15
1 WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT DAY 1
Transcript
Page 1: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

1

WASTE REDUCTION AND

PRODUCTIVITY IMPROVEMENT

DAY 1

Page 2: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

You are not paid to work hard. In fact, you are

not paid for effort at all. You are paid for

results. It's not what you do; it's what you get

done.“

----Larry Winget : Personal success and business author and speaker

2

Page 3: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

EVERY BUSINESS HAS TWO SOURCES OF

CASH FLOW

Cash is the lifeblood of your business. To boost profits, you

will want to earn more or lose less. Every business has two

sources of cash flow:

1. External customers give you money for your products and

services.

2. Internal processes that leak cash like a rusty bucket.

—25% to 40% of your expenses.

Page 4: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

4

EVERY BUSINESS PROCESS HAS THREE BIG LEAKS

Big Leak #1—

Big Leak #2—

Big Leak #3—Variation

Page 5: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

5

Every Business Has Two Improvement Focuses

1)

(2)

Page 6: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

66

LEAN Thinking

1. Identify waste ( as defined by the customer ) and…..

2. Determine appropriate and effective ways to remove waste from the system.

Page 7: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

77

Types of Work – Identifying Waste

Value Adding (VA):

Incidental Work (NVA),

Waste

Page 8: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

88

Waste Elimination

Value

AddWaste

Traditional Focus

• Work Longer-Harder-

Faster

• Add People or Equipment

Lean Six Sigma

• Improve the Value

Stream to Eliminate

Waste

LEAD TIME

Page 9: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

99

The 7 Wastes

Overproduction

Waiting

Inventory

TransportationMotion

Excessive Processing

Defects

1

6

7

5 4

3

2

To produce sooner, faster or in greater quantities

than customer demand.

Raw material,

work in progress

or finished goods

which is not having

value added to it.

People or parts

that wait for

a work cycle to

be completed.

Unnecessary movement

of people, parts or

machines within

a process.

Unnecessary movement of people

or parts between processes.

Non right

first time.

Repetition

or correction

of a process.

Processing

beyond

the standard

required by the

customer.

is the Japanese word for WASTE.MUDA

Seek it out and get rid!

1

2

34

5

6

7

An 8th waste

is the wasted

potential

of people

Page 10: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

TOOLS FOR WASTE

REDUCTION AND

PRODUCTIVITY

IMPROVEMENT

10

Page 11: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

Setup Reduction (SMED)

Page 12: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

Poka Yoke

Page 13: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

One-Piece Flow

Page 14: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

Total Productive

Maintenance (TPM)

Page 15: WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT · 9 The 7 Wastes Overproduction Waiting Inventory Transportation Motion Excessive Processing Defects 1 6 7 5 4 3 2 To produce sooner,

Pull System


Recommended