WAKARUSA WASTEWATER TREATMENT PLANT AND CONVEYANCE CORRIDOR UPDATE CITY PROJECT UT1304 06 January 2015
Transcript
Page 1: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

WAKARUSA WASTEWATER TREATMENT PLANT

AND CONVEYANCE CORRIDOR UPDATE CITY PROJECT UT1304

06 Ja

nuar

y 20

15

Page 2: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

PROJECT OVERVIEW

2

The Wakarusa Wastewater Treatment Plant (WWTP) and Conveyance Corridor facilities will:

o Mitigate wet weather surcharging of sanitary sewers along the 31st Street Corridor

o Reduce wet weather overloading at the existing WWTP

o Provide 20% additional treatment capacity for future growth of community

o Take the first step in the City’s Integrated Plan to meet new environmental regulations for nutrient removal

Page 3: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

PROJECT OVERVIEW

3

Consequences of not proceeding:

o Limited ability to reliably serve existing customers in the highlighted areas served by the 31st Street collection system

o Wet weather overloading at the existing WWTP will continue and get worse, again decreasing service reliability to current customers.

o Community growth will be limited due to a lack of treatment and wet weather handling capacity.

o Increased possibility of formal and aggressive regulatory actions mandating system expansion and improvement.

Page 4: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

PROJECT OVERVIEW

4

Project UT1304 includes:

• Wakarusa WWTP

• Pump Station 10

• Force Mains

• Kansas River WWTP Improvements o Lab expansion o Final clarifier equipment

Page 5: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

• One 2.5 MGD process train versus two 1 MGD trains

• Option for two 2.5 MGD trains (5 MGD total)

• Flexibility to manage flows at 31st and LA (PS10)

• Selected alternative forcemain route

• Upsized forcemains and space for a future 3rd line

• Replacement of Clarifier equipment at KS River WWTP

• Changed site for compliance lab functions to KS River WWTP

• Added enhancements to Baker Wetlands as part of easement agreement.

PROJECT MODIFICATIONS SINCE THE 2012 MASTER PLAN CONCEPT

5

Presenter
Presentation Notes
One 2.5 MGD process train versus two 1 MGD trains - Larger process trains provides facilities that in the future can be added to rather than torn out. - Fewer pieces of equipment to maintain - Added 20% capacity based on more detail analysis of flows at 31st street Option for two 2.5 MGD trains (5 MGD total) With actual bid price value of adding additional capacity now can be considered Flexibility to manage flows at 31st and LA (PS10) - Option to deliver flows from 31st and LA to either plant provides flexibility and reliability Selected alternative forcemain route - The route is shorter and flatter and therefore provides long term benefits in energy savings and thus reduces operational costs and environmental impacts. Upsized and redundant (2 versus 1) forcemains - Added reliability with two force mains and ability to expand capacity Replacement of Clarifier equipment at KS River WWTP Equipment is failing and acquisition with major project providing like equipment will save $ Changed site for compliance lab functions to KS River WWTP - Centralized and expanded laboratory at Kaw WWTP is more practical Added enhancements to Baker Wetlands as part of easement agreement. - Allowed utilizing the shorter and flatter route for the forcemains - Will increase opportunities for the public to access the Baker Wetlands facilities and connections with City trails.
Page 6: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

• 2003 Wastewater Utilities Master Plan recommended new WWTP o Recommended 7.0 MGD plant for a projected 2025 population of 150,000

• 2005 – Solicited Proposals for Engineering Services o Site identification, evaluation, and acquisition

• 2006 Wakarusa WWTP Site Investigation Report o Evaluated 7 potential sites o Recommended site at 41st & O’Connell (N1175 & E1600) o City purchased 538 acres for new WWTP in 2007

• 2007 – Wakarusa WWTP Basis of Design Report o 7.0 MGD plant and Four Seasons Pump Station improvements o Applied for and received Kansas Department of Health Environment (KDHE)

discharge permit

• 2007 – Adopted Resolution 6717 o Construction of new WWTP, pump stations, and other improvements at

estimated cost of $88 million

• November 2007 – Project placed on hold o Allowed City to reassess all aspects of proposed system

PROJECT HISTORY

6

Page 7: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

• 2012 Wastewater Utilities Master Plan and Capital Improvements Program o Initial size of WWTP facility could be reduced to 2.0 MGD based on a

projected 2030 population of 120,000 o Recommended new location for Pump Station 10 o Recommended WWTP and conveyance facilities to be online by 2018 o Estimate of expenditures at $64 Million over the 5-year CIP

• 2013 – Issued RFP for Engineering Services for the Wakarusa WWTP

and Conveyance Corridor Facilities o Selected Design Team - Black & Veatch, PEC, Bartlett & West, and Treanor o City purchased site for Pump Station 10

• 2014 – Authorized Final Design Services and Awarded Construction

Contracts o Authorized Supplement Agreements to Initial Engineering Services o Awarded Contracts 1 and 2A (Force Mains) o Awarded Contract 3 (Wakarusa WWTP Site Fill and Access Roads)

PROJECT HISTORY

7

Page 8: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

2014 Advertise, Bid, and Award • Haskell Casing Pipe Installation (April)

o Emery Sapp & Sons - $88,600

• Force Mains/Baker Wetlands Improvements (August) o BRB Contractors - $8,764,707

• Site Fill and E1600/N1175 Road Improvements (July) o King’s Construction - $5,086,414

2015 Advertise, Bid, and Award • Wakarusa WWTP, Pump Station 10, Kansas River WWTP Lab Expansion

STATUS OF WAKARUSA WWTP AND CONVEYANCE CORRIDOR CONSTRUCTION CONTRACTS

8

Presenter
Presentation Notes
Casing Pipe / Force Mains Installing 4 miles of force mains - 15% increase in force mains Installing 2 miles of fiber Operations savings of over $2.0 Mil over 20 years Wakarusa WWTP Site Fill and Roads 25 Acre Site - 405,000 cubic yard of fill Raise Site to protect during 500 yr flood event Provide Flood Mitigation Channel Construct 41st Street & O’Connell Road - 1.33 miles of additional roads
Page 9: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

• January 13th – Request permission to set bid date • January 14th – Advertise Project • January 28th – Pre Bid Meeting at 9:00 am at City Hall • February 17th – Receive Bids at 2:00 pm at City Hall • March 10th – Award Project • March 31st – Issue Notice to Proceed • May 1st – Approx Construction Start Date

UT1304-CONTRACT 4 WAKARUSA WWTP AND CONVEYANCE CORRIDOR ADVERTISE, BID, AND AWARD SCHEDULE

9

Page 10: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

2013 to 2017 CIP is $161 Million

PROJECT FUNDING

10

Presenter
Presentation Notes
~2 years ago CC adopted 5-Year CIP DWAG project summary Wakarusa Others in CIP Report
Page 11: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

2013 to 2017 CIP is $161 Million

Wakarusa WWTP Total Project is $65 to $70 Million (Estimated Project Cost)

PROJECT FUNDING

11

Presenter
Presentation Notes
~2 years ago CC adopted 5-Year CIP DWAG projects Wakarusa Others in CIP Report 2013 to 2017 CIP can deliver the Wakarusa Base Bid Project
Page 12: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

2013 to 2017 CIP is $161 Million

Wakarusa WWTP Total Project is $65 to $70 Million (Estimated Project Cost)

2013 to 2017 CIP – Funds the Wakarusa Base Bid

PROJECT FUNDING

12

Presenter
Presentation Notes
~2 years ago CC adopted 5-Year CIP DWAG projects Wakarusa Others in CIP Report 2013 to 2017 CIP can deliver the Wakarusa Base Bid Project
Page 13: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

2013 to 2017 CIP is $161 Million

Wakarusa WWTP Total Project is $65 to $70 Million (Estimated Project Funded by 2013 to 2017 CIP)

Wakarusa WWTP Total Project plus Alternatives is $72 to $77 Million

(May or May Not be Funded by 2013 to 2017 CIP)

PROJECT FUNDING

13

Presenter
Presentation Notes
2013 to 2017 CIP can deliver the Wakarusa Base Bid Project CIP/Rate Plan May or May Not Fund Alternatives More on the alternatives later in presentation
Page 14: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

• Pump Station 10 • Force Mains • Baker Wetland Enhancements

OVERALL PROJECT CONSISTS OF AN INTEGRATED TEAM WITH LOCAL PRESENCE

14

• Surveying, Permitting, Platting • WWTP Site Work, Access Roads and Plant Outfall • WWTP Peak Flow Storage Basin

• Wakarusa Administration and Pump Station 10 • Kansas River WWTP Lab Expansion

• Overall Project Coordination • Wastewater Treatment Plant • Kansas River WWTP Lab Expansion/Clarifiers

• Design, Construction & Programming of Control Systems • Planning and Development Coordination • LEED Administration

Page 15: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

• Transfer flows to either Wakarusa or Kansas River WWTP

• Wet well redundancy

• All equipment is

internal

• Odor control is provided

• Continuously monitored through SCADA Network

15

Pump Station 10

Louisiana Street

Flow Diversion

Proposed Pump Station 10

Page 16: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

16

Biological Nutrient Removal (BNR) Basins

Headworks Complex

Final Sludge PS

Vehicle Storage & Maintenance Building

Chemical Storage & Feed

Peak Flow Storage Basin

Administration Building

Proposed Wakarusa WWTP

Final Clarifiers

WAS Thickening

Solar PV

UV Disinfection Plant Outfall

Page 17: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

• “Green” roof at Pump Station 10

• LED lighting will be provided at all facilities

• Flood mitigation and stormwater retention ponds

• Ground-mount up to 200 kW solar photovoltaic system for on-site renewable energy

PUMP STATION 10 / WAKARUSA WWTP DESIGN FEATURES

17

Page 18: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

• Advanced treatment will be provided

• Ultraviolet (UV) light for disinfection

• Treated water will be reused within plant

• Biosolids to be land applied

• Wakarusa WWTP Administration Building will be LEED certified

PUMP STATION 10 / WAKARUSA WWTP DESIGN FEATURES

18

Page 19: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

PROJECT COST ESTIMATES

19

• Wakarusa WWTP, PS10, and KS River WWTP Improvements Base Bid: $40-45 Million

• Construction Phase Engineering Services: $5-6 Million

• Total Project Estimate, w/o Alternatives: $65-70 Million

• Total Project with all Additive Alternatives: $72-77 Million o 2.5 to 5.0 MGD Flow Increase o Solar Panels - 100 or 200 kW o Meeting space

Page 20: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

• January 13th – Request permission to set bid date • January 14th – Advertise Project • January 28th – Pre Bid Meeting at 9:00 am at City Hall • February 17th – Receive Bids at 2:00 pm at City Hall • March 10th – Award Project • March 31st – Issue Notice to Proceed • May 1st – Approx Construction Start Date

UT1304-CONTRACT 4 WAKARUSA WWTP AND CONVEYANCE CORRIDOR ADVERTISE, BID, AND AWARD SCHEDULE

20

Page 21: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

WAKARUSA WWTP AND CONVEYANCE CORRIDOR FACILITIES

21

Proposed Wakarusa WWTP

Proposed Sludge PS

Proposed Administration Building

Proposed Pump Station 10

Page 22: WAKARUSA WASTEWATER TREATMENT PLANT … CIty...•2003 Wastewater Utilities Master Plan recommended new WWTP oRecommended 7.0 MGD plant for a projected 2025 population of 150,000 •2005

WAKARUSA WASTEWATER TREATMENT PLANT

AND CONVEYANCE CORRIDOR UPDATE PROJECT UT1304

06 Ja

nuar

y 20

15


Recommended