Washtenaw County Road Commission Bi-Monthly Meeting of the Board of County Road Commissioners April 21, 2020 – 1 p.m. In an effort to practice social distancing and in accordance with Governor Whitmer’s Stay Home, Stay Safe, Save Lives Executive Order, the Washtenaw County Board of County Road Commissioners will hold a virtual board meeting on Tuesday, April 21 at 1 p.m. Join the virtual board meeting by visiting bit.ly/WCRCVirtualMeeting or dialing (312) 626-6799, meeting ID: 184 341 317. Public participants will be able to address the board virtually during the public comment period on the agenda. Visit wcroads.org/joining-a-virtual-board-meeting/ for more information. AGENDA I. CALL TO ORDER II. APPROVAL OF AGENDA III. ACCEPTANCE OF MINUTES (Action) ...................................................... Page 1-13 A. Board Meeting Minutes of April 7, 2020 IV. PUBLIC COMMENT This is the time set aside on the agenda to receive comments from the public. This is not intended to be a period for dialogue. Each person will be allotted (3) minutes to address the Board. A. Public Comment B. Written Communications ...................................................................... Page 14-19 V. COMMISSIONER AND STAFF FOLLOW-UP TO PUBLIC COMMENT VI. NEW BUSINESS A. Consent Agenda ................................................................................. Page 20-31 1. 2020 Local Bridge Funding Applications 2. 2020 Manchester Township Agreement 3. 2020 Sharon Township Agreement 4. 2020 Ypsilanti Township Agreement 5. Miller Road/Wagner Road Roundabout and Miller Road Bridge – MDOT Contract No. 20-5118 6. Carpenter Road – Construction Zone Temporary Traffic Control Order 7. Parker Road –Temporary Traffic Control Order 8. Non Union Wages 9. Payroll & Bills for April 15, 2020
Transcript
Page 1: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Road Commission Bi-Monthly Meeting of the Board of County Road Commissioners

April 21, 2020 – 1 p.m. In an effort to practice social distancing and in accordance with Governor Whitmer’s Stay Home, Stay Safe, Save Lives Executive Order, the Washtenaw County Board of County Road Commissioners will hold a virtual board meeting on Tuesday, April 21 at 1 p.m.

Join the virtual board meeting by visiting bit.ly/WCRCVirtualMeeting or dialing (312) 626-6799, meeting ID: 184 341 317. Public participants will be able to address the board virtually during the public comment period on the agenda.

Visit wcroads.org/joining-a-virtual-board-meeting/ for more information.

AGENDA

I. CALL TO ORDER

II. APPROVAL OF AGENDA

III. ACCEPTANCE OF MINUTES (Action) ...................................................... Page 1-13

A. Board Meeting Minutes of April 7, 2020

IV. PUBLIC COMMENTThis is the time set aside on the agenda to receive comments from the public. This isnot intended to be a period for dialogue. Each person will be allotted (3) minutes toaddress the Board.

A. Public CommentB. Written Communications ...................................................................... Page 14-19

V. COMMISSIONER AND STAFF FOLLOW-UP TO PUBLIC COMMENT

VI. NEW BUSINESS

A. Consent Agenda ................................................................................. Page 20-31 1. 2020 Local Bridge Funding Applications2. 2020 Manchester Township Agreement3. 2020 Sharon Township Agreement4. 2020 Ypsilanti Township Agreement5. Miller Road/Wagner Road Roundabout and Miller Road Bridge –

MDOT Contract No. 20-51186. Carpenter Road – Construction Zone Temporary Traffic Control Order7. Parker Road –Temporary Traffic Control Order8. Non Union Wages9. Payroll & Bills for April 15, 2020

Page 2: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Board Meeting Agenda – April 21, 2020 Page 2

VII. REPORTS ................................................................................................. Page 32-40 A. County Commissioners Reports B. Road Commission Report C. Managing Director Report 1. Staff Report of 3-30 – 4-12-20 VIII. ADJOURNMENT

Page 3: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Board of Road Commissioners 555 North Zeeb Road, Ann Arbor, MI 48103

Virtual Board Meeting Minutes of April 7, 2020

Board Present: Road Commissioners Douglas Fuller, Barbara Fuller, Rodrick Green

Staff Present: S. Siddall, M. MacDonell, J. Harmon, D. Ackerman C. Ryan, E. Kizer,C. Quinter, B. Houle, N. Peterson

Others Present: Marlene Chockley, Northfield Township Supervisor; Ruth Ann Jamnick, County Commissioner – District 5; Sue Shink, County Commissioner – District 2

The meeting was called to order at 1:00 p.m. by Douglas Fuller, Chair. A moment of silence was recognized to honor all the first responders battling the Coronavirus and people that have lost their lives to this virus.

APPROVAL OF AGENDA RC20-078 B. Fuller moved, R. Green seconded to approve the agenda as presented.

Roll Call Vote: YEAS: B. Fuller, R. Green, D. FullerNAYS: NoneABSENT: None ABSTAIN: None Motion Carried.

ACCEPTANCE OF THE MINUTES RC20-079 R. Green moved, B. Fuller seconded to approve the Board Meeting Minutes

of March 17, 2020 as presented. Roll Call Vote: YEAS: B. Fuller, R. Green, D. FullerNAYS: NoneABSENT: None ABSTAIN: None Motion Carried.

DRAFT

1

Page 4: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

PUBLIC COMMENT Marlene Chockley, Northfield Township Supervisor, stated that she appreciates the flexibility of the Road Commission to delay the Northfield Township Annual Agreement and move forward with seasonal dust control.

WRITTEN COMMUNICATONS ISSUE DATE: 03/30/20 WHEN: Monday, March 30, 2020 WHERE: Whittaker Road between Greene Farm Drive and Martz Road TOWNSHIP: Ypsilanti WHY: Whittaker Road reopened – temporary repairs to failed culvert complete. Road will temporarily close later this week for culvert replacement. CONTACT: Ken Harris, superintendent of maintenance, (734) 327-6696, or via email

at [email protected]

ISSUE DATE: 03/30/20 WHEN: Monday, March 30, 2020 WHERE: Stamford Road between Dawn Avenue and Wiard Road TOWNSHIP: Superior WHY: Eroding road shoulder – Stamford Road closed until further notice

between Dawn Avenue and Wiard Road CONTACT: Matt MacDonell, director of engineering, (734) 327-6688,

[email protected]

ISSUE DATE: 03/29/20 WHEN: Saturday, March 28, 2020 WHERE: Liberty Road between Park Road and Zeeb Road TOWNSHIP: Scio WHY: Liberty Road closed between Park Road and Zeeb Road due to flooding

until further notice CONTACT: Adam Lape, superintendent of maintenance, (734) 327-6697, or via email at

[email protected]

DRAFT

2

Page 5: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

ISSUE DATE: 03/29/20 WHEN: Effective March 28, 2020 WHERE: Whittaker Road between Greene Farm Drive and Martz Road

Arroyo Drive from Canyon Drive to Skyway Drive TOWNSHIP: Ypsilanti WHY: Whittaker Road, Martz Road and Arroyo Drive closed due to culvert failures

until further notice CONTACT: Ken Harris, superintendent of maintenance, (734) 327-6696, or via email at

[email protected]

ISSUE DATE: 03/24/2020 WHAT: Adopt-a-County-Road Spring Clean-Up – CANCELED WHEN: Saturday, April 18 and Sunday, April 19, 2020 WHERE: Countywide WHY: In an effort to help prevent the spread of the coronavirus (COVID-19), the

Washtenaw County Road Commission has canceled the spring Adopt-A-County-Road pickup previously scheduled for Saturday, April 18 and Sunday, April 19, 2020. The program is currently planned to resume with the summer pickup, scheduled for Saturday, July 18 and Sunday, July 19, 2020.

CONTACT: Lauren Purdy, permit clerk, (734) 327-6642, [email protected]. ISSUE DATE: 03/23/20 WHAT: Email Advisory WHY: WCRC Continues to provide “Critical Infrastructure” Services during the Coronavirus outbreak ISSUE DATE: 03/19/20 WHEN: Monday, March 23, 2020 WHERE: Intersection of Ann Arbor-Saline Road and Wagner Road TOWNSHIP: Lodi WHY: Intersection improvement project – Ann Arbor-Saline Road and Wagner

Road Intersection closed for approximately 3 months CONTACT: Michele Ford, project manager, (734) 327-6652, [email protected]

DRAFT

3

Page 6: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

ISSUE DATE: 03/19/20 WHERE: Lehman Road over Mill Creek Tributary, between Sylvan Road and M-52 TOWNSHIP: Sharon WHY: Completion of culvert replacement – Lehman Road reopened CONTACT: Nate Murphy, Bridge Engineer, at (734) 327-6647 or m [email protected]

WHEN: 03/17/20 WHERE: Stony Creek Road Bridge over US-23 TOWNSHIP: York WHY: Bridge barrier wall failure – Stony Creek Road Bridge closed over US-23

until further notice CONTACT: Aaron Jenkins, MDOT Office of Communications, 517-243-9075,

[email protected] ISSUE DATE: 03/17/20

ISSUE DATE: 03/17/20 WHEN: Tuesday, March 17, 2020 WHERE: Earhart Road between 7 Mile Road and 8 Mile Road TOWNSHIP: Northfield WHY: Completion of culvert replacement – Earhart Road reopened between

7 Mile Road and 8 Mile Road CONTACT: Ken Harris, superintendent of maintenance, (734) 327-6696, or via email at

[email protected]

ISSUE DATE: 03/16/20 WHEN: Monday, March 16, 2020 at 8 a.m. WHERE: Liberty Road between Park Road and Zeeb Road TOWNSHIP: Scio WHY: Liberty Road re-opened - flooding receded CONTACT: Adam Lape, superintendent of maintenance, (734) 327-6697, or via email

at [email protected]

DRAFT

4

Page 7: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

ISSUE DATE: 03/16/20 WHEN: 3/17/20 WHERE: Earhart Road between 7 Mile Road and 8 Mile Road TOWNSHIP: Northfield WHY: Culvert replacement – Earhart Road closed CONTACT: Ken Harris, superintendent of maintenance, (734) 327-6696, or via email at

[email protected]

ISSUE DATE: 3/16/20 WHEN: Monday, March 16, 2020 WHY: WCRC Lobby closed and 3/17 Working Session cancelled due to

Coronavirus outbreak

ISSUE DATE: 03/13/20 WHAT: Seasonal Weight Restrictions – SUSPENDED WHEN: Effective 6 a.m. on Monday, March 16, 2020 WHERE: Countywide WHY: The Washtenaw County Road Commission (WCRC) will SUSPEND the

Seasonal Weight Restrictions effective 6 a.m. on Monday March 16, 2020. CONTACT: Mark McCulloch, senior project manager - permits, at (734) 327-6679 or

[email protected]. 03/13/2020

ISSUE DATE: 03/12/20 WHY: Email Advisory – connect with WCRC remotely during Coronavirus outbreak COMMISSIONER AND STAFF FOLLOW UP TO PUBLIC COMMENT No follow up.

DRAFT

5

Page 8: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

CONSENT AGENDA The items approved on the Consent Agenda are as follows: RC20-080 B. Fuller moved, R. Green seconded the approval of the Consent Agenda

for April 7, 2020 as presented. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

2020 Ann Arbor Township Agreement

RC20-081 B. Fuller moved, R. Green seconded that upon the recommendation of the Director of Operations, and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and the Managing Director to sign the 2020 Ann Arbor Township Agreement with the Township’s estimated share being $10,453.60. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

2020 Lyndon Township Agreement

RC20-082 B. Fuller moved, R. Green seconded that upon the recommendation of the Director of Operations, and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and the Managing Director to sign the 2020 Lyndon Township Agreement with the Townships estimated share being $17,484.72. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

DRAFT

6

Page 9: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

2020 Pittsfield Township Agreement

RC20-083 B. Fuller moved, R. Green seconded that upon the recommendation of the Director of Operations, and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and the Managing Director to sign the 2020 Pittsfield Township Agreement with the Townships estimated share being $8,055.00. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

2020 Pittsfield Township Agreement – State Road Improvements

RC20-084 B. Fuller moved, R. Green seconded that upon the recommendation of the Director of Operations, and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and the Managing Director to sign the 2020 Pittsfield Township Agreement with the Townships estimated share being $245,000.00. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

2020 Long Line Pavement Marking Program Bid

RC20-085 B. Fuller moved, R. Green seconded that upon the recommendation of the County Highway Engineer/Director of Engineering and concurrence of the Managing Director, the Board hereby approves and accepts the following qualified bid and an alternate bid for the 2020 Long Line Pavement Marking Program:

1. The qualified bid for Long Line Pavement Markings of $407,770.85 from JV Contracting, Inc., 7285 S. State Rd, Goodrich, MI, 48438 as submitted on March 11, 2020.

DRAFT

7

Page 10: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

2. The alternate bid Long Line Pavement Markings of $466,189.82 from P.K. Contracting, Inc., 1965 Barrett Drive, Troy, MI 48084 as submitted on March 11, 2020.

Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

2020 Special Pavement Marking Program Bid

RC20-086 B. Fuller moved, R. Green seconded that upon the recommendation of the County Highway Engineer/Director of Engineering and concurrence of the Managing Director, the Board hereby approves and accepts the qualified bid for the 2020 Special Pavement Marking Program:

• The qualified bid for Special Pavement Markings of $466,189.82 from P.K. Contracting, Inc., 1965 Barrett Dr, Troy, MI, 48084 as submitted on March 11, 2020.

Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

Ellsworth Road at Lohr Road Intersection Mast Arm Installation – Pittsfield Township Agreement

RC20-087 B. Fuller moved, R. Green seconded that upon the recommendation of the County Highway Engineer and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and Managing Director to sign the Pittsfield Charter Township agreement for the purchase and installation of a traffic signal mast arm at the intersection of Ellsworth Road and Lohr Road at the estimated cost of 147,900.00. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

DRAFT

8

Page 11: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

Oak Valley Drive and Ann Arbor-Saline Road Mast Arms – Pittsfield Township Agreement

RC20-088 B. Fuller moved, R. Green seconded that upon the recommendation of the County Highway Engineer and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and Managing Director to sign the Pittsfield Charter Township agreement for the purchase and installation of traffic signal mast arms to be placed on Oak Valley Drive at Ann Arbor-Saline Road at the estimated cost of $97,025.00. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

Textile Road Traffic Control Device – Ypsilanti Township Agreement

RC20-089 B. Fuller moved, R. Green seconded that upon the recommendation of the County Highway Engineer and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and Managing Director to sign the Ypsilanti Township agreement for the design and administration of the construction of a Rectangular Rapid Flashing Beacon (RRFB) at the entrance to Ford Heritage Park on Textile Rd and a Traffic Control Device agreement for the maintenance of the device at the estimated cost of $25,604.87. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried. DRAFT

9

Page 12: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

TCO No. 2540 Johnson Road West of Macon Road – rescind TCO P 81-106-01

RC20-090 B. Fuller moved, R. Green seconded Pursuant to 1949 PA 300, as amended, Traffic Control Order No. P 81-106-01 on county road Johnson Road in the Township of Saline in Washtenaw County is rescinded based on the results of engineering and investigation. Therefore, we direct that the official signs erected and maintained pursuant to the order be removed. No Parking at any time within the southernly one-half (1/2) of the right of way of Johnson Road from a point two thousand ninety (2090) feet westerly of Macon Road to Macon Road. This order becomes effective when signs giving notice of the above have been removed. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

Payroll & Bills for April 1, 2020 RC20-091 B. Fuller moved, R. Green seconded the Board hereby approves Voucher

10396 totaling $282,364.62 for payroll of April 1, 2020, and Voucher 10397 totaling $2,037,384.84 in payment of bills for April 1, 2020. Roll Call Vote: YEAS: B. Fuller, R. Green, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

REPORTS

COUNTY COMMISSIONERS REPORTS County Commissioner Sue Shink thanked the Road Commission for all the continued work WCRC is doing out on the roads. County Commissioner Ruth Ann Jamnick thanked staff for their work in coordinating this virtual board meeting.

ROAD COMMISSIONER REPORTS Commissioner Barb Fuller: No report. Commissioner Rod Green: No report.

DRAFT

10

Page 13: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

Commissioner Doug Fuller: Commissioner Fuller thanked every employee of the Road Commission for all their efforts with the Coronavirus situation.

MANAGING DIRECTOR’S REPORT

Sheryl Siddall, Managing Director Sheryl stated that every day for the last three weeks has been COVID-19 virus related. The WCRC staff has been phenomenal in adapting to a constantly changing work situation and some staff working remotely from home. Sheryl gave recognition to our field staff who continues to perform work out on our roadways. The flexibility and dedication from WCRC staff have been outstanding. Sheryl expressed that she is very proud and grateful of all our dedicated workers. Commissioner Green also expressed appreciation of all the work from WCRC staff.

ENGINEERING REPORT Matt MacDonell, Director of Engineering • The Ann Arbor-Saline Road and Wagner Road intersection is closed. The contractor

is performing grading, ditching and storm sewer work. The contractor is making good progress.

• The contractor for the Washtenaw Community College Pathway project continues work.

• We are touching base with all contractors for work this year verifying work schedules and confirming things will be progressing. We are in contact with MDOT for guidance on managing contracts during the COVID-19 situation.

• Bids were received for the Pontiac Trail and 7 Mile Road project and Cadillac Asphalt was the read low contractor.

• The Miller Road and Wagner Road roundabout and bridge project is now advertised on MDOT’s website and bids will be received the first Friday in May.

• Stamford Road was closed in Superior Township due to a sanitary sewer structure and pipe failure which has caused the road to partially fail at the shoulder making it unsafe for travel. The Township has mobilized a contractor and is working to complete the repair.

• The Chubb Road paving project in Salem Township between Five Mile Road and Six Mile Road is resuming work on site.

DRAFT

11

Page 14: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

Jim Harmon, Director of Operations Sheryl Siddall, Managing Director, commented that Jim Harmon has been doing a wonderful job continuing to work with our Townships during this Coronavirus situation.

• Emergent response and routine road maintenance are ongoing coming out of winter with more dry weather.

• Local road agreement development is ongoing with all 20 of our townships and working out accommodations during the virus outbreak.

• Crews are limiting work to essential tasks and duties. The workforce is stable and healthy with no confirmed COVID-19 cases within the organization. The Operations Department converted to the four 10-hour days early this year.

• Mike Bernbeck has been working with Cadillac Asphalt, our county wide asphalt resurfacing contractor, on project scheduling. Eight Mile Road between Tower Road and Pontiac Trail is planned to be closed for resurfacing beginning April 20, weather permitting. Crews will then move to Willis Road between Rawsonville Road and Bunton Road for resurfacing. Both projects are part of the county millage program.

• WCRC produced 869 tons of fresh cold patch on April 1st which will provide adequate summer supply.

• The early delivery and seasonal backfill salt orders were placed on the MIDEAL bulk purchasing program for next winter.

Dan Ackerman, Director of Finance & IT Michigan Transportation Fund (MTF) Receipts– Sheryl Siddall stated that MTF and the First Quarter Budget Review will be discussed at the April 21st Working Session.

Dan Ackerman stated that the current Stay Home, Stay Safe Order from Governor Whitmer will have a significant impact on MTF. MTF for February was $3.1 million, 22% higher than February 2019. The year-to-date MTF is 14% higher than last year. Dan stated that CRA’s current projections are to expect a decrease of 5% to 10% each month the Stay Home, Stay Safe order continues. Finance is looking at budget projections. Dan stated that 2019 was a good year when comparing actual numbers to the budget for the WCRC which will help with any financial challenges in 2020. The presentation of the 2019 financials by Plante and Moran as well as the 2020 first quarter budget analysis will be discussed at the April 21st Working Session. Dan stated that he is confident the WCRC will be in a sustainable financial shape in 2020 even if the Stay Home, Stay Safe mandate continues for several months.

DRAFT

12

Page 15: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

April 7, 2020

IT REPORT Dan Ackerman recognized Chris Quinter, Systems Administrator, for doing an excellent job helping the WCRC coordinate the technology to make remote meetings possible and to keep the WCRC moving forward during this time. Dan thanked the Board for previous approval of IT expenditures to keep the WCRC functioning at its highest technology level.

Sheryl Siddall expressed a huge thank you to Emily Kizer, Communications Manager, for coordinating this first virtual board meeting. Chris Quinter and Emily Kizer worked together to coordinate the video conferencing for this meeting.

ADJOURNMENT RC20-092 R. Green moved, B. Fuller seconded to adjourn the April 7, 2020 meeting

at 1:49 p.m. Roll Call Vote:

YEAS: R. Green, B. Fuller, D. Fuller NAYS: None ABSENT: None ABSTAIN: None Motion Carried.

Douglas E. Fuller, Chair

Sheryl Soderholm Siddall, Deputy Clerk Minutes Approved: _____________________ DRAFT

13

Page 16: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Board of County Road Commissioners

Board Meeting of April 21, 2020 Written Communications

WHEN: April 16, 2020 WHERE: Dancer Road between Dexter-Chelsea Road and Beach Road TOWNSHIP: Dexter WHY: Emergency Railroad work – Amtrak will close Dancer Road CONTACT: Larry Pridemore, Traffic Control Designer, (304) 993-8293, email at [email protected]. ISSUE DATE: April 16, 2020 WHEN: Starting Monday, April 20, 2020 WHERE: Pleasant Lake Road between Steinbach Road and Zeeb Road TOWNSHIP: Freedom and Lodi WHY: Road resurfacing – delays are likely due to lane restrictions. CONTACT: Mark McCulloch, senior project manager – permits, (734) 327-6679, email at [email protected] ISSUE DATE: April 14, 2020 WHAT: Virtual Zoom Meeting – Carpenter Road Construction Project WHEN: Wednesday, April 22, 2020, 10 a.m. WHERE: Online: https://bit.ly/wcrcprojectmeeting By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754 WHY: Carpenter Road between Ellsworth Road and Packard Road –

resurfacing project TOWNSHIP: Pittsfield Township CONTACT: Aaron Berkholz, senior project manager, (734) 327-6648, [email protected]. ISSUE DATE: April 13, 2020 WHEN: Starting Monday, April 20, 2020 WHERE: 8 Mile Road between Pontiac Trail and Tower Road TOWNSHIP: Salem WHY: Road resurfacing project CONTACT: Mike Bernbeck, project manager, (734) 327-6659, [email protected] ISSUE DATE: April 6, 2020 WHY: Email Advisory – WCRC to hold Virtual Board Meeting April 7, 2020

14

Page 17: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Road Commission 555 N. Zeeb Road

Ann Arbor, Michigan 48103

ROAD CLOSURE ADVISORY

WHEN: Starting Friday, April 17, 2020

WHERE: Dancer Road between Dexter-Chelsea Road and Beach Road in Dexter Township.

WHY: Emergency Railroad work

BACKGROUND: On Friday, April 17, 2020, Amtrak will close Dancer Road between Dexter-Chelsea Road and Beach Road in Dexter Township for emergency railroad repairs.

The road improvements are expected to take approximately 2 days. However, all dates are tentative and subject to change due to weather conditions.

DETOUR: The posted detour for this closure is Detour

CONTACT: If you have any questions concerning this work, please contact Larry Pridemore, Traffic Control Designer, (304) 993-8293, or via email at [email protected].

ISSUE DATE: 04/16/20

###

15

Page 18: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Road Commission

555 N. Zeeb Road Ann Arbor, Michigan 48103

ROAD WORK ADVISORY

WHEN: Starting Monday, April 20, 2020

WHERE: Pleasant Lake Road between Steinbach Road and Zeeb Road in Freedom and Lodi Townships.

WHY: Road resurfacing

BACKGROUND: On Monday, April 20, 2020, the Washtenaw County Road Commission (WCRC) will begin a road resurfacing project on Pleasant Lake Road between Steinbach Road and Zeeb Road in Freedom and Lodi Townships.

The road will not be closed to traffic, but delays are likely due to

lane restrictions. WCRC encourages motorists, emergency services and others to use an alternate route.

The road improvements are expected to take approximately 10

days. However, all dates are tentative and subject to change due to weather conditions.

CONTACT: If you have any questions concerning this work, please contact

Mark McCulloch, senior project manager – permits, (734) 327-6679, or via email at [email protected]

ISSUE DATE: 04/16/20

###

16

Page 19: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Road Commission

555 N. Zeeb Road Ann Arbor, Michigan 48103

VIRTUAL PUBLIC MEETING NOTICE

WHAT: Carpenter Road Construction Project Virtual Meeting WHEN: Wednesday, April 22, 2020, 10 a.m. WHERE: Online: https://bit.ly/wcrcprojectmeeting By Touchtone Phone: (929) 205-6099, Meeting ID: 879 2332 8754 WHY: The Washtenaw County Road Commission will hold a virtual

construction information meeting to discuss the Carpenter Road Resurfacing Project scheduled to begin in late-April.

Carpenter Road between Ellsworth Road and Packard Road in

Pittsfield Township will be resurfaced. The road will remain open during construction, but lane restrictions are expected to cause delays.

The virtual meeting will be held through Zoom on Wednesday,

April 22, 2020 at 10 a.m. There will be a brief presentation followed by time for questions from the audience. A recording of the meeting will be posted to wcroads.org after the meeting ends.

Click here to learn more about joining the virtual meeting. CONTACT: If you have any questions concerning this project, please contact

Aaron Berkholz, senior project manager, (734) 327-6648, [email protected].

WCRC will provide necessary reasonable auxiliary aids and

services, such as signers for the hearing impaired and audiotapes or printed material being presented at the meeting, to individuals with disabilities upon a 5-business day notice.

Individuals with disabilities requiring auxiliary aids or services

should contact Emily Kizer, communications manager, by phone (734) 327-6646 or by email [email protected].

ISSUE DATE: 04/14/2020

17

Page 20: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Road Commission

555 N. Zeeb Road Ann Arbor, Michigan 48103

ROAD CLOSURE ADVISORY

WHEN: Starting Monday, April 20, 2020

WHERE: 8 Mile Road between Pontiac Trail and Tower Road in Salem Township

WHY: Road resurfacing

BACKGROUND: On Monday, April 20, 2020, the Washtenaw County Road Commission and its contractor will close 8 Mile Road between Pontiac Trail and Tower Road in Salem Township for a road resurfacing project.

The road improvements are expected to take approximately 2

weeks. However, all dates are tentative and subject to change. Residents and property owners who live or work within the project

limits will be provided access to their home or business but there may be delays. All other traffic must follow the posted detour or seek an alternate route.

DETOUR: Click here for the detour CONTACT: If you have any questions concerning this work, please contact

Mike Bernbeck, project manager, (734) 327-6659, [email protected]

ISSUE DATE: 04/13/20

###

18

Page 21: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Road Commission

555 N. Zeeb Road Ann Arbor, Michigan 48103

EMAIL ADVISORY WCRC to Hold Virtual Board Meeting

on April 7 April 6, 2020

In an effort to practice social distancing and in accordance with Governor Whitmer’s Stay Home, Stay Safe, Save Lives Executive Order, the Washtenaw County Board of County Road Commissioners will hold a virtual board meeting on Tuesday, April 7 at 1 p.m.

• Click here for the meeting agenda • Click here for the meeting board packet

The public is welcome and encouraged to join the meeting. There are three ways to join and participate in the meeting:

1. From a computer with internet – Click here to join the meeting. After clicking the link, you will be prompted to download the Zoom software (if you don’t already have it). If you do not want to download the software, you can click the link at the bottom of the message to start the meeting from your browser.

2. From a smart phone with mobile data or WiFi connection – Download the Zoom App (available for Apple or Android) and enter the meeting ID when prompted: 184 341 317

3. From a touch tone phone: Dial (312) 626-6799 and enter meeting ID when prompted: 184 341 317

Once in the meeting, the public will be able to participate by virtually “raising their hand” during the public comment period on the agenda.

Click here for tips on joining and participating in WCRC’s virtual board meeting. Questions? Contact (734) 761-1500.

###

19

Page 22: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Board of County Road Commissioners

Board Meeting of April 21, 2020

CONSENT/ACTION ITEMS

A. CONSENT ITEMS

1. 2020 Local Bridge Funding Applications The Local Bridge Program funding applications are due to the Michigan Department of Transportation by June 1, 2020. Selected bridges will be funded for the 2023 fiscal year. Each agency requesting funding is limited to five (5) applications. To be eligible for bridge funds, the structure must meet the definition of a bridge, which is defined as a structure with a total clear span length of 20 feet.

Board approval is requested to submit five (5) applications for funding through the Local Bridge Program (LBP) for the following structures:

1. Str 10968 Willis Road over Paint Creek (On-System Replacement Funding) 2. Str 11015 Jerusalem Road over Mill Creek (On-System Replacement Funding) 3. Str 10972 Tyler Road over Willow Run (On-System Structure Removal) 4. Str 10987 Dexter-Chelsea Road (On-System Rehabilitation – Superstructure Replacement) 5. Bundle of bridges for Preventative Maintenance:

a. Str 10990 Sharon Hollow Road over River Raisin (On-System PM) b. Str 11003 Whittaker Road over Stony Creek (On-System PM) c. Str 10983 Plymouth Road over Fleming Creek (On-System PM) d. Str 11004 Whittaker Road over Paint Creek (On-System PM) e. Str 11005 Whittaker Road over Paint Creek (On-System PM)

The Road Commission believes the above listed bridges have the highest chances of being selected for funding in the 2023 fiscal year. The Local Bridge Program will fund 95% of the construction costs of the selected bridges. The Road Commission would be responsible for the design, right-of-way, construction engineering and the local match for the construction costs. If the bridge is located on a local road, the Township or other local source would be responsible for sharing 50% of the local costs with the Road Commission.

Prior to the June 1, 2020 deadline, a current certified Board resolution, signed and dated, supporting the projects will need to be submitted with each bridge funding application.

20

Page 23: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

PROPOSED MOTION: that upon the recommendation of the County Highway Engineer and the concurrence of the Managing Director, the Board hereby approves the submittal of five (5) applications to the Local Bridge Program to seek funding for the following bridges:

1. Str 10968 Willis Road over Paint Creek (On-System Replacement Funding) 2. Str 11015 Jerusalem Road over Mill Creek (On-System Replacement

Funding) 3. Str 10972 Tyler Road over Willow Run (On-System Structure Removal) 4. Str 10987 Dexter-Chelsea Road (On-System Rehabilitation –

Superstructure Replacement) 5. Bundle of bridges for Preventative Maintenance:

a. Str 10990 Sharon Hollow Road over River Raisin (On-System PM) b. Str 11003 Whittaker Road over Stony Creek (On-System PM) c. Str 10983 Plymouth Road over Fleming Creek (On-System PM) d. Str 11004 Whittaker Road over Paint Creek (On-System PM) e. Str 11005 Whittaker Road over Paint Creek (On-System PM)

2. 2020 Manchester Township Agreement This agreement for Manchester Township includes three solid applications of contract brine on all certified, unpaved local roads throughout the township. The total estimated cost of the agreement is $50,585.40 with the Township’s estimated share being $25,292.70 (see attached agreement).

PROPOSED MOTION: that upon the recommendation of the Director of Operations, and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and the Managing Director to sign the 2020 Manchester Township Agreement with the Township’s estimated share being $25,292.70.

3. 2020 Sharon Township Agreement This agreement for Sharon Township includes three solid applications of contract brine on all certified, unpaved local roads throughout the township. The total estimated cost of the agreement is $37,525.56 with the Township’s estimated share being $18,762.78 (see attached agreement).

PROPOSED MOTION: that upon the recommendation of the Director of Operations, and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and the Managing Director to sign the 2020 Sharon Township Agreement with the Township’s estimated share being $18,762.78.

21

Page 24: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

4. 2020 Ypsilanti Township Agreement This agreement for Ypsilanti Township includes three solid applications of contract brine on all certified, unpaved local roads throughout the township. The total estimated cost of the agreement is $11,695.86 with the Township’s estimated share being $5,847.93 (see attached agreement).

PROPOSED MOTION: that upon the recommendation of the Director of Operations, and the concurrence of the Managing Director, the Board hereby approves and authorizes the Chair and the Managing Director to sign the 2020 Ypsilanti Township Agreement with the Township’s estimated share being $5,847.93.

5. Miller @ Wagner Road Roundabout and Miller Road Bridge – MDOT Contract No. 20-5118 Staff is requesting the Board to approve MDOT Contract NO. 20-5118. The contract is for the construction of a single lane roundabout along Miller Road at its intersection with Wagner Road, for the removal and replacement of the Miller Road bridge over the Honey Creek and other associated construction costs. The estimated cost of the project is $1,904,469.97, with the Washtenaw County Road Commission responsible for $220,269.97. The project will be funded by state Local Bridge Funds, Federal Surface Transportation Funds and MTF funds. The project has been completed pursuant to WCRC & MDOT policies and procedures and is included in the 2020 WCRC budget.

PROPOSED MOTION: that upon the recommendation of the County Highway Engineer / Director of Engineering, and the concurrence of the Managing Director, the Board hereby approves the MDOT Contract No. 20-5118 and authorizes the Chair and Managing Director to sign the contract for the Miller Road at Wagner Road Roundabout and Miller Road Bridge project.

6. Carpenter Road – Construction Zone Temporary Traffic Control Order To protect workers and reduce problems with drivers speeding through the construction zone on Carpenter Road, from Ellsworth Road to Packard Road, a construction zone speed limit of 35 MPH within the project limits is required for the duration of the project.

PROPOSED MOTION: that upon the recommendation of the County Highway Engineer and the concurrence of the Managing Director, the Board hereby approves a Temporary Construction Zone Traffic Control Order (TCO) to reduce the speed limit on Carpenter Road, from Ellsworth Road to Packard Road, to 35 mph for the duration of the construction project.

22

Page 25: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

7. Parker Road – Temporary Traffic Control Order To provide an alternate route during the Pleasant Lake Road resurfacing project, between Steinbach Road and Zeeb Road, a temporary suspension of the “No Through Trucks” restriction on Parker Road, from Pleasant Lake Road to Scio Church Road, is recommended for the duration of the project.

PROPOSED MOTION: that upon the recommendation of the County Highway Engineer and the concurrence of the Managing Director, the Board approves a Temporary Traffic Control Order (TCO) suspending the “No Through Trucks” restriction on Parker Road, from Pleasant Lake Road to Scio Church Road for the duration of the Pleasant Lake Road resurfacing project.

8. Non-Union Wages

To assure that the Washtenaw County Road Commission continues to remain current with its salary administration program for non-union employees, the Human Resources Manager is proposing the following wage increase for all non-union employees for 2020.

PROPOSED MOTION: that upon the recommendation of the Human Resources Manager, and with the concurrence of the Managing Director, the Board hereby approves the following wage increase for non-union employees:

2020: Three percent (3%) across the board increases effective April 23, 2020.

9. Payroll & Bills for April 15, 2020

Staff is requesting the Board to approve the payment of payroll and bills for April 15, 2020.

PROPOSED MOTION: the Board hereby approves Voucher 10398 totaling $274,112.16 for payroll of April 15, 2020, and Voucher 10399 totaling $1,375,453.31 in payment of bills for April 15, 2020.

23

Page 26: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

2020 MANCHESTER TOWNSHIP AGREEMENT THIS AGREEMENT, made and entered into this _____ day of _______, 2020, by and between the Township Board of Manchester Township, Washtenaw County, parties of the first part and the Board of Washtenaw County Road Commissioners, parties of the second part. WHEREAS, the parties of the first part desire that certain improvements be made upon the local roads in the Township of Manchester, and WHEREAS, proper authority is provided to the parties of the agreement under the provisions in Act 51 of Public Acts of 1951 as amended, IT IS NOW THEREFORE AGREED, the parties of the second part will accomplish the improvements as specified herein, all in accordance with the standards of the parties of the second part. 1. Dust Control (497-16-108):

Work to include placement of three (3) solid applications of contract brine on all certified local gravel/limestone roads within the township. Estimated 282,600 gallons of contract brine @ $0.179 per gallon. Estimated cost of contract brine: $ 50,585.40

AGREEMENT SUMMARY 2020 LOCAL ROAD PROGRAM Dust Control $ 50,585.40 Less WCRC Conventional Matching Funds $ 25,292.70 ESTIMATED AMOUNT TO BE PAID BY MANCHESTER TOWNSHIP UNDER THIS AGREEMENT DURING 2020: $ 25,292.70 FOR MANCHESTER TOWNSHIP: ___________________________________ ____________________________________ Gene DeRossett, Supervisor Witness ___________________________________ ____________________________________ Danell Proctor, Clerk Witness FOR WASHTENAW COUNTY ROAD COMMISSION: ___________________________________ _____________________________________ Douglas E. Fuller, Chair Witness _________________________________ _____________________________________ Sheryl Soderholm Siddall, Managing Director Witness

24

Page 27: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

25

Page 28: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

26

Page 29: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

27

Page 30: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

28

Page 31: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

29

Page 32: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

30

Page 33: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

31

Page 34: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Washtenaw County Road Commission TOWNSHIP/STAFF REPORT

For the period of March 30 thru April 12, 2020

Board Meeting Date: April 21, 2020

TOWNSHIP REPORT MAINTENANCE Scraping of gravel roads and patching of paved roads were performed throughout the county. In addition, the following maintenance activities were performed in individual townships: ANN ARBOR TOWNSHIP Fallen Trees: Ford Road Limestone Patch – Country Club Road, Earhart Road, Englave Drive, Ford Road,

E Huron River Drive Service Drive, Maple Road, Warren Road: 78.7 tons Shoulder Maintenance – Dixboro Road: 4.1 tons

AUGUSTA TOWNSHIP Cleaned Culvert – Willow Road Debris Removal – McKean Road Fallen Trees – Gooding Road, Whittaker Road Limestone Patch – Arkona Road, Bolla Road, Bunton Road, Fuller Road,

Gooding Road, Hitchingham Road: 162 tons Shoulder Maintenance – McCrone Road, Stony Creek Road: 1.5 tons

BRIDGEWATER TOWNSHIP Debris Removal – Neblo Road Fallen Trees – Wilbur Road Gravel Patch – Arkona Road, Bemis Road, Ernst Road, Neblo Road,

Sheridan Road, Willow Road: 27 tons Limestone Patch – Arkona Road, Bemis Road, Ernst Road, Hogan Road,

Neblo Road, Willow Road: 64 tons Shoulder Maintenance – Austin Road, Clinton Road: 12 tons

DEXTER TOWNSHIP Gravel Patch – Glenbrook Road, Hankerd Road: 3 tons Shoulder Maintenance – Dexter-Pinckney Road, North Territorial Road: 3 tons

32

Page 35: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

FREEDOM TOWNSHIP Drainage & Backslopes – Luckhardt Road: 1.5 tons Gravel Patch – Bethel Church Road, Haab Road, Rentz Road, Schmitz Road,

Schneider Road: 42 tons Limestone Patch – Bethel Church Road, Hieber Road, Koebbe Road, Lima Center

Road, Pfaus Road, Spies Road, Steinbach Road: 37 tons Shoulder Maintenance – Parker Road, Pleasant Lake Road, Reno Road: 5 tons

LIMA TOWNSHIP Drainage & Backslopes – Lima Center Road Gravel Patch – Waltrous Road: 9 tons Limestone Patch – Easton Road, Jerusalem Road, Waltrous Road: 15 tons

LODI TOWNSHIP Limestone Patch – Diuble Road, Ellsworth Road, Gensley Road, Tessmer Road,

Textile Road, Waters Road, Zeeb Road: 101 tons Repair Washouts – Alber Road, Bethel Church Road, Clay Creek Drive, Dell Road,

Diuble Road, Ellsworth Road, Gensley Road, Grass Road, Lindemann Road, Saline Waterworks Road, Tessmer Road, Textile Road, Waters Road, Weber Road, Zeeb Road: 14 tons

Shoulder Maintenance – Ann Arbor-Saline Road, Wagner Road: 19 tons LYNDON TOWNSHIP Shoulder Maintenance – Hadley Road, North Territorial Road, Waterloo Road:

8.5 tons MANCHESTER TOWNSHIP Fallen Trees – Austin Road, Wellwood Road Limestone Patch – Bowens Road, Burtless Road, English Road, Fahey Road,

Henzie Road, Mahrle Road, Schleeweis Road, Wolff Road: 20 tons Shoulder Maintenance – Austin Road, Sharon Hollow Road: 6 tons

NORTHFIELD TOWNSHIP Fallen Trees – Five Mile Road Limestone Patch – Brookside Drive, Donna Lane, Eight Mile Road, Elizabeth

Street, Five Mile Road, Hillcrest Road, Longfellow Drive, Nollar Road, Spencer Road, Whittier Street: 86 tons

PITTSFIELD TOWNSHIP Fallen Trees – Campbell Road, Merritt Road, Limestone Patch – Warner Road: 10 tons Structure Maintenance – Oak Valley Drive

33

Page 36: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

SALEM TOWNSHIP Limestone Patch – Chubb Road, Clifton Avenue, Currie Road, Dickerson Street,

Euclid Street, Five Mile Road, Frederick Street, Leota Avenue, Lewis Street, McFadden Street, Pearl Street, Salem Road, South Street, Summit Street: 108.8 tons

Repair Washout – Curtis Road SALINE TOWNSHIP Limestone Patch – Arkona Road, Braun Road, Feldkamp Road, Hack Road,

Hartman Road, Macon Road, Marion Road, Mooreville Road, Schill Road: 270 tons

Shoulder Maintenance – Austin Road: 15 tons Sweeping Approaches – Arkona Road, Braun Road, Dell Road, Feldkamp Road,

Goodrich Road, Grass Road, Hack Road, Macon Road, Oak Park Drive, Schill Road

SCIO TOWNSHIP Boom Mow – Delhi Street, East Delhi Road, Railroad Street, West Delhi Road Limestone Patch – Burton Road, Daleview Drive, Liberty Road, Luella Street,

Myrtle Avenue, Park Road, Riverbend Drive: 74.5 tons Shoulder Maintenance – Huron River Drive: 15 tons Repair Washout – Blueberry Lane, Cottontail Lane, Craig Road, Deerfield Place,

East Delhi Road, Hickory Road, Lamplighter Drive, Laurel Hill Road, Laurentide Drive, Parkridge Drive, Peters Road, Pheasant Drive, Pineview Drive, Robinwood Drive, Roseland Drive, Salzburg Court, Scio Road, Tubbs Road, Walnut Road, West Delhi Road, Woodlea Drive: 45 tons

SHARON TOWNSHIP Boom Mow – Hazel Road, Washburne Road, Wingate Road Gravel Patch – Ellsworth Road, Easudes Road, Haab Road, Kendall Road,

Loeffler Road, Luckhardt Road, Washburne Road, Waters Road: 42 tons Limestone Patch – Bethel Church Road, Hashley Road, Meyers Road,

Sharon Valley Road: 37 tons SUPERIOR TOWNSHIP Boom Mow – Geddes Road Closed Road – Stamford Road Culvert Repair – Warren Road: 1.5 tons Drainage & Backslopes – Vreeland Road: 1.5 tons Fallen Trees – Cherry Hill Road Limestone Patch – Berry Road, Cherry Hill Road: 3 tons Shoulder Maintenance – Clark Road, Geddes Road, Plymouth Road: 67.2 tons

SYLVAN TOWNSHIP Limestone Patch – Lingane Road: 16 tons Shoulder Maintenance – Cavanaugh Lake Road, Kalmbach Road: 2 tons

34

Page 37: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

WEBSTER TOWNSHIP Culvert Replacement – Drainage and Backslopes – Limestone Patch – Chamberlin Road, Donovan Road, Gregory Road, Huron River

Drive, Joy Road, McClatchey Road, Merkel Road, Pellett Drive, Scully Road, Strawberry Lake Road, Valentine Road, Walsh Road, Zeeb Road: 26 tons

Shoulder Maintenance – Cameron Circle, Central Street, Daly Road, Huron River Drive, Joy Road, Mast Road, North Territorial Road, Strawberry Lake Road, Webster Church Road: 24 tons

YORK TOWNSHIP Fallen Trees – Stony Creek Road, Willow Road Limestone Patch – Bolla Road, Judd Road, Maple Road: 28 tons Shoulder Maintenance – Carpenter Road, Willis Road: 2 tons Sweeping Aprons – Arkona Road, Day Road, Hack Road, North Street, Petersburg

Road, Ridge Road YPSILANTI TOWNSHIP Boom Mow – Bagley Avenue, Lakeview Avenue, McCartney Avenue, Service

Drive Debris Removal – Bemis Road, Merritt Road Drainage & Backslopes – Bemis Road, Grove Road, Harris Road, Parkwood

Avenue Fallen Trees – Bagley Avenue, Bemis Road, McCarthy Street, McCartney Avenue,

Merritt Road, Midvale Street, Textile Road Shoulder Maintenance – Martz Road, Merritt Road, Ridge Road, Stony Creek

Road, Textile Road, Tuttle Hill Road: 42 tons STATE TRUNKLINE REPORT Cablerail Repair – I-94 Debris Removal – I-94 Shoulder Maintenance – M-14 Surface Maintenance – US-23

SHOP REPORT Shop Repairs Work Orders Completed – 35 Service Call Runs - 3 New Tire Installation – 9 Tires Repaired – tires Vehicles Serviced – 13

35

Page 38: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Equipment Repair Trucks 360 & 366 – Prepared for dust control operations Tanker 1199 – Rebuilt brine pump Truck 383 – Removed dump box & scraper, installed brine tank Equipment 782 – Shortened flight chain Truck 351 – Replaced air bag, u-joints, yokes & carrier bearing Truck 110 – Replaced outer door handle Truck 182 – Replaced fuel system evaporation valve

BUILDING & GROUNDS REPORT Yard One Performed janitorial cleaning & garage maintenance Inspected brine tanks and serviced Sprayed for ants in HR Office

Yard Two Inspected brine tanks and serviced Unclogged urinal

Yard Three Inspected brine tanks and serviced Replaced urinal valve Repaired hot water tank spigot

Yard Four Installed cover for brine sump pump Inspected brine tanks and serviced Replaced water hose fitting Performed garage maintenance

Yard Six Repaired pressure washer hose in wash bay

36

Page 39: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

PERMITS 2020 FIRST QUARTER REPORT

2020 YTD as of March 31st FY2019 Totals

Right-of-Way Permit Applications = 232 936

Right-of-Way Permits Issued = 214 869 Residential Permits 49 266 Commercial Permits 20 88

Utility Permits 126 432 Miscellaneous Permits 19 83

Transportation Permits Issued = 642 1,720

Permit Staff Review & Inspection

Charges = $ 54,978 $ 250,927

451 000 Utility Lic / Permit Fees $ 21,355 $ 115,318 452 001 Comm Drive Lic/Perm & Rev Fees $ 2,450 $ 18,850 452 002 Non-Comm Drive Lic/Perm Fee $ 3,250 $ 21,970 453 000 Other Construction in Road ROW $ 1,850 $ 5,750 455 000 Transportation $ 58,575 $ 117,800

Permits Application Fees Collected = $ 87,480 $ 279,688

37

Page 40: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

TRAFFIC SIGNAL – QUARTERLY REPORT

FY 2019 Totals 2020 YTD Q1 Q2 Q3 Q4

196 Annual Service = 0 0 120 Trouble Call = 55 55 24 Housekeeping = 0 0 3 Const. Projects = 10 10

76 T&S Projects = 2 2 6397 Miss Dig Requests Rcv'd = 795 795

SIGN SHOP- QUARTERLY REPORT FY 2019 Totals 2020 YTD Q1 Q2 Q3 Q4

727 New Sign Installation = 49 49 2,125 Signs Replaced = 439 439

50 Signs Repaired/Relocated = 8 8 308 Signs Removed = 99 99

38

Page 41: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

Request CategoryWCRC

GeographyNumber of Requests Acknowledged Closed

Avg Days to Acknowledge

Avg Days to Close Open

Unpaved Roads District 1 74 70 74 1.9 2.7 0Unpaved Roads District 6 69 62 62 0.4 3.1 7Unpaved Roads District 4 58 33 56 1.3 5.1 2Unpaved Roads District 3 42 42 42 0.1 1.8 0Unpaved Roads District 5 34 27 34 0.3 1.9 0

Pothole (Paved Roads) District 6 15 15 10 0.8 2.2 5Pothole (Paved Roads) District 2 13 6 13 0.6 1.2 0

Traffic Signal Repair Countywide 12 6 6 3 5.2 6Traffic Sign Repair Countywide 12 8 12 0 2 0Unpaved Roads District 2 10 6 10 0.3 2.1 0

Traffic Signal Timing Concern Countywide 9 3 7 0.8 0.9 2Other Issues Countywide 8 5 6 0.9 2.6 2

Drain is Plugged/Broken District 6 7 7 2 1.3 0.4 5Pothole State Trunkline 7 5 7 0.1 0.9 0

Construction Work Zone Issue Countywide 5 1 4 0 2.7 1New Sign Request Countywide 5 5 3 0.3 7.3 2

Request for Review of Intersection Improvements for Safety

Countywide5 1 4 0.6 0.6 1

Pothole (Paved Roads) District 3 5 4 5 0.5 2.6 0Shoulder Concern District 1 5 5 4 0.6 2.2 1

Roadside Tree Removal/Maintenance District 25 5 5 0.6 0.8 0

Guardrail/Barrier Countywide 4 3 1 1.3 1.4 3

Roadside Tree Removal/Maintenance District 14 3 4 1.8 5.6 0

Shoulder Concern District 2 4 4 3 0.6 1.1 1Pothole (Paved Roads) District 2 4 4 4 0 0.9 0

Flooding District 5 4 3 4 0 2.1 0Shoulder Concern State Trunkline 4 3 2 0.4 2.3 2

Request for Speed Limit Evaluation Countywide 3 2 1 0.5 0.4 2Drain is Plugged/Broken District 1 3 3 1 0.7 0.7 2

Flooding District 1 3 1 3 2.6 1.3 0Flooding District 2 3 2 3 0 0.9 0

Shoulder Concern District 4 3 3 3 0.1 1.8 0Roadside Tree Removal/Maintenance District 5 3 2 3 0.1 1.8 0

Flooding District 6 3 2 1 0.4 0 2Damaged Mailbox Countywide 2 2 2 0.1 0.1 0

Roadside Tree Removal/Maintenance District 32 2 2 0 0.7 0

Drain is Plugged/Broken District 4 2 2 2 0 1 0Drain is Plugged/Broken District 5 2 2 1 0.2 2 1

Shoulder Concern District 6 2 2 1 0.2 0.7 1Icy Roads Countywide 1 1 1 0.2 1 0

Intersection Sight Distance Concern Countywide 1 1 1 0 1.5 0Neighborhood Traffic Concerns

(Requests for speed humps or other traffic calming evaluations)

Countywide1 1 0 1.4 0 1

Drain is Plugged/Broken District 2 1 1 1 0.2 1.4 0Pothole (Paved Roads) District 3 1 1 1 0 0.6 0Drain is Plugged/Broken District 3 1 1 1 0 8.7 0Pothole (Paved Roads) District 4 1 1 1 0.7 2.2 0Roadside Vegetation District 6 1 1 0 0 0 1

Totals 463 369 413 0.8 2.7 50

Townships District NameWebster, Scio, Lodi District 1Pittsfield, Ypsilanti District 2

Lyndon, Dexter, Sylvan, Lima District 3Sharon, Freedom, Manchester,

BridgewaterDistrict 4

Saline, York, Augusta District 5Northfield, Salem, Ann Arbor, Superior District 6

MDOT Roads Within County State Trunkline

WCRC Fix It Monthly Report - March 2020

This is a summary of the requests created in WCRC Fix It between March 1 - March 31, 2020. Most requests are automatically routed to the district foreman for investigation and resolution. If you have any questions about this report, please contact Emily Kizer, WCRC communications manager, (734) 327- 6646 or [email protected].

WCRC District Key

39

Page 42: Washtenaw County Road Commission April 21, 2020 – 1 p.m ... · Washtenaw County Road Commission . Bi-Monthly Meeting of the Board of County Road Commissioners . April 21, 2020 –

WCRC Communications Report March 11 – April 15, 2020

Emails • In the last month, we delivered:

o 13,071 emails

▪ 40% avg. open rate

Social Media

WCRC Facebook (@Washtenaw Roads)

• Total followers: 6,307 people

• Total reach: 17,987 people

WCRC Twitter (@Washtenaw Roads)

• Total followers: 1,574 people

• Total reach: 16,800 people

WCRC LinkedIn

• Total followers: 250

Media Stories

• Projects

o Saline Post – Ann Arbor-Saline Rd/Wagner Rd Project to Begin March 23 (3/19)

o Sun Times News – M-52 Closure Expected Mid-April for 3 Weeks (3/26)

• Misc.

o Sun Times News – County Commissioners Vote to Expand Road Commission

(3/10)

o Sun Times News – County Board of Commissioners Seeking Appointments to

the County Road Commission (3/11)

o Chelsea Update – Road Commission Lobby Closed to Public (3/17)

40