+ All Categories
Home > Documents > Warriors Transit Presentation

Warriors Transit Presentation

Date post: 17-Aug-2015
Category:
Upload: potreroboosters
View: 22 times
Download: 0 times
Share this document with a friend
Description:
A presentation prepared by SFMTA and the Office of Economic and Workforce Development for the Potrero Boosters.
Popular Tags:
25
Mission Bay Blocks 29-32 GSW Event Center and Mixed-Use Development Informational Meeting to the Potrero Boosters July 28, 2015
Transcript

Mission Bay Blocks 29-32GSW Event Center and Mixed-Use Development Informational Meeting to the Potrero BoostersJuly 28, 2015Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksAgenda1. Project Overview2. Transportation Management Plan3. Q & A21. Project Overview3Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksEvent Center +135MainPlaza+8Gatehouse+32+90+90Event Center Approx. 18,064 seat venue Approx. 486,000 leasable sfOffice/Lab 2 Buildings 11 Stories (6 podium) 520,000 leasable sf combined Approx. 2,100 full time employeesRetail and Gatehouse Approx. 50,000 leasable sf over11 Restaurant / Retail Spaces(West Side)Public Plaza / Open Space Approx. 56,800 sf (West Side) Main Plaza = 1 acre Total site open space = 3.2 acresProject ComponentsOffice +160Office +160Third Street16th StreetSouth StreetTerry Francois Boulevard (future alignment)SE Plaza+04Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksExterior View: Aerial Facing SE5Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksSouth Street Tower: View Facing SE6Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksMain Plaza: View Facing East7Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design Richyworks16thStreet Tower: View Facing NE8Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksExterior View: Aerial Facing NWSTEEL BLUE RENDER ?9Potrero Boosters July 15, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksSE Corner: Plaza & Theater Entrance102. Transportation Management Plan11Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksFunded Transportation Improvements Central Subway Caltrain Electrification Muni Forward (TEP implementation) Blue Greenway Completion of Mission Bay road networkPotrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksTransit Service Assumptions Supplemental Muni service 3 Muni Special Event shuttle routes Additional rail service Capital improvements (lengthening platform)Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksEvent Parking Assumptions On-site: 950 stallso Approx. 20 - 30 minute post-event egress o Includes valet area for Retail Off-site/Satellite: o Office parking Ex: 450 South Streeto Event parking Ex: Lot A, UCSF, and underutilized existing garages Street parking: heavily discouragedo Limited meter hours (shorter than event duration)o Special Event pricingPotrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksPre-Event PCO LocationsParking Control Officer (PCO)Variable Message Sign (VMS)Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksPost-EventPCO LocationsPotrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksDual EventPCO Locations Pre-EventPotrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksDual EventPCO Locations Post-EventPotrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksSince DSEIR Publication 1. Developed a Local/Hospital Access Plan with UCSFPotrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksPotrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksSince DSEIR Publication 1. Developed a Local/Hospital Access Plan with UCSF2. Analyzing impacts of two surface parking lots on vacant Port property south of Mission BayPotrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksPotrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksSince DSEIR Publication 1. Developed a Local/Hospital Access Plan with UCSF2. Analyzing impacts of two surface parking lots on underutilized Port property south of Mission Bay3. Proposing a lockbox to set aside City costs for SFMTA and SFPD Potrero Boosters July 28, 2015Event Center and Gatehouse design MANICA ArchitectureOffice Tower design Pfau Long Architecture / AE3 PartnersLandscape design SWA Group / Merrill Morris PartnersRetail design RichyworksNext Steps July 27 Close of EIR Public Comments Late 2015 Final OCII Certification Hearing 2016 Arena Construction Scheduled to Begin 2018 Scheduled Arena OpeningThank You


Recommended