+ All Categories
Home > Documents > . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007...

. was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007...

Date post: 26-Apr-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
13
Transcript
Page 1: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction
Page 2: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction management, quality control and quantity surveying.

The company is passionate about developing people in the industry and has mentored dozens of technical staff who have gone on to enrich

the industry. Archstone has created a vast number of job opportunities over its lifetime.

Our growth and solid reputation has been underpinned by a loyal cohort of partners that are made up of direct clients, developers, architects, and fellow contractors, who repeatedly entrust us with their projects and are part of the company’s success story.

OUR VALUES

Archstone’s trusted reputation in the South African Construction industry has been cemented over the last decade by providing consistent quality and unwavering service excellence to each of our clients.

Our conduct is guided by integrity and professionalism as well as mutual respect for all our stakeholders that include clients, partners and employees.

Our passion for technical innovation and concern for the environment means we constantly educate ourselves about the most sustainable practices as our contribution towards the pursuit of low carbon economy and regard safety for people and planet as one of our paramount priorities.

Archstone has always prided itself on being a highly versatile medium-sized construction company with a diverse portfolio of projects spanning Industrial, Hospitality, Retail, Corporate and Residential Developments. Archstone International will be branching out beyond the borders of South Africa while we forge a new chapter in our company’s history.

OUR APPROACH

Archstone is a comprehensive construction company capable of managing all aspects of the project pipeline from planning to handover.

We believe our respect for the client’s investment, safety of our workers and uncompromising quality of the build means our approach to construction can best be described as ‘people-centred and process driven’. Archstone excels at solving complex challenges that would ordinarily result in delays and overspending and frequently provides original and innovative solutions to construction.

In 2018 we launched Archstone Construction South Africa which is proudly a Level 2 BBBEE company. Archstone Construction South Africa (Pty) Ltd. will be focusing on construction projects within South Africa and will benefit from the full support in terms of management, financing and guidance from Archstone International (Pty) Ltd. This will ensure that we fulfil our responsibilities towards South Africa’s commitment to change.

We believe that we can have the biggest impact through skills development, capacity building and education, and will continue to use every project as a training opportunity to empower future builders.

Page 3: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

DIRECTORS PROFILE FOR ARCHSTONE INTERNATIONAL (PTY) LTD. AND ARCHSTONE CONSTRUCTION SOUTH AFRICA (PTY) LTD.

MANAGING DIRECTOR Christian Micha (Belgian) (Civil Engineering)

Christian began his career in the Democratic Republic of Congo as a partner of Encoba Construction before immigrating to South Africa. He has amassed more than 35 years’ experience in the construction industry, managing contracts and operations. Christian held Directorship at a leading construction company in South Africa before co-founding Archstone Construction in 2007. Christian is responsible for running the day to day business and financial management while still remaining very involved in site operations.

OPERATIONS DIRECTOR Joao Dos Santos (B.Tech Construction Management)

JOÃO DOS SANTOS – OPERATIONS DIRECTOR

João worked in the commercial construction sector for 12 years before starting his own construction company. João holds a Construction management degree obtained at the TUT. He brings more than 20 years’ hands-on experience in the trade and co-founded Archstone in 2007. João is responsible for client relations, best business practice implementation and project quality control while still remaining very involved in site operations.

PROJECTS DIRECTOR Bryan Bester (N. Building Diploma)

Bryan started his career in the industry in 2004 at a leading South African construction firm. Bryan holds a National Building Diploma qualification. He joined Archstone Construction in 2008 and has proven his competencies as a construction manager and senior contract’s manager with strong leadership abilities. Bryan is responsible for managing the overall contract operations, planning, programming, quality control, supervision and client liaison.

COMMERCIAL DIRECTOR Pedro Morgado (N. Building Diploma)

Pedro joined the company in 2008 and assumes responsibility for all Quantity Surveying, Costing of Bids and Procurement. Pedro holds a National Building Diploma qualification. He mentors and oversees the quantity surveying department with strong attention to detail and accuracy in dealing with tight programmes and deadlines. Pedro is responsible for client, sub-contractor and supplier liaison as well as budgeting and financial forecasting.

Page 4: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction
Page 5: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

AHRLAC MANUFACTURING FACILITY - 2017

Project Description: Archstone was contracted to build this specialist manufacturing facility and office space at Wonderboom Airport, outside of Pretoria. The facility is dedicated to the manufacture of the AHRLAC fixed-wing aircrafts that will be completely manufactured and assembled at the facility. Project size: This impressive construction is 10 000m2 in size and has Grade A finishings. Construction type: Conventional. Project duration: 11 months Project value: R94 832 000 Reference: Client: Mr Paul Potgieter - [email protected] AHRLAC has been nominated for the 2017 SAISC steel award.

Page 6: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

HILTI & STRYKER WAREHOUSES AND OFFICES - 2015 Project Description: Archstone was contracted for the construction of two industrial buildings, namely, Hilti and Stryker, each comprising of double storey office blocks with adjoining warehouses. The contract included all external works and services. There was also an access road with mini-sub installation required at the top end of the Stryker site to service both facilities. Project size: Hilti – Warehouse floor area 1 500m2, Office floor area 2 000m2 - grade A+ finishings. Stryker – Warehouse floor area 1 500m2, Office floor area 2 000m2 - grade A+ finishings. Construction type: Conventional Project duration: 8 months

Combined Project value: R79 655 000 Reference: Developer: Arno du Plessis - [email protected] The Hilti project won the prestigious SAPOA award in 2016 in the industrial developments category: https://joom.ag/SvtQ

Page 7: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

SERVEST - 2015

Project Description: Archstone was contracted to construct the new Servest facilities warehouse in Waterfall, Midrand. Project size: The facility consists of a 4 800m² office component split over three floors and a 1 800m² warehouse section. The warehouse has a stacking height of 15m which will allow Servest to maximise the stacking capacity of the warehouse. Construction type: Conventional Project duration: 8 months Project value: R71 951 000

Reference: Developer: Arno du Plessis - [email protected]

Page 8: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

DISCHEM WAREHOUSE - 2013 Project Description: Archstone was contracted to construct the new Dischem Distribution Warehouse in Waterfall, Midrand. The warehouse required careful value engineering from start to finish. Project size: Warehouse Floor area 19 000m2, External Hard stands 5600m2, external paved parking 4000m2, Office floor area 1200m2 Construction type: Unconventional 23m high tilt up column construction Project duration: 8.5 months

Project value: R86 700 000

Reference: Architect: Mark Pestana - [email protected]

Page 9: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

MASSBUILD DISTRIBUTION WAREHOUSE - 2013 Project Description: Archstone was contracted to construct the new Massbuild distribution warehouse. This mega construction required careful planning and value engineering from start to finish of the project. Project size: Warehouse Floor area 32 000m2, External Hard stands 40 000m2, External paved parking 10 000m2, Offices Floor area 4000m2 Construction type: Unconventional one-pour column production. Project duration: 10 months Project value: R130 800 000

Reference: Architect: Alistair Liedtke - [email protected]

Page 10: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

MAXWELL OFFICE PARK DEVELOPMENT – 2013-2014 (Phase II) – 2015-2016 (Phase IV)

Project Description: Archstone was contracted to construct Phase II and IV of this office park development. Each office block unit has 3 floors and 2 basement levels. Accumulative Project size: Maxwell Phase II – Building 5 offices - 4004m2, Building 6 offices - 3917m2, Business Centre Floor area 1000m2 Maxwell Phase IV – Building 3 offices – 6066m2 Grade A+ finishings. Construction type: Conventional construction Accumulative project duration: 21 months Project value: Phase II – R173 360 000 Phase IV – R120 454 000 Reference: Developer: Arno du Plessis - [email protected]

Page 11: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

MENLYN LEARNING HUB - 2016

Project Description: Archstone was contracted to construct the new flagship campus for CTI in pretoria. Project size: Approximately 12 500m2 lettable area in three blocks with two levels of super basement and structured parking and has Grade A+ finishings.

Construction type: Conventional. Project duration: 11 months

Project value: R191 718 000 Reference: Developer: Ruan Caroto - [email protected]

Page 12: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

GOLDWAGON DISTRIBUTION WAREHOUSE AND HEAD OFFICE - 2017

Project Description: Archstone was contracted to construct the new Goldwagon distribution warehouse and head office building. Project size: Approximately 32 000m2 lettable area in the warehouse and office space combined.

Construction type: Office block is Conventional construction. Warehouse facility is unconventional tilt up construction. Project duration: 9 months

Project value: R150 000 000 Reference: Developer: Nico Prinsloo - [email protected]

Page 13: . was established in 2007 by a multi- · Archstone International (Pty) Ltd. was established in 2007 by a multi-disciplinary partnership with core skills in civil engineering, construction

KNIGHTSBRIDGE OFFICE PARK PHASE I - 2017

Project Description: Archstone was contracted to construct Phase I of the new Green Star rated Knightsbridge Office Park. Project size: Approximately 26 000m2 combined lettable area for block A,B & C.

Construction type: Green Star specifications and auditing to ensure a low carbon footprint. Project duration: 15 months Project value: R243 000 000 Reference: Developer: Justin Bowen - jbowen@ emira.co.za