WWW.ICIINC.COMINTERNATIONAL CONTRACTORS INC.
ICI’s working relationship with Wal-Mart
Stores Inc. began in 2006. Since that
time, ICI has successfully completed new
construction, expansion and renovation
projects at more than 20 locations across
the United States.
With a Wal-Mart construction volume
totaling more than $140 million over
the past 6 years, ICI is well-versed in
their stringent processes and rigorous
scheduling. One of the initiatives
that Wal-Mart insists upon for each
of its projects is mandatory SWPPP
Certification for all Field Superintendents.
The SWPPP Certification guarantees
environmental compliance with EPA
and also incorporates procedures for air
quality control. Currently, ICI has 9
SWPPP Certified Team Members and
another individual who is a Certified
Preparer of SWPPP.
Please see the following pages for
examples of ICI’s success with the
construction of new, ground up Wal-
Mart Stores:
Rockton, Illinois
This new 203,000 square foot Supercenter
on a 53 acre site on was completed in 49
weeks. Delays in municipality permitting
led to accelerated schedules, but ICI met
the challenge. During construction, ICI’s
team also completed $2.2 million in
IDOT road work in just 10 weeks. This
project was the first store in the Midwest
Region to incorporate a new high-
efficiency HVAC system, which is 15%
more efficient than standard systems.
Wal-Mart StoresNew ConstructionWAL-MART STORES INC.
LOCATIONS
Rockton, Illinois
Freeport, Illinois
Joliet, Illinois
Waukesha, Wisconsin
Chicago, Illinois [Pullman Neighborhood]
Cicero, Illinois
PROJECT DELIVERY
General Contracting
ARCHITECT
Various
WWW.ICIINC.COMINTERNATIONAL CONTRACTORS INC.
Wal-Mart StoresNew ConstructionWAL-MART STORES INC.
[CONT’D.]
Freeport, Illinois
Situated on more than 23 acres, ICI
completed construction of a 197,885
square foot new supercenter in 36 weeks.
This store is a prototype and currently
serves as a training center for many Wal-
Mart Store Planners and Employees.
Joliet, Illinois
For ICI’s third Wal-Mart Supercenter
project, our team completed this
205,000 square foot building in 35
weeks, skimming three (3) weeks off the
original construction schedule. Despite
a late construction start due to permit
delays and an unseasonably rainy spring,
our construction team was able to meet
Wal-Mart’s Grand Opening deadline.
Challenges included brick and block
construction instead of the typical pre-
cast method used by Wal-Mart and
the discovery of unsuitable soils during
construction. Moreover, the team also
completed installation of 518,400 square
feet of parking lot in three (3) weeks.
Waukesha, Wisconsin
ICI completed the construction of this
140,000 square foot new Wal-Mart
Supercenter and massive 31 acre site
in September 2010. In addition to the
typical retail store requirements, the
scope of work also included reclaiming
a site contaminated by a concrete
products manufacturing company. The
manufacturer produced precast concrete
and abandoned much of its discards
on site. ICI’s pre-construction testing
revealed buried concrete structures
throughout the site. To solve the issue,
RENDERING: PULLMAN WAL-MART
WWW.ICIINC.COMINTERNATIONAL CONTRACTORS INC.
Wal-Mart StoresNew ConstructionWAL-MART STORES INC.
[CONT’D.]
ICI set up a temporary concrete crushing
plant to turn the abandoned structures
and other excavated materials into
suitable landfill. Over 19,221 cubic
yards of suitable fill material was crushed
and reused on site.
ICI also recycled 32.84 tons of wood
and 10.68 tons of metal on the project.
The new Wal-Mart Store incorporates
green areas and a retention pond. The
scope of work also includes constructing
two pad sites for future development.
Approximately 1.5 miles of highway
development were also included in the
project scope.
Chicago, Illinois (Pullman Neighborhood)
ICI was contracted in early Fall 2012 to
construct a new 155,000 SF Wal-Mart
in Chicago’s Pullman neighborhood.
The $16.5 million facility, situated on
more than 15 acres, is unique in the
sense that the City has outlined specific
Minority Business Participation (MBE)
goals. As such, ICI is working with the
Alderman to employee community
residents on-site. MBE subcontractors
are also fulfilling several major trades.
The project is anticipated to be complete
in July 2013.
Cicero, Illinois
In June 2013, ICI was contracted to
construct a new $19 million Wal-Mart
Store in Cicero, Illinois. The store will
be constructed on a vacant parcel in the
heavily industrial area at approximately
33rd Street and Cicero Avenue, north of
Hawthorne Race Course.
WAL-MART WAUKESHA, WISCONSIN