friend
84
Manufacturer of Large Volume Parenterals A-2-44,45 Sector- 15 GIDA Industrial Area Gorakhpur-273209 (U.P.)
Transcript
Page 1: Vision ppt presentation

Manufacturer of Large Volume Parenterals

A-2-44,45 Sector- 15 GIDA Industrial Area Gorakhpur-273209 (U.P.)

Page 2: Vision ppt presentation
Page 3: Vision ppt presentation

Vision parenteral Pvt. Ltd

Page 4: Vision ppt presentation

GARDEN AREA

Page 5: Vision ppt presentation

Reception Area

Page 6: Vision ppt presentation

OFFICE AREA

Page 7: Vision ppt presentation

The company is situated at A-2-44,45 Sector- 15 GIDA Industrial Area Gorakhpur-273209 (U.P.)

We have a well furnished office with all necessary facilities.

Page 8: Vision ppt presentation

CHANGE ROOM

Page 9: Vision ppt presentation

SHOES RACK

Page 10: Vision ppt presentation

LOCKERS

Page 11: Vision ppt presentation

PRIMARY CHANGE ROOM

Page 12: Vision ppt presentation

SECONDRY CHANGE ROOM

Page 13: Vision ppt presentation

Change Room

Page 14: Vision ppt presentation

VISITOR LOBBY

Page 15: Vision ppt presentation

Material Receiving Area

Page 16: Vision ppt presentation

RM STORES In RM Store we have following Segregated area:-

Dedusting Area: In this area dedusting of the received material is done by Vacuum cleaner

Sampling Area : Sampling area has RLAF booth under which sampling is done. The surrounding area is supported by AHU for this booth we have different entries for material and Men. SOP displayed.

Dispensing Area : This area is also equipped with RLAF

for dispensing the RM. Background of RLF is supported by AHU. For this area also we have different entries per material and men along with the equipment washing area.

Page 17: Vision ppt presentation

Dedusting Area

Page 18: Vision ppt presentation

Store lobby

Page 19: Vision ppt presentation

MATERIAL SAMPLING ROOM

Page 20: Vision ppt presentation

SAMPLING RLAF

Page 21: Vision ppt presentation

PASS BOX

Page 22: Vision ppt presentation

MATERIAL UNDER TEST AREA

Page 23: Vision ppt presentation

REJECT MATERIAL ROOM

Page 24: Vision ppt presentation

APPROVED MATERIAL ROOM

Page 25: Vision ppt presentation

MATERIAL DISPENSING ROOM

Page 26: Vision ppt presentation

LABEL STORE ROOM

Page 27: Vision ppt presentation

PACKING MATERIAL AREA

Page 28: Vision ppt presentation

STORE LOBBY

Page 29: Vision ppt presentation

MIXING AREA

Page 30: Vision ppt presentation

MIXING AREAMIXING TANK

Page 31: Vision ppt presentation

Manufacturing Facility

Page 32: Vision ppt presentation

PRODUCTION LOBBY

Page 33: Vision ppt presentation

Filling and Sealing Area Glass BottlesFloor, Coving and Epoxy coated. It is controlled by HEPA filter and AHU

having the cooling system. Contamination is controlled by pressure differentiation in the area.

Page 34: Vision ppt presentation

GLASS FILING MACHINE

Page 35: Vision ppt presentation

CAPING MACHINE

Page 36: Vision ppt presentation

Filling of P.P. BottlesFloor, Coving and Epoxy coated. It is controlled by HEPA filter and AHU having the cooling system. Contamination is controlled by pressure differentiation in the area, activities carried out under LAF.

Page 37: Vision ppt presentation

FFS MACHINE

Page 38: Vision ppt presentation

STERILIZERDouble Door Autoclaves are used for terminal sterilization of Glass & P.P. Bottles of LVP .

Page 39: Vision ppt presentation

STERILIZER

Page 40: Vision ppt presentation

Visual Checking and Packing Area

Page 41: Vision ppt presentation

Visual Checking and Packing Area

Page 42: Vision ppt presentation

Quality Control Microbiological Testing area Hot Zone area : Incubetor, Stability Chamber etc Documentations :-

Calibration record Stability records Trend analysis report SOP Microbiological monitoring

Page 43: Vision ppt presentation

Q.C. DEPARTMENT

Page 44: Vision ppt presentation

QUALITY CONTROL

Page 45: Vision ppt presentation

CHEMICAL ROOM

Page 46: Vision ppt presentation

CHEMICAL ROOM

Page 47: Vision ppt presentation

INSTRUMENT ROOM-1

Page 48: Vision ppt presentation

INSTRUMENT ROOM-1

Page 49: Vision ppt presentation

INSTRUMENT ROOM-2

Page 50: Vision ppt presentation

INSTRUMENT ROOM-3

Page 51: Vision ppt presentation

INSTRUMENT ROOM-1

Page 52: Vision ppt presentation

Quality Control Microbiology Room

Page 53: Vision ppt presentation

Quality Control Sterility Room

Page 54: Vision ppt presentation

HOT ZONE

Page 55: Vision ppt presentation

HOT ZONE

Page 56: Vision ppt presentation

Quality ControlBOD & INCUBATORS

Page 57: Vision ppt presentation

Quality ControlStability chamber

Page 58: Vision ppt presentation

Quality Assurance

Quality assurance deptt is responsible for in process control at all critical stages of manufacturing. QA

Department is also responsible for release of finished batch for distribution, control of documents

Page 59: Vision ppt presentation

Self Inspection System The company has a well-defined Self-Inspection

system through which all manufacturing functions. Engineering Department, Quality Control

Department and Warehouse are audited by a team of representative designated by Technical Director. The Team shall comprise of personnel from Production,

Quality Control , Quality Assurance & Engineering / Maintenance Department. The team shall observe &

check all processes, documents during self inspection programme

Page 60: Vision ppt presentation

Self Inspection System PersonnelPremises including personnel facilities.Maintenance of building & equipments.Storage of starting material & finished products.Equipments .Production & In -process controlsQuality control DocumentationSanitation & Hygiene.Validation & revalidation programme.Calibration of instruments or measurement system.Recall Procedure.Complaint Management.Labels Controls.Results of previous self inspection & any corrective steps taken.

Page 61: Vision ppt presentation

Self Inspection System The audit report includes the observations,

recommendations for the improvement and follow up actions required. The audit report is submitted to the

Technical Director and major action plans are discussed. Such inspection reports are for internal purpose and are

not shared with any other agency.

Page 62: Vision ppt presentation

Quality Assurance

Page 63: Vision ppt presentation

Control Sample Sufficient quantity of control samples of raw materials and finished products are retained

for future reference

Page 64: Vision ppt presentation

Finished Goods Finished goods placed on pallets, at controlled

Humidity &Room temperature

Page 65: Vision ppt presentation

Boilers

Page 66: Vision ppt presentation

Water SystemRaw Water Storage Tank

Page 67: Vision ppt presentation

Water SystemComprises of R.O. Plant, D.M. Water Plant and Multi-column

Distillation units. Water Purification is done by DM Water Plant, D.M. water stored in SS tank, and WFI from Multi-column

Distillation units are separately supplied to formulation area through UV lights in loop line system.

Page 68: Vision ppt presentation

D.M. Water loop line Diagram

Page 69: Vision ppt presentation

D.M. Water Storage Tank

Page 70: Vision ppt presentation

Reverse Osmosis Water Plant

Page 71: Vision ppt presentation

Water SystemMulti-column Distillation Plant

Page 72: Vision ppt presentation

WFI Water loop line Diagram

Page 73: Vision ppt presentation

Pure Steam Generator

Page 74: Vision ppt presentation

WFI Storage S.S. Tanks

Page 75: Vision ppt presentation

HVAC System Separate air handling system is provided to eliminate any

possible potential of Cross contamination from one processing area to another. Each critical process operation has its own air handling system, with HEPA filter temperature and humidity

control, there are 15 AHUs installed .

Page 76: Vision ppt presentation

AHU-system

Page 77: Vision ppt presentation

Service Floor Separate service area is maintained for AHU’s

and for other utilities

Page 78: Vision ppt presentation

Service Floor

Page 79: Vision ppt presentation

D.G.SET - 370KVA

Page 80: Vision ppt presentation

UTILITY AREAAIR COMPRSSUR

Page 81: Vision ppt presentation

UTILITY AREAVACCUM PUMP

Page 82: Vision ppt presentation

UTILITY AREAVAM

Page 83: Vision ppt presentation

FIRE SYSTEM

Page 84: Vision ppt presentation

THANK -YOU


Recommended