+ All Categories
Home > Documents > w4325 - Think Asia, Think Hong...

w4325 - Think Asia, Think Hong...

Date post: 13-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
41
1
Transcript
Page 1: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1

Page 2: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

http://www.flickr.com/photos/trodel/3598488389/sizes/l/

Sustainable Infrastructure DevelopmentSustainable Infrastructure Development-- Hong KongHong Kong’’s Experience and Visions Experience and Vision

Mr WAI ChiMr WAI Chi--singsingPermanent Secretary for Development (Works)Permanent Secretary for Development (Works)

Government of the Hong Kong Special Administrative RegionGovernment of the Hong Kong Special Administrative Region

Page 3: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

33

Hong Kong Special Administrative RegionHong Kong Special Administrative Region

http://hk.bing.com/images/

Page 4: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

44

Shenzhen

Hong KongIsland

LantauIsland

Kowloon

New Territories

South China Sea

Area : 1,104 km2

Developed area : below 25% landmassPopulation : 7.1 million

Page 5: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

55

Airport Core Programme Era 8 Large Scale Projects Era

20072007-- 0808

20092009-- 1010

20202020-- 2121

beyond beyond 20212021

HK$HK$BnBn

HKSAR Government Expenditure on Capital Works ProjectsHKSAR Government Expenditure on Capital Works Projects

HK$60B(£4.8B)

HK$30B(£2.4B)

8 Large Scale Projects Era

Airport Core Programme Era

Ten Major Infrastructure Projects Era

Long Term Vision

Page 6: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

66

1990s : Airport Core Programme Era1990s : Airport Core Programme EraHong Kong International AirportAirport RailwayNorth Lantau ExpresswayTsing Ma BridgeWestern Kowloon ExpresswayWestern Harbour TunnelWest Kowloon Reclamation etc.

http://hk.bing.com/images/search?q=hong+kong+international+airport&viei

1993/95 : HK$30B (£2.4B)ACP Projects : HK$155B (£12.4B)

Page 7: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

77

2000s : Eight Large Scale Projects Era2000s : Eight Large Scale Projects EraSheung Shui to Lok Ma Chau Spur LineHK-Shenzhen Western CorridorContainer Terminal No.9Route 8 (Shatin to Tsing Yi Link)Penny’s Bay DevelopmentCentral Reclamation Phase III etc.

Source: http://www.hyd.gov.hk/chi /major/road/projects/6759th/

2003/04 : HK$31B (£2.48B)8 Major Projects : HK$72B (£5.76B)

Page 8: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

88

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects Era

1. The Guangzhou-Shenzhen Hong Kong Express Railway Link

2. Hong Kong-Zhuhai-Macao Bridge3. Hong Kong-Shenzhen Western Express Line4. Lok Ma Chau Loop

8. West Kowloon Cultural District9. Kai Tak Development10. New Development Areas

Transportation Projects5. South Island Line6. Sha Tin to Central Link7. Tuen Mun-Chek Lap Kok Link

and Tuen Mun Western Bypass

Area Development Projects

Cross Boundary Projects

2011/12 : HK$58.3B (£4.66B)10 Major Projects : >HK$700B (£56B)

Page 9: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

99

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects EraCross Boundary ProjectsCross Boundary Projects

Total estimate : HK$293B (£23.4B)Expenditure incurred : HK$12B (£0.96B)Construction programme : 2009 - 2020

Guangzhou-Shenzhen-Hong Kong Express Rail Link (Hong Kong Section)

Page 10: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1010

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects Era

Hong Kong-Zhuhai-Macao Bridge

Cross Boundary ProjectsCross Boundary ProjectsTotal estimate : HK$293B (£23.4B)Expenditure incurred : HK$12B (£0.96B)Construction programme : 2009 - 2020

Page 11: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1111

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects Era

Hong Kong –Shenzhen Western Express Line Hong Kong International Airport

Cross Boundary ProjectsCross Boundary ProjectsTotal estimate : HK$293B (£23.4B)Expenditure incurred : HK$12B (£0.96B)Construction programme : 2009 - 2020

Page 12: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1212

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects Era

Lok Ma Chau Loop

Cross Boundary ProjectsCross Boundary ProjectsTotal estimate : HK$293B (£23.4B)Expenditure incurred : HK$12B (£0.96B)Construction programme : 2009 - 2020

Page 13: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1313

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects Era

South Island Line (East)

Transportation ProjectsTransportation ProjectsTotal estimate : HK$134B (£10.7B)Expenditure incurred : HK$1.7B (£0.14B)Construction programme : 2011 - 2020

Page 14: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1414

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects EraTransportation ProjectsTransportation Projects

Total estimate : HK$134B (£10.7B)Expenditure incurred : HK$1.7B (£0.14B)Construction programme : 2011 - 2020

Shatin to Central Link

Exhibition Station

Source: http://www.mtr-shatincentrallink.hk/en/project-details/alignment.html

Page 15: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1515

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects Era

Tuen Mun-Chek Lap Kok Link &Tuen Mun Western Bypass

Transportation ProjectsTransportation ProjectsTotal estimate : HK$134B (£10.7B)Expenditure incurred : HK$1.7B (£0.14B)Construction programme : 2011 - 2020

Page 16: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1616

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects Era

West Kowloon Cultural District

Area Development ProjectsArea Development ProjectsTotal estimate : HK$288B (£23B)Expenditure incurred : HK$2.1B (£0.17B)Construction programme : 2011 - 2020

Page 17: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1717

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects EraArea Development ProjectsArea Development Projects

Total estimate : HK$288B (£23B)Expenditure incurred : HK$2.1B (£0.17B)Construction programme : 2011 - 2020

Kai Tak Development

Page 18: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1818

2007+ : Ten Major Infrastructure Projects Era2007+ : Ten Major Infrastructure Projects Era

New Development Areas

Area Development ProjectsArea Development ProjectsTotal estimate : HK$288B (£23B)Expenditure incurred : HK$2.1B (£0.17B)Construction programme : 2011 - 2020

Page 19: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

1919

Other Upcoming Projects to Create a Quality CityOther Upcoming Projects to Create a Quality CityCommunity Services : HK$94B (£7.5B)Sewage Treatment : HK$39.5B (£3.16B)Highway Network : HK$24.5B (£1.96B)Heritage Conservation : HK$220M (£17.6M)

Page 20: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2020

20W0s : Long Term Vision20W0s : Long Term Vision

1. Northern Link2. North Island Line3. South Island Line (West)4. Highway Network

7. Further Development of Tung Chung8. Reclamation Outside Victoria Harbour9. Rock Cavern Development10. Quarries Rehabilitation

Airport & Port Projects5. Third Airport Runway6. Container Terminal No.10

Land Development Projects

Transportation Projects

Utilities & Services Projects11. Seawater Desalination12. Integrated Waste Management Centre

Page 21: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2121

Transportation ProjectsTransportation Projects

20W0s : Long Term Vision20W0s : Long Term Vision

Northern Link

Page 22: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2222

Northern Island Line

20W0s : Long Term Vision20W0s : Long Term VisionTransportation ProjectsTransportation Projects

Page 23: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2323

20W0s : Long Term Vision20W0s : Long Term VisionTransportation ProjectsTransportation Projects

South Island Line (West)

Page 24: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2424

20W0s : Long Term Vision20W0s : Long Term Vision

Highway Network

Transportation ProjectsTransportation Projects

Page 25: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2525

Airport & Port ProjectsAirport & Port Projects

Third Airport Runway

20W0s : Long Term Vision20W0s : Long Term Vision

Page 26: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2626

Container Terminal No.10

20W0s : Long Term Vision20W0s : Long Term Vision

Source: www.flickr.com/photos/14338528@N07/3832759372/

Airport & Port ProjectsAirport & Port Projects

Page 27: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2727

Further Development of Tung Chung

20W0s : Long Term Vision20W0s : Long Term Vision

http://en.wikipedia.org/wiki/File:Tung_Chung_overlook.jpg

Land Development ProjectsLand Development Projects

Page 28: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2828

Reclamation Outside Victoria Harbour

20W0s : Long Term Vision20W0s : Long Term Vision

http://en.wikipedia.org/wiki/File:International_Commerce_Centre_%26_International_Finance_Centre_201007.jpg

Land Development ProjectsLand Development Projects

Page 29: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

2929

Rock Cavern DevelopmentShatin Sewage Treatment Works

20W0s : Long Term Vision20W0s : Long Term VisionLand Development ProjectsLand Development Projects

Page 30: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3030

Quarries Rehabilitation

20W0s : Long Term Vision20W0s : Long Term VisionLand Development ProjectsLand Development Projects

Page 31: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3131

Utilities & Services ProjectsUtilities & Services Projects

Seawater Desalination

20W0s : Long Term Vision20W0s : Long Term Vision

Page 32: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3232

Integrated Waste Management Centre

20W0s : Long Term Vision20W0s : Long Term Vision

Existing operation of Hong Kong Waste

Treatment and Disposal Facilities

Utilities & Services ProjectsUtilities & Services Projects

Page 33: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3333

Business Business Opportunities for Opportunities for UK Construction UK Construction SectorSector

Page 34: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3434

HK$HK$BnBn

Airport Core Programme Era 8 Large Scale Projects Era

20072007-- 0808

20092009-- 1010

20202020-- 2121

beyond beyond 20212021

Airport Core Programme EraGovernment Expenditure on Capital Works ProjectsGovernment Expenditure on Capital Works Projects

long term visionlong term vision

1. Sustainable infrastructure development :1. Sustainable infrastructure development :

HK$60B (£4.8B)

Page 35: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3535

Airport Core Programme Era

2. Emphasis on high quality services :2. Emphasis on high quality services :

Creative Creative designsdesignsInnovative Innovative technologiestechnologies

Creative Creative designsdesignsInnovative Innovative technologiestechnologies

Page 36: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3636

Airport Core Programme Era

3. Wide variety of challenging projects :3. Wide variety of challenging projects :

Page 37: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3737

1. List of approved contractors for public works – Five categories :

• Buildings• Port Works• Roads & Drainage• Site Formation• Waterworks

2. List of approved specialist contractors –49 categories

3. Through joint venture with listed contractors :

• Incorporated JV• Unincorporated JV

CategoriesCategories 1. List of Architectural & Associated Consultants –Six categories :

• Architectural• Building Services• Building Surveying• Landscape

Architectural• Quantity Surveying• Structural

Engineering

2. Directory of Engineering & Associated Consultants –18 categories

3. Through joint venture with listed consultants

ContractorsContractors ConsultantsConsultants

4. Open and transparent system4. Open and transparent system……

Page 38: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3838

List of approved contractors for public works and List of approved specialist contractors :

• Financial capability• Past experience• Managerial & technical

staff• ISO 9000 Certification

Admission Admission RequirementsRequirements

1. List of Architectural & Associated Consultants :

• Qualified professional staff

• Relevant local experience

• ISO 9000 Certification

2. Directory of Engineering & Associated Consultants : no entry requirements

ContractorsContractors ConsultantsConsultants

(Note : Overseas experience certified by the relevant authorities will also be accepted )

4. Business4. Business--friendly environment :friendly environment :

Page 39: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

3939

We welcome you to partner with us in this We welcome you to partner with us in this New Era of infrastructure development !New Era of infrastructure development !

Email : [email protected] : [email protected]

Page 40: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

40

Page 41: w4325 - Think Asia, Think Hong Kongthinkasiathinkhk.com/uk/download/synopsis/session6/ir_chi_sing.pdf5 Airport Core Programme Era 8 Large Scale Projects Era 2007 - 08 2009-- 10 2020

41


Recommended