Landscape Maintenanceand Sidewalk Snow Removal
Plans 2016Washington Dulles International Airport
Metropolitan WashingtonAirports Authority
Maintenance Engineering DivisionSheet Number
L-1
Date: 06/01/16Scale: no scale
Drawn by: T.F.
Approved by:
Accepted by: D.C.
Horse Pen Dam
Washington Dulles International Airport Landscape Maintenance
and Sidewalk Snow RemovalPlans2016
Table of ContentsL-1 - CoversheetL-2 - Landscape Maintenance Plan AL-3 - Landscape Maintenance Plan BL-4 - Landscape Maintenance Plan C Details for Horse Pen Dam and JP Morgan BldgL-5 - Landscape Maintenance Plan D Automatic Irrigation Systems and Annual Flower RotationL-6 - Landscape Maintenance Plan E Turf Mowing DetailsL-7 - Landscape Maintenance Plan F IAB Courtyard Planters DetailL-8 - Sidewalk Snow Removal Plan GL-9 - Sidewalk Snow Removal Zone Plan HN
Area inContract
HOTEL
COUNCOURSE A
SIGNATUREFLIGHT
SUPPORT
LSGSKY
CHEFS
LSGSKY
CHEFSAIR BP
INTL.ARRIVALS
BLDG.
WESTUTIL.BLDG.
EASTUTIL.BLDG.
CARGOBUILDINGS1 AND 2
CARGOBUILDINGS3 AND 4
OFFICEBUILDING
OFFICEBUILDING
J P MorganChase Bldg.
EAST OFFICEBUILDING
GATEGOURMET
FLIGHTKITCHEN
GMRCARGO
UNITEDGSE
CARGOBUILDING
5
CARGOBUILDING
6
DAILY GARAGE NO. 1
HOURLY PARKING
SIGNATUREGSE
BUILDING
Z3 Z3
Z
A
A1
B
BRAVO RAMP III
BRAVO RAMP V
Y2 Y2
Z
Y4
Y7
Z
D
C
D
Future C
Future D
Y4
D
C C
D
J3J3
BB
A5
A
A4
J
A
K
J2J2
J K
JJ1 J
A2
B
A
A3
COMMERCIAL VEHICLE CONNECTOR
AVIATION DRIVEAVIATION DRIVE (Eastbound)AVIATION DRIVE (Westbound)
AUTO
PILO
T DR
IVE
(Sou
thbo
und)
AUTO
PILO
T DR
IVE
(Nor
thbo
und)
DULLES AIRPORT ACCESS HIGHWAY (Southbound)
DULLES AIRPORT ACCESS HIGHWAY
(Northbound)AI
RFRE
IGHT
LAN
EAI
RFRE
IGHT
LAN
E
CARG
O DR
IVE
OFFICEPARKING OFFICE
PARKING OFFICEPARKING
OFFICEPARKING
OFFICEPARKING
OFFICEPARKING
EMPLOYEEPARKING
EMPLOYEE /TENANTPARKING
WIN
DSOC
K DR
IVE
(Sou
thbo
und)
WIN
DSOC
K DR
IVE
(Nor
thbo
und)
COMPASS COURTPROPELLER COURT
MOBILELOUNGE
MAINTENANCE
USPSAIR
MAILFACILITY
ENGINEERINGAND
MAINTENANCE
TEMPORARYBAG BLDG.
CONCOURSE B
DULLESJET CENTER
K1
DAILYGARAGENO. 2
AnimalReliefArea MAIN
TERMINAL
P
DPSK9
Kennel
AirportCommissary
E
P
E
D
P
PE
E
E
E
EE
E
EAnimalReliefAreas
B
B
Trim growth along lakeshore 1x per year
Limits of contract to water line.
Maintain 15' on each side of road
E
INTL.ARRIVALS
BLDG.
VIP LOT
E
Approved by:
Accepted by: D.C.
Estimated quantities of landscape and parking lot areasLandscsape Areas = 221 acres; Public Parking Lots = 170 acres;Employee Parking Lots = 87 acres; Quantities estimated from plans, Contractor shall verify quantities in field.
Denotes limit of contract to tree line.
Denotes limit of contract to fence line
Denotes limit of contract to the curb/edge of road.
Denotes limit of contract to the building line.
A
B
C
D
General Notes for Limits of Contract: (All work to be performed according to the contract documents unless otherwise indicated on the maps)Limits of contract
Limits of Interior areas not in contract
Areas to be mechanically swept by contractorEmployee lots to be swept as needed
Legend: (unless otherwise indicated in the contract documents.)
Limits of area to police trash twice daily
Color Key: (All work to be performed according to the contract documents unless otherwise indicated on the maps)
Aircraft Maintenance Hanger
Non Structure Public Parking
Garage 1 Public Parking
Garage 2 Public Parking
JP Morgan / East Offfice Bldgs.
Car Rental Facilities Common Area
Employee Parking
Contractor Staging Area
P
P
P
E
IAB Courtyard Planterswithin SIDA
LandscapeMaintenance Plan AWashington Dulles International Airport
Metropolitan WashingtonAirports Authority
Maintenance Engineering DivisionSheet Number
L-2
02/16/16Scale: 1" = 350'
Drawn by: T.F.
Accepted by: D.C.
Approved by:
Limits of contract to the cable rail
Dulles LakeIsland
Note: no pavement maintenance
CELL PHONE LOT
Note: no pavement maintenance
FED EX LOT
E NIAB Courtyard PlantersWithin SIDA
Note: Planters behindsecurity fence
Limits of contract to bottom of ditch
Limits of contract to bottom of ditch
Limits of contract to the west edge of pavement at crossover 2
Limits of contract to the cable rail
MAT
CHLI
NE T
HIS
SHEE
T
MAT
CHLI
NE T
HIS
SHEE
T
Matchline sheet L-3
600'-0"
Dry PondMow around edge regularlyMow bottom and sides 2x per year
R.O.
W.
BLUE LOT
GREEN LOT
HERTZ
AVIS
NATIONAL
DOLLAR
BUDGET
RED LOT
ALAMO
GOLD LOT
ENTERPRISE
GATEGOURMETFLIGHT
KITCHEN
CARGOBUILDING
6
ORANGELOT
MOBILHANGAR
MCIHANGAR
GANNETTHANGAR
HAWTHORNEAVIATION
GROUNDTRANSPORTATION
CENTER SALT / SANDSTORAGEBUILDING
COLLECTIONBOOTHS
BUSMAINTENANCE
FACILITY
PURPLE LOT
NORTH EMPLOYEEPARKING LOT
Y1 Y1
Z1
ZY
Y2 Y2
Z2
Z1
Z2
AUTO
PILO
T DR
IVE
(Sou
thbo
und)
AUTO
PILO
T DR
IVE
(Nor
thbo
und)
AUTO
PILO
T DR
IVE
(Sou
thbo
und)
AUTO
PILO
T DR
IVE
(Nor
thbo
und)
MATERIALS ROAD
ARIA
NE W
AY
AUTO
PILO
T DR
IVE
(Nor
thbo
und)
AUTO
PILO
T DR
IVE
(Sou
thbo
und)
RUDDER ROAD (Westbound - Prop.)RUDDER ROAD (Eastbound - Prop.)
RUDDER ROAD (Eastbound)
RUDDER ROAD (Westbound)
AIRF
REIG
HT L
ANE
BLUE LOT
GREEN LOT
ARIA
NE W
AY (
Sout
hbou
nd -
Futu
re)
ARIA
NE W
AY (
Nort
hbou
nd -
Futu
re)
Z Z
E
EE
E
E
GATE
GATE
MAINTENANCEHANGAR
P
P PP
P
P
DPSK9
Kennel
AirportCommissary
ORANGE LOT
Police/FireFacility
A
A
Limits of contract tosouth end of bridge
Limits of contract to north edge of drainage ditch
Limits of contract tofence on both sides of road
B
B A
B
Note: no pavement maintenance
E
E
B
E
E
E
Trim growth along lakeshore 1x per year
Limits of contract to water line.
Maintain 15' on each side of road
Dulles LakeIsland
Note: no pavement maintenance
CELL PHONE LOT
Note: no pavement maintenance
FED EX LOT
E
Water Supply
ContractorStagging
Area
Water Supply
FutureSunoco
Gas Station2016
MAT
CHLI
NE T
HIS
SHEE
T
Matchline sheet L-2
N600'-0"
LandscapeMaintenance Plan B
Washington Dulles International Airport
Metropolitan WashingtonAirports Authority
Maintenance Engineering DivisionSheet Number
L-3
Date: 02/16/16Scale: 1" = 600'
Drawn by: T.F.
Approved by:
Accepted by: D.C.
AnimalReliefArea
Dry PondMow around edge regularlyMow bottom and sides 2x per year
Horse Pen Dam and spillway shall be mowed 4x per growing season.Trash shall be policed before each mowing.The spillway shall be mowed to the woodline.Mow to a height of 6-8".Woody vegetation shall be cut back on the dam.The shoulders of Rt 606 shall be trimmed.The overlfow inlet shall be kept clean of debris.
Area to be maintianed
Horse Pen Dam and Lake MaintenanceExisting
Landscape Maintenance Plan CDetails for Horse Pen Dam
Washington Dulles International Airport
Metropolitan WashingtonAirports Authority
Maintenance Engineering DivisionSheet Number
L-4
Date: 02/16/16
No Scale
Drawn by: T.F.
Approved by:
Accepted by: D.C.
N
Moran Rd. Rt. 606
Greenway Exit
Dam
spillway
HorsepenLakeOverflow
Inlet
Outfall
woodline
woodline
Access from AOA
Access from Rt. 606
SIGN
ATUR
EFL
IGHT
SUPP
ORT
LSG
SKY
CHEF
SLS
GSK
YCH
EFS
AIR
BP
INTL
.AR
RIVA
LSBL
DG.
WES
TUT
IL.
BLDG
.
EAST
UTIL
.BL
DG.
CARG
OBU
ILDI
NGS
1 AN
D 2
CARG
OBU
ILDI
NGS
3 AN
D 4
OFFI
CEBU
ILDI
NGOF
FICE
BUIL
DING
J P
Mor
gan
Chas
e Bl
dg.
EAST
OFF
ICE
BUIL
DING
DAIL
Y GA
RAGE
NO.
1
HOUR
LY P
ARKI
NG
SIGN
ATUR
EGS
EBU
ILDI
NG
COM
MER
CIAL
VEH
ICLE
CON
NECT
OR
AVIA
TION
DRI
VEAV
IATI
ON D
RIVE
(Ea
stbo
und)
AVIA
TION
DRI
VE (
Wes
tbou
nd)
DULL
ES A
IRPO
RT A
CCES
S HI
GHW
AY
CARGO DRIVE
OFFI
CEPA
RKIN
GOF
FICE
PARK
ING
OFFI
CEPA
RKIN
GOF
FICE
PARK
ING
OFFI
CEPA
RKIN
G
OFFI
CEPA
RKIN
G
EMPL
OYEE
PARK
ING
EMPL
OYEE
/TE
NANT
PARK
ING
WINDSOCK DRIVE (Southbound)WINDSOCK DRIVE (Northbound)
COM
PASS
COU
RTPR
OPEL
LER
COUR
T
MOB
ILE
LOUN
GEM
AINT
ENAN
CE
USPS
AIR
MAI
LFA
CILI
TYTE
MPO
RARY
BAG
BLDG
.
DAIL
YGA
RAGE
NO. 2
MAI
NTE
RMIN
AL
P
P
E
INTL
.AR
RIVA
LSBL
DG.
VIP
LOT
Garage 115 Zones1 Rainbird Controller
Hourly Lot17 Zones1 RainMaster Controller18 Zones1 Rainmaster Controller
JP Morgan Chase Bldg8 Zones1 Rainbird Controller
Garage 212 Zones1 Rainbird Controller
East Office Bldg.9 Zones1 Rainbird Controller
NORTH EMPLOYEEPARKING LOT
E
E
E
N
Landscape Maintenance Plan DAutomatic Irrigation Systems
and Annual FlowersWashington Dulles International Airport
Metropolitan WashingtonAirports Authority
Maintenance Engineering DivisionSheet Number
L-5
Date: 02/16/16
Scale: 1" = 400'
Drawn by: T.F.
Approved by:
Accepted by: D.C.
North Employee Lot9 Zone1 Rainbird Controller
Annual flower rotationspring and fall
400 6" pots per rotation
PURPLE LOT
DULLES AIRPORT ACCESS HIGHWAY
(Northbound)
GREEN LOT
NORTH EMPLOYEEPARKING LOT
EE
E
E
E
Mow regularly from curb to concrete ditchMow from ditch to fence 3x per year as directed
Mow all areas regularly, unless otherwise indicated
Mow from paving to fence regularly. Mow from fenceto property line 3x per year
Mow from paving to ditch regularly
Mow/trim guardrail regularly
Mow 10' in from curbregularly. Mow interior3x per year
Mow regularly from paving to fence
Landscape Maintenance Plan ETurf Mowing Details
Washington Dulles International Airport
Metropolitan WashingtonAirports Authority
Maintenance Engineering DivisionSheet Number
L-6
Date: 06/01/16Scale: 1" = 600'
Drawn by: T.F.
Approved by:
Note: All other turf areas to be mowed as specified in the Contract Documents
Accepted by: D.C.
Remote Lot - Employee ParkingAirport Entrance
Roadway and interchange areas shaded in green.Landscape Maintenance shall include:1. Policing for trash daily.2. Turf maintenance: a. Trim shoulders up to guardrails and 4' beyond guardrail b. Trim shoulder without guardrails 10' behind paving. c. Trim to and behind roadway lights. d. Allow remainder of turf areas to grow mowing a maximum of 4 x per year.3. All other turf areas to be maintained according to contract specifications.
Roadway and interchange areas shaded in orange.1. Policing for trash daily. Mowing to be done by others.
Dulles Airport Access Hwy.
RT. 2
8N
N
These areas currently undermetro rail construction
RD
4'-0"
3'-2
"7'
-10
3/4"
7'-10 3/4"
4'-0
"
19 Prunus lauorcerasus 'Schipkaensis' , Skip Laurel 5' ht., container, 4' O.C.
3000 Total Plants, 125 - 3" extended plugs per planter, 6" O.C.
Landscaping
Concrete Planter - Shrubs19 - Prunus lauorcerasus 'Schipkaensis'Skip Laurel 5' ht., container, 4' O.C.
Fiberglass Planters - 8' Square x 4" deep filled with green roof soil-less mixSuspended over slab with paver walkway Green Roof Perennials500 - Sedum album 'Murale'500 - Sedum spurium 'John Creech'500 - Sedum spurium 'Fuldaglut'500 - Sedum kamtschaticum500 - Talinum calycinum500 - Delosperma cooperii
Irrigation
3 Zones, 1" remote valves, Battery controller3/4" quick coupler on swing joint1" P.O.C. under slab in baggage tunnelSkip Laurels - dripperlinePerennials 2 zones with 24 polyflex riser assemblies and 8'Q nozzles each
8'-0"
Phototakenhere X
Controller and Valvesunder pavers
Glass Wall IAB
Landscape Maintenance Plan FIAB Courtyard PlantersLocated within SIDA
Washington Dulles International Airport
Metropolitan WashingtonAirports Authority
Maintenance Engineering DivisionSheet Number
L-7
Date: 02/16/16Scale: 1/8" = 1'
Drawn by: T.F.
Approved by:
Accepted by: D.C.
Location of Planters Photo
Print on 11" x 17" sheetPlanters are located over entrance to baggage handling tunnel.
R.O.W.
HOTEL
BLUE LOT
GREEN LOT
HERT
Z
AVIS
NATI
ONAL
DOLL
AR
BUDG
ET
RED LOT
ALAM
O
GOLD LOT
ENTE
RPRI
SE
SIGNATUREFLIGHT
SUPPORT
LSGSKY
CHEFS
LSGSKY
CHEFS
AIR
BP
INTL.ARRIVALS
BLDG.
WESTUTIL.BLDG.
EASTUTIL.BLDG.
CARGOBUILDINGS1 AND 2
CARGOBUILDINGS3 AND 4
OFFICEBUILDING
OFFI
CEBU
ILDI
NG
J P MorganChase Bldg.
OFFICEBUILDING
GATEGOURMETFLIGHT
KITCHEN
GMRCARGO
UNITEDGSE
CARGOBUILDING
5
CARG
OBU
ILDI
NG6
ORAN
GELO
T
DAILYGARAGENO. 1
HOURLY PARKING
SIGNATUREGSE
BUILDING
MOB
ILHA
NGAR
MCIHANGAR
GANNETTHANGAR
HAWTHORNEAVIATION
GROUNDTRANSPORTATION
CENTER
SALT / SANDSTORAGEBUILDING
SERVICESTATION
COLL
ECTI
ONBO
OTHS
BUSMAINTENANCE
FACILITY
PURPLE LOT
NORTH EMPLOYEEPARKING LOT
Z3
A
Z1
Y2
Z2
Z1
Z2
Y4
A
J
A
K
J2J2
J
K
JJ1
J
A
COM
MER
CIAL
VEH
ICLE
CON
NECT
OR
AVIA
TION
DRI
VEAV
IATI
ON D
RIVE
(Ea
stbo
und)
AVIA
TION
DRI
VE (
Wes
tbou
nd)
AUTOPILOT DRIVE (Southbound)
AUTOPILOT DRIVE (Northbound)
AUTOPILOT DRIVE (Southbound)
AUTOPILOT DRIVE (Northbound)
MAT
ERIA
LS R
OAD
ARIANE WAY
AUTOPILOT DRIVE (Northbound)AUTOPILOT DRIVE (Southbound)
RUDD
ER R
OAD
(W
estb
ound
- Pr
op.)
RUDD
ER R
OAD
(Ea
stbo
und
- Pro
p.)
RUDD
ER R
OAD
(Ea
stbo
und)
RUDD
ER R
OAD
(W
estb
ound
)
DULLES AIRPORT ACCESS HIGHWAY
AIRFREIGHT LANEAIRFREIGHT LANE
CARGO DRIVE
OFFICEPARKING
OFFI
CEPA
RKIN
G
OFFICEPARKING
OFFICEPARKING
OFFICEPARKING
OFFICEPARKING
EMPLOYEEPARKING
EMPLOYEE /TENANTPARKING
WINDSOCK DRIVE (Southbound)WINDSOCK DRIVE (Northbound)
COM
PASS
COU
RT
PROP
ELLE
R CO
URT
MOBILELOUNGE
MAINTENANCE
USPSAIR
MAILFACILITY
ENGINEERINGAND
MAINTENANCE
ARIANE WAY (Southbound - Future)
ARIANE WAY (Northbound - Future)
DULLESJET CENTER
K1
S
E
E
E
E
E
E
E
E
GATE
GATE
MAINTENANCEHANGAR
DAILYGARAGENO. 2
MAINTERMINAL
CellPhoneLot
DPSK9
Kennel
AirportCommissary
ORANGE LOT
Police/FireFacility
INTL.ARRIVALS
BLDG.
VIP
LOT
N
15
14
5
4
3
23
21
12
5
STEP
S
6
5
24
34
34
1 2
1311
11
11 25 26
= PORTIONS OF SIDEWALKS THAT ARE IN CONTRACT
LEGEND:700'-0"
Sidewalk Snow Removal Plan GWashington Dulles International Airport
Metropolitan WashingtonAirports Authority
Maintenance Engineering DivisionSheet Number
L-8
Date: 6-29-16
Scale: 1" = 700'
Drawn by: T.F.
Approved by:
Accepted by: D.C.
7
8
9
9
1210
16
18
19
17
2929
30
31
31
32
33
33
Gate 141
Gate 127Gate 118
28
27
22a
20
UNITED AIRLINESMAINTENANCE
HANGAR
Snow MeltMaterialsStorage
22b
ITEM LOCATION SQUAREYARDS SQUAREFEET1 WestBuildingGroup 960 8,6402 EmployeeLotEandGate127 155 1,3953 MainTerminalDepartureLevel 4,200 37,8004 ManTerminalArrivalsLevel 1,750 15,7505 MainTerminalCommercialVehicleLevel 2,875 25,8756 IAB,CommercialVehicleDrive(WestSide) 2,675 24,0757 Garage2BridgetoMainTerminalandMediaPad 1,468 13,2128 Garage2 2,939 26,4519 MainTerminalHourlyLot 3,096 27,86410 UtilityBuildings 130 1,17011 AnimalReliefAreas(3) 80 72012 EastEmployeeLot,CommercialVehicleDrive(EastSide) 2,400 21,60013 EastLoadingDock 564 5,07614 SignatureAviationandGate141 250 2,25016 Garage1includedallelevatorlobbies,allfloors 4,272 38,44817 DullesWestBldg.,GatewayBldg.,Connector,JPMorganBldg.,EastOfficeBldg. 633 5,69718 HotelSidewalkonAviationDrive 292 2,62819 K-9Facility 45 40520 AnimalReliefArea(cellphonelot) 27 24321 JointPolice/FireFacility 576 5,18423 CommissaryBuilding 85 76524 CargoBuildingNo.6andGate118 296 2,66425 NorthMaintenanceHanger 607 5,46326 GroundTransportationCenter 348 3,13428 BlueLotExit 137 1,23329 BlueLotBusShelters 679 6,11130 BusMaintenanceFacility 130 1,17031 GreenLotBusShelters 1,236 11,12432 GoldLotBusShelters 130 1,17034 NorthEmployeeLotBuildingSidewalksandBusShelters 234 2,106
Subtotal 33,269 299,423FutureareasforSidewalkSnowRemoval
15 PMCTrailers(notInclued) 207 1,86322a AutopilotDriveSidewalkSouth(notinuseuntilmid-2017) 1,107 9,97822b AutopilotDriveSidewalkSouth(notinuseuntilmid-2017) 314 2,81427 RentalCarSidewalk(notinuseuntil2018) 1,135 10,21533 PrupleLotBusShelters 720 6,480
Subtotal 3,483 31,350Note:Areaquantitiesareestimatedfromplans.Contractorshallverifyquantitiesinthefield
EstimatedTotal 36,752 330,773
R.O.W.
HOTEL
BLUE LOT
GREEN LOT
HERT
Z
AVIS
NATI
ONAL
DOLL
AR
BUDG
ET
RED LOT
ALAM
O
GOLD LOT
ENTE
RPRI
SE
SIGNATUREFLIGHT
SUPPORT
LSGSKY
CHEFS
LSGSKY
CHEFS
AIR
BP
INTL.ARRIVALS
BLDG.
WESTUTIL.BLDG.
EASTUTIL.BLDG.
CARGOBUILDINGS1 AND 2
CARGOBUILDINGS3 AND 4
OFFICEBUILDING
OFFI
CEBU
ILDI
NG
J P MorganChase Bldg.
OFFICEBUILDING
GATEGOURMET
FLIGHTKITCHEN
GMRCARGO
UNITEDGSE
CARGOBUILDING
5
CARG
OBU
ILDI
NG6
ORAN
GELO
T
DAILYGARAGENO. 1
HOURLY PARKING
SIGNATUREGSE
BUILDING
MOB
ILHA
NGAR
MCIHANGAR
GANNETTHANGAR
HAWTHORNEAVIATION
GROUNDTRANSPORTATION
CENTER
SALT / SANDSTORAGEBUILDING
SERVICESTATION
COLL
ECTI
ONBO
OTHS
BUSMAINTENANCE
FACILITY
PURPLE LOT
NORTH EMPLOYEEPARKING LOT
Z3
A
Z1
Y2
Z2
Z1
Z2
Y4
A
J
A
K
J2J2
J
K
JJ1
J
A
COM
MER
CIAL
VEH
ICLE
CON
NECT
OR
AVIA
TION
DRI
VEAV
IATI
ON D
RIVE
(Ea
stbo
und)
AVIA
TION
DRI
VE (
Wes
tbou
nd)
AUTOPILOT DRIVE (Southbound)
AUTOPILOT DRIVE (Northbound)
AUTOPILOT DRIVE (Southbound)
AUTOPILOT DRIVE (Northbound)
MAT
ERIA
LS R
OAD
ARIANE WAY
AUTOPILOT DRIVE (Northbound)AUTOPILOT DRIVE (Southbound)
RUDD
ER R
OAD
(W
estb
ound
- Pr
op.)
RUDD
ER R
OAD
(Ea
stbo
und
- Pro
p.)
RUDD
ER R
OAD
(Ea
stbo
und)
RUDD
ER R
OAD
(W
estb
ound
)
DULLES AIRPORT ACCESS HIGHWAY
AIRFREIGHT LANEAIRFREIGHT LANE
CARGO DRIVE
OFFICEPARKING
OFFI
CEPA
RKIN
G
OFFICEPARKING
OFFICEPARKING
OFFICEPARKING
OFFICEPARKING
EMPLOYEEPARKING
EMPLOYEE /TENANTPARKING
WINDSOCK DRIVE (Southbound)WINDSOCK DRIVE (Northbound)
COM
PASS
COU
RT
PROP
ELLE
R CO
URT
MOBILELOUNGE
MAINTENANCE
USPSAIR
MAILFACILITY
ENGINEERINGAND
MAINTENANCE
ARIANE WAY (Southbound - Future)
ARIANE WAY (Northbound - Future)
DULLESJET CENTER
K1
S
E
E
E
E
E
E
E
E
GATE
GATE
MAINTENANCEHANGAR
DAILYGARAGENO. 2
MAINTERMINAL
CellPhoneLot
DPSK9
Kennel
AirportCommissary
ORANGE LOT
Police/FireFacility
INTL.ARRIVALS
BLDG.
VIP
LOT
N
15
14
5
4
3
23
21
12
5
STEP
S
6
5
24
34
34
1 2
1311
11
11 25 26
Sidewalk Snow Removal Zones Plan HWashington Dulles International Airport
Metropolitan WashingtonAirports Authority
Maintenance Engineering DivisionSheet Number
L-9
Date: 6-29-16
Scale: 1" = 700'
Drawn by: T.F.
Approved by:
Accepted by: D.C.
7
8
9
9
1210
16
18
19
17
2929
30
31
31
32
33
33
Gate 141
Gate 127Gate 118
28
27
20
UNITED AIRLINESMAINTENANCE
HANGAR
Snow MeltMaterialsStorage
Zone 1
= PORTIONS OF SIDEWALKS THAT ARE IN CONTRACT
LEGEND:700'-0"
Zone 2
Zone 3
Zone 4
Zone 1 - 1,2,3,4,5,6,7,10,11,12,13,14,15
Zone 2 - 8,9,16,17,18,19,20, 22a
Zone 3 - 21,28,29,30,31,32,33
Zone4 - 22b,23,24,25,26,27,34
Areas In Each Zone
22a 22b