+ All Categories
Home > Documents > WADPA Sildes by Syeam@Yahoo

WADPA Sildes by Syeam@Yahoo

Date post: 10-Apr-2018
Category:
Upload: syeam-khalil
View: 215 times
Download: 0 times
Share this document with a friend

of 21

Transcript
  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    1/21

    1

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    2/21

    Special ThanksSpecial Thanks

    TOTOAll MightyAll Mighty

    2

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    3/21

    Presented By:Presented By:

    SYEAM KHALILSYEAM KHALIL

    3

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    4/21

    MyMy PresentationPresentation on:on:

    WWATERATERAANDND PPOWEROWER DDEVELOPMENTEVELOPMENTAAUTHORITYUTHORITY4

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    5/21

    WAPDAWAPDA - Introduction

    WAPDAWAPDA

    Water and Power Development Authority, was established in 1958

    WAPDA is a non profit organization. The Chairman of WAPDA is Raja Perveiz

    Ashraf. The responsibility of WAPDA is generation , transmission and

    distribution of power. Save water, control flood . WAPDA is responsible for the

    development of the Hydrel Power and water projects in Pakistan. The golden

    period of WAPDA is between 1995 to 1998. the division of WAPDA is to produce

    35000MW in 2025.

    5

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    6/21

    Mission StatementMission Statement

    Our Mission is to bring the assurance of energy to our

    costumers, with world class quality and commitment for the

    satisfaction as we continue in our quest for excellence. WAPDA

    wants to contribute in the development of Pakistan by managing

    smoothly.

    6

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    7/21

    Vision OfWAPDAVision OfWAPDA

    The vision of WAPDA is to provide electricity in every door step of

    all over Pakistan .

    So in this way to achieve this milestone they want to create 35000

    MW till the end of 2025.

    7

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    8/21

    WingsWings ofofWAPDAWAPDA

    There are three main wings of WAPDA.

    1. Water Wing.

    2. Power Wing.

    3. Finance/Coordination Wing.

    Employees Benefit ProgramsEmployees Benefit Programs

    Employees benefit program are

    1. Medical.

    2. Education.

    3. Pension.

    4. Housing.

    5. Training.

    8

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    9/21

    1. Terbella Dam

    2. Warsac Dam

    3. Mangla Dam

    4. Other Small Dams

    5. WAPDA Tharmal

    6. Fuel Wise Generation

    Sources Of GenerationSources Of Generation

    9

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    10/21

    Hydrel Generat

    ion Capac

    ity

    Hydrel Generat

    ion Capac

    ity

    The total capacity of 13 Nos. Hydrel Stations as of today is

    6443.56 - 6444 MW which is 37.10% of total installed generation

    capacity of WAPDA.

    During 2007-2008, aggregate energy sharing during was 33.32%.

    The Hydrel Generation Capacity was reduced from 6463.16 MW

    to 6443.56 MW due to decommissioning of Jabban Hydrel

    Power Station after a fire incident in November, 2006.

    10

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    11/21

    Work Done By MeWork Done By Me

    Foreign Currency Department

    1. Core Working

    2. PC2

    3.PC1

    4. Why WAPDA takes loans

    5. Return Rate

    6. Direct Loan

    7. In-Direct Loan

    11

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    12/21

    Work Done By MeWork Done By Me

    Co-ordination Department

    1. Investment

    2. Book Keeping

    Director ofWater Department

    1. Work Plan

    2. Cash Plan

    12

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    13/21

    Work Done By MeWork Done By Me

    Marine Insurance Department

    1. Marine Insurance Procedure2. Benefits for Marine insurance in WAPDA

    3. Claim Date of loses in Marine Insurance

    13

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    14/21

    Work Done By MeWork Done By Me

    Hydrel Department

    1. Energy Purchase Price2. Budget Section

    3. Share Electricity Between different Areas

    4. Regulatory Tariff Authority.

    14

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    15/21

    SWOT ANALYSISSWOT ANALYSIS

    Strength

    1. Increase Demand

    2. Monopoly

    3. Huge Amount Of Assets

    4. Insured Assets

    5. Pension System

    6. Development Projects

    7. Cheaper Price Production

    15

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    16/21

    SWOT ANALYSISSWOT ANALYSIS

    Weakness

    1. Political Instability

    2. War Against Terrorism

    3. Lack Of Loyalty

    4. Demand Increase Day by Day

    5. Employees are Low Productive

    6. Wastage Of Resources

    16

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    17/21

    SWOT ANALYSISSWOT ANALYSIS

    Opportunities

    1. Can Produce 80,000 MW

    2. Gomal Zam DAM

    3. Meran Dam

    4. Mungla Dam Up Rising.

    5. Re generate Electricity through Terbaila DAM

    6. New Technology

    17

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    18/21

    SWOT ANALYSISSWOT ANALYSIS

    Threats

    1. Labor Union

    2. Political instability

    3. Slow developments program

    4. Uncertain Economic Condition

    5. Bad Reputation

    6. Terrorism

    7. Electric city demand increase day by day

    18

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    19/21

    RECO

    MMENDA

    TION

    SRE

    COMMEN

    DA

    TION

    S

    Threats

    1. Investment

    2. Line Losses

    3. Media Campaign

    4. Electricity Saver Appliances

    5. Privatization

    6. Training and Development

    7. Financial Charges

    8. Free in decision making9. Contract with IPPS

    10.Courses

    11.Control Line Losses

    19

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    20/21

    CONCLUSIONCONCLUSION

    20

  • 8/8/2019 WADPA Sildes by Syeam@Yahoo

    21/21

    21


Recommended