16/5/12 W2W - Waste to Wealth W2W Waste to Wealth A new approach to waste management
Transcript
Page 1: W2W

16/5/12W2W - Waste to Wealth

W2WWaste to WealthA new approach to waste management

Page 2: W2W

16/5/12

Aims & Objectives The Waste to Wealth project aims at dramatically improve the waste

management arena and provide a novel and sustainable model for addressing both the needs of the society in terms of waste management and access to resources, as well as tackle certain aspects of modern urban poverty and social distress.

1

Page 3: W2W

16/5/12

Planned activities

1) develop small equipped mobile units that could allow selective collection/recycling

2) exploit bio-mas & exhausted oil for energy generation

3) develop a facility for the re-use of resources recovered throughout recycling

4) develop facilities for reconditioning recovered appliances

5) develop small facilities to produce fully electrical cars from recuperated secondary resources

2

Page 4: W2W

16/5/12

Expected Outcomes

1) address a major environmental issue (waste management)

2) better the conditions of people living in disadvantaged areas

3) allow recovering significant resources (copper, aluminium, glass, plastic, paper, wood pellets, compost, appliances, equipment exhausted oils and batteries that can be re-conditioned, material for bio-mas and composting)

4) generate a local integrated eco-system where waste is turned both into a resource and a source of work

5) prove that electrical cars and recuperated resources are a viable approach for addressing several socio-economic problems including work scarcity.

3

Page 5: W2W

An example

The H&L #1 Landfill site located south of Danville, Illinois between Highland Boulevard, the Vermilion River and Interstate 74.

4

Page 6: W2W

Equipment in 40ft containersOffices in 40ft containersPower generation containers

Gas collection pipesPower distribution lines

Site parcelling and recuperation phases progression.Equipment and facilities will be progressively relocated during the various phases until completion is reached.

Gas collection and power distribution is shown not in scale but in terms of principle. Directional drilling will be used to place the gas collection pipes and capture devices along with temporary covering so as to ensure maximum harvesting of bio-gas present and at the same time minimise neighbourhood disturbance

Equipment and offices will move close to the new parcel to process while resting on recuperated land