GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES 2017-18 (Applicable from 01/04/2018)
Transcript
Page 1: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES

2017-18

(Applicable from 01/04/2018)

Page 2: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1
Page 3: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

DETAILS OF COMMITTEE FORMED FOR PREPARATION

OF COMMON SCHEDULE OF RATES FOR 2017-18

(Reference—Government Resolution Marathi No.MIS-2212/(343/12)/MI-2

Mantralaya Mumbai 400032 dated 05/07/2014)

1) C.E.(SP), W.R.D. Pune - President

2) C.E. Kokan Region, W.R.D. Mumbai - Member

3) C.E.(SP), W.R.D. Amarwati - Member

4) C.E. & C.A.(CADA) Aurangabad - Member

5) C.E.(WR), W.R.D. Nagpur - Member

6) C.E. Koyana Project Pune - Member

7) C.E.(Mechanical), W.R.D. Nasik - Member

8) S.E. Thane Irrigation Circle, Thane - Member

9) S.E. Kukadi Irrigation Circle, Pune - Member Secretary

Page 4: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1
Page 5: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

DETAILS OF SUBCOMMITTEE FOR PREPARATION OF

COMMON SCHEDULE OF RATES FOR 2017-18

Sr.No. Component of work Members of subcommittee

(1) Additional Lead Charges of all CO-ORDINATOR

Materials Upto 500 Km & C.E., Mechanical, WRD, Nashik

Lift Charges by Head Load MEMBERS

1) S.E. Koyana Design Circle, Pune

(2) Excavation & Embankment CO-ORDINATOR

C.E.(SP), WRD, Pune

MEMBERS

1) C.E., North Maharashtra Region, Nashik

2) C.E., Mechanical, WRD, Nashik

(3) Concrete Work including Centering, CO-ORDINATOR

UCR Masonry, Brick Masonry & C.E.(WR), WRD, Pune

R.C.C. Pipes MEMBERS

1) C.E.(WR), WRD, Aurangabad

2) C.E., Goshikhurd Project, Nagpur

3) C.E.(SP), WRD, Amravati

4) C.E., Tapi, I.D. Corporation, Jalgaon.

5) S.E. Quality Control Circle, Nagpur

(4) Maintenance & Repairs CO-ORDINATOR

C.E. & C.A., CADA, Aurangabad

MEMBERS

1) C.E.(WR), WRD, Aurangabad

2) C.E.(WR), WRD, Nagpur

3) C.E., N.M.R., Nashik

4) C.E., Mechanical, WRD, Nashik

5) C.E.(SP), WRD, Pune

6) S.E. & Director, D.I.R.D., Pune

(5) Tunnel Works CO-ORDINATOR

C.E., Hydroelectric Project, & Q.C. Pune

MEMBERS

1) C.E., Konkan Region, WRD, Mumbai

2) C.E.(WR), WRD, Aurangabad

3) C.E.(WR), WRD, Nagpur

(6) Lift Irrigation Scheme CO-ORDINATOR

C.E.( WR), WRD, Nagpur

MEMBERS

1) C.E.(WR), WRD, Pune

2) C.E.(WR), WRD, Aurangabad

3) C.E., Mechanical, WRD, Nashik

Page 6: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1
Page 7: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

Sr.No. Component of work Members of subcommittee

(7) Surveying & Investigation CO-ORDINATOR

C.E.(SP), WRD, Amravati

MEMBERS

1) C.E. & C.A., CADA, Aurangabad

2) S.E., T.I.C., Thane

(8) Hydrology C.E.(WR), WRD, Nagpur

(9) Items for Cost estimation of Structures in affected villages

C.E.(WR), WRD, Nagpur

(10) Gates - Manufacturing & Repairs CO-ORDINATOR

C.E., Mechanical, WRD, Nashik

MEMBERS

1) C.E., N.M.R., Nashik

2) S.E., Gates Circle, C.D.O., Nashik

3) C.E.(WR), WRD, Aurangabad

4) S.E., Mechanical Circle, Pune

(11) Flow Measuring Devices C.E.(WR), WRD, Nagpur

(12) Marking Blue Line & Red Line CO-ORDINATOR

C.E.(WR), WRD, Pune

MEMBER

S.E., Pune Irrigation Circle, Pune

(13) Land Reclamation Work & CO-ORDINATOR

Soil Survey S.E. & Director, Irrigation Research & Development, Pune

MEMBERS

1) E.E., Irrigation Research & Development, Pune

2) Soil Survey Officer, Soil Survey Dn. Pune

3) Soil Survey Officer, Directorate, Irrigation

Research & Development, Pune

4) Dy.E.E. Irrigation Research & Development,

Pune

Page 8: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1
Page 9: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

I N D E X

Sr. No.

Particulars Pages

From To

1 SECTION-1 1 --

1.1 General Note with Annexure No.1 & 2 2 6

1.2 Lift Charges by Head Load 7 8

1.3 Rates of Construction Materials & Labours 9 14

1.4 Lead Charges Statement for Materials 15 26

2 SECTION-2 27 30

Excavation & Embankment - Item No. 1 to 21 31 36

3 SECTION-3 37 42

Concrete Work including Centering, UCR Masonry,

Brick Masonry & R.C.C. Pipes - Item No. 22 to 69

43 56

4 SECTION-4 57 60

Maintenance & Repairs - Item No. 70 to 93 61 64

5 SECTION-5 65 76

Tunnel Works - Item No. 94 to 106 77 80

6 SECTION-6 81 84

Lift Irrigation Scheme - Item No. 107 to 129 85 94

Page 10: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

Sr. No.

Particulars Pages

From To

7 SECTION-7 95 98

Surveying & Investigation - Item No.130 to 151 99 104

8 SECTION-8 105 108

Hydrology – Item No. 152 to 158 109 110

9 SECTION-9 111 114

Items for Cost estimation of Structures in affected villages – Item No. 159 to 190

115 120

10 SECTION-10 121 126

Gates Manufacturing & Repairs - Item No.191 to 213 127 142

11 SECTION-11 143 146

Flow Measuring Devices - Item No. 214 to 217 147 150

12 SECTION-12 151 154

Marking Blue Line & Red Line - Item No. 218 to 225 155 158

13 SECTION-13 159 162

Land Reclaimation Work & Soil Survey - Item No. 226 to 237

163 164

Page 11: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

1

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-1

1.1 General Note with Annexure No. 1 & 2

1.2 Lift Charges by Head Load

1.3 Rates of Construction Materials & Labour

1.4 Lead charges statement for Materials

Page 12: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

2

सामाईक दरसचूी सन 2017-18 (1.1) सर्वसाधारण टिपणी

प्रस्तार्ना :- सामाईक दरसचूी सन 2017-18 ही ददनाांक 01 /04 /2018 पासनू अांमलात येईल. सदर दरसचूी सन 2017-18 मध्ये खालील प्रमखु बाबींचा समावेश करण्यात आला आहे.

अ) र्स्तू र् सेर्ा कर, स्र्ाटमत्र् शुल्क, कामगार कल्याण उपकर, टर्मा इ. बाबत.

1) सामाईक दर ची सन 2017-18 चे दर हे त्यातील यंत्रसमगु्रीचे दर र्गळता र्स्तू आटण सेर्ाकर टर्रहीत (i.e. C.S.R. 2017-18 rates are excluding G.S.T.) आहेत. अंदाजपत्रके मंजरू करणा-या सक्षम अटधकारी यांनी दरपथृ:करणातील साटहत्य र् मजरुीबाबतच्या दरार्र र्स्त ूआटण सेर्ाकराची उटचत तरतूद अंदाजपत्रकात र् टनटर्देत प्रचटलत टनयमानसुार करार्ी. G.S.T. चे दर हे www.cbec.gov.in/htdocs-

cbec/gst/index# या सकेंतस्थळार्रून घेण्यात यारे्त. 2) र्ाळू, दगड आटण खडी यार्रील स्र्ाटमत्र् शुल्क हे संबं त बाबींच्या दरपथृ:करणात अतं त नाहीत. तसेच

मातीकामाच्या र् भरार् कामाच्या बाबींसाठी लागणारे मरुुम, काळी माती यार्रील स्र्ाटमत्र् शुल्क दरपथृ:करणात अंत त नाही. सदरील बाबी अांदाजपत्रकामध्ये स्वतांत्रपणे घेण्यात याव्यात (शासन पातळीवर महसलू व वन दवभागाच्या वेळोवेळीच्या प्रमाणे गौण खदनजावरील स्वादमत्व शलु्कामध्ये बदल झाल्यास त्याप्रमाणे अांदाजपत्रकातील स्वादमत्व शलु्काच्या रकमकमेत बदल करण्यात यावा.) ज्या टठकाणी Natural sand उपलब्ध होते अशा भागात टजल्हाटधकारी यांनी टनश्चचत केलेल ेर्ाळूचे दर आटण सामाईक दर ची सन 2017-18 मधील Natural sand चा दर यातील फरक अंदाजपत्रक तयार करताना टर्चारात घ्यार्ा. तसेच ज्या टठकाणी Crushed sand आर्थथकदषृ्िया उपयोगात आणणे योग्य असेल अशा कामासाठी संबं त टठकाणचा Crushed sand चा बाजार दर आटण सामाईक दर ची सन 2017-18 मधील Crush sand चा दर यातील फरक अंदाजपत्रक तयार करताना टर्चारात घ्यार्ा.

3)शासन दनणणय क्रमाांक दिएसआर-1090/सीआर-6453/पीएलएन-3, ददनाांक 14/07/1993 नसुार मजरुाांच्या सदुवधाांसाठी दर चीतील प्रत्येक बाबीमध्ये तरतदू करण्यात आली आहे.

4) उद्योग व उजा दवभागाचे शासन दनणणय क्रमाांक बीसीए-2009/सीआर-108/लेबर 7-अ, दद.17/06/2010 नसुार

कामगार कल्याण उपकराची एक टकमकमयाची तरतदू सामाईक दर चीतील बाबीमध्ये दर दनश्चचत करताना दवचारात

घेतलेली नाही. अांदाजपत्रक तयार करताना प्रत्येक बाबीच्या दरपथृ:करणामध्ये कामगार कल्याण उपकराची 1 टकमके

इतकी तरतदू करण्यात यावी व सांदर्भभत शासन दनणणयामध्ये नमदू केल्याप्रमाणे उपकराची रकमकम ठेकेदाराकिून त्याांच्या देयकातनू वसलू करण्यात यावी.

5) दवत्त दवभागाचा शासन दनणणय क्र. दवमासां-1008/प्र.क्र.28/98/शा.हमी, ददनाांक 19/08/1998 नसुार तसेच दवमा

सांचालनालय, महाराष्ट्र, मुांबई याांचे सचुनेनसुार कामाच्या ककमतीच्या 1 टकमकमयाची दवमा कदरताची तरतदू कामाचे अांदाजपत्रकाचे गोषवा-यात करण्यात यावी. सदरची दवमा कदरताची तरतदू सामाईक दर चीतील बाबींच्या दरामध्ये

करण्यात आलेली नाही. दशवाय या करीताची तरतदू दनदवदेतील कामाच्या बाबींच्या दरपथृ:करणात करण्यात येऊ

नये. सांबांधीत कामाचे कां त्राटदाराने दवमा रकमकम भरल्याबाबतचे परुावे सादर केल्यास त्याची दवभागीय लेखापाल

Page 13: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

3

पिताळणी करुन त्यानांतर भरलेल्या रकमकमचेा परतावा, दनदवदा रकमकमेच्या [Cost put to tender] 1 टकमकेचे मयादेत, कां त्राटदारास अदा करावा.

6) इमारती आदण रस्त्याांची काम ेवगळून इतर कामासाठी जलसांपदा दवभागाची सन 2017-18 ची दरसचूी वापरण्यात

यावी. कालव्यास छेदणा-या रस्तापलुाच्या कामासाठी आदण पांपगहृाच्या खोदकामासाठी देखील जलसांपदा दवभागाची सामाईक दर ची सन 2017-18 वापरण्यात यावी.

दटप :- कामाची अांदाजपत्रके तयार करताना व त्या अांतगणत दवदवध बाबीचे दरदवचलेषण करताना वरील अ.क्र. अ (1) ते अ (6) मध्ये नमदू केल्याप्रमाणे अांदाजपत्रकात व दनदवदेत तरतदू करावी व या तरतदुीशी ससुांगत तरतदुी प्रारूप

दनदवदा सांचात कराव्यात. याबाबतची जबाबदारी प्रारुप दनदवदा कागदपते्र तयार करणा-या व मांजरु करणा-या अदधका-याची राहील.

ब) दरपथृ:करणामध्ये टर्चारात घ्यार्याच्या बाबी :- 1) जनजाती क्षेत्रातील तसेच दवशेष कृती कायणक्रम अशा दोहीही क्षेत्राांअांतगणत एखादे क्षेत्र समादवष्ट्ट होत असल्यास

त्या दठकाणी 10 टकमके इतकी वाढ एकदाच घ्यावी.

2) गिदचरोली दजल्हयातील सवण तालकुमयातील कामाकदरता 20 टकमके जादा दर अनजेु्ञय राहतील.

3) या दरसचुीतील दर खारभुमी दवकास कामाांसाठी लाग ूनाहीत. सदरतामापन कें द्राचे कामातील अिचणींचा दवचार करता 30 टकमके जादा दर आकारावेत.

4) वरील अ.क्र. ब (1), ब (2) व ब (3) यापैकी केवळ एक तरतदू अनजेु्ञय राहील.

5) उपरोकमत टीप क्र. ब-1 व ब-3 मध्ये नमदू केलेली दवशेष वाढ रकने / दटप्परने करावयाच्या बाांधकाम सादहत्याच्या वाहतकुीच्या दराांना लाग ूआहे.

6) बहृहीमुांबईतील रेल्वे स्थानकावर राज्य शासनाची माहीयता असलेल्या कामगार सांघटनेच्या अदधकृत दरपत्रकाप्रमाणे

येणा-या दसमेंटच्या भराई / उतराईच्या दरात या कामाच्या जागेवरील वरकि खचण दवचारात घेऊन येणारे दर

शासनाचे पत्र क्रमाांक दरसचूी-2397/256/97 लपा-2, ददनाांक 27/03/1997 अहीवये अनजेु्ञय करण्यात आले

आहे. माथािी कामगाराच्या सांघटना राज्यातील इतर मोठया रेल्वे स्थानकावर देखील असल्यामळेु सांपणुण

राज्यातील माहीयताप्राप्त कामगार सांघटना असलेल्या रेल्वे स्थानकाकदरता सांबांधीत रेल्वे स्थानकावरील माथािी

कामगार सांघटनेचे दर लाग ूकरण्यास शासनाचे पत्र क्र.1098/146/99/लपा-2, ददनाांक 17 मे 2000 अहीवये परवानगी ददली आहे त्यानसुार दर लाग ूकरावेत.

7) बांधकाम साटहत्याचे दर

7अ) लोह : दर ची तयार करताना M.S. / HYSD / TMT स्टीलचे वस्त ूआदण सेवाकर दवरहीत दर हे ददनाांक 01/09/2017 रोजीचे जॉइहीट प्लहॅीट कदमटीनसुार मुांबईचे दर हे त्यातील त्या वेळेस असलेला 18% GST वगळून (उदा. JPC प्रमाणे PIG IRON चा मुांबईचा दर रु. 36580-18 x 36580 (18% GST) = 31000 प्रस्तादवत दर) दवचारात घेतलेले आहेत. (सोबत पटरटशष्ि क्र. 1 आटण 2) जॉइहीट प्लहॅीट कदमटीचे दर हे दजल्हा मखु्यालयाच्या दठकाणचे आहेत असे गहृीत धरावे. अांदाजपत्रक करतेवेळी दरदवचलेषणासाठी त्या त्या वेळी प्रचलीत असलेले जॉइहीट प्लहॅीट कदमटीचे दर आदण दर चीत दवचारात घेतलेले दर यातील फरक दवचारात घ्यावा. JPC चे दर www.jpcindiansteel.nic.in या सांकेतस्थळावरून घेण्यात यावेत.

Page 14: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

4

7ब) टसमेंि : दरसचूी तयार करताना दसमेंटचा वस्त ू आदण सेवाकर दवरहीत दर हा रु.224.20/गोणी दवचारात

घेतलेला आहे. अांदाजपत्रक करतेवेळी दरदवचलेषणासाठी त्या त्या वेळी प्रादेदशक सदमतीने दनश्चचत केलेले

प्रचलीत वस्त ूआदण सेवाकर दवरहीत दर आदण दर चीतील (रु.224.20/गोणी) दर यातील फरक दवचारात घ्यावा.

8) संधानकाच्या कामासाठी Concrete with batching plant & Transit Mixer ची तरतदु गहृीत धरण्यात आलेली आहे. सांधानकाचे पदरमाण आदण कामाचे स्वरुप दवचारात घेता ज्या कामासाठी Batching plant चा वापर सांयशु्कमतक होत नाही अशा दठकाणी सांधानकाचे काम Mixer ने करणे अपदरहायण असल्यास त्यास सांबांधीत अधीक्षक अदभयांता याांची पवुण माहीयता घेऊन सांधानकाच्या बाबीचा मळू दर 5 टकमकमयाने कमी करण्यात यावा. तसेच अपवादात्मक पदरश्स्थतीत self loading दमकमसरच्या सहाय्याने सांधानक केल्यास त्यास सांबांधीत अधीक्षक अदभयांता याांची पवुणमाहीयता घेऊन त्या बाबीचे दर मळू दराच्या दोन टकमकमयाने कमी करावेत. तसेच या कदरता स्वतांत्र Specifications दनदवदेमध्ये अांतभुणत करावेत.

9) ज्या प्रकल्पाचे बाांधकाम पणूण झाले आहे व जेथे कसचन होत आहे अशा कालव्याच्या दरुुस्तीची / पनुस्थापनेची कामे यांत्रसामगु्री वापरुन (कालवा बांद कालावधीत) करताना अदतदरकमत 10 टकमके वाढ दवचारात घेण्यात यावी. सदर वाढ कसचन व्यवस्थापनाच्या सवणसाधारण कामासाठी लाग ूराहणार नाही.

10) जलटनष्कासन (Dewatering) आवचयक असल्यास, सवणसाधारण कामाांसाठी नाला पातळीपयंतच्या कामाच्या

ककमतीच्या 1 टकमका तरतदू अांदाजपत्रकात ठेवण्यात यावी. तसेच नदी व मोठया नाल्यावरील कामाांसाठी नदी व

मोठा नाला तळपातळीपयंतच्या ककमतीच्या 3 टकमके तरतदू अांदाजपत्रकात दवचारात घेण्यात यावी. एखादया

दवदशष्ट्ट कामासाठी फकमत Dewatering चे काम करणे क्रमप्राप्त झाल्यास अशा पदरश्स्थतीत अधीक्षक अदभयांता

याांच्या पवुण माहीयतेनेच सामाईक दर ची सन 2017-18 मधील Dewatering सांबांधीत स्वतांत्र बाब क्र. 20

उपयोगात आणावी.

11) Section-9 मधील बाबी या पनुवणसन गावठाणातील प्रकल्पग्रस्ताांच्या घराचे मलु्याांकनासाठी वापरण्यात याव्यात.

12) उपसा कसचन योजना अांतगणत Valve चे दर महाराष्ट्र जीवन प्रादधकरणाच्या दरसचुीप्रमाणे वापरावेत.

13) नदलका दवतरण प्रणाली अांतगणत कामासाठी महाराष्ट्र जीवन प्रादधकरण दर चीचे दर उपयोगात आणावेत.

Page 15: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

5

पटरटशष्ि क्र. 1 सामाईक दर ची 2017-18 अंतगवत र्स्त ुआटण सेर्ाकर टर्रहीत लोहचे दर

( RATE OF ITEM WITH GST ARE AS PER JOINT PLANT COMMITTEE

AS ON 1 SEP 2017, COPY ATTACHED SEPARATELY)

Sr.No. ITEM RATE OF ITEM WITH GST IN (RS/TONNE)

RATE OF ITEM FOR CSR 2017-18

WITHOUT GST IN

(RS/TONNE)

1 PIG IRON 36580 31000

2 BILLETS 100 MM 38660 32763

3 BLOOME 150X150 MM 39459 33440

4 PENCIL INGOTS 35636 30200

5 WIRE RODS 6 MM 48510 41110

6 WIRE RODS 8 MM 48510 41110

7 ROUNDS 12 MM 44904 38054

8 ROUNDS 16 MM 44904 38054

9 ROUNDS 25 MM 44904 38054

10 TMT 10 MM 38740 32830

11 TMT 12 MM 38040 32237

12 TMT 25 MM 37691 31941

13 ANGLES 50X50X6 MM 39955 33860

14 ANGLES 75X75X6 MM 39511 33484

15 JOISTS 125X70 MM 47790 40500

16 JOISTS 200X100 MM 41135 34860

17 CHANNELS 75X40 MM 40523 34341

18 CHANNELS 150X75 MM 40269 34126

19 PLATES 6 MM 43365 36750

20 PLATES 10 MM 43955 37250

21 PLATES 12 MM 43660 37000

22 PLATES 25 MM 42775 36250

23 H. R. COILS 2.00 MM 43660 37000

24 H. R. COILS 2.50 MM 43660 37000

25 H. R. COILS 3.15 MM 43955 37250

26 C. R. COILS 0.63 MM 48380 41000

27 C. R. COILS 1.00 MM 48675 41250

28 G. P. SHEETS 0.40 MM 55460 47000

29 G. P. SHEETS 0.63 MM 55165 46750

30 G. C. SHEETS 0. 40 MM 55165 46750

31 G. C. SHEETS 0. 63 MM 55165 46750

32 MELTING SCRAP H M S - I 31270 26500

33 MELTING SCRAP H M S - II 26898 22795

34 SPONGE IRON (COAL BASED) 22883 19392

Page 16: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

6

Page 17: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

7

COMMON SCHEDULE OF RATES 2017-18

(1.2) Lift charges by Head Load

Lift in m Rate as per CSR 2017-18

Rs./Cum

1.00 6.00

1.50 7.60

2.00 8.55

2.50 10.25

3.00 11.50

3.50 12.80

4.00 14.20

4.50 16.05

5.00 17.00

5.50 18.20

6.00 21.15

6.50 21.80

7.00 22.70

7.50 24.10

8.00 25.80

8.50 26.65

9.00 28.20

9.50 29.85

10.00 30.95

Note : These rates are applicable only for manual works

& not for work executed by Machinery.

Page 18: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

8

Page 19: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

9

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

(1.3) RATES OF CONSTRUCTION MATERIALS

Sr. No.

Material Unit Rate in Rs.

1 Acetylene Cum 337.30

2 Admixture Kg 65.25

3 Aldrop 30 cm No. 103.40

4 Bamboo 25 mm Rmt 16.95

5 Binding wire Kg 55.95

6 Black glass No. 86.65

7 Brick No. 5.70

8 Brushes No. 60.15

9 Butt Hinges Iron 125 mm No. 30.50

10 Cement (50 Kg bag) Bag 224.20

11 Coal tar paint Kg 43.75

12 Coaltar epoxy paint Litre 199.20

13 Coir string Kg 40.95

14 Copper plate Kg 494.05

15 Copper water stopper 16 gauge Sqm 7866.10

16 Cotton waste Kg 44.75

17 Curing compound Litre 116.10

18 Delay Detonator No. 16.95

19 Electric Detonator No. 10.15

20 Empty cement bag No. 10.00

21 Explosive Kelvex - 220 Kg 53.40

22 First Aid Kit No. 242.85

23 Fiber fibrillated polypropylene fibers

(910 gm /cum of any grade of concrete )

Kg 240.00

24 Fly Ash Kg 0.90

25 Fuse coil Rmt. 16.95

26 G.P. Electrodes No. 9.30

27 Gelatin Kg 124.60

28 Geru Kg 11.45

29 Goggles No. 140.20

Page 20: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

10

Page 21: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

11

Sr. No.

Material Unit Rate in Rs.

30 G. I. Pipe 100 mm dia Rmt. 618.65

31 Hand gloves Pair 201.70

32 Hand screen No. 319.50

33 Handle Iron 125 mm No. 30.50

34 Hook iron & eye oxi 75 mm No. 15.25

35 Hose pipe Oxygen & DA Rmt 71.20

36 J-Bolt (For soldier fixing) No 31.35

37 Kerosene Litre 31.00

38 L.H. Electrodes No. 12.70

39 Latches 250 mm No. 39.00

40 Manila Rope Kg 190.70

41 Metal size 40 mm & above (Including Royalty charges)

Cum. 660.95

42 Metal size 40 mm & above (Excluding Royalty charges)

Cum. 522.85

43 Metal size less than 40 mm (Including Royalty charges)

Cum 757.70

44 Metal size less than 40 mm (Excluding Royalty charges)

Cum 620.00

45 Nails 4 cm Kg 58.45

46 Neoprene pad Cu.cm 1.70

47 Non Teak wood Cum 31983.05

48 Nozzle – 3/64 No. 733.90

49 Nut bolts Kg 55.10

50 Nut bolts and washer Kg 85.60

51 Nylon Rope Kg 242.35

52 Oil paint Litre 199.20

53 Ordinary Detonator No. 5.95

54 Oxygen Cum 42.85

55 P.V.C. water stopper,310mm wide central bulb type Rmt 187.50

56 Painting brush 4” No. 86.45

57 Pickaxe No. 129.65

Page 22: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

12

Sr. No.

Material Unit Rate in Rs.

58 Plum bob No. 86.45

59 Polyethylene film 200 gauge Kg 206.80

60 Primer Litre 127.35

61 Pin header of standard size No. 28.55

62 Red oxide Litre 111.70

63 Rust cleaner Litre 285.15

64 Safety Helmet No. 216.10

65 Safety shoes Pair 1248.30

66 Natural sand / Crushed sand (Including Royalty charges)

Cum. 728.55

67 Natural sand/ Crushed sand (Excluding Royalty charges)

Cum. 591.45

68 Shalitex super Expansion Pad – 12 mm Tk. Sqm 537.30

69 Spirit level - 150 mm No. 103.40

70 Steel MT Rate as per J.P.C.,

Dt.1/9/2017 (As per

Annexure I & II)

71 Stone (Including Royalty charges) Cum. 466.65

72 Stone (Excluding Royalty charges) Cum. 328.55

73 Stone chips (Excluding Royalty charges) Cum. 198.70

74 Super plasticizer Kg 84.40

75 Turpentine Litre 60.15

76 Tower bolt Iron 200 mm No. 60.15

77 Tower bolt Iron 250 mm No. 69.50

78 Water 1000 Ltrs 33.00

79 Water proofing compound Kg 46.10

80 Welding cable 600 AMP Rmt 650.85

81 White glass No. 4.25

82 Wire brush No. 69.50

83 Wire mesh 50 X 50 - 13 gauge Sqm 172.90

84 Zink base oil paint Litre 253.15

85 Zink rich Epoxy primer Litre 230.45

Page 23: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

13

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

LABOUR RATES

Sr. No.

Labour Unit Rate in Rs.

1 Barbender day 467.00

2 Bhisti day 467.00

3 CAD operator / Civil Engg. Assistant day 581.00

4 Carpenter day 494.00

5 Civil Engineer day 939.00

6 Electrician day 455.00

7 Fitter day 494.00

8 Fitter for shuttering day 494.00

9 Foreman day 494.00

10 Gas cutter day 467.00

11 Grinder day 467.00

12 Gauge Inspector day 467.00

13 Mason day 494.00

14 Mazdoor (Heavy) day 467.00

15 Mazdoor (Light) day 448.00

16 Measurement clerk day 494.00

17 Mechanic / Operator day 494.00

18 Mistri / Mukadam day 494.00

19 Painter day 494.00

20 Semiskilled Mazdoor day 467.00

21 Skilled Mazdoor day 494.00

22 Surveyor day 647.00

23 Tile Turner day 494.00

24 Tracer day 552.00

25 Unskilled Mazdoor day 448.00

26 Welder day 494.00

Page 24: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

14

Page 25: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

15

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

(1.4) LEAD CHARGES STATEMENT

FOR MATERIAL

Page 26: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

16

Page 27: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

17

Page 28: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

18

Page 29: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

19

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

सामाईक दरसचूी सन 2017-18 मधील दर हे यांत्रसामगु्री वापरुन करावयाच्या कामाचे आहेत. कामाच्या आवचयकतेप्रमाणे खोदाई / भराव मनषु्ट्यबळाचा वापर करुन काम करावे लागणार असेल तरीही अांदाजपत्रकातील तरतदुी सामाईक दरसचूी नसुार म्हणजेच यांत्रसामगु्री वापराच्या गहृीतकानसुारच राहतील.

उदाहरण- 4 दक.मी. वहन अांतरासाठी खोदकामाचा दर दनश्चचत करण्याचा तपशील खालीलप्रमाणे.

Details Reference Lead charges by mechanised loading and unloading (Rs./Cum)

lead charges for 4 Km. CSR 2017-18 Booklet, Page No.24

46.72

Deduct initial lead charges for 1 Km. lead

CSR 2017-18 Booklet, Page No.24

12.35

Additional lead charges = 46.72 - 12.35 = 34.37

Basic rate for excavation in soil =

CSR 2017-18, booklet I-1/Page No.31

60.60

Rate for excavation for 4 Km. lead =

60.60 + 34.37 = 94.97

उदाहरण- 4 दक.मी. वहन अांतरासाठी भराव कामाच्या गाभा कामाचा (borrow) दर दनश्चचत करण्याचा तपशील खालीलप्रमाणे.

Details Reference Lead charges by mechanised

loading and unloading (Rs./Cum)

lead charges for 4 Km. CSR 2017-18 Booklet, Page No.24

46.72

Deduct initial lead charges for 1 Km. lead

CSR 2017-18 Booklet, Page No.24

12.35

Additional lead charges = 46.72 - 12.35 = 34.37

Basic rate for embankment = CSR 2017-18, booklet

I-13/Page No.33 98.80

Rate for embankment for 4 Km. lead =

98.80 + 34.37 = 133.17

Page 30: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

20

Page 31: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

21

(1.4) Lead Charges Statement for 2017-18 (Excluding Loading and Unloading Charges)

Statement - I

Lead

in Km

Av

Speed In

Km/Hr

No of Trips Km Done Qty of

Diesel

(4 Km/

Litre)

Cost of

diesel

(Rate =

Rs

60/Litre)

(Rs)

Cost of

Mobile Oil

(15 % of

Cost of

Diesel)

( Rs )

Hire

Charges of

Truck

(Rs)

Total Cost

(Rs)

Add 10 %

Overhead

Charges

(Rs)

Cost

Including

Overhead

Charges

(Rs)

Cost per

Trip

(Rs)

1 2 3 4 5 6 7 8 9 10 11 12

L S N=8/(2 x L/S) (2 x NL)+6 Col 4/4 Col 5X 60 col 6 X 0.15 Rs 2000/day col 6+col 7+

col 8 col 9 x 0.10 col 9+col 10 col 11/col 3

0.50 15.00 120.00 126.00 31.50 1890.00 283.50 2000.00 4173.50 417.35 4590.85 38.26

1.00 16.00 64.00 134.00 33.50 2010.00 301.50 2000.00 4311.50 431.15 4742.65 74.10

1.50 16.50 44.00 138.00 34.50 2070.00 310.50 2000.00 4380.50 438.05 4818.55 109.51

2.00 17.00 34.00 142.00 35.50 2130.00 319.50 2000.00 4449.50 444.95 4894.45 143.95

2.50 17.25 27.60 144.00 36.00 2160.00 324.00 2000.00 4484.00 448.40 4932.40 178.71

3.00 17.50 23.34 146.04 36.51 2190.60 328.59 2000.00 4519.19 451.92 4971.11 212.99

3.50 17.75 20.29 148.03 37.01 2220.45 333.07 2000.00 4553.52 455.35 5008.87 246.86

4.00 18.00 18.00 150.00 37.50 2250.00 337.50 2000.00 4587.50 458.75 5046.25 280.35

4.50 18.25 16.23 152.07 38.02 2281.05 342.16 2000.00 4623.21 462.32 5085.53 313.34

5.00 18.50 14.80 154.00 38.50 2310.00 346.50 2000.00 4656.50 465.65 5122.15 346.09

5.50 18.50 13.46 154.06 38.52 2310.90 346.64 2000.00 4657.54 465.75 5123.29 380.63

6.00 18.75 12.50 156.00 39.00 2340.00 351.00 2000.00 4691.00 469.10 5160.10 412.81

6.50 18.85 11.60 156.80 39.20 2352.00 352.80 2000.00 4704.80 470.48 5175.28 446.14

7.00 19.00 10.86 158.04 39.51 2370.60 355.59 2000.00 4726.19 472.62 5198.81 478.71

7.50 19.15 10.22 159.30 39.83 2389.50 358.43 2000.00 4747.93 474.79 5222.72 511.03

8.00 19.30 9.65 160.40 40.10 2406.00 360.90 2000.00 4766.90 476.69 5243.59 543.38

8.50 19.45 9.16 161.72 40.43 2425.80 363.87 2000.00 4789.67 478.97 5268.64 575.18

9.00 19.60 8.72 162.96 40.74 2444.40 366.66 2000.00 4811.06 481.11 5292.17 606.90

9.50 19.80 8.34 164.46 41.12 2466.90 370.04 2000.00 4836.94 483.69 5320.63 637.97

10.00 20.00 8.00 166.00 41.50 2490.00 373.50 2000.00 4863.50 486.35 5349.85 668.73

Page 32: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

22

Lead

in Km

Av

Speed In

Km/Hr

No of Trips Km Done Qty of

Diesel

(4 Km/

Litre)

Cost of

diesel

(Rate =

Rs 60/

Litre)

(Rs)

Cost of

Mobile Oil

(15 % of

Cost of

Diesel)

( Rs )

Hire

Charges of

Truck

(Rs)

Total Cost

(Rs)

Add 10 %

Overhead

Charges

(Rs)

Cost

Including

Overhead

Charges

(Rs)

Cost per

Trip

(Rs)

1 2 3 4 5 6 7 8 9 10 11 12

L S N=8/(2xL/S) (2xNL)+6 Col 4/4 Col 5X60 col 6X0.15 Rs 2000/day col 6+col 7+

col 8 col 9 x 0.10 col 9+col 10 col 11/col 3

11.00 21.00 7.64 174.08 43.52 2611.20 391.68 2000.00 5002.88 500.29 5503.17 720.31

12.00 22.00 7.34 182.16 45.54 2732.40 409.86 2000.00 5142.26 514.23 5656.49 770.64

13.00 23.00 7.08 190.08 47.52 2851.20 427.68 2000.00 5278.88 527.89 5806.77 820.16

14.00 24.00 6.86 198.08 49.52 2971.20 445.68 2000.00 5416.88 541.69 5958.57 868.60

15.00 25.00 6.67 206.10 51.53 3091.50 463.73 2000.00 5555.23 555.52 6110.75 916.15

20.00 25.00 5.00 206.00 51.50 3090.00 463.50 2000.00 5553.50 555.35 6108.85 1221.77

25.00 25.00 4.00 206.00 51.50 3090.00 463.50 2000.00 5553.50 555.35 6108.85 1527.21

30.00 30.00 4.00 246.00 61.50 3690.00 553.50 2000.00 6243.50 624.35 6867.85 1716.96

35.00 30.00 3.43 246.10 61.53 3691.50 553.73 2000.00 6245.23 624.52 6869.75 2002.84

40.00 30.00 3.00 246.00 61.50 3690.00 553.50 2000.00 6243.50 624.35 6867.85 2289.28

45.00 30.00 2.67 246.30 61.58 3694.50 554.18 2000.00 6248.68 624.87 6873.54 2574.36

50.00 30.00 2.40 246.00 61.50 3690.00 553.50 2000.00 6243.50 624.35 6867.85 2861.60

60.00 35.00 2.34 286.80 71.70 4302.00 645.30 2000.00 6947.30 694.73 7642.03 3265.82

70.00 35.00 2.00 286.00 71.50 4290.00 643.50 2000.00 6933.50 693.35 7626.85 3813.43

80.00 35.00 1.75 286.00 71.50 4290.00 643.50 2000.00 6933.50 693.35 7626.85 4358.20

90.00 35.00 1.56 286.80 71.70 4302.00 645.30 2000.00 6947.30 694.73 7642.03 4898.74

100.00 35.00 1.40 286.00 71.50 4290.00 643.50 2000.00 6933.50 693.35 7626.85 5447.75

125.00 40.00 1.28 326.00 81.50 4890.00 733.50 2000.00 7623.50 762.35 8385.85 6551.45

150.00 40.00 1.07 327.00 81.75 4905.00 735.75 2000.00 7640.75 764.08 8404.83 7854.98

175.00 40.00 0.92 328.00 82.00 4920.00 738.00 2000.00 7658.00 765.80 8423.80 9156.30

Page 33: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

23

Lead

in Km

Av

Speed In

Km/Hr

No of Trips Km Done Qty of

Diesel

(4 Km/

Litre)

Cost of

diesel

(Rate =

Rs 60/

Litre)

(Rs)

Cost of

Mobile Oil

(15 % of

Cost of

Diesel)

( Rs )

Hire

Charges of

Truck

(Rs)

Total Cost

(Rs)

Add 10 %

Overhead

Charges

(Rs)

Cost

Including

Overhead

Charges

(Rs)

Cost per

Trip

(Rs)

1 2 3 4 5 6 7 8 9 10 11 12

L S N=8/(2 x L/S) (2 x NL)+6 Col 4/4 Col 5 X60 col 6 X 0.15 Rs 2000/day col 6+col 7+

col 8 col 9 x 0.10 col 9+col 10 col 11/col 3

200.00 40.00 0.80 326.00 81.50 4890.00 733.50 2000.00 7623.50 762.35 8385.85 10482.31

250.00 40.00 0.64 326.00 81.50 4890.00 733.50 2000.00 7623.50 762.35 8385.85 13102.89

300.00 40.00 0.54 330.00 82.50 4950.00 742.50 2000.00 7692.50 769.25 8461.75 15669.91

350.00 40.00 0.46 328.00 82.00 4920.00 738.00 2000.00 7658.00 765.80 8423.80 18312.61

400.00 40.00 0.40 326.00 81.50 4890.00 733.50 2000.00 7623.50 762.35 8385.85 20964.63

450.00 40.00 0.36 330.00 82.50 4950.00 742.50 2000.00 7692.50 769.25 8461.75 23504.86

500.00 40.00 0.32 326.00 81.50 4890.00 733.50 2000.00 7623.50 762.35 8385.85 26205.78

Note : 1) For calculation of carrying capacity ,a truck of 10 Tonne capacity is considered.

2) Above Lead Charges are exclusive of loading and unloading charges.

3)The transportation charges beyond 15 km to 50 km are with 5 km interval ,50 km to 100 km are with 10 km interval ,100 km to 200 km

are with 25 km interval and 200 km to 500 km are with 50 km interval. The transportation charges for intermediate Km within the

range shall be worked out by linearly interpolating between rates of lower and upper values in the range.

Page 34: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

24

Lead Charges Statement for 2017-18 (Excluding Loading and Unloading Charges)

Statement - II

Lead in Km Cost of Trip

( Rs) Lead Charges in Rs / Unit

L

As per col no

12 of

Statement I

Excavated

Rock,

Rubble

Sand ,

Metal Below

40 mm

Murum, Earth,

Metal 40 mm &

above

Concrete Block

Steel,

Cement,

Stone Block

Water Bricks

Carrying

capacity of

Truck

4.70 m3 5.75 m

3 6.00 m

3 7.00 m

3 10.00 MT 9000 Litre 5000 Nos.

Unit for Rate Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.

0.50 38.26 8.14 6.65 6.38 5.47 3.83 4.25 7.65

1.00 74.10 15.77 12.89 12.35 10.59 7.41 8.23 14.82

1.50 109.51 23.30 19.05 18.25 15.64 10.95 12.17 21.90

2.00 143.95 30.63 25.04 23.99 20.56 14.40 15.99 28.79

2.50 178.71 38.02 31.08 29.79 25.53 17.87 19.86 35.74

3.00 212.99 45.32 37.04 35.50 30.43 21.30 23.67 42.60

3.50 246.86 52.52 42.93 41.14 35.27 24.69 27.43 49.37

4.00 280.35 59.65 48.76 46.72 40.05 28.03 31.15 56.07

4.50 313.34 66.67 54.49 52.22 44.76 31.33 34.82 62.67

5.00 346.09 73.64 60.19 57.68 49.44 34.61 38.45 69.22

5.50 380.63 80.99 66.20 63.44 54.38 38.06 42.29 76.13

6.00 412.81 87.83 71.79 68.80 58.97 41.28 45.87 82.56

6.50 446.14 94.92 77.59 74.36 63.73 44.61 49.57 89.23

7.00 478.71 101.85 83.25 79.79 68.39 47.87 53.19 95.74

7.50 511.03 108.73 88.87 85.17 73.00 51.10 56.78 102.21

8.00 543.38 115.61 94.50 90.56 77.63 54.34 60.38 108.68

8.50 575.18 122.38 100.03 95.86 82.17 57.52 63.91 115.04

9.00 606.90 129.13 105.55 101.15 86.70 60.69 67.43 121.38

9.50 637.97 135.74 110.95 106.33 91.14 63.80 70.89 127.59

10.00 668.73 142.28 116.30 111.46 95.53 66.87 74.30 133.75

Page 35: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

25

Lead in Km Cost of Trip

( Rs) Lead Charges in Rs / Unit

L

As per col no

12 of

Statement I

Excavated

Rock,

Rubble

Sand ,

Metal Below

40 mm

Murum,Earth,

Metal 40 mm &

above

Concrete Block

Steel,

Cement,

Stone Block

Water Bricks

Carrying

capacity of

Truck

4.70 m3 5.75 m

3 6.00 m

3 7.00 m

3 10.00 MT 9000 Litre 5000 Nos.

Unit for Rate Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.

11.00 720.31 153.26 125.27 120.05 102.90 72.03 80.03 144.06

12.00 770.64 163.97 134.02 128.44 110.09 77.06 85.63 154.13

13.00 820.16 174.50 142.64 136.69 117.17 82.02 91.13 164.03

14.00 868.60 184.81 151.06 144.77 124.09 86.86 96.51 173.72

15.00 916.15 194.93 159.33 152.69 130.88 91.62 101.79 183.23

20.00 1221.77 259.95 212.48 203.63 174.54 122.18 135.75 244.35

25.00 1527.21 324.94 265.60 254.54 218.17 152.72 169.69 305.44

30.00 1716.96 365.31 298.60 286.16 245.28 171.70 190.77 343.39

35.00 2002.84 426.14 348.32 333.81 286.12 200.28 222.54 400.57

40.00 2289.28 487.08 398.14 381.55 327.04 228.93 254.36 457.86

45.00 2574.36 547.74 447.71 429.06 367.77 257.44 286.04 514.87

50.00 2861.60 608.85 497.67 476.93 408.80 286.16 317.96 572.32

60.00 3265.82 694.86 567.97 544.30 466.55 326.58 362.87 653.16

70.00 3813.43 811.37 663.20 635.57 544.78 381.34 423.71 762.69

80.00 4358.20 927.28 757.95 726.37 622.60 435.82 484.24 871.64

90.00 4898.74 1042.28 851.95 816.46 699.82 489.87 544.30 979.75

100.00 5447.75 1159.10 947.43 907.96 778.25 544.78 605.31 1089.55

Page 36: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

26

Lead in Km Cost of Trip

( Rs) Lead Charges in Rs / Unit

L

As per col no

12 of

Statement I

Excavated

Rock,

Rubble

Sand ,

Metal Below

40 mm

Murum,Earth,

Metal 40 mm &

above

Concrete Block

Steel,

Cement,

Stone Block

Water Bricks

Carrying

capacity of

Truck

4.70 m3 5.75 m

3 6.00 m

3 7.00 m

3 10.00 MT 9000 Litre 5000 Nos.

Unit for Rate Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.

125.00 6551.45 1393.92 1139.38 1091.91 935.92 655.14 727.94 1310.29

150.00 7854.98 1671.27 1366.08 1309.16 1122.14 785.50 872.78 1571.00

175.00 9156.30 1948.15 1592.40 1526.05 1308.04 915.63 1017.37 1831.26

200.00 10482.31 2230.28 1823.01 1747.05 1497.47 1048.23 1164.70 2096.46

250.00 13102.89 2787.85 2278.76 2183.82 1871.84 1310.29 1455.88 2620.58

300.00 15669.91 3334.02 2725.20 2611.65 2238.56 1566.99 1741.10 3133.98

350.00 18312.61 3896.30 3184.80 3052.10 2616.09 1831.26 2034.73 3662.52

400.00 20964.63 4460.56 3646.02 3494.10 2994.95 2096.46 2329.40 4192.93

450.00 23504.86 5001.03 4087.80 3917.48 3357.84 2350.49 2611.65 4700.97

500.00 26205.78 5575.70 4557.53 4367.63 3743.68 2620.58 2911.75 5241.16

Note: 1) For calculation of carrying capacity ,a truck of 10 Tonne capacity is considered.

2) Above Lead Charges are exclusive of loading and unloading charges.

3) The transportation charges beyond 15 km to 50 km are with 5 km interval ,50 km to 100 km are with 10 km interval ,

100 km to 200 km are with 25 km interval and 200 km to 500 km are with 50 km interval. The transportation charges for

intermediate Km within the range shall be worked out by linearly interpolating between rates of lower and upper values in the

range.

Page 37: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

27

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-2

EXCAVATION AND EMBANKMENT

ITEM NO. 1 TO 21

Page 38: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

28

Page 39: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

29

Page 40: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

30

Page 41: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

31

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

EXCAVATION & EMBANKMENT

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

1 Item No.1 :-

Excavation in all kinds of soil including boulders upto 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 1 km and lift upto 6 m.

Cum.

60.60

9.90

2 Item No.2 :-

Excavation in hard murum including boulders upto 0.6 m diameter ( 0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 1 km and lift upto 6 m.

Cum.

73.95

13.40

3 Item No.3 :-

Excavation in soft rock without blasting including boulders upto 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 1 km and lift upto 6 m.

Cum.

90.50

17.05

4 Item No.4 :-

Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia.(0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc., complete with lead upto 1 km and lift upto 6 m.

Cum.

295.35

62.95

Page 42: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

32

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

5 Item No.5 :-

Excavation in hard rock of all toughness including boulders above 0.6 m dia. (0.113Cum) for canals cut-off trench of embankment filter / catch water drains and other appurtenant structures by control blasting methods including control of vibrations by use of delay detonators and control of fly rocks by muffling arrangements and adopting only jack hammers for drilling holes and minimising damage to side slopes of canal in water prism area by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques including cost of all materials, machinery, labour, placing excavated rock neatly approved dump area as directed etc., complete with lead upto 1 km & lift upto 6 m.

Cum.

443.00

94.45

6

Item No.6 :-

Excavation in hard rock of all toughness by breaker including boulders above 0.6 m dia. (0.113Cum) minimising damage to side slopes of excavation and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc., complete with lead upto 1 km and lift upto 6 m.

Cum.

491.05

31.15

7 Item No.7 :-

Watering the embankment in proper layers by tankers including a lead of water upto 1 km and all lifts etc. complete.

Cum.

11.90

---

8 Item No.8 :-

Compaction of bankwork with vibratory Compactor to 95 % of Proctor density including watering with a lead upto 1.00 Km. etc complete.

Cum.

22.80

---

9 Item No.9 :-

Providing cut off trench filling using selected impervious soil directly available from material of excavation including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with lead upto1 km for watering and lift upto 6m.

Cum.

45.50

1.90

Page 43: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

33

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

10 Item No.10 :-

Providing hearting embankment using selected impervious material available directly from excavation in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with lead upto1 km for watering and lift upto 6 m.

Cum.

45.50

1.90

11 Item No.11 :-

Providing casing embankment using selected pervious material available directly from excavation in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with lead upto1 km for watering and lift upto 6 m.

Cum.

55.10

2.55

12 Item No.12 :-

Providing cut off trench filling using selected impervious soil from approved borrow areas including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc. complete with lead upto1 km & lift upto 6 m.

Cum.

108.25

1.95

13 Item No.13 :-

Providing hearting embankment using selected impervious soil from approved borrow areas in layers including cost of all materials, machinery,labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with lead upto1 km & lift upto 6 m.

Cum.

98.80

1.90

Page 44: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

34

Sr. No.

Item Unit

Rate for 2017-18

(Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

14 Item No.14 :-

Providing casing embankment using

selected pervious material from approved

borrow areas in layers of including cost of all

materials, machinery, labour, all other

operations such as collection of soil, spreading

soil in layer of specified thickness, sorting out,

breaking clods, levelling, sectioning edges /

sides, watering, compacting each layer to

density control of not less than 95 percent or

as stipulated using vibratory compactor etc.,

complete with lead upto1 km & lift upto 6 m.

Cum.

118.95

2.55

15 Item No.15 :-

Providing cohesive non-swelling (CNS) material lining to canals using selected material from approved borrow area including cost of all materials, machinery, labour, spreading soil in layers of thickness not more than 150 mm including providing 20 cm or so (perpendicular to side slope) of extra pride ,removing pride just prior to the placement of lining, breaking clods, watering, compacting to density control of not lessthan 95 percent or as stipulated, dressing to required profile etc., complete with lead upto1 km and lift upto 6 m.

Cum.

164.85

40.50

16 Item No.16 :-

Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing etc.,complete with lead upto 50 m and all lifts.

Sqm.

222.45

48.35

17 Item No.17 :-

Providing and constructing 450 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing etc.,complete with lead upto 50 m and all lifts.

Sqm.

301.80

72.40

18 Item No.18 :-

Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc. complete with lead upto 50 m and all lifts.

Cum.

551.00

144.90

Page 45: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

35

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

19 Item No.19 :-

Providing and constructing longitudinal and cross graded filter drains using sand and 20mm down approved clean, hard, graded aggregates satisfying specified filter criteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compaction etc., complete as per specifications and approved drawings with lead upto 50 m and all lifts.

Cum.

870.00

192.25

20 Item No.20 :-

Dewatering by pumping out water collected with 10 to 19 HP Diesel / Electrical pumps including cost of all materials, machinery, labour, providing sump and all other ancillary operations whenever necessary etc. complete under specific & indispensable circumstances with prior approval from competent authority with authentic evidence of records justifying dewatering etc. complete.

BHP Hour

30.10

13.35

21 Item No.21 :-

Providing and Laying of Quarry Spalls of approved trap stone quality of specified thickness including hand packing etc. complete as per specifications & approved drawing as directed with lead of 50m and Lift of 1.5m etc. complete.

Cum.

256.30

35.55

Page 46: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

36

Page 47: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

37

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION 3

CONCRETE WORK INCLUDING

CENTERING, UCR MASONRY, BRICK MASONRY

AND R.C.C. PIPES

ITEM NO 22 TO 69

Page 48: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

38

Page 49: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

39

Page 50: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

40

Page 51: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

41

सामाईक दरसचूी 2017-18 संधानक कामे

सर्वसाधारण टिप्पणी (General Notes)

1.0 सांधानकाच्या कामासाठी Concrete with batching plant & Transit Mixer ची तरतदु गहृीत धरण्यात आलेली आहे. सांधानकाचे पदरमाण आदण कामाचे स्वरुप दवचारात घेता ज्या कामासाठी Batching plant चा वापर सांयशु्कमतक होत नाही अशा दठकाणी सांधानकाचे काम Mixer ने करणे अपदरहायण असल्यास त्यास सांबांधीत अधीक्षक अदभयांता याांची पवुण माहीयता घेऊन सांधानकाच्या बाबीचा मळू दर 5 टकमकमयाने कमी करण्यात यावा. तसेच अपवादात्मक पदरश्स्थतीत self loading दमकमसरच्या सहाय्याने सांधानक केल्यास त्यास सांबांधीत अधीक्षक अदभयांता याांची पवुणमाहीयता घेऊन त्या बाबीचे दर मळू दराच्या दोन टकमकमयाने कमी करावेत. तसेच या कदरता स्वतांत्र Specifications दनदवदेमध्ये अांतभुणत करावेत.

2.0 जर सांधानकाचे काम 6 मी. ककवा जास्त उांचीवर करावयाचे असेल व सांधानकाचे काम पांपाने अगर टॉवर के्रनच्या सहाय्याने करण्याचे दनयोजन असेल तर त्यासाठी अदतदरकमत रू.171.65/घमी एवढा दर अांतभूणत करण्यात यावा. मात्र अशी तरतदू सांबांदधत अधीक्षक अदभयांता याांचे पवूण माहीयतेने करावी. तसेच सदर दर पथृ:करणात 2% Sundries, 10% Over head charges व 1% Labour amenities याांचा अांतभाव असल्याने तरतदू करताना याबाबी दबुार होणार नाहीत, याची दक्षता घ्यावी.

3.0 कालव्यावरील बाांधकामाांसाठी सावणजदनक बाांधकाम दवभागाच्या दरसचूीचा अवलांब यापढेु करू नये. कालव्यावरील बाांधकामाांसाठीच्या सवण स्तरातील खोदकामासाठी सामाईक दरसचूीच्या प्रकरण-2 मधील खोदकाम या बाबींचे दर हे 1.50 पट घ्यावेत.

4.0 कामाच्या स्वरूपानसुार लागणारे सेंटरींग व शटरींग सांबांदधत बाबींच्या दरात दवचारात घेतलेले आहेत. त्यानसुार कामाचे स्वरूप दवचारात घेऊन दरसचूीतील यथायोग्य दराची दनवि करण्यात यावी. याबाबतची जबाबदारी ताांदत्रक माहीयता देणाऱ्या अदधकाऱ्याची राहील.

5.0 सन 2017-18 साठी सादहत्याच्या दराांतगणत वाळूचा दर हा Natural sand & Crushed sand साठी एकच राहील

6.0 फेरो दसमेंटचे काम हे सांबांदधत मखु्य अदभयांता याांचे माहीयतेने हाती घ्यावे. 7.0 दर ची तयार करताना M.S. / HYSD / TMT स्टीलचे वस्त ू आदण सेवाकर दवरहीत दर हे ददनाांक

01/09/2017 रोजीचे जॉइहीट प्लहॅीट कदमटीनसुार मुांबईचे दर हे त्यातील त्या वेळेस असलेला 18% GST

वगळून (उदा. JPC प्रमाणे PIG IRON चा मुांबईचा दर रु. 36580-18 x 36580 (18% GST) =

31000 प्रस्तादवत दर) दवचारात घेतलेले आहेत. (सोबत पटरटशष्ि क्र. 1 आटण 2) जॉइहीट प्लहॅीट

कदमटीचे दर हे दजल्हा मखु्यालयाच्या दठकाणचे आहेत असे गहृीत धरावे. अांदाजपत्रक करतेवेळी

दरदवचलेषणासाठी त्या त्या वेळी प्रचलीत असलेले जॉइहीट प्लहॅीट कदमटीचे दर आदण दर चीत दवचारात

घेतलेले दर यातील फरक दवचारात घ्यावा. JPC चे दर www.jpcindiansteel.nic.in या सांकेतस्थळावरून घेण्यात यावेत.

8.0 टर्टर्ध व्यासाच्या आरसीसी नटलका बसटर्णेबाबत :- दरपथृ:करणात फकमत दवदवध व्यासाच्या नदलका पसरणे व जोिणे यासाठीचा प्रदत मीटरचा दर पदरगदणत

करण्यात आलेला आहे. अांदाजपत्रके तयार करताना सांबांदधत अधीक्षक अदभयांता याांनी आर.सी.सी. पाईपचे दरानषुांगाने दवहीत पध्दतीने दनयमानसुार माहीयता देऊन सांबांधीत पाईपचे दर उपयोगात आणावेत.

Page 52: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

42

CONSUMPTION OF MATERIAL CONSIDERED IN RATE ANALYSIS

Sr No Item in brief Cement

in bags Coarse

Aggregate Fine

Aggregate

1 CC M-10 (80 MSA) per cum 4.33 0.94 0.47

2 CC M-15 (80 MSA) per cum 4.99 0.89 0.45

3 CC M-7.5 (40 MSA) per cum 3.40 0.94 0.47

4 CC M-10 (40 MSA) per cum 4.40 0.94 0.47

5 CC M-15 (40 MSA) per cum 5.2 0.89 0.45

6 CC M-15 (20 MSA) per cum 5.64 0.9 0.45

17 50 CM thick lining with precast CC slab M-10 and filling joints in CM 1:3 (20 MSA) per sqm

4.40 0.94 (Crushed metal)

0.47

18 10 CM thick CC M-10 for canal bed lining (20 MSA) per sqm

4.90 0.94 (Crushed metal)

0.47

19 M10 Canal side lining 20 MSA

a) 8 Cm thick per sqm 0.392 0.0752 0.0376

b) 10 Cm thick per sqm 0.49 0.094 0.047

20 10 Cm thick CC M-15 (20 MSA) for canal bed lining per sqm

0.564 0.09 0.045

21 a) 8 Cm thick CC M-15 (20 MSA) for canal side lining per sqm

0.4512 0.072 0.036

a) 10 Cm thick CC M-15 (20 MSA) for canal side lining per sqm

0.564 0.09 0.045

26 Cement Plaster 6 mm thick in CM 1:3 in single coat without neeru finish per sqm

0.057 - 0.006

27 Coalcrete of grade M-20 with reqd. pressure of CM 1:2 and 80 mm metal to 200 mm size stone pieces per cum

5.85 1.05 0.50

28 Coalcrete of grade M-15 with reqd. pressure of CM 1:2 and 80 mm metal to 200 mm size stone pieces per cum

4.90 1.05 0.50

29 Coalcrete of grade M-10 with reqd. pressure of CM 1:2 and 80 mm metal to 200 mm size stone pieces per cum

4.00 1.05 0.50

30 A) M-15 (80 MSA) with batching plant where overall qty. of concrete will be more than 5000 Cum

5.20 0.90 0.45

B) M-15 (40 MSA) with batching plant where overall qty. of concrete will be more than 5000 Cum

5.20 0.89 0.45

B) M-15 (20 MSA) with batching plant where overall qty. of concrete will be more than 5000 Cum

5.64 0.90 0.45

32 a) 10 Cm thick CC M-15 (20 MSA) for canal bed lining by using batching plant & transit mixer per sqm by paver

0.564 0.09 0.045

b) 8 Cm thick CC M-15 (20 MSA) for canal side lining by using batching plant & transit mixer per sqm by paver

0.4512 0.072 0.036

37 CC M-20 (20 MSA) per cum 6.60 0.90 0.45

38 CC M-25 (20 MSA) per cum 7.62 0.90 0.45

39 CC M-20 (40 MSA) per cum 6.08 0.89 0.45

40 CC M-25 (40 MSA) per cum 6.88 0.89 0.45

Page 53: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

43

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

CONCRETE WORKS

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

DAM & ALLIED WORKS

FOUNDATION & BEDDING

22 Item No.22 :- Providing and laying in situ cement concrete of grade M-10 of trap/ granite / quartzite / graded metal for foundation and bedding with Batching Plant & Transit Mixer including placing, compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

(A) M-10 (20 MSA) (Cement 4.4 bags/Cum) Cum. 3093.40 351.84

(B) M-10 (40 MSA) (Cement 4.4 bags/Cum) Cum. 3093.40 351.84

(C) M-10 (80 MSA) (Cement 4.33 bags/Cum) Cum. 3039.50 351.84

23 Item No.23 :- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite /graded metal for foundation and bedding with Batching Plant & Transit Mixer including placing, compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum. 3363.90 351.84

(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum. 3246.15 351.84

(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum. 3161.40 351.84

SUB & SUPER STRUCTURE

24 Item No.24 :- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for PCC with or without surface reinforcement / RCC concreting requiring heavy or special type of shuttering for works of gallery, sluice, spillway crest, spillway downstream face, energy dissipating structures, intake structures, training walls, piers, abutments etc. with Batching Plant and Transit mixer with shuttering and scaffolding, placing, compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

Page 54: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

44

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum. 3941.20 575.70

(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum. 3823.50 575.70

(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum. 3742.45 575.70

25 Item No.25 :- Providing and laying in situ cement concrete of grade M-20 of trap / granite / gneiss / quartzite / graded metal for RCC works of gallery, sluice, spillway crest, spillway downstream face, energy dissipating structures, intake structures, training walls, piers, abutments, slab etc. with Batching Plant and Transit mixer including shuttering and scaffolding, compacting, curing etc. complete with an initial lead of 5 km. and lift of 1.5 m.

(A) M-20 (20 MSA) (Cement 6.60 bags/Cum) Cum. 4182.75 575.70

(B) M-20 (40 MSA) (Cement 6.08 bags/Cum) Cum. 4044.85 575.70

26 Item No.26 :- Providing and laying in situ cement concrete of grade M-25 of trap / granite / gneiss / quartzite / graded metal for RCC works of gallery, sluice, spillway crest, spillway downstream face, energy dissipating structures, intake structures, training walls, piers, abutments, slab etc. with Batching Plant and Transit mixer including shuttering and scaffolding, placing, compacting, curing etc. complete with an initial lead of 5 km. and lift of 1.5 m.

(A) M-25 (20 MSA) (Cement 7.62 bags/Cum) Cum. 4439.35 575.70

CANAL & ALLIED WORKS

27

Item No.27 :- Providing and laying in situ M-15 (20 MSA) (28 days cube compressive strength not less than 15N/sqmm) grade cement concrete with clean, hard, graded aggregates for canal lining for side and bed including cost of all materials, machinery, labour, cleaning with batching plant and transit mixer placing in position, finishing with all slope of canal including scaffolding, formwork, compaction, curing, by cutting grooves, filling with sealing compound and providing porous plugs, preparation of

(Item contd. on next page)

Page 55: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

45

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

sub grade excluding royalty of materials etc. complete with an initial lead of 5 km. and lift of 1.5 m.

(A) For Bed Lining (Cement 5.64 bags/Cum) Cum. 4280.90 382.71

(B) i) For Side Lining with curing compound (Cement 5.64 bags/Cum)

Cum. 4538.90 302.49

ii)For Side Lining without curing compound i.e. by curing with water (Cement 5.64 bags/Cum)

Cum. 4443.50 390.02

28 Item No.28 :- Providing and laying in situ mechanised lining in M-15 (20 MSA)(28 days cube compressive strength not less than 15N/sqmm) grade cement concrete with clean, hard, graded aggregates for canal side and bed using vibrating cylindrical type mechanical paver including cost of all materials, machinery, labour, cleaning with batching plant and transit mixer, finishing with all slope of canal including scaffolding, formwork, compaction, curing, by cutting grooves, filling with sealing compound and providing porous plugs, preparation of sub grade excluding royalty of materials etc. complete with an initial lead of 5 km. and lift of 1.5 m.

(A) For Bed Lining (Cement 5.64 bags/Cum) Cum. 4505.65 382.71

(B) i) For Side Lining with curing compound (Cement 5.64 bags/Cum)

Cum. 4763.65 302.49

ii)For Side Lining without curing compound i.e. by curing with water (Cement 5.64 bags/Cum)

Cum. 4668.25 390.02

29 Item No.29 :- Providing & laying chip masonry back filling behind concrete lining in C.M.1:8 including striking joints, curing, scaffolding etc. complete but excluding pointing, excluding royalty of material. (35% mortar) (Cement 1.25 bags/Cum)

Cum.

1450.95

412.60

30 Item No.30 :- Providing, laying, erecting and dismantling M.S. plates form work for side lining (for steeper slopes only) (To be used with prior approval of C.E.)

Sqm. 160.95 79.77

Page 56: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

46

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

31 Item No.31 :- Providing and laying polythene film of 031 properly manufactured from 100% virgin granules confirming to I.S. 2508-1984 with 1.5 to 2.5 m. package in rolls/ as per specifications.

(A) 200 microns Sqm. 42.40 1.99

(B) 400 microns Sqm. 82.85 1.99

(C) 600 microns Sqm. 123.25 1.99

32 Item No.32 :- Providing and laying 40 and 45 cm. thick UCR masonry in C.M. 1:5 for side lining of the canal including raking joints, scaffolding and curing etc. complete excluding pointing, excluding royalty of material with lead upto 50 m. and lift upto 1.5 m. (35% mortar) (Cement 2.00 bags/Cum)

Cum.

2011.45

638.68

33 Item No.33 :- Providing and laying cement plaster 6 mm thick in C.M. 1:3 single coat without neru finish to concrete surface in all position including scaffolding, curing, including etc. complete. (Cement 0.057 bags/Sqm)

Sqm.

89.55

49.18

CANAL STRUCTURES

34 Item No.34 :- Providing and laying in situ cement concrete of grade M-10 of trap/ granite / quartzite / graded metal for foundation and bedding with Batching Plant & Transit Mixer including shuttering, placing, compacting, curing, etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

(A) M-10 (20 MSA) (Cement 4.4 bags/Cum) Cum. 3629.75 683.24

(B) M-10 (40 MSA) (Cement 4.4 bags/Cum) Cum. 3629.75 683.24

(C) M-10 (80 MSA) (Cement 4.33 bags/Cum) Cum. 3575.80 683.24

35 Item No.35 :- Providing and laying in situ cement concrete of grade M-15 of trap/granite/gneiss/quartzite/ graded metal for foundation and bedding by Batching Plant and Transit Mixer including shuttering,scaffolding,placing,compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

(Item contd. on next page)

Page 57: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

47

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum. 3900.20 683.24

(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum. 3782.45 683.24

(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum. 3697.70 683.24

36 Item No.36 :- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for RCC works of retaining walls, piers, abutments, etc. with Batching Plant & Transit mixer, including shuttering, scaffolding, placing, compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

(A) M-15 (20 MSA) (Cement 5.64 bags/Cum)

i) For Abutment, wing walls, returns, transition walls

Cum. 4451.60 773.58

ii) For Piers Cum. 4560.35 815.76

(B) M-15 (40 MSA) (Cement 5.20 bags/Cum)

i) For Abutment, wing walls, returns, transition walls

Cum. 4333.85 773.58

ii) For Piers Cum. 4442.65 815.76

(C) M-15 (80 MSA) (Cement 4.99 bags/Cum)

i) For Abutment, wing walls, returns, transition walls

Cum. 4252.85 773.58

ii) For Piers Cum. 4361.60 815.76

37 Item No.37 :- Providing and laying in situ cement concrete of grade M-20 of trap / granite / gneiss / quartzite / graded metal for RCC works of abutment, wing walls, returns, transition walls, columns, beams and slabs, diaphram walls, Road slabs trough (Box Culvert) trough for aqueduct, wearing coat, etc. with Batching Plant and Transit mixer including shuttering, scaffolding, placing, compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

(A) M-20 (20 MSA) (Cement 6.60 bags/Cum)

i) For Abutment, wing walls, returns, transition walls

Cum. 4693.10 773.58

ii) For Piers Cum. 4801.85 815.76

iii) Columns Cum. 6324.65 1406.19

iv) Beams and slabs Cum. 6564.15 1373.76

Page 58: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

48

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

v) Road Slab, kerb, super passage/slab culvert etc.

Cum. 6385.65 1312.10

vi) Trough resting on ground Cum. 5859.65 1130.43

vii) Trough for aqueduct Cum. 7080.70 1552.17

viii) Wearing Coat and other required concrete Cum. 3605.40 351.84

(B) M-20 (40 MSA) (Cement 6.08 bags/Cum)

i) For Abutment, wing walls, returns, transition walls

Cum. 4555.25 773.58

ii) For Piers Cum. 4664.05 815.76

38 Item No.38 :- Providing and laying in situ cement concrete of grade M-25 of trap / granite / gneiss / quartzite / graded metal for RCC works of columns, beams and slabs, diaphram walls, Road slabs trough (Box Culvert) trough for aqueduct, wearing coat, etc. with Batching Plant and Transit mixer, including shuttering, scaffolding, placing, compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

(A) M-25 (20 MSA) (Cement 7.62 bags/Cum)

i) Columns Cum. 6581.25 1406.19

ii) Beams and slabs Cum. 6820.75 1373.76

iii) Road Slab, kerb, super passage / slab culvert etc.

Cum. 6642.25 1312.10

iv) Trough resting on ground Cum. 6116.25 1130.43

v) Trough for aqueduct Cum. 7337.30 1552.17

vi) Wearing Coat Cum. 3862.00 351.84

39 Item No.39 :- Providing and laying in situ cement concrete of grade M-30 for trough of aqueduct etc. of trap / granite / gneiss / quartzite / graded metal with Batching Plant and Transit mixer, including shuttering, scaffolding including placing, compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

(A) M-30 (20 MSA) for trough of aqueduct (Cement 9.20 bags/Cum)

Cum. 7682.90 1552.17

(B) M-30 (20 MSA) for slab (Cement 9.20 bags/Cum)

Cum. 7166.35 1373.76

Page 59: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

49

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

40 Item No.40 :- Providing and laying expansion / construction joint with 18 SWG copper plate and shalitex expansion pad below and above the copper plate including sealing the joint with shalitex sealing compound etc. complete including 50x50x5 mm angle frame with stainless steel bolts etc. (For all slab thickness).

(A) 60 cm wide copper plate Sqm. 11942.85 369.52

(B) 37.50 cm wide copper plate Sqm. 13865.05 591.23

41 Item No.41 :- Providing and laying expansion / construction joint with shalitex super expansion pad (jute fiber) 12 mm thick including sealing the joint with shalitex sealing compound etc. complete (For all slab thickness).

Sqm.

1033.95

135.40

42 Item No.42 :- Providing and fixing G.I. sheet 24 gauge and 22.5 cm. wide for the construction joint in R.C.C. trough wall including cutting 15 cm. overlap, riveting the joints and fixing in position etc. complete.

Rmt.

163.60

27.58

43 Item No.43 :- Cutting, bending, hooking, laying in position and tying M.S./HYSD/TMT bars for reinforcement of R.C.C. work as per detailed drawing etc. complete.

MT

7062.85

6460.49

Ferro Cement (Items to be implemented with prior permission of Chief Engineer)

44 Item No.44 :- Providing and Fixing and errecting, welding 8 mm MS bar @ 200 mm C/c both ways for ferrocement walling witu welded mesh of size 100x100x2.30 mm and chiken mesh 3 layers.

Sqm

694.55

85.47

45 Item No.45 :- Providing and casting Ferro cement wall in C.M. 1:3 including curing etc complete.

(A) 30 mm thick wall Sqm. 405.10 274.81

(B) 40 mm thick wall Sqm. 533.15 366.04

(C) 50 mm thick wall Sqm. 660.60 458.38

Page 60: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

50

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

CENTERING ITEMS

46 Item No.46 :- Providing, erecting and laying steel shuttering formwork and making surface suitable for concreting including dismantling etc. complete.

(A) For abutments, piers, wings, returns etc. Sqm. 334.65 129.76

(B) For RCC Solid / Deck slab / Box Cells / Trough of Aqueduct etc.

Sqm. 375.70 129.76

(C) For curved surface Sqm. 401.60 155.72

47 Item No.47 :- Providing and erecting steel props centering

(A) Up to 3.00 m height including bracing, strengthening and dismantling etc. complete.

Sqm. 185.40 79.29

(B) Rate for centering for every Additional 1.00 m height

Sqm. 67.10 39.65

U.C.R. MASONARY

48 Item No.48 :- Providing U.C.R. masonry in C.M. 1:5 in foundation upto 0.5 m above G.L. with 50 m. lead and lift upto 1.5 m. including striking joints, curing, excluding royalty of material etc. complete.

(A) Thickness of wall upto 1 m (30% morter)

Cum.

1606.20

369.56

(B) Walls of water retaining structures thinner than 1.0 m. and walls of structures thicker than 1.0 m. other than dams and water retaining structures. (35% mortar).

Cum. 1623.40 298.54

(C) For dams and water retaining structures (45% mortar)

Cum. 1797.30 298.54

49 Item No.49 :- Providing U.C.R. masonry in C.M. 1:6 in foundation upto plinth with 50 m. lead and lift upto 1.5 m. including striking joints, curing excluding royalty of material etc. complete.

(A) (30% mortar) Cum. 1535.75 369.56

(B) (35% mortar) Cum. 1540.35 298.54

(C) (45% mortar) Cum. 1689.15 298.54

Page 61: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

51

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

50 Item No.50 :- Providing U.C.R. masonry in C.M. 1:5 in superstructure with 50 m. lead and lift upto 1.5 m. including striking joints and excluding royalty of material etc. complete

(A) Thickness of walls upto 1 m. (30% mortar) Cum. 1624.70 388.04

(B) Walls of water retaining structures thinner than 1.0 m. and walls of structures thicker than 1.0 m. other than dams and water retaining structures. (35% mortar).

Cum. 1638.30 313.46

(C) For dams and water retaining structures (45% mortar)

Cum. 1821.45 322.68

51 Item No.51 :- Providing khandki facing to the face of masonry with pointing in C.M. 1:2 including finishing to the required shape & slope with necessary scaffolding, curing and excluding royalty of material etc. complete with lead of 50m. (It is assumed that the Khandkis are of the size 20cm x 20cm. No mortar for jointing is taken into account, only face pointing of joint is considered).

(A) With khandki facing on one side Sqm. 1397.65 81.79

(B) With khandki facing on both side. Sqm. 1346.55 81.79

52 Item No.52 :- Providing and laying dry stone rubble masonry excluding pointing and royalty of material.

Cum.

799.60

216.25

53 Item No.53 :- Providing pointing with cement mortar for stone masonry including racking joints, scaffolding, curing excluding royalty of material etc. complete.

(A) In Cement mortar 1:3 Sqm. 39.70 28.05

(B) In Cement Mortar 1:2 Sqm. 43.80 28.31

54 Item No.54 :- Providing and constructing coarse rubble masonry II sort in C.M. 1:4.5 for super structure with lead upto 50m. and lift upto 1.5m. including striking joints, curing excluding royalty of material etc. complete excluding cement pointing etc. complete. 30% mortar.

Cum.

4012.25

610.99

Page 62: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

52

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

55 Item No.55 :- Cutting rectangular grooves of size 10 cm x 10 cm in stone masonry including clearing pointing etc. to facilitate smooth working of needles etc. complete.

Rmt.

1007.65

1007.65

56 Item No.56 :- Providing and laying rough dressed cut stone coping 23 cm. thick in C.M. 1:5 excluding cement pointing but including watering with lead 50 m. and lift upto 1.5 m., excluding royalty of material etc. complete.

Cum.

4743.40

2148.88

57 Item No.57 :- Providing coalgrout U.C.R. masonry in C.M. 1:3 (43% mortar) proper packing rubble and of the required shape and quality with the coalgrout at required pressure with 50 m. lead and lift upto 1.5 m. including scaffolding, watering and excluding royalty of material etc. complete. (Excluding formwork and staging)

Cum.

2486.65

291.19

BRICK MASONARY

58 Item No.58 :- Providing B.B. masonry with conventional I.S. type bricks for super structure including striking joints, watering, scaffolding with lead upto 50 m. and lift upto 1.5 m., including cost of material and excluding royalty of material.

Cum.

4127.95

413.18

59 Item No.59 :- Providing B.B. masonry with conventional I.S. type bricks in cement mortar 1:5 in super structure upto floor level including mild steel reinforcement of 2 bars of 6 mm dia. placed by every 3rd course properly bent, bounded at ends, scaffolding, watering etc. complete with lead upto 50 m. and lift upto 1.5 m. including cost of material and excluding royalty of material.

Sqm.

563.65

56.69

PIPE LAYING

60 Item No.60 :- Laying and jointing R.C.C. pipe of NP2 class or IRC standard in C.M. 1:2, proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc. complete with lead up to 50 m and all lifts. (Item contd. on next page)

Page 63: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

53

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

(A) 1200 mm dia Rmt. 389.90 235.71

(B) 1000 mm dia Rmt. 291.75 176.86

(C) 900 mm dia Rmt. 280.30 176.86

(D) 800 mm dia Rmt. 268.85 176.86

(E) 600 mm dia Rmt. 205.65 147.44

(F) 450 mm dia Rmt. 159.05 118.02

(G) 300 mm dia Rmt. 141.65 118.02

61 Item No.61 :- Laying and jointing R.C.C. pipe of NP3 class or IRC standard in C.M. 1:2, proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc. complete with lead up to 50 m and all lifts.

(A) 1200 mm dia Rmt. 460.60 306.42

(B) 900 mm dia Rmt. 333.35 229.92

62 Item No.62 :- Laying and jointing R.C.C. pipe of P1 class of 900 mm dia or IRC standard in C.M. 1:2, proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc. complete with lead up to 50 m and all lifts.

Rmt.

333.35

229.92

63 Item No.63 :- Providing and laying in situ cement concrete of grade M-20 of trap / granite / gneiss / quartzite / graded metal for Staunch wall with Batching Plant & Transit Mixer, including shuttering, scaffolding, placing, compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m.

Cum.

6917.60

1636.51

64 Item No.64 :- Providing and fixing RCC Boundary / Guard / Chainage blocks of size 75 x 20 x 20 cm including excavation and fixing in a block of 45 x 45 x 45 cm in M-15 Concrete with oil painting of two coats, lettering etc. complete, height of stone above GL 40 cm.

No.

616.45

97.41

Page 64: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

54

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

65 Item No.65 :- Providing and fixing RCC Km / half km / submergency boundary blocks of size 95 x 20 x 20 cm including excavation and fixing in a block of 45 x 45 x 45 cm in M-15 Concrete with oil painting of two coats, lettering etc. complete, height of stone above GL 60 cm.

No.

731.95

152.78

66 Item No.66 :- Providing and fixing canal information board of 1.2 x 0.75 m prepared on 16 gauge M.S. sheet with angle iron frame of size 35 X 35 X 3 mm with cross bracing of size 25 X 25 X 3 mm including painting with one coat of zinc chromate storing primer and two coats each of green/white back ground and back side grey store enamelled bonded with red retro reflective sheet Engineering grade, border / letters / numeral / arrows coated with non pealable crystal clear protective transparent coat retaining 100% reflection including two angle iron post of size 50X50X5 mm of 3.65 m long inflated at bottom drilled on top and painted in white and black bonds of 30 cm with four numbers high strength of G.I. bolts and nuts of size 10 mm dia. and 20 mm long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete in M-15 block of size 60 X 60 X 75 cm as directed by engineer-in-charge.

No.

4474.15

1831.32

67 Item No.67 :- Providing and laying rubble soling below foundation in layers including filling with rubble chips, murum etc. complete (excluding royalty of material)

Cum.

817.60

373.62

68 Item No.68 :- Back filling up to ground level behind the canal structures etc. complete (without royalty) with suitable material of approved quality in layers not exceeding 20 cm without disturbing the structure etc. complete.

Cum.

32.95

2.23

Page 65: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

55

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

69 Item No.69 :- Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm dia. Steel dowel rods on either side at 1 m interval, forming 125 X 125 size groove in between 2 water stops for filling asphalt, fixing 15 mm dia. two legged G.I. pipe with U-bend at bottom for circulating steam at interval and forming 150 mm ida. formed drain behing water seals including cost of all materials, machinery, labour, filling asphalt in groove, circulation of steam at intervals, vulcanizing water seal joints etc. complete with all leads and lifts.

Rmt.

1369.20

125.11

Page 66: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

56

Page 67: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

57

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-4

MAINTENANCE AND REPAIRS

ITEM NO 70 TO 93

Page 68: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

58

Page 69: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

59

Page 70: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

60

Page 71: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

61

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

MAINTAINANCE & REPAIRS

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

70 Item No.70 :- Dismantling the Stone Masonary in cement morter including stacking the material as directed with 15 m. lead and 1.5 mtr. lift

Cum.

168.25

168.25

71 Item No.71 :- Dismantling the old lime concrete or cement concrete including stacking the material as directed with 15 m. lead and 1.5 mtr. Lift.

Cum.

202.70

202.70

72 Item No.72 :- Dismantling R.C.C. works and removing the stuff to a distance of 15 m and 1.50 mtr. lift including stacking etc. complete as directed.

Cum.

304.05

304.05

73 Item No.73 :- Cleaning cutting thorny shrubs bushes, grass as directed with 15m lead and lift up to 1.5m.

Sqm.

1.90

1.90

74 Item No.74 :- Cutting down trees including cutting trunks & branches and stacking the material as directed with 15 mtr. lead and lift up to 1.5 mtr. etc. complete including up roofing and refilling the pit with material as directed (excluding extra material required for refilling)

(A) Girth between 30 cm to 60 cm No. 195.30 154.18

(B) Girth between 60 cm to 90 cm No. 233.90 192.78

(C) Girth between 90 cm to 1.5 mtr. No. 426.65 385.53

(D) Girth between 1.50 mtr to 3.00 mtr. No. 619.30 578.18

(E) Girth between 3.00 mtr to 4.50 mtr. No. 1004.80 963.68

75 Item No.75 :- Numbering road and canal sites trees including painting etc. complete.

No.

11.55

5.33

76 Item No.76 :- Removing dry silt from the canal bed and stacking as directed with 15 mtr. lead and 1.50 mtr. lift etc. complete.

Cum.

45.60

45.60

Page 72: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

62

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

77 Item No.77 :- Removing wet silt from canal bed with 15.00 mtr. lead and 1.50 mtr. lift including depositing the excavated stuff as directed.

Cum.

67.15

67.15

78 Item No.78 :- Removing old paint from steel and other surface with flame, cleaning and making the surface even including scaffolding etc. complete.

Sqm.

33.90

30.39

79 Item No.79 :- Providing and applying Primer Red Oxide Paint in two coats including surface preparation, chipping the welding, cleaning spatters, dust etc. complete.

Sqm.

184.40

99.10

80 Item No.80 :- Providing and applying anticorrosive coal tar black paint IS 290-1961 in two coats including surface preparation, chipping the welding, cleaning spatters, dust etc. complete.

Sqm.

246.65

197.20

81 Item No.81 :- Providing and applying anticorrosive H.D. black paint for upstream side in two coats including surface preparation, chipping the welding, cleaning spatters, dust etc. complete.

Sqm.

244.55

131.90

82 Item No.82 :- Providing and applying two coats of flat oil paint of approved colour and shade to internal/external plastered surfaces including scaffolding if necessary clearing and preparing surfaces excluding primer paint.

Sqm.

68.00

33.00

83 Item No.83 :- Providing and applying two coats of flat oil paint of approved colour to the old structural steel work and iron work previously painted including scaffolding if necessary clearing & preparing surface excluding primer coat etc. complete.

Sqm.

65.75

33.30

84 Item No.84 :- Providing and applying two coats of lead/zinc base oil paint/bituminous paint of approved colour and shade to wood work/fibre boards previously painted including scaffolding if necessary, preparing surface excluding primary coat etc. complete.

Sqm.

87.00

42.60

Page 73: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

63

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

85 Item No.85 :- Providing and applying coal tar in one coat on previously painted wood work including preparing the surface scaffolding etc. complete.

Sqm.

18.55

11.20

86 Item No.86 :- Applying geru wash and white wash to canal road side Km stones / Boundary stones/ Ch. stones/bottom of trees, etc.

No.

47.95

38.60

87 Item No.87 :- Removing M.S. needles from the K.T. Weir opening before onset of the mansoon for Passing the flood water through the K.T. Weir openings including conveying the same up to the river banks, stacking the same as directed with all leads and lifts etc. complete.

No.

119.50

116.60

88 Item No.88 :- Transportation of M.S. Needles from the river bank to the store shed / safe place or from store shed/safe place to river bank by Bullock cart including loading unloading and stacking as directed with all leads and lifts etc. complete (Lead Half km)

No.

37.30

37.30

89 Item No.89 :- Providing supplying and applying 1 coats of red oxide to the steel structure as a primary coat including cleaning, scrubbing for preparing the surface to apply paint with lead up to 15 mt. and lift up to 1.50 mt.etc complete.

Sqm.

132.45

84.20

90 Item No.90 :- Fixing of M.S. Needles in weir openings after offset of the mansoon for storage of Water from post mansoon river flow and making it water tight by using wooden pegs, Dungry cloth & empty cement bags etc. with all leads & lifts and including all material and labour etc. complete.

Needle

381.75

111.60

Page 74: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

64

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

91 Item No.91 :- Cleaning by redrilling the vertical porous drain pipes including removing of leaching material, grout material if any inside of the V.P.D. etc complete with all leads and lifts. (Vertical upward drilling)

(A) From 0 to 5 m. Rmt. 6167.30 1054.00

(B) From 5 to 10 m. Rmt. 6784.00 1159.40

(C) From 10 to 15 m. Rmt. 7400.75 1264.80

(D) From 15 to 20 m. Rmt. 7709.10 1317.50

92 Item No.92 :- Providing and applying single coat of epoxy primer (4.42 sqm per kg) (Resin : Hardner 2:1) on old UCR / concrete surface etc. Complete.

Sqm.

363.10

80.10

93 Item No.93 :- Providing & applying of Epoxy Mortar layers to Monolith joint of Masonry Dam with all lead & lift etc. complete.

Kg.

167.40

52.30

Page 75: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

65

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-5

TUNNEL WORKS

ITEM NO 94 TO 106

Page 76: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

66

Page 77: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

67

Page 78: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

68

Page 79: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

69

सामाईक दर ची सन 2017-18

बोगदा कामे

सर्वसाधारण टिप्पणी

बोगदा व दववर खोदकामाचे दर ठरदवताना वापरलेली गदृहतके रेखादचत्राांसह सोबत

जोिलेली आहेत. प्रत्यक्ष कामाचे दठकाणच्या के्षदत्रय पदरश्स्थतीनसुार गदृहतकाांमध्ये बदल होत

असल्यास सोबतच्या दरसचूीतील गदृहतकाांच्या ढाच्याच्या आधारे सधुादरत दरपथृ:करणास सक्षम

स्तरावर माहीयता देण्यात यावी.

Page 80: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

70

Page 81: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

71

COMMON SCHEDULE OF RATES FOR 2017-18 TUNNEL WORKS

General Assumptions ( गहृितके)

Item No. 94 :- Excavation of tunnel in all types of rock through itself / adit by drilling and smooth control perimeter blasting, mucking, disposing muck in muck yard, lighting, ventilation inside tunnel with initial lead of 1Km (From Average face to Dump yard 500 m & including length of Adit as 1Km etc. Complete.

प्रवेश भुयाराद्वारे बोगदा खोदाई कामासाठी खालील प्रमाणे गहृितके गहृित धरणेत आली आिेत.

Cross Section & Drilling Pattern Considered (Elevation & Pattern Drawing attached Separately)

Assumption :- I) General:- Distance of starting face of tunnel from Dumping yard including length of Adit = 500 m Length of tunnel to be excavated from face is 1 Km. Average length of tunnel = 500 m Average lead= 500 + 500 = 1000 m (1Km)

i.e. Initial Lead =1 Km Most common type of tunnel D- Shaped with 6.50m Dia & 6.50 m Height (Min. Exc.Line) Pay line 150mm. C/S area upto MEL – 38.745 Sqm C/S area upto Payline – 42.31 Sqm II) Drilling Pattern:- 4.65 m Depth of drilling = 3.00m Pull = (2.16m) 72% Total No of Holes per section = 103 Nos. , Total length of drilling = 309 Rmt. III) Quantity of Excavation:- Qty. excavated per pull=(Pull X payline area)=2.16 X 42.31=91.37 Cum Say 92 Cum Loose Qty.= 1.50 X Compact Qty. = 92 X 1.5 = 138 Cum

Page 82: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

72

Page 83: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

73

Item No. 95 :- Excavation of tunnel in all type of rock through shaft by drilling and smooth control perimeter blasting, mucking, disposing muck in muck yard, lighting, ventilation inside tunnel with initial lead of 1Km (From Average face to Dump yard) and Initial lift of 50m etc. Complete.

हववराद्वारे (Shaft) द्वारे बोगदा खोदाई कामासाठी खालील प्रमाणे गहृितके गहृित धरणेत आली आिेत.

Cross Section & Drilling Pattern Considered (Elevation & Pattern Drawing attached Separately)

50 m

Assumption :- I) General:- Distance of starting face of tunnel from Dumping yard including length of Adit = 500 m Length of tunnel to be excavated from face is 1 Km. Average length of tunnel = 500 m, Lead from shaft top to Dump yard= 500 m

Distance from Average face of tunnel to Dump yard =1000m (i.e. Initial Lead = 1Km) Depth of Shaft already excavated = 50 m, Lift from shaft bottom to shaft top =50 m

Most common type of tunnel D- Shaped with 6.50m Dia & 6.50 m Height (MEL) Pay line 150mm. C/S area upto MEL – 38.745 Sqm C/S area upto Payline – 42.31 Sqm

II) Drilling Pattern:- 4.65 m Depth of drilling = 3.00m Pull = (2.16m) 72% Total No of Holes per section = 103 Nos. , Total length of drilling = 309 Rmt.

III) Quantity of Excavation:- Qty. excavated per pull=(Pull X payline area)=2.16 X 42.31=91.37 Cum Say 92 Cum Loose Qty.= 1.50 X Compact Qty. = 92 X 1.5 = 138 Cum

Page 84: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

74

Page 85: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

75

Item No. 96 :- Excavation of Shaft in all type of rock by drilling and smooth control perimeter blasting, mucking, disposing muck in muck yard, lighting, ventilation inside shaft with initial lead of 500 m (From Top of Shaft to Dump yard ) & Initial lift of 25 m etc. Complete. Shaft खोदाई कामासाठी खालील प्रमाणे गहृितके गहृित धरणेत आली आिेत.

Cross Section & Drilling Pattern Considered (Pattern Drawing attached Separately):- Assumption :- I) Genaral Size of Shaft = 12 X 5 m Average depth of shaft = 25m

50 m Lead from shaft top to dumping yard is 500m Rectangular shaped construction shaft with

dimensions 12m length x 5m width.(MEL) Pay line 150mm. C/S area upto MEL – 60.00 Sqm. C/S area upto Payline – 65.19 Sqm. II) Drilling Pattern:- Consider depth of drilling = 1.50m Pull = (0.90m) 60% Consider 2.45 No of holes per Sqm area Total No of Holes per section = 160 Nos. Total length of drilling = 240 Rmt.

III) Quantity of Excavation:- Qty. excavated per pull=(Pull X payline area)= 0.90 X

65.19=58.67 Cum Say 59 Cum Loose Qty.= 1.50 X Compact Qty. = 59 X 1.5 = 88.5

= Say 89 Cum

Page 86: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

76

Page 87: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

77

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

TUNNEL & ALLIED WORKS

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

94 Item No.94 :- Excavation of tunnel in all type of rock through itself / adit by drilling and smooth control perimeter blasting, mucking, disposing muck in muck yard, lighting, ventilation inside tunnel considering cross section of tunnel as D-shaped with 6.5 m. bottom width & 6.5 m. height with initial lead of 1 Km (From Average face to Dump yard including length of Adit) etc. Complete.

Cum.

1795.00

552.38

95 Item No.95 :- Excavation of tunnel in all type of rock through Shaft by drilling and smooth control perimeter blasting, mucking, disposing muck in muck yard, lighting, ventilation inside tunnel considering cross section of tunnel as D-shaped with 6.5 m. bottom width and 6.5 m. height with initial lead of 1 Km (From Average face to Dump yard ) & Initial lift of 50 m etc. Complete.

Cum.

2459.00

552.38

96 Item No.96 :- Excavation of Shaft in all type of rock by drilling and smooth control perimeter blasting, mucking, disposing muck in muck yard, lighting, ventilation inside shaft considering size of shaft as Rectangular shape 12 x 5 m. and total depth of 50 m. with initial lead of 500 m (From Top of Shaft to Dump yard) & Initial lift of 25 m etc. Complete.

Cum.

2417.00

1013.34

97 Item No.97 :- Providing and fixing steel rock bolts of various lengths with resin bond cement capsule anchorage including drilling holes, inserting grout capsule, driving bolt, fixing 10 mm thick plate and nuts and tightening the same by torque wrench after hardening of cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc complete with lead upto 1km and all lifts. Total weight of rock bolts 3.10X2.98X10 = 92.38 kg

Kg.

199.00

18.18

98 Item No.98 :- Providing and fixing steel rock bolts of various lengths with mechanical/wedge type anchorage including drilling holes, providing tapered steel (Item contd. on next page)

Kg.

139.00

18.18

Page 88: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

78

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

wedge, plate and nuts and tightening the same by torque wrench after hardening of cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc complete with lead upto 1km and all lifts. Total weight of rock bolts 3.10X2.98X10 = 92.38 kg

99 Item No.99 (A) :- Providing and fixing steel Anchor with resin bond cement capsule anchorage including drilling holes, inserting grout capsule, driving anchor, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc complete with lead upto 1km and all lifts. Total weight of 25 mm steel 3.375X3.85X10 =129.94 kg

Kg.

117.00

11.13

Item No.99 (B) :- Providing and fixing steel Anchor with resin bond cement capsule anchorage including drilling holes, inserting grout capsule, driving anchor, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc complete with lead upto 1km and all lifts. Total weight of 32 mm steel 4.32X6.32X10 =273.02 kg

Kg.

84.00

5.30

100 Item No.100 :- Providing, fabricating and fixing in position permanent structural steel supports as per details including cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting, ventilation, drainage and all other ancillary operations etc. complete with initial lead upto 1 Km and all lifts.

MT.

86609.00

15860.58

101 Item No.101 :- Providing fabricating and placing in position reinforcement steel for tunnel RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding joints wherever required, tying with binding wire including cost of all materials, labour, machinery, ventilation, lighting, drainage etc. complete with initial lead upto 1 km and all lift.

MT.

45252.00

--

Page 89: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

79

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

102 Item No.102 :- Drilling 32mm diameter grout holes in concrete / rock by percusion drilling using jack hammer as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lightening, drainage and all other ancillary operations etc., complete.

Consider 100 m drilling for analysis

Rmt.

352.00

52.08

103 Item No.103 :- Grouting cement slurry in grout holes under specified pressure for consolidation / contact grouting including cost of all materials, machinery, labour, redrilling wherever necessary ventilation, lightening, drainage and other ancillary operations etc., complete with lead upto 1 Km and all lifts.

Average progress of grouting per shift considered = 1.50 MT

MT.

9355.00

1410.98

104 Item No.104 :- Providing and applying M-28 plain Wet shotcrete 50 mm thick in layers as directed including admixtures, scaffolding, necessary machinery, labours, ventilation, lighting, drainage and all other ancillary operations etc. complete with lead upto 5 Km & all lifts.(By non robotic machine.) (Excluding Royalty)

Qty of Shotcrete excluding rebound 16.00/1.30 = 12.31 Cum

Area covered by concrete 12.31/0.05 = 246.00 Sqm

Sqm.

808.00

41.67

105 Item No.105 :- Providing & laying insitu vibrated M-20 grade cement concrete using 20mm clean, hard, graded aggregates crushed from tunnel muck for Side and Arch lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator car, placing in position, laying, vibrating, finishing, curing, ventilation, lighting, draining and all other ancillary operations etc., complete with lead upto 5 Km and all lifts for Tunnel. (Excluding Royalty)

Cum.

5649.00

1002.38

Page 90: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

80

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

106 Item No.106 :- Providing & laying in situ vibrated M-20 grade cement concrete using 20mm clean, hard, graded aggregates crushed from tunnel muck for Invert (Kerb and bed) lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator car, placing in position, laying, vibrating, finishing, curing, ventilation, lighting, draining and all other ancillary operations etc., complete with lead upto 5 Km and all lifts for Tunnel.

(Excluding Royalty)

Cum.

5569.00

1343.19

Page 91: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

81

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-6

LIFT IRRIGATION SCHEME

ITEM NO 107 TO 129

Page 92: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

82

Page 93: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

83

Page 94: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

84

Page 95: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

85

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

LIFT IRRIGATION SCHEME

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

107 Item No.107 :- Excavation for deep trenches for laying rising main in Earth, Soil of all types, sand, gravel and soft murum including trimming to correct line, level and to specified widths including removing the excavated material and stacking or spreading the same upto a distance of 15 metres and lifts of 1.5 m as directed, preparing the bed for foundation and necessary safety precautions , keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation)

Cum.

76.20

20.00

108 Item No.108 :- Excavation for deep trenches for laying rising main in Hard murum, soft bhisa, hard man and boulder including trimming to correct line and level and to specified width, including removing the excavated material and stacking or spreading the same upto a distance of 15 metres and lifts of 1.5 m as directed, preparing the bed for foundation and necessary safety precautions , keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation)

Cum.

93.10

27.00

109 Item No.109 :- Excavation for deep trenches for laying rising main in Soft Rock by crow bar and shavel including trimming to correct line and level and to specified width including trimming and levelling the bed by chiselling, removing the excavated material and stacking the same upto a distance of 15 metres and lifts of 1.5 m as directed and safety precautions to keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation)

Cum.

112.90

25.00

Page 96: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

86

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

110 Item No.110 :- Excavation for deep trenches for laying rising main in Hard Rock of any toughness by blasting to correct line and level and to specified width including trimming and levelling the bed as directed, removing the excavated material and sorting, stacking the same upto a distance of 15 metres and lifts of 1.5 m as directed, preparing the bed for foundation and keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation)

Cum.

411.20

348.40

111 Item No.111 :- Murum bedding in trenches with murum of approved quality in layers not exceeding 150 mm to 200 mm, each layer shall be consolidated by watering and ramming as directed etc complete.

Cum.

151.10

109.50

112 Item No.112 :- Providing and filling in sand boxing in trenches with sand of approved quality including watering and compaction as directed etc complete.

Cum.

764.20

107.10

113 Item No.113 :- Backfilling the trenches in layers not exceeding 300 mm, each layer shall be consolidated by watering and ramming without disturbing the pipe line with excavated stuff as directed including breaking of clods of soil etc complete. (The backfilling on the two sides of the pipeline should be carried out simultaneously)

Cum.

157.90

157.90

114 Item No.114 :- Manufacturing, Providing and Supplying spirally welded / ERW / SAW / fabricated M.S. pipes (Commercial Quality) made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size, rolling, tack welding, assembling in suitable lengths to form pipes, all continuous spiral/circumferential and longitudinal welding to form a pipe on automatic welding machine using electrodes having weldmark E7018 (Low Hydrogen electrodes) and forming 'V' edge on both ends of pipes,

(Item contd. on next page)

Kg.

66.25

12.40

Page 97: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

87

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

third party inspection charges, lowering and laying to correct position on prepared bedding or on pedastals or chairs, field hydraulic testing at specified test pressure as per IS 5822: 1994 sec 11, field welding to join pipes after laying, Radiographic (5%) and ultrasonic (10%) testing of welds including all equipments submitting report, expert personnel required for testing, interpreting and submitting report along with develop film where applicable, all incidental charges etc complete as per IS - 3589:2001 and as per specifications (No negative Tolerance in thickness is permissible).

115 Item No.115 :- Lowering, laying in position to correct line & level including M.S. pipes with / without any outcoating on prepared bedding or on pedaetals or chairs or upon prepared formation including loading, unloading, hoisting, marginal cutting wherever required, assembling and tack welding, and transportation upto 500 m etc. completed as specified with all lead & lift etc. complete including field hydraulic testing at specified pressure and as per procedure mentioned in section 11 of IS 5822: 1994. (item to be used only in situations where pipes are already procured)

Kg.

6.70

3.89

116 Item No.116 :- Manufacturing, Providing and Supplying tapers made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on both ends for welding it to pipe, including fabrication & full welding of stiffeners as per design requirements, third party inspection charges, lowering & laying to correct position etc, complete as per IS - 3589 and IS - 5504 as applicable and as per detailed specifications. Cost of longitudinal welding and " V " edging required for circumferencial welding required to connect MS special to Rising main / delivery pipes is inclusive in the rate however circumferencial welding for connecting the M.S. special to Rising main shall be paid separately on running meter basis. (No negative Tolerance in thickness is permissible)

Kg.

69.70

14.85

Page 98: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

88

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

117 Item No.117 :- Manufacturing, Providing and Supplying "Y" connection with Crotch plate made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on all the three ends for welding it to pipe, including fabrication and full welding of crotch plate and stiffeners as per design requirements, third party inspection charges ,lowering & laying to correct position etc, complete as per IS - 3589 and IS - 5504 as applicable as per detailed specifications. Cost of welding of crotch plate is included in the rate. Cost of longitudinal welding and " V " edging required for circumferencial welding required to connect MS special to Rising main /delivery pipe is inclusive in the rate however circumferencial welding required for connecting Y-piece to Rising main / manifold pipe shall be paid separately on running meter basis. (No negative Tolerance in thickness is permissible).

Kg.

80.00

18.60

118 Item No.118 :- Manufacturing, Providing and Supplying "Y" and "T" branches with collar plate made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on both ends for welding it to pipe, including fabrication & full welding of collar plate and stiffeners as per design requirements, third party inspection charges ,lowering & laying to correct position etc, complete as per IS - 3589 and IS - 5504 as applicable as per detailed specifications. Cost of "V" edging, machining and welding of collar plate in "Y" and "T" connection is included in the rate. Cost of longitudinal welding and "V" edging required for circumferencial welding required to connect MS special to Rising main / delivery pipes is inclusive in the rate however circumferencial welding required to connect Y/T to Rising main or manifold shall be paid separately on running meter basis. (No negative Tolerance in thickness is permissible).

Kg.

71.30

16.10

Page 99: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

89

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

119 Item No.119 :- Manufacturing, Providing and Supplying manhole covers made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding and full welding on either automatic welding machine or manually and forming 'V' edge on both ends, including fabrication and full welding of stiffeners as per design requirements, lowering & laying to correct position etc, third party inspection charges complete as per IS - 3589 and IS - 5504 as applicable and as per detailed specifications. Cost of longitudinal welding and 'V' edging required for circumferencial welding required to connect MS special to Rising main /delivery pipes is inclusive in the rate however circumferencial welding required for connecting man hole to Rising main shall be paid separately on running meter basis. Cost of washers , nuts, bolts, etc. required for fixing manhole cover is included in the rate. (No negative Tolerance in thickness is permissible).

Kg.

71.30

16.10

120 Item No.120 :- Manufacturing, Providing and Supplying M S bends made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on both ends for welding it to pipe, including fabrication & full welding of stiffeners as per design requirements, lowering & laying to correct position, third party inspection charges etc, complete as per IS - 3589 and IS - 5504 as applicable as per detailed specifications. Cost of longitudinal welding and " V " edging required for circumferencial welding required to connect MS special to Rising main /delivery pipes is inclusive in the rate however circumferencial welding required for connecting M.S. special to Rising Main shall be paid separately on running meter basis.

(No negative Tolerance in thickness is permissible).

Kg.

71.30

16.10

Page 100: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

90

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

121 Item No.121 :- Manufacturing, Providing and Supplying short pipes, cants made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on both ends for welding it to pipe, including fabrication and full welding of stiffeners as per design requirements, lowering & laying to correct position third party inspection charges etc, complete as per IS - 3589 and IS - 5504 as applicable as per detailed specifications. Cost of longitudinal welding and " V " edging required for circumferencial welding required to connect MS special to Rising main /delivery pipes is inclusive in the rate however circumferencial welding required for connecting M.S. special to Rising Main shall be paid separately on running meter basis. (No negative Tolerance in thickness is permissible).

Kg.

66.75

13.60

122 Item No.122 :- Radiographic testing of welded butt joints in Rising main as per Procedure given in IS 4853:1982 including cost of all materials, equipments & expert personnel required for testing, developing, interpreting and submitting report along with developed films, including all incidental charges, transportation to site and local transportation on site etc. complete.

Rmt.

1388.40

836.70

123 Item No.123 :- Ultrasonic testing of field welded joints as per Procedure laid down in IS 4260:1986 including actual testing, interpreting and submitting test report in detail including cost of all materials, equipments & expert personnel required for testing, developing, interpreting and submitting report, including all incidental charges, transportation to site and local transportation on site etc. complete.

Rmt.

324.60

184.40

124 Item No.124 :- Cleaning the surface of rising main pipe by Sand Blasting to expose fresh metal surface ready for painting including removal of all rust, oil, grease, etc. as per specification including all material, labour and equipments etc complete. (Qty. of sand 3cum/100sq.mtr.)

Sqm.

70.30

19.60

Page 101: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

91

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

125 Item No.125 :- Providing & applying Liquid epoxy coating system to the external surface of Rising Main Pipes as per Annex-B of IS 3589:2001, preferably by airless spray with one coat of Zinc rich epoxy primer (90 % zink (DFT 40 micron , coverage 9 Sqm / lit) and two coats of coal tar epoxy paint (DFT 120 X 2 micron coverage 5 Sqm / Lit / coat) including cleaning the surface to the satisfaction of Engineer in charge by sand blasting / scraping removing oil, grease, other foreign materials including all necessary material , labour with all leads and lifts etc. complete.

Sqm.

549.70

335.00

126 Item No.126 :- Providing & applying Liquid epoxy coating system to the interior surface of Rising Main Pipes as per Annex - B of IS 3589:2001, preferably by airless spray with one coat of Zinc rich epoxy primer (90% zink ,DFT 40 micron , coverage 9 Sqm / lit) and three coats of coal tar epoxy paint (DFT 120 X 3 micron coverage 5 Sqm/Lit/coat) including cleaning the surface to the satisfaction of Engineer in charge by sand blasting /chemical cleaning / scraping removing oil, grease, other foreign materials including all necessary material, labour with all leads and lifts etc. complete. (Qty. of sand 3cum/100sq.mtr.)

Sqm.

677.50

426.00

127 Item No.127 :- Providing and applying external 25 mm thick cement mortar coating in CM 1 : 3 (cement consumption 15.94 kg/sqm) pnumatically under pressure of 2.1 to 2.8 kg /Sq cm, with weld mesh 50 x 50 x 2.54 mm (13 gauge), after duly cleaning the surface by wire brushing, degreasing etc. including necessary admixtures (200 ml / bag of cement), curing, rehandling the pipe from fabrication shop to guniting place and from guniting place to laying location etc. complete with all leads & lifts.

Sqm.

464.20

59.90

Page 102: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

92

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

128 Item No.128 :- Providing inner cement mortar lining of specified thickness in proportion 1:1.5 using mechanical spinning machine, including all necessary labour, material, plants and equipments, local handling etc. complete as per procedure laid down in IS 3589:2001.

(A) For 9 mm thick inner mortar lining Sqm. 315.60 95.70

(B) For 12 mm thick inner mortar lining Sqm. 394.75 100.00

129 Item No.129 :- Providing 'X' Ray Quality M.S. Welding in all positions with required number of runs, for M.S. pipes internally and / or externally including gauging wherever necessary, fixing appurtenances and other accessories in connection with pipe laying work as per specification, using electrodes having weldmark E7018 (Low hydrogen electrodes), including Surface preparation (i.e. Removal of scale, cleaning, etc.) including all materials, labour, equipments, etc. complete.

A : Single 'V' Butt Joint

Butt Joint : Plate thickness

6 mm Rmt. 320.00 --

8 mm Rmt. 453.00 --

10 mm Rmt. 638.00 --

12 mm Rmt. 747.00 --

14 mm Rmt. 934.00 --

16 mm Rmt. 1125.00 --

18 mm Rmt. 1348.00 --

20 mm Rmt. 1587.00 --

22 mm Rmt. 1795.00 --

25 mm Rmt. 2055.00 --

Page 103: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

93

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

B : Fillet Type Joint

Fillet Weld Size

4 mm Rmt. 132.00 --

5 mm Rmt. 198.00 --

6 mm Rmt. 270.00 --

8 mm Rmt. 373.00 --

10 mm Rmt. 569.00 --

12 mm Rmt. 794.00 --

14 mm Rmt. 1085.00 --

16 mm Rmt. 1515.00 --

Page 104: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

94

Page 105: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

95

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-7

SURVEYING AND INVESTIGATION

ITEM NO 130 TO 151

Page 106: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

96

Page 107: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

97

Page 108: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

98

Page 109: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

99

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

SURVEYING AND INVESTIGATION

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

SURVEY WORK - COMPLETED ITEM (WITH TOTAL STATION)

130 Item No.130 :- Double levelling using Digital state of art Total station to connect Geodetic Trignometrical survey, bench mark & establishing permanent bench mark at Dam site at place along the canal alignment, submergence & in command area etc complete (Excluding cost of B.M. structure)

Km.

746.00

435.29

131 Item No.131 :- Block contour survey of 10 x 10 m grid (Not less than 121 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.

(A) Total Station Ha. 581.00 405.42

(B) DGPS Ha. 219.00 97.21

132 Item No.132 :- Block contour survey of 15 x 15 m grid (Not less than 64 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.

(A) Total Station Ha. 391.00 273.25

(B) DGPS Ha. 148.00 65.59

Page 110: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

100

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

133 Item No.133 :- Block contour survey of 20 x 20 m grid (Not less than 36 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.

(A) Total Station Ha. 293.00 204.96

(B) DGPS Ha. 111.00 49.19

134 Item No.134 :- Block contour survey of 30 x 30 m grid (Not less than 25 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.

(A) Total Station Ha. 201.00 140.65

(B) DGPS Ha. 76.00 33.75

135 Item No.135 :- Block contour survey of 60 x 30 m grid (Not less than 15 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.

Page 111: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

101

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

(A) Total Station Ha. 103.00 72.34

(B) DGPS Ha. 39.00 17.36

136 Item No.136 :- Block contour survey of 150 x 30 m grid (Not less than 5 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art instrument, Including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.

(A) Total Station Ha. 46.00 32.15

(B) DGPS Ha. 17.00 7.71

137 Item No.137 :- Carrying out line survey using digital state of art Total station for fixing FRL/HFL including C/s survey with levels at 20m interval / survey for 'L' section of alternative Dam site and 'L' section of river 1Km U/s 1Km D/s of alternative Dam line etc complete including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawing shall be approved by engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper.

Km.

575.00

401.90

138 Item No.138 :- Survey for main canal, branches, distributaries on falling contour including investigation of alternative line, taking falling contour fixing canal line, taking 'L' section and cross section on final line and distributaries survey etc complete. (Excluding fixing apex / chainage stones) including transfer of entire data to computer system in different georeferential layer / themes using features of standard plotting Software compatible with canal irrigation system design Software packages (Item contd. on next page)

Km.

690.00

482.28

Page 112: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

102

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

including contour plotting at specified interval & scale. Absolutely linear survey for all types of canals (Length of survey for L-section and cross sections to be measured separately for payment)

139 Item No.139 :- Preparation of detailed construction plan for pipe distribution network system including necessary command survey, linear survey for pipe laying, chak planning designing of pipe network and preparation of estimates.

Ha.CCA

356.90

281.42

140 Item No.140 :- Providing permanent bench mark dressed stone of basalt, granite or gneiss of size 30CmX30CmX45Cm at least 15Cm below the ground and embedding it to a depth of 30Cm in grade M-15 in situ concrete of size 90CmX90CmX60Cm deep over 1M deep foundation concrete of grade M-10 including excavation, concrete, providing and fixing dressed stone and backfilling the pit up to ground level with sand etc complete.

No.

4166.00

357.82

141 Item No.141 :- Fixing precast RCC alignment blocks (Pillar) on alternative dam site finally approved of size 900x175x100 mm at 90 M interval including fixing in 1:3:6 (600 x 450 x 450mm) cement concrete, excavation, backfilling and coloring etc as necessary (0.75 kg steel)

No.

421.30

35.41

SURVEY ITEMS FOR DEPARTMENTAL EXECUTION – (LABOUR RATES ONLY)

142 Item No.142 :- Supplying labours for Double levelling to connect Geodetic Trignometrical Survey, Bench mark and establishing the permanent Bench mark at Dam site at place along the canal alignment submergence and in command area etc complete.(Excluding cost of P.B.M. structure)

Km.

830.00

830.00

143 Item No.143 :- Supplying labours for Submergence survey including establishment of temporary bench mark to prepare submergence plan with 1 to 1.5 mt. interval contours etc complete (Grid size 30 x 60 mt.)

Ha.

469.00

469.00

Page 113: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

103

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

144 Item No.144 :- Supplying labours for Detailed survey of dam seat and waste weir and borrow area finally approved including mapping to the extent 3 meter above the top of dam level on either flanks and 500 meter up-stream and 500m down-stream, showing all important features, rock outcrops, pools, water courses etc complete. (Grid size 30 x 30M)

Ha.

911.00

911.00

145 Item No.145 :- Supplying labours for Survey for longitudinal section of Alternative dam alignment and longitudinal section of river 1.00km. up-stream and 1.00 km. down-stream of alternative dam alignment etc complete.

Km.

2655.00

2655.00

146 Item No.146 :- Supplying labours for Contour survey for command area including preparation of contour map with 1.00m contour interval, including establishing working temporary bench mark in command area etc complete. (Grid size 150 x 30m)

Ha.

204.00

204.00

147 Item No.147 :- Supplying labours for Survey for main canal, branches, distributaries on falling contour, including investigation of alternative line, taking falling contour, fixing canal line, taking longitudinal-section and cross-section of final line and distributaries survey etc complete.

Km.

3318.00

3318.00

INVESTIGATION & FOUNDATION EXPLORATION

148 Item No.148 :- Taking trial bore for detailed investigation with NX diamond drill double tube in all sorts of soil like soft murum, hard murum and boulders including all materials such as casing pipes, accessories, grease, steel boolsam and other such materials and or as required including conveying such materials and machinery to site of works, preserving the loose samples in glass/plastic jar and core samples serially numbered at site of work and conveying the same to the head quarter of concerned office as directed and submission of detailed bore log sheet complete.(As directed by the Engineer in charge)

Page 114: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

104

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

(A) Over Burdon Rmt. 1450.00 225.00

(B) Soft Rock / Weathered Rock Rmt. 2068.00 270.00

(C) Hard Rock other than quartzite Rmt. 2904.00 270.00

149 Item No.149 :- Providing tun tappa core boxes of jungle wood of size 1.25mx0.35mx0.15m for preserving core sample with all fixtures and fastening handles including locking arrangement etc. complete. (As per PWD Survey RSR 2017-18 rate is 1980/- I.No. 1.49/page no 7) (cost of material excluding labour component Rs.410/- is Rs1570/-. Excluding tax component of 18% material cost comes out to Rs.1330.51/-. Hence rate equals to 1330.50+410=1740.50)

No.

1740.50

410.00

150 Item No.150 :- Carrying out water intake test / permeability test at any stage or depth as may be directed by Engineer In charge by filling the bore hole with water or air at specific pressure of specified limit as and where directed etc completed.

Test

519.20

279.10

151 Item No.151 :- Excavation for taking trial pits on final alignment of dam line and canal at specified interval and in Nalla-bed of size 2.00 x 2.00 x 2.50mtr. in length, breadth and depth respectively or size as may be directed by the Engineer In charge including back filling trial pits etc complete.

Cum.

99.60

7.45

Page 115: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

105

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-8

HYDROLOGY

ITEM NO 152 TO 158

Page 116: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

106

Page 117: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

107

Page 118: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

108

Page 119: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

109

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

HYDROLOGY

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

152 Item No.152 :- Standard Rain Gauge Station (Measurer) Providing person to take measurement at every morning 8:30 am to SRG station, taking the entry in the register. Send the reading daily to Sub-Dn by post card & monthly progress (reading) to Sub-Dn, including taking care of instruments established on the station. (Required Proforma / post card / Register etc. will be supplied by concern Sub-Dn. The rate of item is for 35 minutes per day working.

Per Month

1227.00

1227.00

153 Item No.153 :- Autographic Rain Gauge Station (Gauge Khalashi) Providing person to take measurement at every morning 8:30 am of autographic rain gauge station including changing graph at 8:30 am, taking reading in the register, also sending reading to Sub-Dn by post card & monthly progress (reading) send to Sub-Dn, with taking care of instruments established on the station. (Required Proforma / post card / Register etc. will be supplied by concern Sub-Dn.) The rate of item is for 75 minutes per day working.

Per Month

2630.00

2630.00

154 Item No.154 :- Full Climatic Station (Gauge Karkoon) Providing person to take reading from the scientific instruments established in the F.C.S Station (Given below) including taking reading in the register as per prescribed Proforma given by the Sub-Dn, also send to concern Engineer in the Proforma time to time.The rate of item is for daily working.

1) ARG 2) SRG 3) Pan Evaporimeter, 4) Pan Water Temperature, 5) Thermometer (i. Dry, ii. Wet, iii. Minimum, iv. Maximum) 6) Thermo hygrograph. 7) Anemometer,8) Wind Vane, 9) Sunshine Recorder.

Per Month

16764.00

16764.00

Page 120: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

110

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

155 Item No.155 :- Gauge Discharge (Gauge Khalashi / Gauge Karkoon) Providing to supply of Gauge Khalashi/ Gauge Karkoon (He is a good Swimmer & he must have to take measurements in the river in rainy & other season) including accidiental insurance .The rate of item is for daily working.

Per Month

16403.00

16403.00

156 Item No.156 :- Gauge Discharge (Gauge Khalashi / Gauge Karkoon) Providing Gauge Khalashi / Gauge Karkoon to take measurement by winch & Cradle with current meter or by float method from required compartment in the flood season, taking measurements at every hour or instruction given by concern Engineer, taking Water levels in four times daily, change paper of AWLR and Calculate Velocity as per given area. Taking all readings in the register, send all readings to Concern Engineer/ Higher Engineer as per instructions in the prescribed proforma, including accidiental insurance. The rate of item is for daily working.

Per Month

17352.00

17352.00

157 Item No.157 :- Gauge Discharge (Boat Driver) Providing Boat driver for GD Station to drive the boat for taking measurements near compartment in the Steady position. After taking the measurement brought back the boat & concern persons in the boat safely. Installed the boat in out of danger area etc. complete, including accidiental insurance (Boat Driving Licence given by Govt. Authority or authorised organisation must be mandatory to boat driver) The rate of item is for daily working.

Per Month

17908.00

17908.00

158 Item No.158 :- Gauge Discharge (Boat Chowkidar) Providing Chowkidar to take care & Security of boat (He is not an ordinary person, he is a good swimmer, when the Water Level of river increase or decrease, he must have tighten the boat of safe place & taking care of boat in the night) including accidiental insurance. The rate of item is for daily working.

Per Month

17256.00

17256.00

Page 121: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

111

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-9

ITEMS FOR COST ESTIMATION OF STRUCTURES

IN AFFECTED VILLAGES

ITEM NO 159 TO 190

Page 122: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

112

Page 123: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

113

Page 124: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

114

Page 125: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

115

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

ITEMS FOR COST ESTIMATION OF STRUCTURES IN AFFECTED VILLAGES

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

159 Item No.159 :- Providing and constructing stone masonry in mud mortar in foundation and plinth including scaffolding, finishing etc. complete.

(A) Up to Plinth Cum. 951.80 385.80

(B) Super structure Cum. 1075.40 641.40

160 Item No.160 :- Providing and constructing U.C.R. masonry in lime 1:6 mortar in foundation and plinth including scaffolding, finishing etc. complete

Cum.

1704.30

384.30

161 Item No.161 :- Providing second class B.B. masonry with conventional / I.S. type bricks in mud mortar in super structures, including racking out joints, when plastering is to be done including scaffolding and watering etc. complete.

(A) For Super structure Cum. 4062.40 765.40

(B) For foundation and Plinth Cum. 3909.30 612.30

162 Item No.162 :- Providing and constructing arch like B.B. Masonry slab roofing including 'I' Section as a bottom support and tie rods with scaffolding, centering etc. complete.

Sqm.

1938.70

484.72

163 Item No.163 :- Providing and constructing gawhan for cattle (0.6m x 10.0m) with necessary excavation, CC1:4:8, brick masonry and plastering 12mm thick etc. complete.

Rmt.

1575.70

472.69

164 Item No.164 :- Providing 50 mm. mud plaster including racking out joints, scaffolding all finishing etc. complete.

Sqm.

122.50

99.50

165 Item No.165 :- Providing & Constructing Kud Walls with vertical posts, bamboos and tur/cotton/Paddy bushes Excluding mud plaster etc. complete.

Sqm.

240.60

85.77

Page 126: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

116

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

166 Item No.166 :- Providing 25 mm thick mud plaster to kud walls including cow dung wash etc. complete.

Sqm.

98.20

87.20

167 Item No.167 :- Providing and constructing Kud walls with clothing of grass / other vegetation with vertical posts and bamboos excluding mud plaster etc. complete.

Sqm.

114.30

17.30

168 Item No.168 :- Providing and constructing Kud walls including mud plaster 25 mm thick on both sides with cow dung wash etc. complete.

Sqm.

437.10

271.10

169 Item No.169 :- Providing and constructing Kud walls, split Bamboo knitted together and covered with 12 mm. thick mud plaster on both sides etc. complete.

Sqm.

338.90

183.90

170 Item No.170 :- Providing and constructing kud roofing with bamboos and balli rafter alongwith tur/cotton bushes excluding mud plaster etc. complete.

Sqm.

421.50

149.50

171 Item No.171 :- Providing and fixing non teak wood Dhaba including mud flooring and mud plaster on non teak planks, rested on non teak rafter at 1.5 X 2.5 m. intervals, including mud flooring over the planks etc. complete (Jungle wood Dhaba)

Sqm.

3963.00

171.00

172 Item No.172 :- Providing and fixing teak wood dhaba including mud flooring and mud plasters on non teak wood planks rested on teak wood rafters 1.5 X 2.5 m. intervals including mud flooring etc. complete (vertical posts and beams are considered in teak wood)

Sqm.

7545.20

139.20

173 Item No.173 :- Providing and constructing split bamboo mesh knitted together including all labour material lead and lift etc. complete.

Sqm.

271.20

45.20

174 Item No.174 :- Providing and constructing mud boulder otta with earthen Ranjan.

No.

852.00

295.00

Page 127: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

117

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

175 Item No.175 :- Providing and constructing Mud Wall including preparation of mud mortar including placing, scaffolding, finishing etc. complete.

Cum.

1267.65

930.65

176 Item No.176 :- Providing and fixing non teak doors /windows 40 mm. Thick ledged with 25 mm. Thick plain planked shutters without ventilators /fan light /iron bars including the frames of the sizes as per standard specification, iron fixtures and fastenings and finishing the wood work with oiling etc. complete.

Sqm.

3972.20

1327.20

177 Item No.177 :- Providing and fixing non teak doors / window II class fully pannelled without ventilators /fan light /iron bars including the frames of the sizes as per standard specification, iron fixtures and fastenings and finishing the wood work with oiling etc. complete.

Sqm.

6030.80

2964.80

178 Item No.178 :- Providing and fixing non teak doors ledged and braced with 20 mm thick planked shutters including the frame without sill with all fixture and fastenings oil painting etc. complete.

Sqm.

5875.50

1801.50

179 Item No.179 :- Providing and fixing Jungle wood door of frame 60 mm X 100 mm for second class door's and window with / without ventilators fan light and clear storey windows including chamfering / rounding. rebating and hold fast finishing with one coat of primer etc complete.

Sqm.

2258.80

322.80

180 Item No.180 :- Providing & fixing Country Teak Wood frame with G. I. Sheet Shutter.

Sqm.

2042.30

646.30

181 Item No.181 :- Providing and fixing country teak wood plank ceiling 12 mm. Thick with planked on underside, longuled and grooved including scaffolding, fixtures with oiling and two coats of varnishing etc. complete. (excluding battens and joists)

Sqm.

1462.50

400.50

Page 128: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

118

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

182 Item No.182 :- Providing and fixing non teak wood plank ceiling 12 mm. Thick with planked on underside, longuled and grooved including scaffolding , fixtures with oiling and two coats of varnishing etc. complete. (Excluding battens and joists)

Sqm.

961.50

400.50

183 Item No.183 :- Providing and fixing wooden shelf of country teak wood plank 30 cm wide and 20 mm thick with wooden brackets of 50mm x 50mm without fillets including all fixtures with oil painting etc. complete.

Sqm.

663.40

160.40

184 Item No.184 :- Providing and fixing eaves board of country teak wood plank 20 cm. x 20mm thick plan decorative type including scaffolding & painting with 2 coats etc. complete.

Sqm.

350.10

35.10

185 Item No.185 :- Providing and fixing T.W. frame and shutter to wall cupboard made of 25 mm thick particle board one face with approved colour laminated face borided with phenol formal desynthetic lipping, beading oxidised iron fixtures & oill primer coat etc. complete.

Sqm.

2485.10

988.10

186 Item No.186 :- Providing & fixing xpm Jalli with teak wood /non teak wood frame including fixing, painting etc. complete.

(A) Non teak wooden frame into wooden bar jalli

Sqm. 1552.50 559.53

(B) N.T. Wooden frame & M.S. Bar Sqm. 914.30 320.30

(C) Country teak wooden frame with M.S. bar Sqm. 1263.10 320.10

(D) xpm Jalli with wooden frame Sqm. 1214.20 320.20

(E) Providing and fixing xpm jalli with non teak wood frame including fixing oiling etc. complete.

Sqm. 865.30 320.30

187 Item No.187 :- Providing and fixing half round single country tiled roofing over bamboo battens including nails, battens etc. complete.

Sqm.

626.20

277.20

Page 129: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

119

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

188 Item No.188 :- Providing and fixing medium grade G I pipe below C G I sheet roofing etc complete.

Rmt.

274.50

24.46

189 Item No.189 :- Providing and fixing M S angle of size 35 x 35 x 6 mm.

Rmt.

148.00

25.01

190 Item No.190 :- Providing and fixing half round single country tiled roofing over bamboo mats laid on half split bamboo battens including all fastenings etc. complete.

Sqm.

694.60

258.60

Page 130: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

120

Page 131: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

121

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-10

GATE MANUFACTURING AND REPAIRS

ITEM NO 191 TO 213

Page 132: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

122

Page 133: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

123

Page 134: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

124

Page 135: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

125

सामाईक दर ची 2017-18

द्वार टनर्थमती आटण दरुुस्ती

सर्वसाधारण टिप्पणी

1 All materials / bought out components for embedded parts, gates, hoists and allied works shall conform to relevant Indian standards as provided in Annexure-I.

2 The basic rates are INCLUSIVE of preparation of Q.A.P. / working drawings material schedules etc., as per specifications and other technical data including revisions. If the responsibility of the structural designs is on the contractor, additional 1% amount shall be payable.

3 The basic rates are inclusive of 3 % provision towards cost of packing, forwarding and transportation of all materials from their source of supply up to work site. No separate lead charges and loading unloading shall be added.

4 The basic rates are inclusive of Machinery mobilization (1.5%) & Demobilization (1.5%) Charges on machinery charges.

5 The basic rates are inclusive of 1% labour amenities and 10% overhead charges.

6 For charges of transportation of Gate parts at Site Refer Lead Charges Statement of Material.

7 Fabrication charges include all welding charges including tack welding and full welding.

8 The basic rates are inclusive of preparatory works such as rectification of damages, repairing shop, painting, cleaning, positioning and anchoring first stage embedments.

9 The basic rates are inclusive of painting with one coat of zinc primer and 2 coats of solvent less coal tar epoxy paint with sand blasting.

10 HOIST EQUIPMENT - 1. Where sand blasting is not possible, hand and power tool/ chemical cleaning be adopted without any additional cost.

11 The weight of the Mechanical component in CSR are as per Standard drawings and as per sectional weights provided in relevant IS standards of respective materials. Actual weight of the components should be verified as per actual material received and accordingly the amount should be worked out.

12 Provision for GST is not included in the rate analysis and appropriate provision shall be made in the estimate, if applicable.

Page 136: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

126

Annexure 1

List of IS codes

1 IS 4622 Recommendations for Structural design of fixed wheel gates

2 IS 2062 Hot rolled low, medium, high tensile Structural steel

3 IS 4623 Recommendations for Structural design of radial gates (Second Revision)

4 IS1030 Carbon steel castings for general engineering purposes.

5 IS28 Phosphor bronze ingots and castings

6 IS305 Specification for Aluminum Bronze ingots and casting

7 IS 318 Specification for leaded tin bronze ingots and casting

8 IS 6911 stainless steel plate , sheet and strip

9 IS 209 Zinc Ingot specification

10 IS 11855 Guidelines for Design and use of Different type of Rubber seals for hydraulic gates.

11 IS 14177 Guidelines for painting system for hydraulic gates and hoists.

12 IS 2485 Drop forged sockets for wire ropes for general engineering purposes

13 IS 325 -1996 Three phase induction motor specification

14 IS 2266-2000 Specification of wire ropes.

15 IS7443 Methods for load Rating of Warm Gears

16 IS 10210-1982 Design of hydraulic hoist for gates.

17 IS 7718-1991 Recommendations for inspection, testing and maintenance of fixed wheel and slide gates (first revision).

18 IS 9349 Recommendation for structural design of medium and high head slide gates

19 IS 210 Geay iron castings

20 IS 6938 Design for rope drum and chain hoist for hydraulic gates

21 IS 1030 Carbon steel and castings

22 IS 7215 Tolerances for fabrication of steel structures.

Page 137: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

127

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

GATE MANUFACTURING AND REPAIRS

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

RADIAL GATE EMBEDMENT - Manufacturing, Erection, Commissioning & Testing

191 Item No.191 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of embedded parts of Radial gate with parts consisting of Erection Jig, Vertical Anchorages, Trunion Chair, Trunion Girder box / Yoke Girders, Horizontal anchorages, Trunion bracket assly, Wall plate assly, Sill beam assly, trunion supports, Locking arrangement, etc. All material used shall conformed to related IS Codes specified in IS 4623. Above item covers Mild steel confirming to IS 2062. The tolerances between Components & assembly Shall confirm to IS 4623.the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit) & with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Zinc (IS 209), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177,The embedment & gate assembly shall be reasonably water tight, the maximum permissible leakage being not more than 5 liters/min/m wetted length of seal. The surface finish of seal plates should be within the range of 1.6 to 6.3 µm (IS 9349).

MT

109647.00

21415.00

Page 138: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

128

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

RADIAL GATE LEAF - Manufacturing, Erection, Commissioning & Testing

192 Item No.192 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Gate leaf of Radial gate with parts consisting of End arm assly, Horizontal Girder, Skin plate assly, tie flats / Channels, Bracing Angles & Gusset plate etc. All material used shall conformed to related IS Codes specified in IS 4623. Above item covers Mild steel confirming to IS 2062. The tolerances between Components & assembly Shall confirm to IS 4623. The fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Zinc (IS 209), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, The embedment & gate assembly shall be reasonably water tight, the maximum permissible leakage being not more than 5 liters/min/m wetted length of seal. The surface finish of seal plates should be within the range of 1.6 to 6.3 µm (IS 9349).

MT

105128.00

20159.00

Page 139: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

129

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

HOIST BRIDGE - Manufacturing, Erection, Commissioning & Testing

193 Item No.193 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Hoist Bridge. All materials used shall confirmed to related IS Codes. Mild steel used for manufacturing shall conform to IS 2062. Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177.

MT

89069.00

24575.00

ROPE DRUM HOIST without Hoist Bridge - Manufacturing, Erection, Commissioning & Testing

194 Item No.194 :- Manufacturing with QAP, fabrication, erection, commissioning & testing with 125 % of rated capacity of Rope Drum Hoist consisting of central drive unit, gear train frames, rope drums, gears, pinions, shafts, 3 phase electric motor, brake, reduction gear box, wire ropes, gate position indicators, manual operation arrangement, ICTP main switch, electric starter, etc. All material used shall conformed to related IS Codes specified in IS 6938. Above item covers Mild steel confirming to IS 2062. the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. Other Material includes C.I (IS 210), C.S (IS1030), P. Bronze (IS 305), Al. Bronze (IS 318), S.S (IS 6911), Wire rope (IS 2266), Wire rope sockets ( Is 2485), 3p S4 duty Induction Motor (IS 325), Reduction gear box ( IS 7443), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, (Item contd. on next page)

MT

171888.00

16413.00

Page 140: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

130

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total sloventless coal tar epoxy paint applied to give dry film thickness 70 +/- 5 microns and 2 coats of minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177.

VERTICAL LIFT BARRAGE GATE EMBEDMENT / STOP LOG GATE EMBEDMENT -

Manufacturing, Erection, Commissioning & Testing

195 Item No.195 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of embedded parts of V.L. Barrage gate/Stop log gate Consisting of Primary Embedments, Sill beam, Roller Track, Side guide, Side seal kit etc. All material used shall conformed to related IS Codes. Mild steel confirming to IS 2062.The tolerances between Bushing / Bearing /Pin Should confirm to IS 919 (Part I & II). Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177.The embedment & gate assembly shall be reasonably water tight, the maximum permissible leakage being not more than 5 liters/min/m wetted length of seal. The surface finish of seal plates should be within the range of 1.6 to 6.3 µm (IS 9349).

MT

112050.00

18708.00

Page 141: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

131

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

VERTICAL LIFT BARRAGE GATE LEAF / STOP LOG GATE LEAF -

Manufacturing, Erection, Commissioning & Testing

196 Item No.196 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Gate leaf of V.L. Barrage gate Consisting of following parts. Gate Leaf, Horizontal girder, Guide roller assembly, & Roller Assembly. All material used shall conformed to related IS Codes. Mild steel confirming to IS 2062.The tolerances between Components & assembly Shall confirm to IS 4623.the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit) & with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference) as per IS 4623. Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177,The embedment & gate assembly shall be reasonably water tight, the maximum permissible leakage being not more than 5 liters/min/m length of seal.

MT

103974.00

21150.00

PYLON STRUCTURE - Manufacturing, Erection, Commissioning & Testing

197 Item No.197 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Pylon Structure. All materials used shall confirmed to related IS Codes. Mild steel used for manufacturing shall conform to IS 2062. Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead (Item contd. on next page)

MT

89939.00

18233.00

Page 142: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

132

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 141

GOLIATH CRANE - Manufacturing, Erection, Commissioning & Testing

198 Item No.198 :- Manufacturing with QAP, fabrication, erection, commissioning & testing with 125 % of rated capacity of Goliath Crane consisting of drive unit, A Frame, Main Frame, , LT Driving and driven trolleys, CT Crab Including Central Drive unit, gear train frames, rope drums, gears, pinions, shafts, Driving electric motor, brake, reduction gear box, wire ropes, manual operation arrangement, ICTP main switch, electric starter, etc. All material used shall conformed to related IS Codes specified in IS 6938. Above item covers Mild steel confirming to IS 2062. the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. Other Material includes C.I (IS 210), C.S (IS1030), P. Bronze (IS 305), Al. Bronze (IS 318), S.S (IS 6911), Wire rope (IS 2266), Wire rope sockets ( Is 2485), 3p S4 duty Induction Motor (IS 325), Reduction gear box ( IS 7443), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints ). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177.

MT

128299.00

15406.00

Page 143: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

133

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

GOLIATH RAIL ARRANGEMENT - Manufacturing, Erection, Commissioning & Testing

199 Item No.199 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Railing arrangement for Goliath Crane (Span 27 mtr).MS Material used shall conform to IS 2062. The Dimensions, shape and other requirements of Crane rail sections conform to IS 3443.Welding electrodes (AWS E6013 for MS to MS weld joints & E7016 for MS to rail weld joints). It includes all materials, Labour charges, machining and machinery charges, 1 km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns as per IS 14177.

MT

83707.00

9783.00

LIFTING BEAM - Manufacturing, Erection, Commissioning & Testing

200 Item No.200 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Lifting Beam.MS Material used shall conform to IS 2062. All parts of Lifting Beam like Guide rollers, Hooks, Pins, conform to IS 13591.Welding electrodes (AWS E6013 for MS to MS weld joints & E7016 for MS to rail weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177.

MT

74766.00

12854.00

Page 144: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

134

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

OUTLET GATE-SLIDING TYPE EMBEDMENT - Manufacturing, Erection, Commissioning & Testing

201 Item No.201 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Sliding type gate Embedments consisting of following parts. Sill Beam, Track Girder, Vertical Seal & Horizontal Seal assly. Guide Tee & Lining Plate. Anchorages etc. All material used shall conformed to related IS Codes. All material used shall conformed to related IS Codes specified in IS 9349. Mild steel confirming to IS 2062.The tolerances for embeded parts and in components of gate are as per IS 9349. The tolerances between Bushing/Bearing /Pin Should confirm to IS 919 ( Part I & II). Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177 .The embedment & gate assembly shall be reasonably water tight, the maximum permissible leakage being not more than 5 liters/min/m wetted length of seal. The surface finish of seal plates should be within the range of 1.6 to 6.3 µm (IS 9349).

MT

131913.00

21804.00

OUTLET GATE-SLIDING TYPE GATE LEAF - Manufacturing, Erection, Commissioning & Testing

202 Item No.202 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Gate leaf of Sliding type gate Consisting of following parts. Skin plate skeleton, End Verticals, Guide Brackets, vertical and horizontal stiffeners etc. (As per Drg.) All material used shall conformed to related IS Codes specified in IS 9349. Mild steel confirming to IS 2062.The tolerances for embeded parts and in (Item contd. on next page)

MT

110524.00

20893.00

Page 145: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

135

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

components of gate are as per IS 9349. The tolerances between Bushing/Bearing /Pin Should confirm to IS 919 (Part I & II). Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177 .The gates shall be reasonably watertight. Leakage, if any, unless otherwise specified, shall not normally exceed 5 and 10 liter/min/m wetted length of periphery of the sealing surface, for medium and high head gates, respectively as per IS 9349.

OUTLET GATE ROLLER TYPE WITH BUSH IN ROLLER - GATE LEAF - Manufacturing, Erection, Commissioning & Testing

203 Item No.203 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of parts of Roller type gate leaf with bush in the roller consisting of following parts. Skin plate skeleton, End verticals, Guide bracket etc. (As per Drg.) All material used shall conformed to related IS Codes specified in IS 4622. Mild steel confirming to IS 2062.The tolerances for embeded parts of gate are as per IS 4622. Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318),S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). The tolerances between Components & assembly Shall confirm to IS 4623.the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit) & with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference) as per IS 4623.The above items also include Sundry Material, Workshop charges, Labour charges,

(Item contd. on next page)

MT

118454.00

24315.00

Page 146: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

136

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

Inspection & Quality control charges, Sand blasting with one coat of Zinc rich primer on dry film, should be applied to give total dry film thickness 70 +/- 5 microns. Also 2 coats of solvent less coal tar epoxy paint should be given with a minimum dry film thickness of 150+/- 5 micron per coat should be applied as per IS 14177.The gates shall be reasonably watertight. Leakage, if any, unless otherwise specified, shall not normally exceed 5 and 10 liter/min/m wetted length of periphery of the sealing surface, for medium and high head gates, respectively as per IS 9349.

OUTLET GATE ROLLER TYPE WITH BEARING IN ROLLER GATE LEAF - Manufacturing, Erection, Commissioning & Testing

204 Item No.204 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Gate leaf of Roller type gate with Bearing in the roller consisting of following parts. Skin plate skeleton, End verticals, roller bearings, Guide bracket etc.(As per Drg.) All material used shall conformed to related IS Codes specified in IS 4622. Mild steel confirming to IS 2062.The tolerances for components of gate are as per IS 4622The tolerances between Components & assembly Shall confirm to IS 4623.the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit) & with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference) as per IS 4623. Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). The above items also include Sundry Material, Workshop charges, Labour charges, Inspection & Quality control charges, Sand blasting with one coat of Zinc rich primer on dry film, should be applied to give total dry film thickness 70 +/- 5 microns. Also 2 coats of slovent less coal tar epoxy paint should be given with a minimum dry film thickness of 150+/- 5 micron per coat should be applied as per IS 14177.The gates shall be reasonably watertight. Leakage, if any, unless otherwise specified, shall not normally exceed 5 and 10 liter/min/m wetted length of periphery of the sealing surface, for medium and high head gates, respectively as per IS 9349.

MT

150595.00

25256.00

Page 147: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

137

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

SCREW STEM HOIST - Manufacturing, Erection, Commissioning & Testing

205 Item No.205 :- Manufacturing with QAP, fabrication, erection, commissioning & testing with 125 % of rated capacity of Screw stem hoist consisting of Screw stem, Nut, Gear Pinion, Worm wheel, Shaft, Keys etc. All material used shall conformed to IS Codes specified in IS 11228.Mild steel confirming to IS 2062. Other Material includes C.S. (IS1030), P. Bronze (IS 305), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints).The tolerances between Components & assembly Shall confirm to IS 4623.the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit) & with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177.

MT

95336.00

14159.00

Straight Needle K.T. Weir Gate- Manufacturing

206 Item No.206 :- Manufacturing with QAP & fabrication of KT weir needle gates - straight type size 2.15 x 0.5M- 94 Kg. weight as per relevant Indian Standards with all material, Mild steel confirming to IS 2062, Rubber seal confirming to IS 4623 & Welding electrodes AWS E6013 for general weld joints. It includes all materials, Labour charges, machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177.

MT

73937.00

6855.00

Page 148: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

138

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

Curved Needle K.T. Weir Gate- Manufacturing

207 Item No.207 :- Manufacturing with QAP & fabrication of KT weir needle gates - curved type size 2.15 x 0.5M- 74 Kg. weight as per relevant Indian Standards with all material, Mild steel confirming to IS 2062, Rubber seal confirming to IS 4623 & Welding electrodes AWS E6013 for general weld joints. It includes all materials, Labour charges, machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177.

MT

86812.00

8513.00

208 Dismantling and fitting of Rubber Seal of Radial Gate 12 x 8 m - 1 No -

Item No.208 (A) :- Dismantling of old damaged side rubber seal from gate leaf of R.G. 12 x 8 m - 1 No. supplying & fitting new L type side rubber seal confirming to IS 11855-1986 (Updated) and G.I. bolt with double washer including cost of material, labour, machining, sundry material etc complete.

ITEM

72813.00

21501.00

Item No.208 (B) :- Dismantling of old damaged Bottom rubber seal from gate leaf of R.G. 12 x 8 m - 1 No. Supplying & fitting flat type bottom rubber seal confirming to IS 11855-1986 (Updated) of size 90x15 mm - 12.2 mtr and G.I. bolt M-20x80 - 97 Nos with double washer including cost of material, labour, machining, sundry material etc complete.

ITEM

37533.00

12357.00

209 Repairs to Radial Gate Hoist of 42 MT Capacity - 1 No - (wire rope, cardium compound, gear oil, grease)

Item No.209 (A) :- Dismantaling of damaged Wire rope, Wire rope socket of 42 MT cap hoist - 1 No. Fixing new Wire rope of Dia 36 mm of falls, confirming to IS 2266. into Wire rope socket confirming to IS 2485, by Zinc (IS 209) Pouring and carrying load test.

(Item contd. on next page)

ITEM

142422.00

11306.00

Page 149: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

139

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

Applying Cardium compound (Servocoat 140) with satisfactory test & Trial. Complete job with material, sundry material & Labour charges.

Item No.209 (B) :- Removing Old Cardium Compound of Wire rope of 42 MT cap hoist - 1 No by cleaning agent & Applying new Cardium Compound (Servocoat 140) . Complete job with material, sundry material & Labour charges.

ITEM

9265.00

2688.00

Item No.209 (C) :- Draining of Old Oil from RGB & filling with Gear oil GX-90 , Cleaning Gear train by removing old Grease & Applying M.P. Grease to Gear train, Pedestal, Drum axle. Of 42 MT cap hoist -1 No., Complete job with cost of material, sundry material & labour charges.

ITEM

9017.00

2132.00

210 Repairs to Vertical Lift Gate (15 x 5 m - 1 No) - (wire rope, rubber seal, track roller) And Repairs to Stop Log gate (12 x 1 m - 1 No.) - (rubber seal, track roller)

Item No.210 (A) :- Dismantalling of damaged Wire rope of Vertical Lift Gate of size 15 x 5 m - 1 No. Fitting of new Wire rope of Dia 32 mm x 180 Mtr length confirming to IS 2266, with 'D' Clamp Applying Cardium compound (Servocoat - 140) along with satisfactory load test. Complete job with material, sundry material & Labour charges.

ITEM

182538.00

11306.00

Item No.210 (B) :- Dismantaling of Damaged Side Rubber Seal from Gate leaf of V.L. Gate size 15 x 5 Mtr - 1 No. and fitting of new "Z" type Side rubber seal confirming to IS 11855-1986, along, with G. I. Bolt , with Double Washer and Nut with satisfactory test & trial. Complete job with material, sundry material & labour charges.

ITEM

44035.00

14641.00

Item No.210 (C) :- Dismantalling of Damaged Bottom Rubber Seal from Gate leaf of V. L. Gate 15 x 5 m - 1 No & fitting of new Flat type Bottom rubber seal confirming to IS 11855-1986 with G. I. Bolt with Double Washer and Nut with satisfactory test & trial. Complete job with material, sundry material & labour charges.

ITEM

39283.00

8649.00

Page 150: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

140

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

Item No.210 (D) :- Dismantaling & Cleaning of Track Roller - 8 Nos, Guide Rollers - 4 Nos. & Equilliser Assembly Rollers of Vertical Lift Gate of size 15 x 5 m - 1 No. Refitting after applying M.P. Grease Complete job with material, sundry material & labour charges.

ITEM

6613.00

4264.00

Item No.210 (E) :- Dismantalling & Cleaning of Track Roller - 4 Nos of stoplog Gate 12 x 1 Mtr - 1 No. and refitting with M. P. Grease - 4 Kg & Damaged 'O' Ring - 12.00 Mtr. Complete Job with Material, sundry material & Labour Charges.

ITEM

4669.00

1607.00

Item No.210 (F) :- Dismantling of damaged side rubber seal from gate leaf of stoplog gate of size 12 x 1 m -1 No, on Maintenance Platform and fitting new Hollow type side rubber seal confirming to IS11855 / 1986 and G. I. Bolt with Double Washer and Nut with satisfactory test & trial. Complete job with material & labour charges.

ITEM

19227.00

6548.00

Item No.210 (G) :- Dismantaling of damaged Bottom rubber seal from gate leaf of stoplog gate of size 12 x 1 m - 1 No. and fitting of new flat type Rubber seal confirming to IS 11855- 1986, and G. I. Bolt with Double Washer and Nut with satisfactory test & trial. Complete job with material, sundry material & labour charges.

ITEM

33428.00

11306.00

211 Repairs to Goliath Crane 16 MT capacity - (wire rope, cardium compound, zink pouring] gear oil, greasing) -

Item No.211 (A) :- Dismantaling of damaged Wire rope, Wire rope socket of 16 MT cap Goliath Crane -1 No. Fixing new wire rope of 19 mm dia. of falls, confirming to IS 2266 into Wire Rope socket confirming to IS 2485 by Zinc (IS 209) pouring and carrying load test. Applying Cardium compound. (Servocoat 140) with satisfactory test & Trial. Complete job with material & Labour charges.

ITEM

55145.00

9730.00

Item No.211 (B) :- Removing Old Cardium Compound of wire rope (100 Mtrs) of 16 MT cap Goliath Crane - 1 No., by cleaning Agent, Applying new Cardium Compound (Servocoat 140) Complete job with material, sundry material & Labour charges.

ITEM

7034.00

2688.00

Page 151: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

141

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

Item No.211 (C) :- Draining of Old Oil from RGB - 3 Nos. (O:600 - 1No. & O:400 - 2 Nos.) Filling with new gear oil GX 90 , Cleaning Gear train by removing old grease, Applying M.P. Grease to Gear train, Pedastal, Drum axle. etc to 16 MT Goliath crane - 1 No. Complete job with cost of material, sundry material & labour charges.

ITEM

8988.00

3213.00

212 Repairs to Roller type Gate 0.9 x 0.9 m and 1.2 x 1.2 m -

Item No.212 (A) :- Dismantling of Roller type Gate leaf of size 0.9 x 0.9 Mtr / 1.2 x 1.2 Mtr (20 MWH) and hoist assembly - 1 No. lifting of the same up-to Platform for Repair work and lowering on Sill Beam. Complete job including cost of sundry material and labour charges.

ITEM

13880.00

7538.00

Item No.212 (B) :- Dismantaling of Damaged Side Rubber seal - 1 Mtr from Gate Leaf & fitting of new Musical note type Side rubber seal (confirms to IS: 11855 / 1986 (Updated)) with Nut Bolts Complete job with Material, Sundry material, & Labour charges.

ITEM

19436.00

6487.00

Item No.212 (C) :- Dismantaling of Damaged Top Rubber seal - 1 Mtr from Gate Leaf & fitting of new Double Stem type Top rubber seal (confirms to IS: 11855 / 1986 (Updated)) with Nut Bolts Complete job with Material, Sundry material, & Labour charges.

ITEM

12056.00

3243.00

Item No.212 (D) :- Dismantaling of Damaged Bottom Rubber seal - 1 Mtr from Gate Leaf & fitting of new Plain Flat type Bottom rubber seal (confirms to IS: 11855 / 1986) with Nut Bolts Complete job with Material, Sundry material, & Labour charges.

ITEM

9038.00

3243.00

Item No.212 (E) :- Dismantaling & Cleaning of Track Rollers (4 Nos), of Roller type Gate of size 0.9 x 0.9 M / 1.2 x 1.2 Mtr (20 MWH) - 1 No.. Refitting with M.P. Grease Complete job including cost of sundry material and labour charges. (Excluding Cost of New Bearing / Bush).

ITEM

3288.00

2132.00

Page 152: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

142

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

213 Item No.213 :- Dismantling Square threaded / "V" threaded Stem Rod 90 mm dia - 1 No. of 15 MT capacity Screw Stem Hoist. Removing bend on hydraulic Press machine, Threads Cleaning and refitting of the same. Complete job including cost of sundry material, Machinery and labour charges. (Excluding new material charges)

ITEM

7251.00

2688.00

Page 153: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

143

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-11

FLOW MEASURING DEVICES

ITEM NO 214 TO 217

Page 154: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

144

Page 155: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

145

Page 156: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

146

Page 157: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

147

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

FLOW MEASURING DEVICES

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

214 Item No.214 :- Providing and fixing gauge plate of Aluminium composite panel sheet with exterior panel coated with kynar 500 (min 70%) PVDF coating with computerised gauge marking with reflective radium pasting, spray lamination with polyurethane chemical for surface protection including material required for fixing, nut bolts, washers, Nylon rope, hanger, drilling machine etc.

Sqm.

21333.00

1562.00

215 Item No.215 :- Providing, installing & erecting in correct line and level, fiber glass reinforced plastics(FRP) "V notch" of following sizes and discharge capacities, for accurate measurement of water flowing through open channel with prefabricated fiber glass lining moulded engraved gauge marking ( in lit/sec and in cms) including discharge table, capacity marking, flow direction, sand treatment on the back side of "V" notch, testing, etc. complete

(Excluding base preparation i.e. CBL, canal section other concrete etc.)

(A) FRP V notch having discharge capacity 15 lit/ sec of section 20 x 40 cms with upstream and downstream channel.

No. 10064.00 521.00

(B) FRP V notch having discharge capacity 30 lit/ sec of section 25 x 50 cms with upstream and downstream channel.

No. 15626.00 651.00

(C) FRP V notch having discharge capacity 45 lit/ sec of section 28 x 56 cms with upstream and downstream channel.

No. 17654.00 781.00

(D) FRP V notch having discharge capacity 60 lit/ sec of section 30 x 60 cms with upstream and downstream channel.

No. 21156.00 911.00

(E) FRP V notch having discharge capacity 90 lit/ sec of section 35 x 70 cms with upstream and downstream channel.

No. 26761.00 1041.00

(F) FRP V notch having discharge capacity 120 lit/ sec of section 42 x 84 cms with upstream and downstream channel.

No. 33773.00 1172.00

Page 158: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

148

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

216 Item No.216 :- Providing , installing & erecting in correct line and level, fiber glass reinforced plastics(FRP) cut throat flume (CTF) measuring devices on calculated hump level for accurate measurement of water flowing through open channel , with prefabricated fiber glass lining moulded engraved gauge marking (in lit/sec and in cms.) including discharge table, capacity marking, flow direction, sand treatment on the back side of flume, testing etc. complete.

(Excluding CBL and hump preparation, canal section and other concrete required for hump, U/S and D/S slopes of hump etc.)

A) Cut throat flume 10 x 90 cms - 0.33 cusecs No. 3825.00 781.00

B) Cut throat flume 10 x 90 cms - 0.50 cusecs No. 4255.00 781.00

C) Cut throat flume 20 x 90 cms - 1.00 cusecs No. 8215.00 1041.00

D) Cut throat flume 20 x 90 cms - 2.00 cusecs No. 8919.00 1041.00

E) Cut throat flume 20 x 90 cms - 3.00 cusecs No. 9988.00 1041.00

F) Cut throat flume 20 x 90 cms - 4.00 cusecs No. 10342.00 1041.00

G) Cut throat flume 40 x 180 cms - 5.00 cusecs No. 24904.00 1562.00

H) Cut throat flume 40 x 180 cms - 6.00 cusecs No. 26323.00 1562.00

I) Cut throat flume 40 x 180 cms - 8.00 cusecs No. 27737.00 1562.00

J) Cut throat flume 40 x 180 cms - 10.00 cusecs No. 29160.00 1562.00

K) Cut throat flume 40 x 180 cms - 12.00 cusecs No. 30578.00 1562.00

L) Cut throat flume 40 x1 80 cms - 15.00 cusecs No. 33415.00 1562.00

M) Cut throat flume 40 x 180 cms - 18.00 cusecs No. 34838.00 1562.00

N) Cut throat flume 40 x 180 cms - 20.00 cusecs No. 36257.00 1562.00

O) Cut throat flume 100 x 270 cms - 25.00 cusecs No. 59433.00 2083.00

P) Cut throat flume 100 x 270 cms - 30.00 cusecs No. 61520.00 2083.00

Q) Cut throat flume 100 x 270 cms - 35.00 cusecs No. 65695.00 2083.00

R) Cut throat flume 100 x 270 cms - 40.00 cusecs No. 69865.00 2083.00

S) Cut throat flume 100 x 270 cms - 50.00 cusecs No. 74044.00 2083.00

T) Cut throat flume 100 x 270 cms - 60.00 cusecs No. 80306.00 2083.00

U) Cut throat flume 100 x 270 cms - 70.00 cusecs No. 84481.00 2083.00

V) Cut throat flume 100 x 270 cms - 80.00 cusecs No. 90734.00 2083.00

Page 159: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

149

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

217 Item No.217 :- Providing, installing & erecting in correct line and level, fiber glass reinforced plastics (FRP) parshall flume on calculated hump level of following sizes and discharge capacities, for accurate measurement of water flowing through open channel with prefabricated fiber glass lining moulded engraved gauge marking (in lit/sec and in cms) including discharge table, capacity marking, flow direction, sand treatment on the back side of flume, testing, etc. complete.

(Excluding CBL and hump preparation, canal section and other concrete required for hump, U/sand D/S slopes of hump etc.)

A) Parshall flume - 242.80 x 437 cms-100 cusecs No. 216719.00 2083.00

B) Parshall flume - 243.80 x 437 cms-150 cusecs No. 230832.00 2083.00

C) Parshall flume - 426 x 595.50 cms-200 cusecs No. 414073.00 3124.00

D) Parshall flume-426.70x595.50 cms-250 cusecs No. 424424.00 3124.00

E) Parshall flume - 426 x 595.50 cms-300 cusecs No. 434502.00 3124.00

F) Parshall flume-426.70x 595.50 cms-400 cusecs No. 459685.00 3124.00

G) Parshall flume - 457 x 1189 cms -500 cusecs No. 758847.00 4166.00

H) Parshall flume - 457 x 1189 cms -750 cusecs No. 809037.00 4166.00

I) Parshall flume - 610 x 1311 cms -1000 cusecs No. 1085835.00 4166.00

J) Parshall flume - 610 x 1311 cms -1250 cusecs No. 1152495.00 4166.00

K) Parshall flume - 762 x 1341 cms -1500 cusecs No. 1198058.00 4166.00

Page 160: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

150

Page 161: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

151

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-12

MARKING BLUE LINE AND RED LINE

ITEM NO 218 TO 225

Page 162: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

152

Page 163: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

153

Page 164: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

154

Page 165: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

155

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

MARKING BLUE LINE & RED LINE

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

218 Item No.218 :- Fixing control points by Differential Global Position System (DGPS) instrument at every One Km. along the both side of river including collection of necessary flood data etc. complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Km.

974.35

529.15

219 Item No.219 :- Traverse Survey along river with cross section at 100 m. c/c along river .The levels on cross section shall be at every 30 m c/c beyond past locally observed flood line, using Differential Global Position System (DGPS) instrument including labor, transportation, using sounding by boat in river water in wet condition and transfer of entire data to computer system in different geo referential layers/ themes using features of standard plotting software computable with design software package including contour plotting at required interval and at a scale and following deliverables etc. all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

(A) For Rivers/Nalas in Dry condition. Ha. 382.10 240.02

(B) For River and Nalas with deep water and flowing condition.

Ha. 431.50 253.42

220 Item No.220 :- Delivering Contour map of 0.50 m. contour interval by using standard software and superimposing it on village map with scale 1:5000 showing Prohibited line( Blue line) & Restricted line (Red line) along with mapping of structures & other details etc all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Ha.

36.40

30.40

Page 166: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

156

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

221 Item No.221 :- Providing computerised detailed cross section drawings in two copies at 100 m interval with actual profile of river (levels at every 30m. distance along cross section) on A-3 size paper with scale 1cm = 15m or 1cm = 30m which is suitable as per site condition showing 25 year return flood line (Blue line) and 100 years return flood line (Red line) computed by software analysis and submission in the form of soft and hard copy as directed by Engineer in charge. So as to use the data of above Item No.218 to 220 by HEC-RAS Software. including submission of check print and getting approval of Engineer in charge etc all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Cross Section

320.75

--

222 Item No.222 :- Computation of Blue line ( 25 Year return flood line) and red line ( 100 year return flood line ) by using HEC-RAS software including estimation of flood getting approval of competent authority for the same giving all the precise necessary input details into the software, viz. cross sectional and longitudinal features of the stream, flow obstructions etc. including site validation & recalculation to the satisfaction of Engineer In charge etc all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Km.

2404.60

--

223 Item No.223 :- Providing computerised detailed river alignment with contours on A-1 size paper with scale 1 cm equal to 15 m or 30m whichever is suitable as per site condition. (one sheet for one Km. length of river) with contour at 0.50 m. interval including marking 25 years return flood level (Blue line) & 100 years return flood level (Red line) line & showing locations of bridges, KT Weirs & other permanent structures on each drawing along and across the river as directed by Engineer in Charge, including providing one colour check print & six hard copies (colour print) with one soft copy etc. all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Sheet

968.70

--

Page 167: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

157

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

224 Item No.224 :- Marking of 25 years return flood level ( blue line) & 100 years flood level (Red line) on permanent structures like Bridges, Temples & other permanent structures along & across river including painting, lettering at every not less than 100 m. interval & not more than 500 m. on both the banks of river, after the final approval of flood level. as directed by engineer in charge etc. all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

No.

426.30

95.37

225 Item No.225 :- Carry out Arial Survey for purpose of crop area measurement and assessment

i. Carry out Arial survey of area of irrigation

project as directed by engineer in-charge using

drone or any appropriate device taking all

necessary permissions from appropriate

authority.

ii. Capturing images of entire area with

resolution of at least 2 cm, with all necessary

activities, generation of orthomosaic image

using appropriate software and tools,

georeferencing etc.

iii. Collection of data regarding land records

such as village / tahasil /district boundaries,

survey number / gut numbers of land under

each village and its ownership, and preparation

of layers of this data using appropriate software

and tools, as directed by engineer-in charge.

iv. Collection of data regarding irrigation project

and canal network along with important

structures and creation of layer using

appropriate software and tools, as directed by

engineer-in charge.

v. Superimposing the data about land record

and irrigation project and canal network on

orthomosaic image, identification of crop within

each field, along with area under that crop, and

filling the details in Form No. 12 (PWD 166), in

Marathi language, as directed by engineer-in

charge. The said form is attached in PDF

format. This data shall be submitted in hard

copy (3 sets).

Ha.

156.00

--

Page 168: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

158

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

vi. Submission of drawing on C0 size paper in

hard copy (3 copies) covering entire survey area

showing details of canal, structures, villages,

survey number, crop details etc. in different

colour coding, as directed by engineer-in

charge.

vii. Submission of approx. 100 drawings on A0

size paper in hard copy covering area of

1000 ha approximately on each drawing,

showing details of irrigation project, canal

network, important structures, village details,

crop details, survey number of each land,

farmers details etc, as directed by engineer-in

charge.

viii. Submission of all above details (i.e.

orthomosaic image, layer of village/land details,

layer of canal/structure details, layer of crop

details etc.) in digital format, all important layers

as directed engineer-in-charge in kmz/kml/shp

format, Form No. 12 in spreadsheet format (e.g.

excel) in hard disk of 10 TB capacity.

The rate is excluding GST and including survey with all details.

Page 169: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

159

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2017-18

SECTION-13

LAND RECLAIMATION WORK AND SOIL SURVEY

ITEM NO 226 TO 237

Page 170: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

160

Page 171: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

161

Page 172: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

162

Page 173: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

163

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2017-18

LAND RECLAIMATION WORK AND SOIL SURVEY

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

226 Item No.226 :- Collecting and filling soil samples in plastic bag of size (15X23 cm) 200 gauge and cloth bag of size (18X25 cm) with inside flap of 4 X 5 cm for address tag and packing properly including cost of bags etc. complete.

Per augur hole

70.20

48.10

227 Item No.227 :- Taking well observations in the command area including collecting data of well water level, taking photos of wells for GPS Based Monitoring, with Software developing, Maintainance of Web & Producing reports, Syncronisation of reloads through Internet. & Cloud storege, Water samples, visual observation of crops and preparing data base recording in well observation book collecting water samples.

No.

71.20

71.20

228 Item No.228 :- Taking augur bores of 10 cm.dia.with augur for classifying strata including putting the excavated stuff in cyclic order, dewatering for recuperating results etc. complete.

Rmt.

435.35

435.35

229 Item No.229 :- Taking augur bores of 10 cm. dia. with augur for classifying strata including putting the excavated stuff in cyclic order, dewatering for recuperating results etc. complete. (Augur karkoon engaged departmentally)

Rmt.

342.05

342.05

230 Item No.230 :- Measuring drain discharge in every season including transporting and installing temporarilly available measuring device such as " V " notch on site with all labour, material, recording in well observation book etc. complete

No.

264.60

264.60

231 Item No.231 :- Collecting & filling water samples in plastic bottles including cost of plastic bottles etc. complete.

No.

2.80

0.00

Page 174: WATER RESOURCES DEPARTMENT - Maharashtra · GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES FOR 2017-18 I N D E X Sr. No. Particulars Pages From To 1

164

Sr. No.

Item Unit

Rate for 2017-18 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

232 Item No.232 :- Testing of soil sample obtained auger as per depth, doing weight of 100gm of soil sample mix distilled water with 1:2 hence 200ml for 5 minutes, Testing Ec & pH of each sample filling result in prescribe forms cleaning of equipments, measuring cylinder etc. complete.

No.

29.15

25.80

233 Item No.233 :- Labour charges for removing grass, thorny shrubs, Jungli shrub, Kubabul and alike grass along and in the drain / canal making the ground clean by showel and phavaras etc. complete.

Sqm.

10.10

10.10

234 Item No.234 :- Taking open pits, one open pit per sq.km., including refilling of open pit after taking down all necessary morphological observations. Size of pit - Length 2.5 m. x Width 1.20 m and Depth of open pit up to 2.50 m. or up to hard strata, if met first.

No.

543.00

543.00

235 Item No.235 :- Carrying out infiltration tests at the location of open pits in the command area.

Test

264.60

264.60

236 Item No.236 :- Carrying out phase level mapping for confirmation of morphological properties of soil and their interconnection in field for various phases such as texture, erosion, slope, salinity, rockiness, stoniness etc.

Sqkm.

699.80

699.80

237 Item No.237 :-- Carrying out drying, pounding, sieving of soil samples in laboratory including washing the sets of soil samples after every test and discarding of tested soil samples at the laboratory.

Sample

12.70