\t\hshingrcn A WGL Company. DC Water Tunneling and Bloomingdale Area Replacement Project FACT SHEET Washington Gas is working in conjunction with the DC Clean Rive/s - First Street Tunnel Project and will be relocating natural gas mains in the Bloomingdale area. washington Gas will also take this opportunity to upgrade mains and services as we work to provide safe and reliable natural gas service. The selection of mains and services to be replaced is based on a number of criteria including age of pipe and leak as well as other factors. First Street Pipe Replacement Program Whot residents should expect. Crews will install a new plastic gas by in the west side of First Street between U and V Streets. The new main will be tied in to an existing main and charged with gas. 5ervice crews will then start the replacement of existing services. Prior to the actual start of the service replacement, customers will be contacted by a technician to schedule the date of their service replacement. Every effort will be made to minimize disruption to homeowners' properties. Gas will be off during the service replacement, but no longer than one day. Relighting of gas appliances will be done after the service replacement is completed. customers m ust allow the seNice crews access to all gas appliances to ensure a safe restoration of gas service. Restoration crews will do temporary property and sidewalk restoration immediately following each service replacement. Final restoration of property and sidewalk will commence after all services on the block are completed as weather conditions allow. Washington Gas will work restore the area to as closely to as-found condition as is possible. Services on the east side of the block will be scheduled for replacement at a later date. Please refer to the Washington Gas notification letter for more information on this project and on restoring your new gas service. Thank you for your patience during this pro.iect.
Transcript

 

\t\hshingrcn

A

WGL Company.

DC Water

Tunneling

and Bloomingdale

Area Replacement

Project

FACT SHEET

Washington Gas

is working in conjunction

with the DC Clean

Rive/s

-

First Street

Tunnel Project and

will

be

relocating natural

gas

mains

in

the

Bloomingdale area.

washington Gas will also

take this

opportunity

to

upgrade

mains and services

as

we

work

to

provide

safe and

reliable natural

gas

service.

The selection

of mains

and

services to

be

replaced is

based

on a

number of criteria including

age

of

pipe

and

leak

as

well as other factors.

First Street

Pipe Replacement

Program

Whot

residents

should

expect.

Crews

will install a new

plastic

gas

by

in the west side of

First Street between U

and

V Streets.

The new main will

be

tied

in

to

an existing

main and charged

with

gas.

5ervice crews

will

then start

the replacement of existing

services.

Prior to the actual start of the service

replacement, customers

will be contacted by

a

technician

to

schedule

the date of

their service replacement.

Every

effort will be made to minimize disruption

to homeowners'

properties.

Gas

will be off during the service

replacement,

but

no longer than one day.

Relighting of

gas

appliances

will

be done after

the service replacement

is

completed.

customers

m ust allow the seNice crews access

to all

gas

appliances

to ensure

a

safe restoration of

gas

service.

Restoration crews will do temporary

property

and sidewalk

restoration

immediately

following

each service

replacement.

Final restoration

of

property

and sidewalk will commence after all services on

the

block are

completed as

weather

conditions allow. Washington

Gas

will work restore the area to

as closely

to as-found condition as

is

possible.

Services on the east side

of

the

block will

be

scheduled

for replacement at a later date.

Please

refer

to the Washington Gas

notification

letter for more information on this

project

and

on restoring

your

new

gas

service.

Thank

you

for

your patience

during this

pro.iect.

 

PROJECT

OVERVIEW

Project

Sched

ule:

FIRST

STREET

GAS MAIN

AND

SERVICE

IMPROVEMENTS

Together

with

DC Water

First

Street

Tunnel

project

THOMIS

ST

TST

We

constantly

study

our

gas

pipeline

system

to be

sure it meets

our service

expectations-in

neighborhoods

both

old and new.

As

part

of our

ongoing

commitment

to

ensure

the safest,

most reliable

delivery

of

natural

gas

to

all of

our

valued

customers,

we

wlll

be

replacing

portions

of our

pipeline

system

in

communities

across Virginia,

Maryland,

and Washington,

D.C.

your

neighborhood

is

one

that

will

benefit.

The

pipelines

that

bring natural

gas

into

your

home

or business

are

often

made

of

steel

or cast

iron.

Just

like other

important

parts

of the infrastructure

in

our

communities,

such as highways

and

bridges, age

and condition

can impact

their

safety

and reliability.

While

your

current

system has

performed

well,

it

is

now

time

to

replace

the

pipelines,

usually with

much

longer

lasting,

specially-designed,

plastic

pipe.

Nov. 2013

-

Streets

Affected

First

St

NW

WSt

NW

USTNW

N Nottingham

St

2

st

Nw

Proiect

Scooe

Install:

Direct

Bury/lnsert

4

PLA

Direct

Bury/lnsert

2

?LA

Number

of

Customer

Services

Adams

St

N

VSt

N

Thomas

St

TSt NW

Flagger

Pl

307s

ft

1200

ft

L75

I nfrastructure

lmorovement

Proiect

Direct

Bury

or Insert

Main Line.

Replace

of Change

Over

Service.

lmprove

Safety.

Increase

Reliability.

lmprove

Services.

Reduce

Greenhouse

Gas Emission.

Project

Contacts:

Frank

Frost

Telephone:

(703)

750

4391

Email:

[email protected]

Bill

Bailey

Telephone:

703-965-9316

Email:

[email protected]

John

Barmore

Telephone:

703-966-0595

Email:

[email protected]

P

Adam

St

NW

VST

NW


Recommended