+ All Categories
Home > Technology > Visure Solutions INCOSE Tool Vendor Challenge 2013

Visure Solutions INCOSE Tool Vendor Challenge 2013

Date post: 24-Jan-2015
Category:
Upload: visure-solutions
View: 175 times
Download: 1 times
Share this document with a friend
Description:
Visure Solutions INCOSE Tool Vendor Challenge 2013
Popular Tags:
26
Fernando Valera - Alliance Manager Tool Vendor Challenge INCOSE 25th of June, 2013
Transcript
Page 1: Visure Solutions INCOSE Tool Vendor Challenge  2013

Fernando Valera - Alliance Manager

Tool Vendor Challenge

INCOSE

25th of June, 2013

Page 2: Visure Solutions INCOSE Tool Vendor Challenge  2013

2

Tool Vendor Challenge Goals

The requirements

company

• Capture Stakeholder needs • Requirements Management • Capture the definition and description of the system including structure and behavior • Derive System Requirements • Capture Assumptions • Derive and capture external and internal Interfaces

• Decision Analysis • Design Optimization

• Capture and portray end-to-end Traceability between Requirements, System Model elements, and Designs including Allocations

• Conducting Impact Analysis (Ex:, requirement changes on system design, impact of delayed design features on requirements satisfaction)

• Gap Analysis/is anything missing (i.e. are all the requirements captured)?

• Consistency/accuracy/completeness checking (i.e. is the model correct? Does it comply with SysML/UPDM/other? Are there any errors in the model?)

• Automatically Generating Documentation such as an RFP, SPEC, ICD, Test Plan

• System Configuration Management (CM)/Change control • Modeling (Functional and/or Object) and Simulation

Page 3: Visure Solutions INCOSE Tool Vendor Challenge  2013

3

Understanding the problem

Problem Domain Model Use Case Diagrams

Context Diagrams

Page 4: Visure Solutions INCOSE Tool Vendor Challenge  2013

4

The Project Structure

Page 5: Visure Solutions INCOSE Tool Vendor Challenge  2013

5

Different types of Stakeholder needs

Page 6: Visure Solutions INCOSE Tool Vendor Challenge  2013

6

Capturing Stakeholder needs

Page 7: Visure Solutions INCOSE Tool Vendor Challenge  2013

7

Capturing Stakeholder needs

• Atomic requirements including:

Page 8: Visure Solutions INCOSE Tool Vendor Challenge  2013

8

Capturing Stakeholder needs

• Atomic requirements including:

– Rich Text Format capabilities, including OLE objects and tables

Page 9: Visure Solutions INCOSE Tool Vendor Challenge  2013

9

Capturing Stakeholder needs

• Atomic requirements including:

– Rich Text Format capabilities, including OLE objects and tables

– Graphical workflows capabilities

Page 10: Visure Solutions INCOSE Tool Vendor Challenge  2013

10

Capturing Stakeholder needs

• Atomic requirements including:

– Rich Text Format capabilities, including OLE objects and tables

– Graphical workflows capabilities

– Quick, automated documentation

Page 11: Visure Solutions INCOSE Tool Vendor Challenge  2013

11

Capturing Stakeholder needs

• Atomic requirements including:

– Rich Text Format capabilities, including OLE objects and tables

– Graphical workflows capabilities

– Quick, automated documentation

Page 12: Visure Solutions INCOSE Tool Vendor Challenge  2013

12

Capturing Stakeholder needs

• Atomic requirements including:

– Rich Text Format capabilities, including OLE objects and tables

– Graphical workflows capabilities

– Quick, automated documentation

– Synchronization with IBM Rational DOORS databases

Page 13: Visure Solutions INCOSE Tool Vendor Challenge  2013

13

Risk management and FMEA

• Automatic calculation of Risk Priority Number (RPN)

Page 14: Visure Solutions INCOSE Tool Vendor Challenge  2013

14

Deriving System Requirements

• System Requirements may be derived directly from the User

Requirements

Page 15: Visure Solutions INCOSE Tool Vendor Challenge  2013

15

Search for inconsistencies

within the specification

Page 16: Visure Solutions INCOSE Tool Vendor Challenge  2013

16

Gap Analysis: Are we missing anything?

Page 17: Visure Solutions INCOSE Tool Vendor Challenge  2013

17

Reusing existing elements

Are there existing

components that we can

reuse?

Page 18: Visure Solutions INCOSE Tool Vendor Challenge  2013

18

Semantic Search of reusable elements

Page 19: Visure Solutions INCOSE Tool Vendor Challenge  2013

19

Customer Requirements

System Requirements

Hardware Requirements Software Requirements

You already built a similar system?

Reusing existing elements

Page 20: Visure Solutions INCOSE Tool Vendor Challenge  2013

20

Component X

Why not reusing a defined subset of the requirements…

Reusing existing elements

Page 21: Visure Solutions INCOSE Tool Vendor Challenge  2013

21

Customer Requirements

System Requirements

Hardware Requirements Software Requirements

Component X

Customer Requirements

System Requirements

Hardware Requirements Software Requirements

… in the new project for the disaster relief?

Reusing existing elements

Page 22: Visure Solutions INCOSE Tool Vendor Challenge  2013

22

Customer Requirements

System Requirements

Hardware Requirements Software Requirements

Customer Requirements

System Requirements

Hardware Requirements Software Requirements

… in the new project for the disaster relief?

Reusing existing elements

Page 23: Visure Solutions INCOSE Tool Vendor Challenge  2013

23

Complete Impact Analysis

Page 24: Visure Solutions INCOSE Tool Vendor Challenge  2013

24

Complete Impact Analysis

Page 25: Visure Solutions INCOSE Tool Vendor Challenge  2013

25

Complete Impact Analysis

Page 26: Visure Solutions INCOSE Tool Vendor Challenge  2013

26

Thank you

Thanks for your attention!

Fernando Valera - Alliance Manager

[email protected]

c: +1 (415) 606-5851

Skype: fvalera.visure


Recommended