Vodafone Fixed/ Convergence Open Office 20 September 2017 1 Site visit
Transcript

Vodafone Fixed/ Convergence Open Office

20 September 2017

1

Site visit

12 cities already open to sale in FTTH

• More than 1.8m HHs passed

• More than 1.7m HHs available for sale

• Today’s visit: focus on Venice and Mestre area

– 142k HHs total

– 114k HHs Open Fiber coverage target (80%)

– 63k HHs available for sale (~57% of target)

– 2 active POPs

Vodafone and Open Fiber

Cagliari

Venezia

Palermo

Catania

NapoliBari

Perugia

Padova

= Open to sale

BolognaTorino

Genova

Milano

2

PFP Area 1024 HH

• FTTH architecture allow reduced number of POPs and no street

active equipment

• User access speed is independent of distance

(from the cabinet or the central office)

FTTH: an efficient coverage strategy

POP1:16

PTA

PTE

PTE

ONT

ONT

ONT

ONT

ONT

ONT

PFS

1:16

PTA

PTE

PTE

ONT

ONT

ONT

ONT

ONT

ONT

PFS

1:16

PTA

PTE

PTE

ONT

ONT

ONT

ONT

ONT

ONT

PFS

256 House holds

1:16

PTA

PTE

PTE

ONT

ONT

ONT

ONT

ONT

ONT

PFS

Venice coverage

FTTC – 554 Active Elements (CAB)

FTTH – 1 Active Element (POP)

OLT1:4

PFP

Each PON tree connects up to 64 active

users over 1024 potential customers

for efficient PON occupation during

customers acquisition and migration

1024 House holds

1024 House holds

Primary

fibre ring

7 Km

PON 1:64 splitting 256 PtP fibres

OLT

Long reach fibre and PON+PtP flexibility

reduce number of active nodes and allow

efficient coverage during rollout

PFP Area

1024 HH

OLT – Optical Line Termination

ONT – Optical Network Termination

POP – Point of Presence

PFP – Primary flexibility point

PFS – Secondary flexibility point

PTA – Street Termination Box

PTE – Building Termination Box

Open FiberOpen Fiber Open Fiber

Open Fiber

PON (Passive Optical Network) Architecture elements

Up to 64

users per PON1:16

ONT

ODF

Optical Distrib. Frame

optical socket

ONToptical socket

VF-IT

OLTOptical Line Termination

10G

1G

1G/10G services over the same passive infrastructure

POP

PFP PFS PTE

mini-dig

aerial

New fibre roll-out techniques,

both aerial (in synergy with

power distribution) and with

mini-digs, reduce cost and time

for deployment.

1:4

OLT – Optical Line Termination

ONT – Optical Network Termination

POP – Point of Presence

PFP – Primary flexibility point

PFS – Secondary flexibility point

PTA – Street Termination Box

PTE – Building Termination Box

Primary

flexibility point

Secondary

flexibility pointBuilding

Termination

Box

Vodafone

IT Network

Open Fiber

Vodafone

4

POP

OTDR

FTTH customer activation

PTEPFSPFP

ODFVF-IT

OLT

ONToptical socket

ONT

1:64 PON 256 PtP

3

optical socket4

5

3. Customer dedicated fibre identification and

cross-connection to Operator splitter/PON

at Secondary Flexibility Point (PFS)

1:161:4

2. Automatic pre-provisioning of network

5. ONT connection and fibre line verification(VOX and ONT shipped to Open Fiber warehouse by Vodafone)

1. FTTH line request trigger coverage verification

and start activation process

2

4. Vertical installation (if not present),

customer Optical socket installation and

connection at Building Termination Box (PTE)

6. E2E service activation

Coverage

verification

Connection

at PFSPre-Provisioning

1

Fibre Line

verification

1 2 3FTTH line

request

5Vertical and

Connection at PTE

4Service

activation

6

6

Open Fiber

Vodafone

5

FTTH customer assurance

POP

PTEPFSPFP

VF-IT

OLT

ONToptical socket

ONToptical socket

3

Ticket

Opening

Fault

location

1

1Proactive

monitoring

or

Customer

Complain

Check and

Ticket Closure

ODF

OTDR

2

4

1:161:4

4Fault

fixing

2 3

!

• No issue of power loss as no active

street elements installed

• Passive fibre infrastructure has

very limited incident rate

• FTTH Service has half the trouble

tickets compared to FTTC

Managed by

Vodafone

Active elements issue

Passive

Infrastructure

issue

Analysis

Open Fiber

Vodafone

1:64 PON 256 PtP

6

Venice FTTH tour – timing

8:00 8:15

S - Hotel (FTTH introduction - presentation)8:15 8:30

8:30 8:45

8:45 9:00 Transfer to Site 1Transfer to Site 2

9:00 9:15 1 - Giudecca (split into 2 sub-groups)

9:15 9:30 A. PFP and PFS B. PTE+Vertical 2 - Rialto (split into 2 sub-groups)

9:30 9:45 B. PTE+Vertical A. PFP and PFS A. Demo in VF Shop B. fibre in historical area

9:45 10:00Transfer to Site 2

B. fibre in historical area A. Demo in VF Shop

10:00 10:15Transfer to Site 1

10:15 10:30 2 - Rialto (split into 2 sub-groups)

10:30 10:45 A. Demo in VF Shop B. fibre in historical area 1 - Giudecca (split into 2 sub-groups)

10:45 11:00 B. fibre in historical area A. Demo in VF Shop A. PFP and PFS B. PTE+Vertical

11:00 11:15Transfer to Hotel

B. PTE+Vertical A. PFP and PFS

11:15 11:30 Transfer to Hotel

11:30 11:45S - Hotel (Wrap Up and Q&A)

11:45 12:00

RialtoGiudecca

S

1

2

S. San Clemente

1. Giudecca

2. Rialto

S - 1: 10 minS - 2: 30 min1 - 2: 20 min

Time for transfer

OLT

7

A. PFP – P.to Flessibilita’ Primario

Primary Flexibility Point (1:4 splitter)

B. PFS – P.to Flessibilita’ Secondario

Secondary Flexibility Point (1:16 splitter)

C. PTE – P.to Terminazione Edificio

Building Termination Box

Giudecca - details

8

C

BA

PFP

PFS

PTE+Vertical5min

on foot

Campo

Junghans

Docking point

Campo Junghans

Rialto - details

9

PFP manhole

Aerial fibre

Vodafone Store

A. Fibre rollout in an historical area

B. Aerial fibre

C. Vodafone Shop demo

C

B

A

Vodafone store

Docking point

Rialto

Venice FTTH Tour – takeaways

10

• Single POP to cover all Venice (no distance limits)

• No street active elements (easy assurance and half faults compared to FTTC)

• Easy activation thanks to street passive flexibility

points (splitters in PFP and PFS)

• Positive results in Vertical installations

• Mini-digs for efficient fibre deployment with no aesthetic impacts

• Fast aerial fibre rollout with strong synergy

with electrical infrastructure

• FTTH is the only future proof technology for up to 10G services

• Fibre Infrastructure; primary

& secondary fibre flexibility

point (PFP/PFS)

• Building Termination Box

(PTE) and vertical solutions

1. Fibre rollout in an

historical area

2. Aerial fibre techniques

3. Vodafone Shop demo

PFP

Vertical

1 - Giudecca

2 - Rialto

PFS

2

3

1

11