15
WAMS in China Jingtao Wu [email protected] Beijing Sifang Automation Co. Ltd 12 June 2007 Ullensvagen hotel, Norway
Transcript
Page 1: WAMS in China - EPCC Workshop

WAMS in China

Jingtao [email protected]

Beijing Sifang Automation Co. Ltd12 June 2007

Ullensvagen hotel, Norway

Page 2: WAMS in China - EPCC Workshop

Northeast

North

GuangdongGuizhou

Yunnan

Guanxi

Northwest

East

Hainan

Center

300GWgeneration

80GWgeneration

3000km

1000km

2000km

4000km

Power System in China

HVDC

HVDCHVDC

HK

Taiwan

Tibet

Page 3: WAMS in China - EPCC Workshop

2003

2003

2002

2004

2005

2003

20052006

2006

2007

2007

2006

2006

2007

2006

2006

DC under construction(9)

DC realized(16)

PMU

2006

20062007

2007

2004

2007

2007

2007

2007

Page 4: WAMS in China - EPCC Workshop

PMU increment / year

35

50

80

180

2003 2004 2005 2006

year

More than400 PMU will be installed in the end of 2007

More than 12 million $ investment

2007(Feb-March)

PMU locationSubstaion:All 750kV All 500kVPart 330kVPart 220kV

Generator:All 600MWPart 300MW

50

Page 5: WAMS in China - EPCC Workshop

Distributed measurement in substation

CSS-200/1PCSS-200/1G

CSFU-107 CSFU-107CSS-200/1ACSS-200/1ACSS-200/1A

Ethernet 100M

GPS Communication System

Data center

AC voltagesAC currents

Rotationpulse

PPS & Clock

25-100 Frames/s

Rotor AnglePhasor

Page 6: WAMS in China - EPCC Workshop

Data center in dispatching center

WAMSData center

EMSWarning

Special designed Real time DB to handle PMU data with timestamp refreshing 10-20ms

Special designed History DBto handle Huge data more than 1000GB

Page 7: WAMS in China - EPCC Workshop

Event analysisFind the root cause of system events.

Page 8: WAMS in China - EPCC Workshop

Simulation model analysis by artificial tests

In 2004 and 2005, northeast grid 500kV transmission line three phase to ground to investigate the load model.In 2007 , northwest grid 330kV transmission single line phase toground ,trip generators to testify new generation models and PSSperformance.

PSS off, Damp 5%

PSS on,Damp 9%

Page 9: WAMS in China - EPCC Workshop

Low frequency oscillation managementThere were lots of oscillation in past 3 years, WAMS become imperative to deal with the dangerous oscillation.

Assess osc. freq.and damping

Intelligent warning

Wide area control

Normal state

Under osc.

Under osc.

Power ocsillation

Page 10: WAMS in China - EPCC Workshop

Assessment of oscillationScan all transmitting power under normal state. If oscillation power > 10MW and duration > 5 oscillating cycles, the event is registered. Statistics shows: oscillation with poor damping will have more events.The assessment successfully predicts dangerous oscillation event before its real occurrence.

Osc.events distrubition

Real power -- Event

Freq. -- Event

Page 11: WAMS in China - EPCC Workshop

Intelligent warning during oscillation

Group coherent bus and

identify the oscillation

interface.

Sort contribution factors

of bus injeciton power to

indicate the dangerous

bus or generator.

Visualization of

oscillation distribution.

Page 12: WAMS in China - EPCC Workshop

WAMS based damping control

CSS-200/5M DC

CSS-200/5C

CSS-200/1CSS-200/1CSS-200/1PMU

CSS-200/5CController

RTDS center of China southern grid co.

HDVC

Page 13: WAMS in China - EPCC Workshop

Simulation of HDVC supplement control

Adaptive control:Online recognize the oscillationAnd change controller parameters

Adaptive function OFF

Adaptive function ON

Page 14: WAMS in China - EPCC Workshop

In futureIn data center: – WAMS and EMS will be combine with each other,

full dynamic EPCC will be realized – More response based application will be developed.

(others are model based analysis).In substation: – PMU and RTU will be replaced by new IED with

synchrophasor measurement function and supporting IEC 61850

1960s

EMS

2000s

EMS/WAMS

2020s

WAMS

Page 15: WAMS in China - EPCC Workshop

ReferenceWAMS Implementation in China and the Challenges for Bulk Power

System Protection. IEEE General Meeting June 24-28, 2007 , Tampa,

Florida, USA

Design and experiment of heuristic adaptive HVDC supplementary

damping controller based on online Prony analysis, IEEE General

Meeting June 24-28, 2007 , Tampa, Florida, USA

Advanced Low Frequency Oscillation Analysis Based on WAMS in a

Provincial Dispatching Centre. International Conference and

Exhibition Relay Protection and Substation Automation of Modern

EHV Power Systems, September 9-12, 2007, Moscow Russia