E.D. CANOPYWAS
HING
TON
ADVE
NTIS
T
EMERGENCY
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
2:1
4:21
PM
1" = 40'-0"
PROJECTINFORMATION,
DRAWING INDEX
A-001
Author
Checker
Approver
AUGUST 1, 2014
WASHINGTON ADVENTIST HOSPITALWHITE OAK
CERTIFICATE OF NEED (C.O.N.) SUBMITTAL
PROJECT DRAWINGSAugust 1, 2014
ARCHITECTRTKL ASSOCIATES, INC.
WASHINGTON, DC
CIVIL ENGINEERSOLTESZ ENGINEERING
ROCKVILLE, MD
LANDSCAPE ARCHITECTPARKER RODRIGUEZ, INC.
ALEXANDRIA, VA
M/E/P ENGINEERT.L.C. ENGINEERING
ORLANDO, FL
Issued Drawing LogNo. Date Item
Sheet ListSheet
Number Sheet Name
A-001 PROJECT INFORMATION, DRAWING INDEXA-101 SITE PLANA-110 CELLAR LEVEL OVERALL PLANA-110A MAIN HOSPITAL CELLAR LEVEL FLOOR PLAN - AREA AA-110B MAIN HOSPITAL CELLAR LEVEL FLOOR PLAN - AREA BA-111 LEVEL 1 OVERALL PLANA-111A MAIN HOSPITAL LEVEL 1 FLOOR PLAN AREA AA-111B MAIN HOSPITAL LEVEL 1 FLOOR PLAN AREA BA-112 LEVEL 2 OVERALL PLANA-112A MAIN HOSPITAL LEVEL 2 FLOOR PLAN AREA AA-112B MAIN HOSPITAL LEVEL 2 FLOOR PLAN AREA BA-113 LEVEL 3 OVERALL PLANA-113A MAIN HOSPITAL LEVEL 3 FLOOR PLAN AREA AA-113B MAIN HOSPITAL LEVEL 3 FLOOR PLAN - AREA BA-114 LEVEL 4 OVERALL PLANA-114A MAIN HOSPITAL LEVEL 4 FLOOR PLAN AREA AA-114B MAIN HOSPITAL LEVEL 4 FLOOR PLAN AREA BA-115 LEVEL 5 OVERALL PLANA-115A MAIN HOSPITAL LEVEL 5 FLOOR PLAN AREA AA-115B MAIN HOSPITAL LEVEL 5 FLOOR PLAN AREA BA-116 MAIN HOSPITAL LEVEL 6 FLOOR PLANA-117 MAIN HOSPITAL LEVEL 7 FLOOR PLANA-119 PENTHOUSE AND ROOF PLANA-200 HOSPITAL EAST AND WEST ELEVATIONSA-201 HOSPITAL NORTH AND SOUTH ELEVATIONS
PRIVATE STREET
FUTUREM.O.B.
SOUTH PARKING
PROPERTY LINE
ENTRANCE DRIVE
MAIN ENTRY
PROPOSED HOSPITALEMERGENCY
ENTRYEMERGENCY DEPT.
STORMWATERRETENTION
FUTURE EXPANSION
LOADING DOCK
FUTURE PARKING GARAGE
FUTURE M.O.B.
STORMWATERRETENTION
FUTUREEXPANSION
AMBULANCEDRIVE
HELIPAD
COOLING TOWERS
GAS FARM
PLUM ORCHARD DRIVE
NORTHPARKING
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:4
9:33
PM
1" = 80'-0"
SITE PLAN
A-101
Author
Checker
Approver
AUGUST 1, 2014
1" = 80'-0"1 SITE PLAN
Issued Drawing LogNo. Date Item
PRO
PUP
UP
UP
UP
12345678910
A
B
C
D
F.5
1112131415161718
H
F
G
E
0.5
B.5
C.5
E.2
C.8
SURGICALSERVICES
(CSS)PHARMACY KITCHEN
LAB
HIM
PATIENT CAREEQUIPMENT
INFORMATIONSYSTEMS
ANATOMICALPATHOLOGY
STAFFFACILITIES
MATERIALSMANAGEMENT
MATERIALSMANAGEMENT
BEDSTORAGE
ENVIRONMENTALSERVICES
PLANT OPERATIONS
ENV.SERV.
ENGINERINGSERVICES
FUTURE EXPANSION
FUTURE M.O.B.
LOADING DOCK
LINE OFBUILDINGABOVE
CENTRAL ENERGYPLANT
ENG.SERV.
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
10' 20' 40'
1" = 20' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
A BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:4
9:37
PM
1" = 20'-0"
CELLAR LEVELOVERALL PLAN
A-110
Author
Checker
Approver
AUGUST 1, 2014
1" = 20'-0"1 CELLAR LEVEL FLOOR PLAN - OVERALL
Issued Drawing LogNo. Date Item
UP
UP
UP
7875 SFCORRIDOR
1904 SF
INPATIENTPHARMACY
3472 SFKITCHEN
293 SF
IS SUPPORT(STAGING
7040 SF
CLINICALLABORATORY
461 SF
SERVICEELEVATORS
301 SF
PUBLICELEVATORS
4130 SF
GENERALSTORES
258 SFMAIL ROOM
51 SFSTF TLT
8910
A
B
C
D
F.5
1112131415161718
H
F
G
E
B.5
C.5
E.2
C.8209 SF
OFFICE -CLERICAL
281 SF
RECEIVING/BREAKDOWN
2854 SF
CLEANSTERILE
STORAGE989 SFPREP/ASSEMBLY
48 SFHK
44 SFDETERGENT
53 SFHK
64 SF
CARTWASHER
67 SF
MACH.ROOM
108 SF
MACH.ROOM
428 SF
DRYSTORAGE
119 SF
WALK-INFREEZER
225 SF
WALK-INREFRIG.
115 SF
WALK-INREFRIG.
53 SF
TRASH/EXTRACTOR
71 SF
MACH.ROOM
65 SFHK
261 SF
ROOMSERVICE
274 SFOFFICES
120 SF
CATERINGSTORAGE
70 SFADMIN
90 SFOFFICE
90 SFOFFICE
90 SFOFFICE
90 SFOFFICE
90 SFOFFICE
90 SFOFFICE
119 SF
OFFICE-BUYER
239 SF
RECEIVING/BREAKDOWN 43 SF
WAIT. 127 SFLIBRARY
80 SF
TRASHROOM
86 SF
SOLUTIONSTORAGE
188 SFANTE ROOM
180 SF
STAFFBREAK/
LOCKERS
45 SFSTF TLT
44 SFSTF TLT
TRUCK TRUCK TRUCK LINEN
143 SFELECT
360 SFCLERKS
741 SF
BEDSTORAGE
251 SF
UNIFORMDISTRIBUTION
630 SF
CLEANLINEN
HOLDING
93 SFLINEN MGR
469 SF
FEMALESTAFF
LOCKERS340 SF
MALE STAFFLOCKERS
50 SFWORK AREA122 SF
OFFICE -DIRECTOR
102 SF
OFFICE -SUPV
136 SFBUYERS
427 SF
SHAREDSUPPORTLOUNGE
1829 SF
ANATOMICALPATHOLOGY
1047 SF
MAINTECHNOLOGY
ROOM
91 SFUPS
95 SF
ENTRANCEFACILITY
206 SFHVAC
140 SF
OFFICE -SHARED
175 SF
COMPUTERREPAIR
104 SF
BREAKROOM
80 SFOFFICE 89 SF
OFFICE
128 SF
FILESTORAGE
1397 SFBILLERS
13 SFSCAN
36 SFSCAN
127 SF
SOILEDEQUIP
HOLDING 242 SF
EQUIP.DECONTAM
517 SF
CLEANEQUIP.
HOLDING
223 SF
BREAKROOM
100 SF
OFFICE -MGR
558 SFDISPATCH
73 SFCHEMO
232 SFIV PREP
44 SFVESTSURGICAL
SERVICES (CSS)
PHARMACY KITCHEN
PATIENTCARE
EQUIPMENT
MATERIALSMANAGEMENT
83 SFLOCKERS
60 SFTLT/SHWR65 SF
TLT/SHWR113 SF
LOCKERS
204 SFCORRIDOR
184 SFCORRIDOR
68 SFCORRIDOR
208 SFCORRIDOR
254 SFSTAIR 1
182 SFCORRIDOR
228 SFSTAIR 3
154 SFSTF. TLT
171 SFSTF. TLT34 SF
SHWR
28 SFSHWR 28 SF
SHWR 34 SFSHWR
1387 SF
LOADINGDOCK
146 SFELEC
455 SFMechanical
STAFF FACILITIES
LAB
HIM
INFOSYSTEMS
CLEAN DOCK
FUTURE EXPANSION
FUTURE M.O.B.
MECHANICALMEZZANINEABOVE CEILING
976 SFCSS SOLIED
SHAFTABOVE
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
AA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:4
9:40
PM
1/16" = 1'-0"
MAIN HOSPITALCELLAR LEVEL
FLOOR PLAN - AREA A
A-110A
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 CELLAR LEVEL FLOOR PLAN - AREA A
Issued Drawing LogNo. Date Item
PRO
P
UP
UP
3472 SFKITCHEN
241 SF
BODYHOLDING
461 SF
SERVICEELEVATORS
301 SF
PUBLICELEVATORS
4028 SF
CENTRALPLANT
2485 SFMECHANICAL
4130 SF
GENERALSTORES
258 SFMAIL ROOM
12345678910
A
B
C
D
F.5
1112
H
F
G
E
0.5
B.5
C.5
E.2
C.8
136 SFPARX/PS
428 SF
DRYSTORAGE
119 SF
WALK-INFREEZER
225 SF
WALK-INREFRIG.
115 SF
WALK-INREFRIG.
53 SF
TRASH/EXTRACTOR
71 SF
MACH.ROOM
65 SFHK
TRUCK TRUCK TRUCK LINEN
RECYCLE
COMPACTOR
COMPACTOR
143 SFELECT
152 SFDATA
360 SFCLERKS
741 SF
BEDSTORAGE
251 SF
UNIFORMDISTRIBUTION
630 SF
CLEANLINEN
HOLDING
93 SFLINEN MGR
128 SF
FAMILYVIEWING
355 SF
SOILEDLINEN
97 SF
MEDICALWASTE
138 SF
SOILEDCART
HOLDING
108 SFCART WASH
139 SF
CLEAN CARTHOLDING
469 SF
FEMALESTAFF
LOCKERS340 SF
MALE STAFFLOCKERS
138 SFWORKST.
234 SF
EQUIP.RECHARGE
188 SFCONFERENCE
50 SFWORK AREA122 SF
OFFICE -DIRECTOR
102 SF
OFFICE -SUPV
48 SFSTF TLT
734 SF
WATER /FIRE
SERVICE
73 SFRECEPT.
136 SFBUYERS
50 SFSTF TLT 479 SF
BULKSUPPLY
713 SF
EQUIPMENTSTORAGE
122 SF
OFFICE -DIRECTOR
1178 SF
GENERALSHOP &PARTS
STORAGE
99 SFOFFICE
101 SFOFFICE
99 SFOFFICE
99 SFOFFICE
120 SF
OFFICE -DIRECTOR
139 SF
WORKROOM/
RECORDS
71 SFLOCKERS 126 SF
LOCKSMITH
210 SF
ELECTRICWORK SHOP
157 SF
PAINT STOR.& SHOP
69 SF
STFTLT/SHWR
94 SF
RECEPT/WAITING
427 SF
SHAREDSUPPORTLOUNGE
1829 SF
ANATOMICALPATHOLOGY
KITCHEN
ENVIRONMENTALSERVICES
MATERIALSMANAGEMENT
MATERIALSMANAGEMENT
PLANT OPERATIONS
254 SFSTAIR 1
147 SFCORRIDOR
246 SFCORRIDOR
182 SFCORRIDOR
228 SFSTAIR 3
154 SFSTF. TLT
171 SFSTF. TLT34 SF
SHWR
28 SFSHWR 28 SF
SHWR 34 SFSHWR
1387 SF
LOADINGDOCK
450 SF
MED GAS(MANIFOLD)
4001 SFELEC
906 SF
MED GAS(COMP/VAC)
146 SFELEC
110 SFELECT
455 SFMechanical
ENV.SERV.
BODY HOLDING
ENG. SERVICES
STAFF FACILITIES
CLEAN DOCK SOILED DOCK
2836 SF
CENTRALPLANT
MECHANICALMEZZANINEABOVE CEILING
LINE OF BUILDINGABOVE
249 SFSTAIR 2
322 SFCORRIDOR
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:4
9:43
PM
1/16" = 1'-0"
MAIN HOSPITALCELLAR LEVEL
FLOOR PLAN - AREA B
A-110B
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 CELLAR LEVEL FLOOR PLAN - AREA B
Issued Drawing LogNo. Date Item
CO
O
DNUP
DNUP
DN
DN
12345678910
A
B
C
D
F.5
1112131415161718
H
F
G
E
2' -
0"
11' - 0"
0.5
B.5
C.5
E.2
42' -
6"
C.8
PATIENT ACCESSVOLUNTEERS
EMPL. HEALTHHUMAN RESOURCES
INFORMATICS / NURSING ADMIN. / GUEST SERVICES
EXECUTIVE OFFICES
RADIOLOGY
SAFETY/ SECURITY
RADIOLOGY - NUC.MEDICINE
MEDICALSTAFF
EMERGENCY DEPARTMENT
RADIOLOGY
HIM
FUTURE EXPANSION
ENTRY COURTYARD
FUTURE M.O.B.
CENTRAL PLANT ROOF
ENTRY
ENTRY
CLINICAL DECISION/OBSERVATION
GIFT SHOPENTRY
LOBBY
ENTRY
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
10' 20' 40'
1" = 20' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
A BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:4
9:47
PM
1" = 20'-0"
LEVEL 1OVERALL PLAN
A-111
Author
Checker
Approver
AUGUST 1, 2014
1" = 20'-0"2 LEVEL 01 OVERALL PLAN
Issued Drawing LogNo. Date Item
DN
UP
DN
DN
100 SFOFFICE
6131 SF
CAFETERIA /SERVERY
461 SF
SERVICEELEVATORS
2129 SFLOBBY
275 SFMEDITATION
168 SF
MALEPUBLIC TLT
174 SF
FEMALEPUBLIC TLT
756 SFED WAITING
910
A
B
C
D
F.5
1112131415161718
H
F
G
E
B.5
C.5
E.2
42' -
6"
C.8
365 SFGEN RAD
460 SFR/F
173 SFULTRASOUND
175 SFULTRASOUND
174 SFULTRASOUND
455 SF
GAMMACAMERA
215 SFCONTROL
186 SF
STRESSTEST
210 SFCONTROL
460 SF
GAMMACAMERA
92 SFHOT LAB
114 SFDOSE ADMIN
111 SF
IP DOSEADMIN 116 SF
CONSULT
165 SF
RADIOLOGYRECEPTION/
REGISTR
193 SF
REPORTROOM
131 SFELECT
133 SFDATA
503 SFDINING
174 SF
WORKROOM
223 SFHIM
1066 SFENTRY
201 SF
INFORMATION/ RECEPTION
84 SF
OFFICE - HRASSIST
137 SFELECT
791 SF
BOARDROOM
78 SFWAITING
78 SFRECEPTION
251 SF
OFFICE -PRESIDENT
229 SF
OFFICE - VPOPERATIONS
229 SF
OFFICE -FINANCE
100 SFOFFICE
101 SFOFFICE
119 SFOFFICE
150 SF
OFFICE -DIRECTOR
150 SF
OFFICE -DIRECTOR
71 SFRN MAILBOX
66 SFWAITING
94 SFPANTRY120 SF
OFFICE
100 SF
STFTLT/SHWR
53 SFSTF TLT
81 SFFILE ROOM
83 SF
OFFICE - FINANALYST
84 SF
OFFICE -MARKT &
COMM
126 SF
FILESTORAGE
169 SFWAITING
126 SFEXAM
128 SFEXAM
121 SF
OFFICE -NURSE
208 SFCONFERENCE
83 SF
OFFICE -EMP
RELATIONS62 SF
STF TLT
75 SF
OFFICE -BENE. SP.
219 SFDICTATION
92 SFHIM WAITING
92 SF
HIMCONSULT
66 SFSTF TLT
89 SF
OFFICE -RECRUIT
191 SF
OFFICE -FIN. CLERK
255 SFWAITING
50 SFREGISTR.
50 SFREGISTR.
50 SFREGISTR.
50 SFREGISTR.
66 SF
OFFICE -SCHED.283 SF
OFFICE -DECO
CLERKS
151 SF
VOLUNTEERWORKROOM
63 SF
VOLUNTEERLOCKERS
117 SF
OFFICE -DIRECTOR
105 SF
OFFICE -ASSIST. DIR
23 SFPANTRY
62 SF
RECEPT/ADMIN
21 SFWAITING47 SF
RECEPTION
120 SF
OFFICE -DIR.
PATIENT ACCESSVOLUNTEERS
EMPL. HEALTH HUMAN RESOURCES
INFORMATICS / NURSING ADMIN. / GUEST SERVICES
EXECUTIVE OFFICES
127 SFOFFICE
60 SF
WORKROOM
46 SFPANTRY
88 SF
WORKSTATIONS
188 SF
OFFICE - VPNURSING
189 SF
OFFICE -CMO
170 SF
OFFICE -AVP CLIN.EFFECT.
72 SF
OFFICE - FINANALYST
90 SF
OFFICE -MARKT &
COMM
189 SF
OFFICE - VPBUSINESS
DEV.
50 SFSTF TLT
47 SFSTF TLT
87 SF
OFFICE -PHYS
LIASON
88 SF
OFFICE -PHYS
LIASON
91 SF
WORKSTATIONS
64 SFPANTRY
67 SFWORK AREA
48 SFPAT TLT
55 SFCHANGE
86 SFWAITING
21 SFLOCKERS
108 SF
FIRECOMMAND/CONTROL
105 SF
OPERATIONSBMS
108 SF
COMM-DISPATCH 74 SF
OFFICE -DIRECTOR
506 SF
RADIOLOGYWAITING
RADIOLOGY
SAFETY/ SECURITY
RADIOLOGY - NUC.MEDICINE
MEDICALSTAFF
89 SF
WORKSTATIONS
90 SF
WORKSTATIONS
49 SF
WORKSTATION
55 SFCHANGE
58 SFPAT TLT
48 SFPAT TLT
48 SFPAT TLT
273 SF
RADIOLOGYSTAFF
LOUNGE /LOCKER
78 SF
CLEANSUPPLY
651 SF
TECH WORKAREA
22 SFCLOSET
216 SFSTAIR 4
16 SFCLOSET
497 SFCORRIDOR
3833 SFCORRIDOR
131 SFVESTIBULE
314 SFSTAIR 1
301 SF
PUBLICELEVATORS
101 SFTLT/SHWR
57 SFWAITING
47 SFRECEPT.
26 SFAPPLIC.
HIM
81 SFON-CALL
95 SFON-CALL
FUTURE EXPANSION
399 SFVESTIBULE
ENTRY COURTYARD
FUTURE M.O.B.
99 SF
WORKSTATIONS
1060 SFCORRIDOR
1109 SFCORRIDOR
1373 SFCORRIDOR
136 SFCORRIDOR
380 SFCORRIDOR
126 SFCORRIDOR
62 SFCORRIDOR
231 SFSTAIR 3
251 SFSTAIR 5
117 SFOFFICE
232 SF
OFFICE -V.P.
MEDICALAFFAIRS
91 SFTLT
226 SF
CONFERENCEROOM
194 SFVESTIBULE
150 SFDATA
82 SF
PUBLICLOCKERS
449 SF
PHYSICIANLOUNGE
195 SF
FEMALEPUBLIC TLT
184 SF
MALEPUBLIC TLT
90 SF
OFFICE -RECRUITER
GIFT SHOP
189 SF
RECEIVING /BULK STOR.
141 SFOFFICE
117 SFOFFICE
108 SF
OFFICE -BED
CONTROL
71 SF
OFFICE -SUPV.
52 SF?
39 SFPANTRY
45 SF
STFTLT
519 SF
GIFTSHOP
60 SF
OFFICE -SUPV.
124 SF
OFFICE -DIR.
176 SFINTERPRETERS
86 SF
OFFICE -DIRECTOR
296 SF
GUESTLOUNGE
75 SF
OFFICERECRUIT.
121 SF
OFFICE -DIRECT.
84 SF
OFFICE -SUPV.39 SF
PANTRY71 SF
ADMIN.
192 SF?
360 SF?
666 SFCORRIDOR
ENTRY
ENTRY
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
AA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:4
9:50
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 1 FLOOR PLAN
AREA A
A-111A
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 1 FLOOR PLAN - AREA A
Issued Drawing LogNo. Date Item
DNUP
DN
6131 SF
CAFETERIA /SERVERY
461 SF
SERVICEELEVATORS
2129 SFLOBBY
127 SFEXAM
275 SFMEDITATION
168 SF
MALEPUBLIC TLT
174 SF
FEMALEPUBLIC TLT
756 SFED WAITING
127 SFEXAM
127 SFEXAM
127 SFEXAM
127 SFEXAM
127 SFEXAM
127 SFEXAM
127 SFEXAM
127 SFEXAM
141 SF
SECUREEXAM
128 SF
TRIAGE /EXAM
231 SF
SUB-WAIT
133 SF
TRIAGE /EXAM
130 SFDECONTAM
91 SFEMS
12345678910
A
B
C
D
F.5
111213
H
F
G
E
2' -
0"
11' - 0"
0.5
B.5
C.5
E.2
C.8
68 SFPAT TLT
240 SFRESUS.
245 SFRESUS.
127 SFEXAM
127 SFEXAM
127 SFEXAM
126 SFEXAM
127 SFEXAM
127 SFEXAM
127 SFEXAM
261 SF
EQUIP.STOR.
146 SFDATA126 SF
EXAM
126 SFEXAM
127 SFEXAM
127 SFEXAM
147 SFELECT
58 SFPAT TLT
127 SFEXAM
127 SFEXAM
127 SFEXAM
127 SFEXAM
127 SFEXAM
127 SF
CLINICALDECISION
127 SF
CLINICALDECISION
127 SF
CLINICALDECISION 68 SF
PAT TLT
128 SF
CLINICALDECISION
68 SFPAT TLT
491 SFMRI
420 SFCT
136 SF
CLINICALDECISION
110 SF
CLEANSUPPLY
127 SF
CLINICALDECISION
87 SF
SOILEDHOLDING
354 SFGEN RAD
467 SFR/F365 SF
GEN RAD
460 SFR/F
173 SFULTRASOUND
475 SFCT
175 SFULTRASOUND
174 SFULTRASOUND
382 SF
ED STAFFLOUNGE
128 SFEXAM
122 SF
TRIAGENURSE
211 SFLAB91 SF
OFFICE
455 SF
GAMMACAMERA
215 SFCONTROL
186 SF
STRESSTEST
210 SFCONTROL
460 SF
GAMMACAMERA
92 SFHOT LAB
114 SFDOSE ADMIN
111 SF
IP DOSEADMIN
127 SF
CLINICALDECISION
127 SF
CLINICALDECISION
127 SF
CLINICALDECISION
127 SF
CLINICALDECISION
127 SF
CLINICALDECISION
126 SF
CLINICALDECISION
261 SFEQUIP STOR
205 SFMED
81 SFPAT TLT
68 SFPAT TLT
59 SFPAT TLT
55 SFPAT TLT
96 SFCHARTING
96 SFCHARTING55 SF
MED
27 SFNOURISH
107 SFVESTIBULE
127 SFEXAM
127 SFEXAM
125 SF
CLEANSUPPLY
109 SF
SOILEDUTILITY
261 SFCHARTING
182 SFCHARTING
264 SF
PHYSICIANWORK AREA
152 SF
CLEANSUPPLY
133 SF
SOILEDUTILITY
305 SFCHARTING
213 SFCHARTING 28 SF
MED199 SFCHART
348 SF
RECEPTION /REGISTRATION
116 SFCONSULT
68 SFPAT TLT
165 SF
RADIOLOGYRECEPTION/
REGISTR
193 SF
REPORTROOM
131 SFELECT
1066 SFENTRY
201 SF
INFORMATION/ RECEPTION
137 SFELECT
126 SF
EQUIP.STORAGE
48 SFPAT TLT
55 SFCHANGE
86 SFWAITING
21 SFLOCKERS
108 SF
FIRECOMMAND/CONTROL
105 SF
OPERATIONSBMS
108 SF
COMM-DISPATCH 74 SF
OFFICE -DIRECTOR
506 SF
RADIOLOGYWAITING
RADIOLOGY
SAFETY/ SECURITY
RADIOLOGY - NUC.MEDICINE
55 SFCHANGE
58 SFPAT TLT
48 SFPAT TLT
48 SFPAT TLT
273 SF
RADIOLOGYSTAFF
LOUNGE /LOCKER
219 SFREADING
78 SF
CLEANSUPPLY
66 SF
SOILEDHOLDING48 SF
STF TLT
41 SFCHANGE
56 SFCHANGE
78 SFEQUIP
195 SFCONTROL
46 SFCHANGE
46 SFCHANGE
48 SFPAT TLT
48 SFPAT TLT
651 SF
TECH WORKAREA
120 SF
PATIENTHOLDING
35 SFCASHIER
93 SFOFFICE
67 SFADMIN117 SF
OFFICE -DIRECTOR
3833 SFCORRIDOR
314 SFSTAIR 1
301 SF
PUBLICELEVATORS
262 SFVESTIBULE
187 SF
ZONE IIPATIENT
PREP
57 SFPAT TLT
101 SFTLT/SHWR
51 SFLOCKERS
164 SFEQUIP
55 SFCHANGE
410 SF
ZONE IIICONTROL
38 SF
WHEELCHAIRSTOR.
EMERGENCY DEPARTMENT
RADIOLOGY
81 SFON-CALL
95 SFON-CALL
141 SF
SECUREEXAM
28 SFALCOVE
52 SF
PAT.TLT 87 SF
CHARTING
59 SFSECURITY
399 SFVESTIBULE
CENTRAL PLANT ROOF
ENTRY
ENTRY
FUTUREEXPANSION NORTH
AMBULANCE ENTRY / PARKING
1373 SFCORRIDOR
1000 SFCORRIDOR
5498 SFCORRIDOR
2665 SFCORRIDOR
252 SFCORRIDOR
1117 SFCORRIDOR
210 SFCORRIDOR
136 SFCORRIDOR
201 SFCORRIDOR
97 SFCORRIDOR
62 SFCORRIDOR
230 SFSTAIR 2
231 SFSTAIR 3
150 SFDATA
CLINICAL DECISION/OBSERVATION
195 SF
FEMALEPUBLIC TLT
184 SF
MALEPUBLIC TLT
519 SF
GIFTSHOP
176 SFINTERPRETERS
86 SF
OFFICE -DIRECTOR
296 SF
GUESTLOUNGE
192 SF?
ENTRY
CANOPY ABOVE
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
7:36
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 1 FLOOR PLAN
AREA B
A-111B
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 1 FLOOR PLAN - AREA B
Issued Drawing LogNo. Date Item
DNUP
DN UP
12345678910
A
B
C
D
F.5
111213
13
1415161718
H
F
G
E16' - 5 1/4"
14' - 10 1/2"
0.5
B.5
C.5
2' - 8"
29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0"
2' - 0"
E.2
C.8
PRE/POST SURGERYPACU
CRITICAL CARE UNIT
RESPIRATORY CARE
SURGICAL SUITE
FUTURE EXPANSION
FUTURE M.O.B.
CENTRAL PLANT BELOW
ROOF BELOW
CANOPY BELOW
OPEN TO BELOW
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
10' 20' 40'
1" = 20' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
A BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:00
PM
1" = 20'-0"
LEVEL 2OVERALL PLAN
A-112
Author
Checker
Approver
AUGUST 1, 2014 1" = 20'-0"2 LEVEL 2 - OVERALL PLAN
Issued Drawing LogNo. Date Item
DN UP
1800 SF
CLEANCORE
91 SFSOIL
461 SF
SERVICEELEVATORS
94 SFOFFICE
75 SFHALLWAY
319 SF
STAFFLOUNGE /LOCKERS
600 SFOR
600 SFOR
564 SF
EQUIPMENTSTORAGE
600 SFOR
600 SFOR
654 SFOR
650 SFCARDIAC OR
652 SFCARDIAC OR
685 SFHYBRID OR
118 SFCONTROL
793 SF
STAFFLOUNGE
133 SF
OFFICERN
MGR.
153 SFDATA
126 SFPUMP ROOM
115 SF
PERFUSIONISTWORKROOM
181 SF
HYBRID OREQUIPMENT
181 SF
ANESTHSIAWORKROOM
427 SF
CLEANEQUIPMENT
HOLD
301 SF
PUBLICELEVATORS
8910
A
B
C
D
F.5
111213
13
1415161718
H
F
G
E16' - 5 1/4"
14' - 10 1/2"
B.5
C.5
2' - 8"
29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0"
2' - 0"
E.2
C.8
105 SFPACU 5
105 SFPACU 6
105 SFPACU 7
105 SFPACU 8
105 SFPACU 9
116 SF4
114 SF3
116 SF2
115 SF1
104 SFCLEAN
42 SFSTF TLT
113 SF
PHYS.DICT.
109 SFPACU 2
114 SFPACU 3
108 SFPACU 4 160 SF
22109 SF
21111 SF
20106 SF
19
247 SF
STAFFLOUNGE
120 SFCONSULT
114 SFCONSULT
104 SFPACU 1080 SF
PACU 11101 SF
PACU 12
105 SF18
110 SF17
109 SF16
114 SF6
114 SF7
114 SF8
114 SF9
117 SFSOIL
124 SFELECT.
80 SF
SCOPEWASH
80 SF
CLEANSCOPE
388 SFENDOSCOPY
388 SFENDOSCOPY
53 SFMED
70 SFOFFICE
77 SFOFFICE 165 SF
LEADTHERAPIST
126 SFDECONTAM
111 SF
STAFFROOM56 SF
LOCKERS56 SF
STF TLT
135 SF
MULTI-PURPOSE
ROOM
12 SFALCOVE
12 SFALCOVE
140 SFELECT
52 SFTLT
51 SFTLT
2013 SF
FAMILYWAITING
159 SFRECEPTION
68 SFOFFICE
110 SFOFFICE
112 SFOFFICE
52 SFADMIN ASST
80 SFOFFICE
80 SFOFFICE188 SF
RECEPT /WAIT
157 SFREGISTRATION
158 SF
REGISTRATIONWORKROOM
244 SF
PHYSICIANSLOUNGE
572 SF
FEMALESTAFF
LOCKERS450 SF
MALE STAFFLOCKERS
120 SF
SCRUBDISPENSING
169 SF
FEMALEPUBLIC TLT
169 SF
MALEPUBLIC TLT 253 SF
FAMILYWAITING
314 SFSTAIR 1
PRE/POST SURGERYPACU
84 SFOFFICE
84 SFOFFICE
RESPIRATORY CARE
SURGICAL SUITE
40 SFSCRUB
40 SFSCRUB
23 SFSCRUB
34 SFSCRUB
112 SF
OFFICE-SUPPLY
MGR.
22 SFSCRUB
53 SFSCRUB
52 SFALCOVE
52 SFALCOVE
52 SFALCOVE
52 SFALCOVE
52 SFALCOVE
FUTURE EXPANSION
FUTURE M.O.B.OPEN TO BELOW
285 SFALCOVE
125 SFPACU 13
194 SFPACU 1
1179 SFCORRIDOR
1849 SFCORRIDOR
227 SFCORR
1641 SFCORRIDOR
3783 SFCORRIDOR
156 SFCORRIDOR
216 SFSTAIR 4
228 SFSTAIR 3
193 SF
NURSESTATION
201 SF
NURSESTATION317 SF
CORRIDOR43 SFPAT TLT
308 SF
NURSESTATION
2104 SFCORRIDOR
460 SF
SOILEDCARTS
502 SFCYSTO
219 SF
EQUIPMENTSTORAGE
211 SFELECT.
97 SF
SHAREDON-CALL
104 SF
SHAREDON-CALL 45 SF
TLT
327 SFTEAM ROOM
297 SF
SHAREDOFFICE -
CASEMANAGEMENT
60 SF
RESOURCECENTER
118 SF
CONSULTROOM
220 SF
EQUIPMENTSTORAGE
113 SF10
119 SF11
114 SF12
118 SF13
84 SF
PATTLT
114 SF5
71 SF
PATTLT
125 SF15
119 SF14
227 SF
MINORPROCEDURE
130 SFCLEAN
88 SF
OFFICECOORD.
127 SFSOIL
102 SFMED
150 SFCLEAN
67 SF
PATTLT
67 SF
PATTLT38 SF
ALCOVE 222 SF
NURSESTATION
112 SF
ORCONTROL
58 SFHK
190 SFCORRIDOR
522 SFCORRIDOR
402 SF
EQUIPMENTSTORAGE
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
AA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:04
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 2 FLOOR PLAN
AREA A
A-112A
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 2 FLOOR PLAN - AREA A
Issued Drawing LogNo. Date Item
DNUP
461 SF
SERVICEELEVATORS
94 SFOFFICE
75 SFHALLWAY
283 SFICU 02 272 SF
ICU 03
293 SFICU 04 311 SF
ICU 05329 SFICU 06
271 SFICU 07 283 SF
ICU 08
283 SFICU 09 272 SF
ICU 10
290 SFICU 12
296 SFICU 13
272 SFICU 19283 SF
ICU 21271 SFICU 22
329 SFICU 23311 SF
ICU 24293 SFICU 25
272 SFICU 26
283 SFICU 27
283 SFICU 28
283 SFICU 01
319 SF
STAFFLOUNGE /LOCKERS
793 SF
STAFFLOUNGE
133 SF
OFFICERN
MGR.
153 SFDATA
181 SF
ANESTHSIAWORKROOM
293 SFICU 11
283 SFICU 20
427 SF
CLEANEQUIPMENT
HOLD
301 SF
PUBLICELEVATORS
12345678910
A
B
C
D
F.5
1112
H
F
G
E16' - 5 1/4"
14' - 10 1/2"
0.5
B.5
C.5
2' - 8"
29' - 0"
E.2
C.8
117 SFSOIL
124 SFELECT.
80 SF
SCOPEWASH
80 SF
CLEANSCOPE
388 SFENDOSCOPY
70 SFOFFICE
77 SFOFFICE 165 SF
LEADTHERAPIST
126 SFDECONTAM
111 SF
STAFFROOM56 SF
LOCKERS56 SF
STF TLT
135 SF
MULTI-PURPOSE
ROOM
12 SFALCOVE
12 SFALCOVE
140 SFELECT
137 SFELECT
144 SF
CLEANSUPPLY
297 SF
EQUIPMENTSTORAGE
124 SF
PHYSICIANWORKROOM
34 SFHK
42 SFSTF TLT
81 SFMED
59 SFNOURISH
135 SF
SOILEDUTILITY
51 SFTLT
159 SFRECEPTION
68 SFOFFICE
110 SFOFFICE
112 SFOFFICE
52 SFADMIN ASST
80 SFOFFICE
80 SFOFFICE188 SF
RECEPT /WAIT
157 SFREGISTRATION
158 SF
REGISTRATIONWORKROOM
244 SF
PHYSICIANSLOUNGE
572 SF
FEMALESTAFF
LOCKERS450 SF
MALE STAFFLOCKERS
120 SF
SCRUBDISPENSING
169 SF
FEMALEPUBLIC TLT
169 SF
MALEPUBLIC TLT 253 SF
FAMILYWAITING
133 SFANTE ROOM
131 SFANTE ROOM
314 SFSTAIR 1
319 SF
CHARTINGSTATION
84 SFOFFICE
84 SFOFFICE 124 SF
SOILEDUTILITY318 SF
CHARTING150 SFDATA
169 SF
CLEANSUPPLY
76 SFMEDICATION
61 SFNOURISH
14 SFALCOVE
14 SFALCOVE
CRITICAL CARE UNIT
RESPIRATORY CARE
112 SF
OFFICE-SUPPLY
MGR.
52 SFALCOVE
CENTRAL PLANT BELOW
ROOF BELOW
CANOPY BELOW
OPEN TO BELOW
290 SFICU 14
286 SFICU 15
296 SFICU 16290 SF
ICU 17293 SFICU 18
317 SF
EQUIPMENTSTORAGE
1179 SFCORRIDOR
1849 SFCORRIDOR
227 SFCORR
212 SF
CHARTINGSTATION
156 SFCORRIDOR
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
26 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
278 SFSTAIR 2
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
26 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
23 SFTLT
228 SFSTAIR 3
40 SFALCOVE
97 SF
SHAREDON-CALL
104 SF
SHAREDON-CALL 45 SF
TLT
327 SFTEAM ROOM
297 SF
SHAREDOFFICE -
CASEMANAGEMENT
60 SF
RESOURCECENTER
118 SF
CONSULTROOM
220 SF
EQUIPMENTSTORAGE
130 SFCLEAN
88 SF
OFFICECOORD.
2261 SFCORRIDOR
2604 SFCORRIDOR
522 SFCORRIDOR
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:07
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 2 FLOOR PLAN
AREA B
A-112B
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 2 FLOOR PLAN - AREA B
Issued Drawing LogNo. Date Item
DN
DN UP
12345678910
A
B
C
D
F.5
1112131415161718
H
F
G
E
0.5
B.5
C.5
E.2
C.8
PATIENT CARE SERVICES(TELEMETRY)
HEART CENTER
FUTURE EXPANSION
FUTURE M.O.B.
SHELL SPACE
MECH.
CATH LAB SUITES
PREP/RECOV
CARDIOLOGYWAITING
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
10' 20' 40'
1" = 20' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
A BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:11
PM
1" = 20'-0"
LEVEL 3OVERALL PLAN
A-113
Author
Checker
Approver
AUGUST 1, 2014
1" = 20'-0"2 LEVEL 3 - OVERALL PLAN
Issued Drawing LogNo. Date Item
DN UP
462 SF
SERVICEELEVATORS
301 SF
PUBLICELEVATORS
103 SF
SCHEDULECLERKS
211 SF
PATIENTROOM
211 SF
PATIENTROOM76 SF
ON-CALL
213 SFWAITING
8910
A
B
C
D
F.5
1112131415161718
H
F
G
E
B.5
C.5
E.2
C.8
100 SFMEDICATION
84 SF
PHYS. DICT/PACS
437 SFCHARTING163 SF
ELECT.
108 SFCONSULT
56 SF
RESOURCECENTER
168 SFECHO
151 SFECG/HOLTER
169 SFECHO
168 SFECHO
163 SFECHO
131 SFECG
218 SFECG/STRESS
107 SFOFFICE 128 SF
WAITING
48 SFPAT TLT
169 SFPUBLIC TLT
169 SFPUBLIC TLT
90 SF
CLEANSUPPLY
180 SFREADING
138 SFDATA
229 SF
TECH WORKROOM
169 SF
PATIENTHOLDING
314 SFSTAIR 1
34 SFPAT TLT
228 SFSTAIR
117 SF
OFFICE - EDDIRECTOR
117 SF
OFFICE -CATH
DIRECTOR79 SFCOPY/ FILE
45 SFRECEPT
43 SFBILLER
856 SFCORRIDOR
HEART CENTER
FUTURE EXPANSION
FUTURE M.O.B.
SHELL SPACE
MECH.
CATH LAB SUITES
PREP/RECOV
CARDIOLOGYWAITING
245 SF
SHAREDOFFICE -
CASEMANAGEMENT
31 SFWAIT
1207 SFCORRIDOR
223 SFCORRIDOR
216 SFSTAIR 4
272 SFSTAIR 5
913 SF
CLEANSUPPLY
91 SFOFFICE
107 SFOFFICE
140 SFOFFICE
86 SF
PATTLT
103 SFEQUIP
133 SFCONTROL
590 SFCATH LAB
105 SFEQUIP
134 SFCONTROL
567 SFCATH LAB
32 SFSCRUB
105 SFEQUIP
134 SFCONTROL
567 SFCATH LAB
94 SFEQUIP
120 SFCONTROL
589 SFCATH LAB
457 SF
STAFFLOUNGE
444 SF
STAFFLOCKERS
118 SFSTAFF TLTS
215 SF
STAFFLOCKERS
118 SFSTAFF TLTS
53 SFSHWR
48 SFSHWR
31 SFSCRUB
32 SFSCRUB
32 SFSCRUB
202 SFREADING
158 SF
SOILEDUTILITY
32 SFSCRUB
559 SFEP LAB
371 SFTILT TABLE
136 SFCONTROL
559 SFEP LAB
136 SFCONTROL
108 SFEQUIP
108 SFEQUIP
104 SF
SOILEDHOLD
111 SF5
110 SF4
119 SF3
110 SF2
112 SF1 101 SF
14
167 SF
CLEANSUPPLY /
MED
103 SF6
103 SF7
106 SF8
106 SF9
104 SF10
113 SF11
105 SF12
112 SF13
36 SFVEST.
58 SFVEST.
56 SFVEST.
39 SFVEST.
46 SFHK
108 SFALCOVE
32 SFSCRUB
40 SFNOURISHMENT
179 SF
NURSESTATION
163 SF
NURSESTATION
131 SFELECT
62 SF
PATTLT
348 SF
RADIALLOUNGE
226 SFECG/STRESS
107 SFOFFICE
151 SFRECEPTION
35 SFHK
265 SF
MULTI-PURPOSE
ROOM
50 SFPAT TLT 34 SF
PAT TLT
98 SFON-CALL
155 SFCONSULT
128 SFHALLWAY
257 SF
RECEPTION /REGISTRATION
2337 SFCORRIDOR
1515 SFCORRIDOR
378 SFCORRIDOR
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
AA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:13
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 3 FLOOR PLAN
AREA A
A-113A
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 3 FLOOR PLAN - AREA A
Issued Drawing LogNo. Date Item
DN
462 SF
SERVICEELEVATORS
301 SF
PUBLICELEVATORS
103 SF
SCHEDULECLERKS
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM76 SF
ON-CALL
213 SFWAITING 211 SF
PATIENTROOM
12345678910
A
B
C
D
F.5
1112
H
F
G
E
0.5
B.5
C.5
E.2
C.8
100 SFMEDICATION
84 SF
PHYS. DICT/PACS
437 SFCHARTING163 SF
ELECT.
389 SF
CLEANSUPPLY 223 SF
SOILEDUTILITY
48 SFHK
151 SFDATA89 SF
OFFICE
108 SFCONSULT
381 SF
EQUIP.STORAGE 438 SF
CHARTING98 SFMED
84 SF
PHYS. DICT /PACS
248 SF
CLEANSUPPLY
196 SF
SOILEDUTILITY 161 SF
ELECT
89 SFOFFICE
56 SF
RESOURCECENTER
168 SFECHO
151 SFECG/HOLTER
169 SFECHO
168 SFECHO
163 SFECHO
131 SFECG
218 SFECG/STRESS
107 SFOFFICE 128 SF
WAITING
48 SFPAT TLT
210 SF
PATIENTROOM
260 SF
PATIENTROOM
210 SF
PATIENTROOM
262 SF
PATIENTROOM
169 SFPUBLIC TLT
169 SFPUBLIC TLT
90 SF
CLEANSUPPLY
180 SFREADING
138 SFDATA
229 SF
TECH WORKROOM
169 SF
PATIENTHOLDING
314 SFSTAIR 1
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
34 SFPAT TLT50 SF
PAT TLT34 SF
PAT TLT50 SFPAT TLT
34 SFPAT TLT50 SF
PAT TLT
34 SFPAT TLT50 SF
PAT TLT
34 SFPAT TLT50 SF
PAT TLT
34 SFPAT TLT50 SF
PAT TLT
34 SFPAT TLT
228 SFSTAIR
117 SF
OFFICE - EDDIRECTOR
117 SF
OFFICE -CATH
DIRECTOR79 SFCOPY/ FILE
45 SFRECEPT
43 SFBILLER
246 SF
STAFFLOUNGE
68 SFSTF LOCKER
52 SFALCOVE
51 SFALCOVE
2467 SFCORRIDOR
856 SFCORRIDOR
PATIENT CARE SERVICES(TELEMETRY)
HEART CENTER
234 SF
PATIENTROOM
251 SF
PATIENTROOM
233 SF
PATIENTROOM
248 SF
PATIENTROOM
245 SF
SHAREDOFFICE -
CASEMANAGEMENT
281 SFTEAM ROOM98 SF
EQROOM
31 SFWAIT
2774 SFCORRIDOR
255 SFSTAIR 2
50 SFPAT TLT
34 SFPAT TLT
50 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
45 SFPAT TLT
1207 SFCORRIDOR
223 SFCORRIDOR
444 SF
STAFFLOCKERS
118 SFSTAFF TLTS
48 SFSHWR
39 SFVEST.
226 SFECG/STRESS
107 SFOFFICE
151 SFRECEPTION
35 SFHK
265 SF
MULTI-PURPOSE
ROOM
50 SFPAT TLT 34 SF
PAT TLT
98 SFON-CALL
155 SFCONSULT
128 SFHALLWAY
78 SFNOURISH
53 SFSTAFF TLT.
257 SF
RECEPTION /REGISTRATION
378 SFCORRIDOR
49 SFSTAFF TLT.
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:17
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 3 FLOOR PLAN
- AREA B
A-113B
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 3 FLOOR PLAN - AREA B
Issued Drawing LogNo. Date Item
DN
12345678910
A
B
C
D
F.5
1112131415161718
H
F
G
E
C.5
2' -
11"
10' - 11"
E.2
C.8
MATERNITY(ANTE/POST PARTUM)
FUTURE M.O.B.
C-SECTION
PUBLICWAITINGTRIAGE
ROOF
1 2 3
LABOR AND DELIVERY
(4 ROOMS)
MED/SURG PATIENT ROOMS
(11 ROOMS)
POST PARTUM PATIENT ROOMS
(7 ROOMS)
POST PARTUM PATIENT ROOMS
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
10' 20' 40'
1" = 20' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
A BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:20
PM
1" = 20'-0"
LEVEL 4OVERALL PLAN
A-114
Author
Checker
Approver
AUGUST 1, 2014
1" = 20'-0"2 LEVEL 4 - OVERALL PLAN
Issued Drawing LogNo. Date Item
DN
458 SF
SERVICEELEVATORS
301 SF
PUBLICELEVATORS
8910
A
B
C
D
F.5
1112131415161718
H
F
G
E
C.5
10' - 11"
E.2
C.8
169 SFPUBLIC TLT
169 SFPUBLIC TLT
100 SFMED
84 SFPHYS DICT
89 SFTLT/ SHWR
165 SFELECT
437 SFCHARTING
314 SFSTAIR 1
644 SF
FAMILYWAITING
225 SFSTAIR
103 SFON-CALL
98 SFON-CALL
91 SFON-CALL
103 SFTLT / SHWR
115 SFON-CALL
98 SFON-CALL
94 SFON-CALL
218 SF
MULTI-PURPOSE
ROOM
FUTURE M.O.B.
C-SECTION
PUBLICWAITINGTRIAGE
ROOF
272 SFTEAM ROOM
398 SFLDR
394 SFLDR
392 SFLDR
236 SF
CLEANSUPPLY
261 SF
EQUIP.STORAGE
164 SFELECT
387 SFLDR
387 SFLDR
166 SF
NURSESTATION
86 SFNOURISH.
386 SFLDR
188 SF
STAFFLOUNGE
73 SFOFFICE
97 SFOFFICE
105 SFSOIL HOLD
485 SFC-SECTION
450 SFC-SECTION
218 SF
FEMALELOCKER
99 SF
MALELOCKER
130 SF
TLTSHOWER
123 SF
CLEANSUPPLY
50 SFPAT TLT
117 SFMED
1 2 3
12 SFALC
70 SF
ANESTHESIAWORKROOM
102 SFDATA
32 SFHK
LABOR AND DELIVERY
105 SFMED
61 SFHK
101 SF
CLEANSUPPLY
84 SFSOIL HOLD 173 SF
CONSULT/BEREAVEMENT
178 SFEXAM
392 SFLDR
117 SF
SOILEDHOLDING
694 SFCORRIDOR
3186 SFCORRIDOR
549 SFCORRIDOR
807 SFWAITING
168 SFRECEPTION
117 SF
NURSESTATION
303 SF
NURSESTATION
272 SFCORRIDOR
216 SFSTAIR 4
268 SFSTAIR 5
34 SFPAT TLT
34 SFPAT TLT
34 SFPAT TLT
34 SFPAT TLT
91 SFCORRIDOR
97 SFCORRIDOR
279 SFCORRIDOR
288 SF
PRE/ POSTPROCEDURE
154 SFEXAM
159 SFEXAM
159 SFEXAM
154 SFEXAM
67 SF
TLTSHOWER
212 SFSUB-STERILE
110 SFSCRUB
71 SFSTF TLT
112 SFMED
54 SF
PHYS.DICT.
162 SF
EQUIP.STOR.
128 SFCORRIDOR
425 SFCORRIDOR
34 SFPAT TLT
34 SFPAT TLT
34 SFPAT TLT
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
AA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:22
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 4 FLOOR PLAN
AREA A
A-114A
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 4 FLOOR PLAN - AREA A
Issued Drawing LogNo. Date Item
458 SF
SERVICEELEVATORS
301 SF
PUBLICELEVATORS
212 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
181 SFLACTATION
211 SF
PATIENTROOM
213 SF
PATIENTROOM
213 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
374 SF
RESPITENURSERY
211 SF
PATIENTROOM
211 SF
PATIENTROOM
12345678910
A
B
C
D
F.5
1112
H
F
G
E
C.5
2' -
11"
10' - 11"
E.2
C.8
169 SFPUBLIC TLT
169 SFPUBLIC TLT
100 SFMED
84 SFPHYS DICT 240 SF
CLEANSUPPLY
180 SF
SOILEDUTILITY
100 SFOFFICE
75 SFHK
54 SFSTF TLT
261 SF
STAFFLOUNGE /LOCKERS
203 SFDATA
89 SFTLT/ SHWR
212 SF
PATIENTROOM
212 SF
PATIENTROOM
64 SFMED
72 SF
CLEANSUPPLY
66 SF
SOILEDUTILITY
35 SFGOWN
285 SF
EQUIPSTORAGE
164 SF
SOILEDHOLDING
2029 SF
CONTINUINGCARE
NURSERY
199 SF
GOWN /WORK AREA
165 SFELECT
437 SFCHARTING
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT
34 SFPAT TLT50 SF
PAT TLT
34 SFPAT TLT50 SF
PAT TLT
256 SFSTAIR 2
314 SFSTAIR 1
644 SF
FAMILYWAITING
225 SFSTAIR
51 SFALCOVE
100 SFOFFICE 232 SF
WORK AREA139 SFELECT
389 SFCHARTING
103 SFMEDS
103 SFON-CALL
98 SFON-CALL
91 SFON-CALL
103 SFTLT / SHWR
115 SFON-CALL
98 SFON-CALL
94 SFON-CALL
218 SF
MULTI-PURPOSE
ROOM
MATERNITY(ANTE/POST PARTUM)
C-SECTION
PUBLICWAITING
253 SF
SHAREDOFFICE -
CASEMANAGEMENT
272 SFTEAM ROOM
211 SF
PATIENTROOM
233 SF
PATIENTROOM
248 SF
PATIENTROOM
34 SFPAT TLT
50 SFPAT TLT
50 SFPAT TLT
258 SF
PATIENTROOM
62 SFHK
69 SFSTF TLT
210 SF
CLEANSUPPLY
264 SFISOLATION
204 SFEXAM
131 SF
HEARINGTESTING
93 SFPHYS DICT
485 SFC-SECTION
450 SFC-SECTION
218 SF
FEMALELOCKER
99 SF
MALELOCKER
117 SFMED
1 2 3
12 SFALC
70 SF
ANESTHESIAWORKROOM
102 SFDATA
32 SFHK
101 SF
CLEANSUPPLY
84 SFSOIL HOLD 173 SF
CONSULT/BEREAVEMENT
117 SF
SOILEDHOLDING
694 SFCORRIDOR
1517 SFCORRIDOR
2034 SFCORRIDOR
809 SFCORRIDOR
3186 SFCORRIDOR
549 SFCORRIDOR
807 SFWAITING
168 SFRECEPTION
117 SF
NURSESTATION
272 SFCORRIDOR
34 SFPAT TLT
50 SFPAT TLT
91 SFCORRIDOR
97 SFCORRIDOR
279 SFCORRIDOR
288 SF
PRE/ POSTPROCEDURE
159 SFEXAM
67 SF
TLTSHOWER
212 SFSUB-STERILE
110 SFSCRUB
110 SFNOURISHMENT
272 SF
EQUIP.STORAGE
162 SF
EQUIP.STOR.
(4 ROOMS)
MED/SURG PATIENT ROOMS
(11 ROOMS)
POST PARTUM PATIENT ROOMS
(7 ROOMS)
POST PARTUM PATIENT ROOMS
425 SFCORRIDOR
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:25
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 4 FLOOR PLAN
AREA B
A-114B
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 4 FLOOR PLAN - AREA B
Issued Drawing LogNo. Date Item
12345678910
A
B
C
1112131415161718
H
F
G
E
INPATIENT PM&R
PATIENT CARE SERVICES(MED-SURG)
FUTURE M.O.B.
ROOF BELOW
ROOF
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
10' 20' 40'
1" = 20' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
A BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:28
PM
1" = 20'-0"
LEVEL 5OVERALL PLAN
A-115
Author
Checker
Approver
AUGUST 1, 2014
1" = 20'-0"2 LEVEL 5 - OVERALL PLAN
Issued Drawing LogNo. Date Item
677 SF
SERVICEELEVATORS
80 SFON-CALL
301 SF
PUBLICELEVATORS
438 SFCONFERENCE
211 SF
PATIENTROOM
211 SF
PATIENTROOM
250 SF
SHAREDOFFICE
209 SFWAITING
8910
A
B
C
1112131415161718
H
F
G
E
84 SFPHYS DICT
100 SFMED
437 SFCHARTING
108 SFCONSULT
50 SF
RESEARCHCENTER
163 SFELECT
720 SFOPEN GYM
34 SFPAT TLT
314 SFSTAIR 1
498 SFHYDROTHERAPY
153 SFSTORAGE
254 SFCHARTING
85 SFADL TLT
INPATIENT PM&R
169 SF
MALEPUBLIC TLT
169 SF
FEMALEPUBLIC TLT
88 SFON-CALL
77 SFON-CALL
79 SFTLT/ SHWR
79 SFTLT/ SHWR
89 SFON-CALL
88 SFON-CALL
82 SFON-CALL
FUTURE M.O.B.
ROOF BELOW
256 SF
MULTI-PURPOSE
ROOM
ROOF
863 SFCORRIDOR
358 SFCORRIDOR
100 SFCORRIDOR
101 SFCORRIDOR
34 SFPAT TLT
347 SFCORRIDOR
250 SF
SHAREOFFICE -
CASEMANAGEMENT
256 SF
SHAREDOFFICE -
HOSPITALISTS
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
AA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:30
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 5 FLOOR PLAN
AREA A
A-115A
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 5 FLOOR PLAN - AREA A
Issued Drawing LogNo. Date Item
677 SF
SERVICEELEVATORS
80 SFON-CALL
301 SF
PUBLICELEVATORS
438 SFCONFERENCE
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
262 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
250 SF
SHAREDOFFICE
209 SFWAITING
12345678910
A
B
C
1112
H
F
G
E
84 SFPHYS DICT
389 SF
CLEANSUPPLY
223 SF
SOILEDUTILITY
89 SFOFFICE
89 SFOFFICE
380 SF
EQUIPMENTSTORAGE
246 SF
STAFFLOUNGE
151 SFDATA
48 SFHK
98 SFMED
248 SF
CLEANSUPPLY
203 SF
SOILEDUTILITY
154 SFELECT
100 SFMED
438 SFCHARTING
84 SFPHYS DICT
437 SFCHARTING
108 SFCONSULT
50 SF
RESEARCHCENTER
163 SFELECT
720 SFOPEN GYM
34 SFPAT TLT
44 SFPAT TLT 34 SF
PAT TLT34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT
50 SFPAT TLT
50 SFPAT TLT34 SF
PAT TLT34 SF
PAT TLT34 SF
PAT TLT
50 SFPAT TLT
314 SFSTAIR 1
498 SFHYDROTHERAPY
153 SFSTORAGE
254 SFCHARTING
85 SFADL TLT
INPATIENT PM&R
169 SF
MALEPUBLIC TLT
169 SF
FEMALEPUBLIC TLT
88 SFON-CALL
77 SFON-CALL
79 SFTLT/ SHWR
79 SFTLT/ SHWR
89 SFON-CALL
88 SFON-CALL
82 SFON-CALL
68 SF
STAFFLOCKERS
52 SFALCOVE
51 SFALCOVE
PATIENT CARE SERVICES(MED-SURG)
262 SF
PATIENTROOM
234 SF
PATIENTROOM
248 SF
PATIENTROOM
34 SFPAT TLT
45 SFPAT TLT
50 SFPAT TLT
251 SF
PATIENTROOM
234 SF
PATIENTROOM
275 SFTEAM ROOM
256 SF
MULTI-PURPOSE
ROOM
94 SF
EQROOM
2785 SFCORRIDOR
2467 SFCORRIDOR
863 SFCORRIDOR
358 SFCORRIDOR
100 SFCORRIDOR
101 SFCORRIDOR
34 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
45 SFPAT TLT
34 SFPAT TLT
50 SFPAT TLT
347 SFCORRIDOR
255 SFSTAIR 2
50 SFSTAFF TLT
53 SFSTF TLT
79 SFNOURISH
250 SF
SHAREOFFICE -
CASEMANAGEMENT
256 SF
SHAREDOFFICE -
HOSPITALISTS
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:33
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 5 FLOOR PLAN
AREA B
A-115B
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 5 FLOOR PLAN - AREA B
Issued Drawing LogNo. Date Item
677 SF
SERVICEELEVATORS
111 SF
TREATMENTBAY
921 SF
CLINICALENGINEERING
301 SF
PUBLICELEVATORS
387 SF
CONFERENCEROOM
256 SF
MULTIPURPOSEROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
262 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
518 SF
STAFFTRAINING
ROOM208 SFWAITING
123456789101112
H
F
G
E
0.5
169 SF
FEMALEPUBLIC TLT
167 SF
MALEPUBLIC TLT
100 SFMED
84 SFPHYS DICT
163 SFELECT
389 SF
CLEANSUPPLY
223 SF
SOILEDUTILITY
89 SFOFFICE 380 SF
EQUIPSTORAGE
246 SF
STAFFLOUNGE
151 SFDATA
48 SFHK
98 SFMED
248 SF
CLEANSUPPLY
203 SF
SOILEDUTILITY 155 SF
ELECT
437 SFCHARTING
438 SFCHARTING
84 SFPHYS DICT
89 SFOFFICE
108 SFCONSULT
50 SF
RESOURCECENTER
314 SFSTAIR 1
844 SFCORRIDOR
2467 SFCORRIDOR
367 SFCORRIDOR
34 SFPAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT
50 SFPAT TLT34 SF
PAT TLT34 SF
PAT TLT
34 SFPAT TLT 50 SF
PAT TLT
34 SFPAT TLT 50 SF
PAT TLT
34 SFPAT TLT 50 SF
PAT TLT
34 SFPAT TLT 50 SF
PAT TLT
34 SFPAT TLT 50 SF
PAT TLT
34 SFPAT TLT 50 SF
PAT TLT
34 SFPAT TLT
137 SF
TREATMENTBAY
111 SF
TREATMENTBAY
107 SF
TREATMENTBAY
118 SF
TREATMENTBAY
106 SF
TREATMENTBAY
101 SF
TREATMENTBAY
130 SF
NURSEWORKSTATION
63 SFPAT TLT
255 SF
EQUIPMENTCLEANING/STORAGE72 SF
CLEANSUPPLY
51 SFALCOVE
68 SF
STAFFLOCKERS
51 SFALCOVE
PATIENT CARE SERVICES(MED-SURG)
INPATIENT DIALYSIS
234 SF
PATIENTROOM
251 SF
PATIENTROOM
262 SF
PATIENTROOM
234 SF
PATIENTROOM
248 SF
PATIENTROOM
275 SFTEAM ROOM
96 SF
EQUIP.STOR.
50 SFSTAFF TLT
2785 SFCORRIDOR
255 SFSTAIR 2
45 SFPAT TLT
34 SFPAT TLT
52 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
45 SFPAT TLT
758 SFCORRIDOR
53 SFSTF TLT
79 SFNOURISH
250 SF
SHAREDOFFICE -
CASEMANAGEMENT
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
A B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
2:1
1:32
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 6 FLOOR PLAN
A-116
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 6 FLOOR PLAN - AREA B
Issued Drawing LogNo. Date Item
353 SF
PUBLICELEVATORS
403 SF
CONFERENCEROOM
210 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
PATIENTROOM
211 SF
NEG.PRESSURE
PATIENTROOM
211 SF
NEG.PRESSURE
PATIENTROOM
211 SF
NEG.PRESSURE
PATIENTROOM
211 SF
NEG.PRESSURE
PATIENTROOM
210 SF
NEG.PRESSURE
PATIENTROOM
262 SF
NEG.PRESSURE
IMCUPATIENTROOM
211 SF
NEG.PRESSURE
PATIENTROOM
211 SF
NEG.PRESSURE
PATIENTROOM
211 SF
NEG.PRESSURE
PATIENTROOM
211 SF
NEG.PRESSURE
PATIENTROOM
211 SF
NEG.PRESSURE
PATIENTROOM
211 SF
OBSERVROOM
211 SF
OBSERVROOM
211 SF
OBSERVROOM
211 SF
OBSERVROOM
211 SF
OBSERVROOM
211 SF
OBSERVROOM
211 SF
OBSERVROOM
211 SF
OBSERVROOM
123456789101112
H
F
G
E
0.5
162 SFELECT
437 SFCHARTING 100 SF
MED
84 SFPHYS DICT
389 SF
CLEANSUPPLY
223 SF
SOILEDUTILITY
89 SFOFFICE
89 SFOFFICE
380 SF
EQUIPSTOR.
246 SF
STAFFLOUNGE
151 SFDATA
48 SFHK
438 SFCHARTING
98 SFMED
84 SFPHYS DICT
248 SF
CLEANSUPPLY 200 SF
SOILEDUTILITY
158 SFELECT
99 SFCONSULT
34 SFPAT TLT
50 SFPAT TLT 34 SF
PAT TLT
44 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT 34 SF
PAT TLT
50 SFPAT TLT
34 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
34 SFPAT TLT50 SF
PAT TLT50 SF
PAT TLT
34 SFPAT TLT50 SF
PAT TLT
34 SFPAT TLT50 SF
PAT TLT
34 SFPAT TLT50 SF
PAT TLT
34 SFPAT TLT50 SF
PAT TLT
34 SFPAT TLT
34 SFPAT TLT
314 SFSTAIR 1
51 SFALCOVE
68 SF
STAFFLOCKERS
51 SFALCOVE
2702 SFCORRIDOR
PATIENT CARE SERVICES(TELEMETRY)
234 SF
NEG.PRESSURE
IMCUPATIENTROOM
251 SF
NEG.PRESSURE
IMCUPATIENTROOM
262 SF
NEG.PRESSURE
IMCUPATIENTROOM
247 SF
NEG.PRESSURE
IMCUPATIENTROOM
234 SF
NEG.PRESSURE
IMCUPATIENTROOM
PATIENT TRANSPORT
BEDS (8)
PATIENT OBSERVATION
45 SFPAT TLT
34 SFPAT TLT
52 SFPAT TLT
50 SFPAT TLT
34 SFPAT TLT
45 SFPAT TLT
(8 ROOMS)
IMCU / NEGATIVE PRESSURE PATIENT ROOMS
94 SF
EQROOM
275 SFTEAM ROOM
2529 SFCORRIDOR
250 SF
SHAREDOFFICE -
CASEMANAGEMENT
518 SF
STAFFTRAINING
ROOM
677 SF
SERVICEELEVATORS
175 SF
MALEPUBLIC TLT
176 SF
FEMALEPUBLIC TLT
940 SF
WORKSTATIONS
182 SF
PULMONARYFUNCTIONTESTING
132 SF
OFFICE -RISK MGMT
121 SF
WORKROOM
116 SFOFFICE - QC
129 SFOFFICE - QC
48 SFSTF TLT
48 SFSTF TLT
61 SFPANTRY
253 SF
PATIENTTRANSPORT
STORAGE348 SF
PATIENTTRANSPORT
ADMIN
116 SFOFFICE - IC
129 SFOFFICE - IC
168 SFRECEPT
141 SF
PULMONARYADMIN
1209 SFCORRIDOR
50 SFSTAFF TLT
255 SFSTAIR 2
213 SF
FAMILYWAITING
BEDS (8)
PATIENT OBSERVATION
(8 ROOMS)
MED / SURG PATIENT ROOMS
(8 ROOMS)
IMCU / NEGATIVE PRESSURE PATIENT ROOMS
53 SFSTF TLT
79 SFNOURISH
256 SF
CONFERENCEROOM
59 SF
RESOURCECENTER
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
A B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
2:1
1:11
PM
1/16" = 1'-0"
MAIN HOSPITALLEVEL 7 FLOOR PLAN
A-117
Author
Checker
Approver
AUGUST 1, 2014
1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 7 FLOOR PLAN - AREA B
Issued Drawing LogNo. Date Item
12345678910111213
H
F
G
E
0.5
243 SF
ELEVATORMACHINE
ROOM
356 SFSTAIR 2
SHAFT
AHU
SHAFT
AHU
SHAFT
12345678910111213
H
F
G
E
0.5
ROOF
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
NORTH
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
A BA B
KEY PLAN
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
4:5
2:46
PM
1" = 20'-0"
PENTHOUSE ANDROOF PLAN
A-119
Author
Checker
Approver
AUGUST 1, 2014
1" = 20'-0"1 PENTHOUSE FLOOR PLAN
1" = 20'-0"2 ROOF FLOOR PLAN - OVERALL
Issued Drawing LogNo. Date Item
E.D. CANOPYWAS
HING
TON
ADVE
NTIS
T
EMERGENCY
LEVEL 10' - 0"
LEVEL 218' - 0"
LEVEL 336' - 0"
CELLAR-21' - 0"
LEVEL 451' - 0"
LEVEL 566' - 0"
LEVEL 681' - 0"
LEVEL 796' - 0"
PENTHOUSE111' - 0"
ROOF131' - 0"
LEVEL 10' - 0"
LEVEL 218' - 0"
LEVEL 336' - 0"
CELLAR-21' - 0"
LEVEL 451' - 0"
LEVEL 566' - 0"
LEVEL 681' - 0"
LEVEL 796' - 0"
PENTHOUSE111' - 0"
ROOF127' - 0"
LEVEL 10' - 0"
LEVEL 218' - 0"
LEVEL 336' - 0"
CELLAR-21' - 0"
LEVEL 451' - 0"
LEVEL 566' - 0"
LEVEL 681' - 0"
LEVEL 796' - 0"
PENTHOUSE111' - 0"
ROOF126' - 0"
EP3G1EP1 EP4
G1 C1
C2 EP1 G2 M2 C2
EP1
G4
G5
C3
BUILDING SIGNAGE, ILLUMINATED
MAIN HOSPITALENTRY
SOUTH COURTYARDENTRY EMERGENCY
ENTRYEMERGENCY
VEHICLES
E.D. CANOPY
CONNECTION TOBUILDING 'A'
C2
G2
LEVEL 10' - 0"
LEVEL 218' - 0"
LEVEL 336' - 0"
CELLAR-21' - 0"
LEVEL 451' - 0"
LEVEL 566' - 0"
LEVEL 681' - 0"
LEVEL 796' - 0"
PENTHOUSE111' - 0"
ROOF126' - 0"
G1
EP3 G1EP1EP4
C1
G5
G2C2
EP1
C2C1G2
CENTRAL UTILITY PLANTWEST PATIO
LAODING DOCK
E.D CANOPY
C2
C2
G5 G2
C1 ARCHITECTURAL SPLIT FACECMU VENEER, W BUFF FINISH.
MATERIAL LEGEND
C1B ARCHITECTURAL SPLIT FACE CMUSCREEN WALL. W BUFF FINISH
C2 ARCHITECTURAL GROUND FACECMU VENEER W. SMOOTH FINISH
EP1POLYMER BASED SOLID PHENOLIC EXTERIOR WALLPANELS, INSTALLED WITH EXPOSED FASTENERS.BIRCH WOOD GRAINED VENEER FINISH
EP2 COMPOSITE ALUMINUM METAL PANEL SYSTEM.
EP3COMPOSITE ALUMINUM METAL PANEL SYSTEM.3-STONE JADE COLOR, STAGGERED SEAM,RANDOM PATTERN AND SIZE.
EP4 SCREEN WALL SYSTEM PAINTED W/ HIGHPERFORMANCE SILVER COATING
G1ALUMINUM CURTAINWALL WINDOWSYSTEM W/SPANDREL & FRIT GLASS.HIGH PERFORMANCE INSULATED GLAZING
G2ALUMINUM STOREFRONT WINDOW SYSTEMW/SPANDREL & FRIT GLASS.HIGH PERFORMANCE INSULATED GLAZING
G3ALUMINUM STOREFRONT WINDOW SYSTEMW/ HIGH PERFORMANCE INSULATED GLAZINGAND SPANDREL GLAZING
G4 PUNCHED ALUMINUM WINDOW SYSTEM W/ HIGHPERFORMANCE INSULATED GLASS
G5 ALUMINUM RIBBON WINDOW SYSTEM W/ HIGHPERFORMANCE INSULATED GLAZING
G6FOOD COURT VERANDA METAL GUARDRAILSYSTEM W/ HIGH PERFORMANCE PAINTEDMETAL SLAB FASCIA COVER
L1 ARCHITECTURAL ALUMINUM LOUVER SYSTEMHIGH PERFORMANCE PAINTED FINISH
M1A PAINTED ALUMINUM HORIZONTALSUNSHADES FINSIH TYP. DARK GRAY COLOR
M1B PAINTED ALUMINUM VERTICALSUNSHADES , TYP. DARK GRAY COLOR
M2 METAL WRAPPED BUILDING COPINGDARK GRAY PAINTED
MATERIAL LEGEND ABBREVIATIONS:CMU - CONCRETE MASONRY UNIT WALL SYSTEMEP - EXTERIOR WALL PANEL SYSTEMG - GLAZING SYSTEML - LOUVER SYSTEMM - METTALIC FINISH SYSTEM
C3 LARGE FORMAT CMU VENEER W.ROUGH FINISH
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:41
PM
As indicated
HOSPITAL EAST ANDWEST ELEVATIONS
A-200
Author
Checker
Approver
AUGUST 1, 2014
1" = 20'-0"1 EAST ELEVATION - OVERALL
1" = 20'-0"2 WEST ELEVATION - OVERALL
Issued Drawing LogNo. Date Item
FUTURE MOB
EMERGENCY
LEVEL 10' - 0"
LEVEL 218' - 0"
LEVEL 336' - 0"
LEVEL 451' - 0"
LEVEL 566' - 0"
LEVEL 681' - 0"
LEVEL 796' - 0"
PENTHOUSE111' - 0"
ROOF131' - 0"
LEVEL 10' - 0"
LEVEL 218' - 0"
LEVEL 336' - 0"
LEVEL 451' - 0"
LEVEL 566' - 0"
LEVEL 681' - 0"
LEVEL 796' - 0"
PENTHOUSE
FUTURE MOB
LEVEL 10' - 0"
LEVEL 218' - 0"
LEVEL 336' - 0"
LEVEL 451' - 0"
LEVEL 566' - 0"
LEVEL 681' - 0"
LEVEL 796' - 0"
PENTHOUSE
ROOF131' - 0"
LEVEL 10' - 0"
LEVEL 218' - 0"
LEVEL 336' - 0"
LEVEL 451' - 0"
LEVEL 566' - 0"
LEVEL 681' - 0"
LEVEL 796' - 0"
PENTHOUSE111' - 0"
EMERGENCYAMBULANCE ENTRANCE
G1
EP1
C1
G1
C2
EP1
CENTRAL UTILITYPLANT BEYOND
G1
G1
G2
C3
G1
EP1 G1
G2
SOUTH COURTYARDENTRY
INTERIORSPACE
C3
C2
C1 ARCHITECTURAL SPLIT FACECMU VENEER, W BUFF FINISH.
MATERIAL LEGEND
C1B ARCHITECTURAL SPLIT FACE CMUSCREEN WALL. W BUFF FINISH
C2 ARCHITECTURAL GROUND FACECMU VENEER W. SMOOTH FINISH
EP1POLYMER BASED SOLID PHENOLIC EXTERIOR WALLPANELS, INSTALLED WITH EXPOSED FASTENERS.BIRCH WOOD GRAINED VENEER FINISH
EP2 COMPOSITE ALUMINUM METAL PANEL SYSTEM.
EP3COMPOSITE ALUMINUM METAL PANEL SYSTEM.3-STONE JADE COLOR, STAGGERED SEAM,RANDOM PATTERN AND SIZE.
EP4 SCREEN WALL SYSTEM PAINTED W/ HIGHPERFORMANCE SILVER COATING
G1ALUMINUM CURTAINWALL WINDOWSYSTEM W/SPANDREL & FRIT GLASS.HIGH PERFORMANCE INSULATED GLAZING
G2ALUMINUM STOREFRONT WINDOW SYSTEMW/SPANDREL & FRIT GLASS.HIGH PERFORMANCE INSULATED GLAZING
G3ALUMINUM STOREFRONT WINDOW SYSTEMW/ HIGH PERFORMANCE INSULATED GLAZINGAND SPANDREL GLAZING
G4 PUNCHED ALUMINUM WINDOW SYSTEM W/ HIGHPERFORMANCE INSULATED GLASS
G5 ALUMINUM RIBBON WINDOW SYSTEM W/ HIGHPERFORMANCE INSULATED GLAZING
G6FOOD COURT VERANDA METAL GUARDRAILSYSTEM W/ HIGH PERFORMANCE PAINTEDMETAL SLAB FASCIA COVER
L1 ARCHITECTURAL ALUMINUM LOUVER SYSTEMHIGH PERFORMANCE PAINTED FINISH
M1A PAINTED ALUMINUM HORIZONTALSUNSHADES FINSIH TYP. DARK GRAY COLOR
M1B PAINTED ALUMINUM VERTICALSUNSHADES , TYP. DARK GRAY COLOR
M2 METAL WRAPPED BUILDING COPINGDARK GRAY PAINTED
MATERIAL LEGEND ABBREVIATIONS:CMU - CONCRETE MASONRY UNIT WALL SYSTEMEP - EXTERIOR WALL PANEL SYSTEMG - GLAZING SYSTEML - LOUVER SYSTEMM - METTALIC FINISH SYSTEM
C3 LARGE FORMAT CMU VENEER W.ROUGH FINISH
0'
GRAPHIC SCALE
KEYPLAN
CONTACT:
Drawn
RTKL Proj No.
Scale:
2008 RTKL ASSOCIATES INC.
RTKL Associates, Inc., Washington, DC
NOT FORCONSTRUCTION
FILE
NAME
:TIM
E:
1
Issue Date:
Soltesz Engineering,Rockville, MD
Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL
Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD
LaSalle Engineering, LLC, Willow Grove, PA
NORTH
Checked
Approved
CONSULTANTS:
Geoffrey A. MorganVice President
Washington Adventist Hospital301.891.5458
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
A B C D E F G H J K
A B C D E F G H J K
8' 16' 32'
1/16" = 1' - 0"
CON APPLICATION
Was
hing
ton
Adv
entis
t Hos
pita
lR
epla
cem
ent P
roje
ct
PLU
M O
RC
HA R
D D
RIV
ESI
LVER
SPR
ING
, MA R
YLAN
D 2
0 904
- OCT 4, 2013 CON SUBMITTAL
C:\U
sers
\hm
celro
y\D
ocum
ents
\WAS
HIN
GTO
NAD
VEN
TIST
_IN
TER
IOR
_CEN
TRAL
_E_h
mce
lroy.
rvt
8/8/
2014
1:5
0:42
PM
As indicated
HOSPITAL NORTHAND SOUTHELEVATIONS
A-201
Author
Checker
Approver
AUGUST 1, 2014
1" = 20'-0"1 NORTH ELEVATION - OVERALL
1" = 20'-0"2 SOUTH ELEVATION - OVERALL
Issued Drawing LogNo. Date Item