+ All Categories
Home > Documents > Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Date post: 14-Dec-2015
Category:
Upload: wilfred-stokes
View: 220 times
Download: 2 times
Share this document with a friend
Popular Tags:
12
Visit on Friday 15 th March 2013
Transcript
Page 1: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Visit on Friday 15th March 2013

Page 2: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Still a building site – due to open in August

Page 3: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

A standard classroom

Page 4: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Martine Scott taking pictures for the records

Page 5: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

A science lab – the chairs in the middle can be rearranged

Page 6: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Stairs that are wide with windows and outside light!

Page 7: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Home Economics – plenty of space

Page 8: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Toilets – the cubicle walls are still to be built! There will need to be discussion about the best design.

Page 9: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Looking into the canteen area – the steps on the right will also be an informal seating area

Page 10: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

A high quality wooden finish in many areas with plenty of daylight throughout the building

Page 11: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

High quality games hall. Very effective soundproofing panels and systems are used all over the school

Page 12: Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Quality Welsh slate finish to the outside walls


Recommended