+ All Categories
Home > Documents > Walking Tour Stopping Points: 1 3 5 7 Lee Highway at N. Illinois … · 2014. 10. 13. · in...

Walking Tour Stopping Points: 1 3 5 7 Lee Highway at N. Illinois … · 2014. 10. 13. · in...

Date post: 20-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
2
Lee Highway at N. Illinois Street • TD Bank • N. Illinois St. Neighborhood Conservaon (NC) Streetscape project Lee Highway at N. Greenbrier Ct. • AT&T Lots • Heritage Square Garden City Business Visits • Saran Indian Cuisine • Caribbean Grill Lee Highway at N. Dinwiddie St. • Calloway United Methodist Church • Calloway Cemetery Lee Highway at N. Harrison Street • Lee Harrison Shopping Center • Intersecon Improvements Lee Highway at George Mason Dr. • Intersecon Improvements • Garden City Introducon Lee Highway at N. Edison • Strip development • Topography Lee Highway at N. Cameron St. • Halls Hill High View Park 1 3 5 7 2 4 6 8 Walking Tour Stopping Points: The following stops and and urban design components will be covered on the tour. Current issues and opportunies will be discussed to provide parcipants with a beer understanding of development paerns, standards, and potenal.
Transcript
Page 1: Walking Tour Stopping Points: 1 3 5 7 Lee Highway at N. Illinois … · 2014. 10. 13. · in conjunction with the Yorktown Civic Association representatives and the organizers of

Lee Highway at N. Illinois Street• TD Bank• N. Illinois St. Neighborhood Conservation (NC) Streetscape project

Lee Highway at N. Greenbrier Ct.• AT&T Lots• Heritage Square

Garden City Business Visits• Saran Indian Cuisine• Caribbean Grill

Lee Highway at N. Dinwiddie St.• Calloway United Methodist Church• Calloway Cemetery

Lee Highway at N. Harrison Street• Lee Harrison Shopping Center• Intersection Improvements

Lee Highway at George Mason Dr.• Intersection Improvements • Garden City Introduction

Lee Highway at N. Edison• Strip development • Topography

Lee Highway at N. Cameron St.• Halls Hill High View Park

1 3 5 7

2 4 6 8

Walking Tour Stopping Points:The following stops and and urban design components will be covered on the tour. Current issues and opportunities will be discussed to provide participants with a better understanding of development patterns, standards, and potential.

Page 2: Walking Tour Stopping Points: 1 3 5 7 Lee Highway at N. Illinois … · 2014. 10. 13. · in conjunction with the Yorktown Civic Association representatives and the organizers of

LEE HIGHWAY CIVIC ASSOCIATIONS’ PRESIDENTS’ BREAKFASTS

Saturday, September 14, 20139:00- 11:00 a.m. (tour starts at TD Bank (Lee Hwy. at N.Illinois St.)

N. Illinois St. to N. Cameron St. Walking Tour

This document was prepared by the Urban Design and Research Section of the Arlington County Planning Department in conjunction with the Yorktown Civic Association representatives and the organizers of the Lee Highway Presidents’ Breakfasts.

Streetscape elements> Street furniture- benches, bike racks, waste bins, etc. > Sidewalk Paving and Plaza treatments> Roadway Pavements/crosswalks> Lighting> Landscaping- use and effect, sight lines, color, form, maintenance> Sustainability- Stormwater management/ green infrastructure> Bus stops> Wayfinding> Branding- Identity> Public art

ZONING MAP

STREETSCAPE DESIGN

WALKING TOUR GOALS:

• Review planning and zoning framework• Discuss context for streetscape and landscape design • Review corridor improvements and investments

Urban Design and Research

N

ApprovedSite Plans

C-O Commercial Office Building, Hotel and Multiple-Family Dwelling DistrictsC-O-1.0 Commercial Office Building, Hotel & Apartment DistrictC-1-O Limited Commercial Professional Office Building DistrictC-1 Local Commercial District C-2 Service Commercial – Community Business Districts

R A6-15 Apartment Dwelling DistrictsR -6 One-Family Dwelling DistrictsR -8 One-Family Dwelling Districts


Recommended