Date post: | 04-Jun-2018 |
Category: |
Documents |
Upload: | scott-roberts |
View: | 213 times |
Download: | 0 times |
\t\hshingrcn
A
WGL Company.
DC Water
Tunneling
and Bloomingdale
Area Replacement
Project
FACT SHEET
Washington Gas
is working in conjunction
with the DC Clean
Rive/s
-
First Street
Tunnel Project and
will
be
relocating natural
gas
mains
in
the
Bloomingdale area.
washington Gas will also
take this
opportunity
to
upgrade
mains and services
as
we
work
to
provide
safe and
reliable natural
gas
service.
The selection
of mains
and
services to
be
replaced is
based
on a
number of criteria including
age
of
pipe
and
leak
as
well as other factors.
First Street
Pipe Replacement
Program
Whot
residents
should
expect.
Crews
will install a new
plastic
gas
by
in the west side of
First Street between U
and
V Streets.
The new main will
be
tied
in
to
an existing
main and charged
with
gas.
5ervice crews
will
then start
the replacement of existing
services.
Prior to the actual start of the service
replacement, customers
will be contacted by
a
technician
to
schedule
the date of
their service replacement.
Every
effort will be made to minimize disruption
to homeowners'
properties.
Gas
will be off during the service
replacement,
but
no longer than one day.
Relighting of
gas
appliances
will
be done after
the service replacement
is
completed.
customers
m ust allow the seNice crews access
to all
gas
appliances
to ensure
a
safe restoration of
gas
service.
Restoration crews will do temporary
property
and sidewalk
restoration
immediately
following
each service
replacement.
Final restoration
of
property
and sidewalk will commence after all services on
the
block are
completed as
weather
conditions allow. Washington
Gas
will work restore the area to
as closely
to as-found condition as
is
possible.
Services on the east side
of
the
block will
be
scheduled
for replacement at a later date.
Please
refer
to the Washington Gas
notification
letter for more information on this
project
and
on restoring
your
new
gas
service.
Thank
you
for
your patience
during this
pro.iect.
PROJECT
OVERVIEW
Project
Sched
ule:
FIRST
STREET
GAS MAIN
AND
SERVICE
IMPROVEMENTS
Together
with
DC Water
First
Street
Tunnel
project
THOMIS
ST
TST
We
constantly
study
our
gas
pipeline
system
to be
sure it meets
our service
expectations-in
neighborhoods
both
old and new.
As
part
of our
ongoing
commitment
to
ensure
the safest,
most reliable
delivery
of
natural
gas
to
all of
our
valued
customers,
we
wlll
be
replacing
portions
of our
pipeline
system
in
communities
across Virginia,
Maryland,
and Washington,
D.C.
your
neighborhood
is
one
that
will
benefit.
The
pipelines
that
bring natural
gas
into
your
home
or business
are
often
made
of
steel
or cast
iron.
Just
like other
important
parts
of the infrastructure
in
our
communities,
such as highways
and
bridges, age
and condition
can impact
their
safety
and reliability.
While
your
current
system has
performed
well,
it
is
now
time
to
replace
the
pipelines,
usually with
much
longer
lasting,
specially-designed,
plastic
pipe.
Nov. 2013
-
Streets
Affected
First
St
NW
WSt
NW
USTNW
N Nottingham
St
2
st
Nw
Proiect
Scooe
Install:
Direct
Bury/lnsert
4
PLA
Direct
Bury/lnsert
2
?LA
Number
of
Customer
Services
Adams
St
N
VSt
N
Thomas
St
TSt NW
Flagger
Pl
307s
ft
1200
ft
L75
I nfrastructure
lmorovement
Proiect
Direct
Bury
or Insert
Main Line.
Replace
of Change
Over
Service.
lmprove
Safety.
Increase
Reliability.
lmprove
Services.
Reduce
Greenhouse
Gas Emission.
Project
Contacts:
Frank
Frost
Telephone:
(703)
750
4391
Email:
Bill
Bailey
Telephone:
703-965-9316
Email:
John
Barmore
Telephone:
703-966-0595
Email:
P
Adam
St
NW
VST
NW