51
Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim, Jaenam Lee Irrigation Australia / 7 th Asian Regional Conference, ICID Droughts, Floods, Environment: Managing Consumptive Water Needs Sustainably 27 June 2012 Dept. of Agricultural and Rural Engineering, Chungnam National University
Transcript
Page 1: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Water balances between upper dam and lower estuary reservoir in South Korea

– Case of Boryeong dam and Busa esturary reservoir

Jaekyoung Noh, Daesik Kim, Jaenam Lee

Irrigation Australia / 7th Asian Regional Conference, ICIDDroughts, Floods, Environment: Managing Consumptive Water Needs Sus-tainably

27 June 2012

Dept. of Agricultural and Rural Engineering, Chungnam National University

Page 2: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Background and objective

• High salinity of the Busa estuary reservoir in Korea, from which are being irrigated to upper paddy fields in transplanting period.

• Inflow to Busa reservoir are restricted to outflows from upper Boryeong dam.

• To develop models for water balances of Boryeong dam and Busa estuary reservoir, from which will be used to plan counter measures on high salinity in Busa reservoir.

Page 3: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Sites

Page 4: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Land uses

Page 5: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

DEMs

Page 6: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Area capacity curves

Page 7: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Boryeong multipurpose dam on 18:30 14 June 2012

Busa estuary reservoir on 15:40 14 June 2012

Page 8: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Meteorological Data

Page 9: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Rainfalls (1973-2011)

Page 10: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Weirs for irrigation and thermal power plant

Page 11: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Weirs for suppling water to thermal power plant

Boryeong power plant

Seocheon power plant

Page 12: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Salinity (ppm)

Year 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

April 4,300 100 400 1,200 800 1,200 1,500 2,100 1,400 4,800

May 790 150 550 850 1,000 1,500 1,800 2,400 1,400 1,900

Page 13: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

2009

Page 14: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

2010

Page 15: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

2011

Page 16: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Water levels in Busa

Page 17: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Inflows

DAWAST model (Noh, 1991)

TPHM model (Kim, 2002)

Parameter: UMAX, LMAX, FC, CP, CE

Parameter: Smax, α

Page 18: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

S

Q

ETa

P

Q = f(e-k2 Sα) S

Eta = f(e-k1 S) ETo

One parameter : α

ONE(One parameter New Exponential) Hydrologic Model

Page 19: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

General one parameter equation of ONE hydrologic model

Page 20: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Daily inflows using general one pa-rameter (Daecheong dam, 1981-2001)

Page 21: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

One year (Daecheong dam, 1998)

Page 22: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Comparison of dekadal inflows (Daecheong dam, 1981-2001)

Page 23: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Water balance in Boryeong dam

• S(i) = S(i-1) + Q(i) – EW(i) – SQ(i)• SQ(i) = DW(i) + IW(i)+ AW(i) + MW(i)

– S: water storage– O: inflow– SQ: water supply– EW: evaporation in water surface– DW: domestic water– IW: industrial water– AW: agricultural water– MW: instreamflow

• OV(i) = S(i) – FS, if H(i)>FH– OV: overflow– FS: full water storage– FH: full water level

Page 24: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Daily operation result of Boryeong dam

Page 25: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Daily inflow to Boryeong dam (1998-2011)

Page 26: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Comparison of daily inflows

Page 27: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Comparison of dekadal inflows to Boryeong dam (1998-2011)

Page 28: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Domestic water 200,000 m3/d, paddy field area 1039.5 ha, industrial water 15000 m3/d, instream-

flow 0.38 m3/s

Daily irrigation water (1966-2011) from Boryeong dam

Page 29: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Domestic water 200,000 m3/d, paddy field area 1,039.5 ha, industrial water 15,000

m3/d, instreamflow 0.38 m3/s

Reliability 95.6%

Page 30: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Domestic water 226,100 m3/d, paddy field area 1,039.5 ha, industrial water 79,100

m3/d, instreamflow 0.38 m3/s – present con-dition

Reliability 79.6 %

Page 31: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Water balance of Busa reservoir

• Inflow to Busa (QIbs) = SQ from Bo-ryeong (SQbr)+ QI from lateral

• SQ from Boryeong = IW + AW + MW + FW + OV

• QI from lateral = Q – IW + DWr – AWbr + AWrbr + AWrbs

• IW = IWsh (Seohae) + IWbr (Bo-ryeong)

Page 32: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

• S(i) = S(i-1) + QIbs(i) + SQbr(i) – SQbs(i) - EWbs(i) – GW(i) – AWbs(i) – AWnp(i)

• SQbs = 1000×(-385.2 + 3527.9 (h + 1.5)) – h: water level of

Busa (EL.m)

Page 33: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Water level to outflow of Busa

Page 34: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Dropped water level to Outflow from Busa

Page 35: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Water levels in Busa reservoir

Page 36: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Inflow to Busa reservoir- Outflow from Boryeong dam

Page 37: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Lateral inflow

Page 38: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Inflow to Busa

Page 39: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Comparison of irrigated waters from Busa

Page 40: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Daily simulated water storages in Busa (2009-2011)

Page 41: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Case of 2011

Page 42: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Long term simulation in Busa- inflow (1966-2011)

Page 43: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Inflow (1998-2011)

Page 44: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Water storages (1998-2011)

Page 45: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Salinity to inflow

Page 46: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Inflows during salinity data period

Page 47: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Comparison of salinities in Busa

Page 48: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Water storages during salinity data period

Page 49: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Water storage to salinity

Page 50: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,

Conclusion

• Water balance models were con-structed.

• Upper Boryeong dam had not enough capacity to supply various waters.

• Water storages of lower Busa reser-voir were well fitted to observed data.

• Using these developed models, up-per dam and lower reservoir will be able to operate effectively in high salinity period.

Page 51: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,