+ All Categories
Home > Documents > WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... ·...

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... ·...

Date post: 18-Apr-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
17
Implementing Agency: Procurement Steps for CONSULTANTS Actual Re-adv. /Actual Planned Actual Planned Actual Planned Re-adv./ Planned Actual Re-adv. /Actual Planned Actual Re-adv. /Actual Planned Preparation of TORs/Cost Estimates 11.09.2008 N.R. 30.07.2008 11.09.2008 15.08.2008 11.09.2008 05.06.2008 20.01.2013 11.09.2008 Not Required -- 11.09.2008 Not Required -- Bank’s No-objection to TORs (for prior review cases) 13.09.2008 Not Required 05.08.2008 13.09.2008 20.08.2008 13.09.2008 10.06.2008 25.01.2013 13.09.2008 Not Required -- 13.09.2008 Not Required -- Expression of Interest/CVs invited 19.10.2008 26.06.2011 30.08.2008 19.10.2008 15.09.2008 07.06.2009 20.06.2008 12.02.2013 19.10.2008 -- -- 19.10.2008 10.07.2011 -- Evaluation of CV’s of at least 3 candidates / Recommendation for Award to most qualified candidate 18.02.2009 19.07.2011 15.09.2008 30.06.2009 30.09.2008 30.06.2009 30.06.2008 30.02.2013 06.08.2009 -- -- 18.02.2009 29.07.2011 -- Bank’s No-objection to Evaluation of CV of the Recommended Candidate (for prior review cases) 21.02.2009 22.07.2011 20.09.2008 16.07.2009 05.10.2008 27.11.09 05.07.2008 05.03.2013 11.08.2009 02.11.2011 # -- 21.02.2009 29.07.2011 -- Negotiations/Preparation of Draft Contract 02.03.2009 22.07.2011 25.09.2008 18.07.2009 10.10.2008 30.11.2009 10.07.2008 10.03.2013 11.08.2009 -- -- 02.02.2009 29.07.2011 -- Bank’s No-objection to draft contract (For prior review cases) Not Obtained Not Obtained 30.09.2008 Not Obtained 15.10.2008 Not Obtained 15.07.2008 15.03.2013 Not Obtained 02.11.2011 -- Not Obtained Not Obtained -- Contract Signing 25.03.2009 22.08.2011 05.10.2008 20.07.2009 20.10.2008 01.12.2009 20.07.2008 20.03.2013 15.08.2009 01.07.2011 -- 25.03.2009 02.08.2011 -- Contract Completion 24.03.2011 -- 22.08.2013 30.06.2011 19.10.2010 31.07.2012 01.12.2012 28.02.2014 31.05.2011 -- 30.06.2012 24.03.2011 -- 02.08.2013 Actual Cost: 2. Actual Cost encircles time priod from 25.03.2009 to 22.08.2013. (Prior Review) The incumbant had resigned from the position in May 2011 due to insufficient monthly remuneration rate based on qualification & experience as compared to prevalent market rates. However, he was re-employed on SSS basis on 01.07.2011 & Bank's retroactive NOL was secured on 02.11.2011. Continuity of services of the incumbant shall be required till the completion of project. Foot Notes for Explanation, if any: -- 2. Actual Cost encircles time priod from 15.08.2009 to 30.06.2013. 1. Defined time period of two years in PC - II for the position was lapsed on Mar. 2011 and World Bank's NOL was not obtained while lying off the services. On Bank's suggestion due to proc/contract management issues, position was revived. Continuity of services of the incumbant shall be required till the completion of project. 1. The incumbant had resigned from the position in March 2011. However, World Bank pressed hard for hiring of professional on the position and therefore, he has been re-employed through competition on 02.08.2011 with Bank's NOL. Continuity of services of the incumbant shall be required till the completion of project. 2. Actual Cost encircles time priod from 24.03.2009 to 02.08.2013. Subsequent to completion of two years' tenure of a consultant, the position has been abolished in Re- Structuring Plan. Dates Dates (Prior Review) Dates Method of Proc. Individual Consultant (Prior Review) Actual Cost: Activity - 1 Procurement Specialist = 01 PMPIU Actual Cost: Activity - 2 Water Consultant = 01 PMPIU Financial & Business Management Specialist = 01 PMPIU Individual Consultant (SSS) Method of Proc. Individual Consultant Method of Proc. Method of Proc. Individual Consultant Actual Cost: Activity - 3 Activity - 4 Principal River Engineer = 01 PMPIU Dates Team Leader = 01 PMPIU Actual Cost: Activity - 5 WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK] REVISED/UPDATED PROCUREMENT PLAN OF INDIVIDUAL CONSULTANTS FOR YEAR 2012/13 Project Management & Policy Implementation Unit (PMPIU) - WCAP Method of Proc. (Prior Review) 2. Actual Cost encircles time priod from 01.12.2009 to 31.07.2012. Individual Consultant (Prior Review) Dates The incumbant Team Leader has resigned on 31.07.2012. In view of the additional financing for WCAP, induction of full time new professional is necessitated. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized
Transcript
Page 1: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency:

Procurement Steps for

CONSULTANTS

Actual

Re-adv.

/Actual Planned Actual Planned Actual Planned

Re-adv./

Planned Actual

Re-adv.

/Actual Planned Actual

Re-adv.

/Actual Planned

Preparation of TORs/Cost

Estimates11.09.2008 N.R. 30.07.2008 11.09.2008 15.08.2008 11.09.2008 05.06.2008 20.01.2013 11.09.2008

Not

Required-- 11.09.2008

Not

Required--

Bank’s No-objection to TORs

(for prior review cases)13.09.2008

Not

Required05.08.2008 13.09.2008 20.08.2008 13.09.2008 10.06.2008 25.01.2013 13.09.2008

Not

Required-- 13.09.2008

Not

Required--

Expression of Interest/CVs invited 19.10.2008 26.06.2011 30.08.2008 19.10.2008 15.09.2008 07.06.2009 20.06.2008 12.02.2013 19.10.2008 -- -- 19.10.2008 10.07.2011 --

Evaluation of CV’s of at least 3

candidates / Recommendation for

Award to most qualified candidate

18.02.2009 19.07.2011 15.09.2008 30.06.2009 30.09.2008 30.06.2009 30.06.2008 30.02.2013 06.08.2009 -- -- 18.02.2009 29.07.2011 --

Bank’s No-objection to Evaluation

of CV of the Recommended

Candidate (for prior review cases)

21.02.2009 22.07.2011 20.09.2008 16.07.2009 05.10.2008 27.11.09 05.07.2008 05.03.2013 11.08.2009 02.11.2011 # -- 21.02.2009 29.07.2011 --

Negotiations/Preparation of Draft

Contract02.03.2009 22.07.2011 25.09.2008 18.07.2009 10.10.2008 30.11.2009 10.07.2008 10.03.2013 11.08.2009 -- -- 02.02.2009 29.07.2011 --

Bank’s No-objection to draft

contract (For prior review cases)

Not

Obtained

Not

Obtained30.09.2008 Not Obtained 15.10.2008

Not

Obtained15.07.2008 15.03.2013

Not

Obtained02.11.2011 --

Not

Obtained

Not

Obtained--

Contract Signing 25.03.2009 22.08.2011 05.10.2008 20.07.2009 20.10.2008 01.12.2009 20.07.2008 20.03.2013 15.08.2009 01.07.2011 -- 25.03.2009 02.08.2011 --

Contract Completion 24.03.2011 -- 22.08.2013 30.06.2011 19.10.2010 31.07.2012 01.12.2012 28.02.2014 31.05.2011 -- 30.06.2012 24.03.2011 -- 02.08.2013

Actual Cost:

2. Actual Cost encircles time priod from

25.03.2009 to 22.08.2013.

(Prior Review)

The incumbant had resigned from the

position in May 2011 due to insufficient

monthly remuneration rate based on

qualification & experience as compared to

prevalent market rates. However, he was

re-employed on SSS basis on 01.07.2011 &

Bank's retroactive NOL was secured on

02.11.2011. Continuity of services of the

incumbant shall be required till the

completion of project.

Foot Notes for Explanation, if any:

--2. Actual Cost encircles time priod from

15.08.2009 to 30.06.2013.

1. Defined time period of two years in PC -

II for the position was lapsed on Mar. 2011

and World Bank's NOL was not obtained

while lying off the services. On Bank's

suggestion due to proc/contract

management issues, position was revived.

Continuity of services of the incumbant

shall be required till the completion of

project.

1. The incumbant had resigned from the

position in March 2011. However,

World Bank pressed hard for hiring of

professional on the position and

therefore, he has been re-employed

through competition on 02.08.2011

with Bank's NOL. Continuity of services

of the incumbant shall be required till

the completion of project.

2. Actual Cost encircles time priod from

24.03.2009 to 02.08.2013.

Subsequent to completion of two

years' tenure of a consultant, the

position has been abolished in Re-

Structuring Plan.

Dates Dates

(Prior Review)

Dates

Method of Proc.

Individual Consultant

(Prior Review)

Actual Cost:

Activity - 1

Procurement Specialist = 01

PMPIU

Actual Cost:

Activity - 2

Water Consultant = 01

PMPIU

Financial & Business Management

Specialist = 01

PMPIU

Individual Consultant (SSS)

Method of Proc.

Individual Consultant

Method of Proc.Method of Proc.

Individual Consultant

Actual Cost:

Activity - 3 Activity - 4

Principal River Engineer

= 01

PMPIU

Dates

Team Leader = 01

PMPIU

Actual Cost:

Activity - 5

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN OF INDIVIDUAL CONSULTANTS FOR YEAR 2012/13

Project Management & Policy Implementation Unit (PMPIU) - WCAP

Method of Proc.

(Prior Review)

2. Actual Cost encircles time priod from

01.12.2009 to 31.07.2012.

Individual Consultant

(Prior Review)

Dates

The incumbant Team Leader has resigned

on 31.07.2012. In view of the additional

financing for WCAP, induction of full time

new professional is necessitated.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb350881
Typewritten Text
75399
Page 2: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agencies:

Procurement Steps for Activity - 8 Activity - 9 Activity - 10

CONSULTANTS Short Term Consultant for

Expansion of WCAP/

Revision of PC - II = 01

PMPIU

Short Term Consultant for

Development of

Communication Strategy =

01

PMPIU

Short Term Consultant for

PMPIU's Capacity Building

& Data Reconciliation in

SAP/PIFRA = 01

PMPIU

US$ 16,938 US$ 16,696 US$ 41,741

Method of Proc. Method of Proc. Method of Proc.

Individual Consultant Individual Consultant Individual Consultant

(Post Review) (Post Review) (Post Review)

Dates Dates Dates

Actual Planned Actual

Re-adv.

/Actual Planned Planned Planned Planned Actual Planned

Preparation of TORs/Cost

Estimates10.06.2010 06.05.2010 11.09.2009 Not Required -- 10.02.2013 10.02.2013 10.02.2013 31.03.2009 01.02.2009

Bank’s No-objection to TORs

(for prior review cases)11.06.2010 31.05.2010 13.09.2009 Not Required -- Not Required Not Required Not Required 08.06.2009 07.02.2009

Expression of Interest/CVs invited 13.02.2010 15.06.2010 19.10.2009 25.08.2011 -- 12.02.2013 12.02.2013 12.02.2013 11.06.2009 10.02.2009

Evaluation of CV’s of at least 3

candidates / Recommendation for

Award to most qualified candidate

11.04.2011 30.06.2010 18.02.2009 22.09.2011 -- 30.02.2013 30.02.2013 30.02.2013 31.07.2009 25.02.2009

Bank’s No-objection to Evaluation

of CV of the Recommended

Candidate (for prior review cases)

15.04.2011 01.07.2010 21.02.2009 10.10.2011 -- Not Required Not Required Not Required 31.08.2009 02.03.2009

Negotiations/Preparation of Draft

Contract15.04.2011 08.07.2010 02.03.2009 10.10.2011 -- 10.03.2013 10.03.2013 10.03.2013 31.08.2009 05.03.2009

Bank’s No-objection to draft

contract (For prior review cases)Not Obtained Not Obtained 06.05.2009 Not Obtained -- Not Required Not Required Not Required Not Obtained 10.03.2009

Contract Signing 16.04.2011 13.07.2010 14.03.2009 21.10.2011 -- 15.03.2013 15.03.2013 15.03.2013 31.08.2009 12.03.2009

Contract Completion -- 16.04.2013 13.03.2010 21.10.2013 25.05.2013 15.05.2013 282.0.2014 15.06.2011 12.07.2009

The Contract's time period was

extended, however, World Bank's

NOL was not obtained being prior

review case.

----2. Actual Cost encircles time priod from

14.03.2009 to 21.10.2013.

Activity re-planned. Earlier it's

procurement cycle was

scheduled to start in December

2012.

Foot Notes for Explanation, if any:

Continuity of services of the

incumbant shall be required till the

completion of project.

2. Actual Cost encircles time priod

from 16.04.2011 to 16.04.2013.

1. Services were not hired after completion of

one year contractual period of professional on

13.03.2010. However, due to Project's needs,

new recruitment was made on 21.10.2011.

--

(Prior Review)

Dates

Activity - 7

Actual Cost:Actual Cost:

Method of Proc.Method of Proc.

Individual Consultant

Actual Cost:

Legal Expert (Retainer Basis) = 01

PMPIU

Activity - 6

Individual Consultant Individual Consultant

Method of Proc.

(Prior Review)

Dates

Director (Technical) = 01

PMPIU

(Prior Review)

Dates

GIS Specialist = 01

IRSA

Activity - 11

Newly added activity. Newly added activity.

--

PMPIU & IRSA

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN OF INDIVIDUAL CONSULTANTS FOR YEAR 2012/13

Page 3: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency:

Procurement Steps for Activity - 15 Activity - 16 Activity - 17

CONSULTANTS System Administrator = 02

IRSA

Senior Engineer/

GIS Specialist = 01

IRSA

Senior Hydrological

Modeling Expert = 01

IRSA

US$ 29,630 US$ 14,815 US$ 12,593

Method of Proc. Method of Proc. Method of Proc.

Individual Consultant Individual Consultant Individual Consultant

(Post Review) (Post Review) (Post Review)

Dates Dates Dates

Actual Planned Actual Planned Actual

Re-adv.

/Actual Planned Planned Planned Planned

Preparation of TORs/Cost

Estimates26.06.2009 01.02.2009 26.06.2009 01.02.2009 09.02.2009

Not

Required-- 20.02.2013 20.02.2013 20.02.2013

Bank’s No-objection to TORs

(for prior review cases)29.06.2009 07.02.2009 29.06.2009 07.02.2009 12.02.2009

Not

Required-- Not Required Not Required Not Required

Expression of Interest/CVs invited 10.07.2009 10.02.2009 10.07.2009 10.02.2009 20.02.2009 01.04.2010 -- 22.02.2013 22.02.2013 22.02.2013

Evaluation of CV’s of at least 3

candidates / Recommendation for

Award to most qualified candidate

27.10.2009 25.02.2009 27.10.2009 25.02.2009 19.03.2009 15.05.2010 -- 25.03.2013 25.03.2013 25.03.2013

Bank’s No-objection to Evaluation

of CV of the Recommended

Candidate (for prior review cases)

18.12.2009 02.03.2009 27.10.2009 02.03.2009 21.03.2009 22.05.2010 -- Not Required Not Required Not Required

Negotiations/Preparation of Draft

Contract18.12.2009 05.03.2009 24.12.2009 05.03.2009 19.03.2009 29.05.2010 -- 30.03.2013 30.03.2013 30.03.2013

Bank’s No-objection to draft

contract (For prior review cases)Not Obtained 10.03.2009 Not Obtained 10.03.2009

Not

Obtained

Not

Obtaibed-- Not Required Not Required Not Required

Contract Signing 18.12.2009 12.03.2009 24.12.2009 12.03.2009 02.04.2009 21.06.2010 -- 01.04.2013 01.04.2013 01.04.2013

Contract Completion 15.06.2011 12.07.2009 15.01.2011 12.07.2009 01.04.2010 26.09.2012 -- 28.02.2014 28.02.2014 28.02.2014

--

The Contract's time period was

extended, however, World Bank's

NOL was not obtained being prior

review case.

---- --

The Contract's time period was

extended, however, World Bank's

NOL was not obtained being prior

review case.

Dates

--

1. The earlier hired Consultant did not

continue after expiry of his contract

beyond 01.04.2010. However, new

recruitment was made through

competition on 21.06.2010 with Bank's

NOL. Nonethless, WB's NOL was not

obtained on time extension of later

consultant beyond 20.06.2011 and

increased monthly remuneration rate.

--

Foot Notes for Explanation, if any:

Dates Dates

(Prior Review)

Individual Consultant

Method of Proc.

Activity - 12

Modeling & Database

Management Expert = 01

IRSA

Actual Cost:

Method of Proc.

Individual Consultant

(Prior Review)

Actual Cost:

Individual Consultant

Project Coordinator = 01

IRSA

Activity - 14

(Prior Review)

Activity - 13

Flow Measurement

Specialist = 01

IRSA

REVISED/UPDATED PROCUREMENT PLAN OF INDIVIDUAL CONSULTANTS FOR YEAR 2012/13

Based on the need analysis carried out by contracted consultant (NESPAK) induction of

professionals for establishment & future management of GIS/MIS Lab and Decision Support

System was planned. Earlier, the procurement cycle scheduled to start in November 2012,

now re-planned.

Actual Cost:

Method of Proc.

IRSA

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]

Page 4: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agencies:

Procurement Steps for Activity - 18 Activity - 19 Activity - 20

CONSULTANTS Junior Engineer/

Assistant GIS Specialist = 01

IRSA

Junior Hydrological Modeling

Expert = 01

IRSA

Sr. Project Officer = 01

IRSA

US$ 12,593 US$ 12,593 US$ 29,630

Method of Proc. Method of Proc. Method of Proc.

Individual Consultant Individual Consultant Individual Consultant

(Post Review) (Post Review) (Post Review)

Dates Dates Dates

Planned Planned Planned Actual Planned Actual Planned Actual Planned

Preparation of TORs/Cost

Estimates20.02.2013 20.02.2013 20.02.2013 29.12.2009 -- 29.12.2009 -- 29.12.2009 --

Bank’s No-objection to TORs

(for prior review cases)Not Required Not Required Not Required 20.01.2010 -- 20.01.2010 -- 20.01.2010 --

Expression of Interest/CVs invited 22.02.2013 22.02.2013 22.02.2013 06.04.2010 -- 06.04.2010 -- 06.04.2010 --

Evaluation of CV’s of at least 3

candidates / Recommendation for

Award to most qualified candidate

25.03.2013 25.03.2013 25.03.2013 19.04.2010 -- 19.04.2010 -- 19.04.2010 --

Bank’s No-objection to Evaluation

of CV of the Recommended

Candidate (for prior review cases)

Not Required Not Required Not Required 21.04.2010 -- 21.04.2010 -- 21.04.2010 --

Negotiations/Preparation of Draft

Contract30.03.2013 30.03.2013 30.03.2013 10.08.2010 -- 10.08.2010 -- 10.08.2010 --

Bank’s No-objection to draft

contract (For prior review cases)Not Required Not Required Not Required Not Obtained -- Not Obtained -- Not Obtained --

Contract Signing 01.04.2013 01.04.2013 01.04.2013 22.10.2010 -- 22.10.2010 -- 12.10.2010 --

Contract Completion 28.02.2014 28.02.2014 28.02.2014 -- 21.07.2013 -- 24.07.2013 -- 21.07.2013

Foot Notes for Explanation, if any:

WAPDA has extended the

contractual time period with No

Objection of the World Bank.

-- -- --

WAPDA has extended the

contractual time period with No

Objection of the World Bank.

WAPDA has extended the

contractual time period with No

Objection of the World Bank.

New activity

--

Dates

Individual Consultant

(Prior Review)

Individual Consultant

(Prior Review)

Dates

Method of Proc.Method of Proc.

Deputy Managers (One each for

Oracle Database & Hardware

and GIS/MIS) = 02

(IBMR) WAPDA

Actual Cost:

Activity - 22

Actual Cost:

Activity - 23

Individual Consultant

Hydrologist = 01

(IBMR)

WAPDA

Actual Cost:

Method of Proc.

(Prior Review)

Dates

Activity - 21

Manager (Water Resources

Database) = 01

(IBMR)

WAPDA

--

Based on the need analysis

carried out by NESPAK,

induction of professional for

establishment /management of

GIS/MIS Lab and DSS was

planned. Earlier, the

procurement cycle scheduled to

start in November 2012, now re-

planned.

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN OF INDIVIDUAL CONSULTANTS FOR YEAR 2012/13

Based on the need analysis

carried out by contracted

consultant (NESPAK) induction

of professionals for

establishment & future

management of GIS/MIS Lab

and Decision Support System

was planned. Earlier, the

procurement cycle scheduled to

start in November 2012, now re-

planned.

IRSA & WAPDA

Page 5: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agencies: WAPDA

Procurement Steps for

CONSULTANTS

Actual Planned Actual Planned

Preparation of TORs/Cost Estimates 29.12.2009 -- Not Applicable --

Bank’s No-objection to TORs

(for prior review cases)20.01.2010 -- do --

Expression of Interest/CVs invited 06.04.2010 -- do --

Evaluation of CV’s of at least 3 candidates /

Recommendation for Award to most

qualified candidate

19.04.2010 -- do --

Bank’s No-objection to Evaluation of CV of

the Recommended Candidate (for prior

review cases)

21.04.2010 -- 21.04.2011 --

Negotiations/Preparation of Draft Contract 10.08.2010 -- 30.03.2011 --

Bank’s No-objection to draft contract (For

prior review cases)Not Obtained -- 21.04.2011 --

Contract Signing 12.10.2010 -- 01.06.2011 --

Contract Completion -- 06.08.2013 -- 06.08.2013

Foot Notes for Explanation, if any:

WAPDA has extended the contractual time period

with No Objection of the World Bank.

Copy of the contract agreement has not been

shared by WAPDA. Also, NOL of the World Bank

for extension of contract agreement beyond

26.12.2012 is not available.

-- --

International Consultant = 01

(Upgradation of CMTL)

WAPDA

Actual Cost: Actual Cost:

Activity - 25Activity - 24

Individual Consultant (SSS)

(Prior Review)(Prior Review)

Processing Engineer = 01

(IBMR)

WAPDA

Dates

Method of Proc.

Individual Consultant

Dates

Method of Proc.

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-REVISED/UPDATED PROCUREMENT PLAN OF INDIVIDUAL CONSULTANTS FOR YEAR 2012/13

Page 6: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency: Components: A1 & C

Procurement Steps

Dates

Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

Preparation of TORs/Cost

Estimates/EOI19.12.2008 -- 22.11.2011 15.12.2011 25.11.2009 -- 25.11.2009 -- 18.07.2009 --

Bank’s No-objection to TORs and EOIs

(for prior review cases only)21.03.2009 -- 28.05.2012 22.01.2012 01.04.2010 -- 19.05.2010 -- 28.07.2009 --

Advertising for Expression of Interests

in National Newspapers. 28.03.2009 -- 02.06.2012 25.01.2012 07.04,2010 -- 24.05.2010 -- 02.08.2009 --

Receipt of Interests from Firms15.04.2009 -- 10.07.2012 10.02.2012 22.04.2010 -- 08.06.2010 -- 17.08.2009 --

Preparation of Short List 30.05.2009 -- 16.08.2012 25.02.2012 21.05.2010 -- 19.06.2010 -- 28.08.2009 --

Bank’s No-objection to Short List (For

prior review cases only)06.11.2009 -- 10.09.2012 02.03.2012 25.06.2010 -- 06.07.2101 -- 28.08.2009 --

Preparation of RFP30.05.2009 -- 16.08.2012 25.02.2012 Not Done -- Not Done -- Not Done --

Bank’s no-objection to RFP (for prior

review cases)06.11.2009 -- 10.09.2012 02.03.2012 No Obtained -- Not Obtained -- Not Obtained --

Issuance of RFP to Short-listed Firms12.11.2009 -- 12.09.2012 04.03.2012 25.06.2010 -- 07.07.2010 -- 31.08.2009 --

Receipt of Technical and Financial

Proposals28.12.2009 -- 12.11.2012 12.11.2012 26.07.2010 -- 28.07.2010 -- 15.09.2009 --

Completion of Technical Evaluation10.02.2010 -- 28.12.2012 30.11.2012 31.07.2010 -- 03.08.2010 -- 18.09.2009 --

Bank’s No-objection to Technical

Evaluation (for prior review cases)05.04.2010 -- -- 25.01.2013 Not Obtained -- Not Obtained -- 08.12.2009 --

Opening of Financial Proposals08.04.2010 -- -- 04.02.2013 11.08.2010 -- Not Required -- 16.09.2009 --

Completion of Combined/Final

Evaluation14.04.2010 -- -- 08.02.2013 11.08.2010 -- Not Required -- 05.01.2010 --

Bank's clearence of Combined/Final

Evaluation (For Prior Review Cases)03.05.2010 -- 12.02.2013 No Obtained Not Obtained Not Obtained --

Negotiations/ Preparation of Draft

Contract13.07.2010 -- -- 18.02.2013 11.08.2010 -- 10.08.2010 -- 30.12.2009 --

Bank’s No-objection to draft Contract

(for prior review cases)27.07.2010 -- -- 22.02.2013 Not Obtained -- Not Obtained -- 20.01.2010 --

Contract Signing 29.07.2010 -- -- 28.02.2013 08.09.2010 -- 19.08.2010 -- 30.01.2010 --

Contract completion11.02.2012 11.02.2012 -- 28.01.2014 31.12.2011 03.10.2011 15.09.2011 18.04.2011 31.12.2011 29.11.2010

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN OF CONSULTANT SERVICES FOR YEAR 2012/13

Foot Notes for Explanation, if any:

Planned dates are not trackable in

record. Contract has been completed in

all respects.

Contract has been completed in all

respects.

The dateline for submission of EOI was

extended from 21.06.2012 to

10.07.2012 on request of potiential

consultants through issuance of

corrigendum in same manner in which

EOI was published, with World Bank's

concurrence. Dateline for submission of

Proposals was also been extended with

NOL of WB from 31.10.2012 to

12.11.2012

Method of Proc.CQS

Method of Proc.QCBS

(Prior Review)

The cost overrun the post review

threshold & retroactive NOL of WB was

secured on contract award on

08.07.2011. Contract has been

completed in all respects.

The cost overrun the post review

threshold and retroactive NOL of WB

was secured on contract award on

08.07.2011. WB declined retroactive

NOL on No Cost Time Extensions upto

15.09.2011. However, the contract has

been completed in all respects.

Method of Proc.

(Prior Review)

Nationwide Study of Groundwater

Availability and Conjunctive

Management

Comp # A1

PMPIU

CONSULTANCIES

Method of Proc.

Dates Dates

CQS(Prior Review)

CQS(Prior Review)

QCBS

Dates

Method of Proc.

Actual Cost: Actual Cost: Actual Cost:

Activity - 1

(Prior Review)

Project Management & Policy Implementation Unit (PMPIU) - WCAP

Activity - 3 Activity - 4

Evaluation of Past & Present

Resettlement in Pakistan

Comp # A1

PMPIU

Studies and Policies for Benefit

Sharing on Hydropower Projects

among Stakeholders

Comp # A1

PMPIU

Strategy for Sectoral Environment

& Social Assessments of the Whole

Indus Basin

Comp A 1

PMPIU

Estimated Cost:

Activity - 2 Activity - 5

Handbook on Water Statistics of

Pakistan

Comp # C

PMPIU

Actual Cost:

Dates

Page 7: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency: Component: C

Procurement Steps

Actual Planned Actual Planned Actual Planned Actual Planned

Preparation of TORs/Cost

Estimates/EOI01.12.2009 -- 10.02.2009 -- 03.04.2009 -- 14.02.2009 --

Bank’s No-objection to TORs and EOIs

(for prior review cases only)05.04.2010 -- 21.03.2009 -- 04.06.2009 -- 21.02.2009 --

Advertising for Expression of Interests

in National Newspapers. 16.12.2009 -- 28.03.2009 -- 20.04.2009 -- 27.02.2009 --

Receipt of Interests from Firms06.01.2010 -- 15.04.2009 -- 06.05.2009 -- 15.03.2009 --

Preparation of Short List 16.01.2010 -- 04.08.2009 -- 26.05.2009 -- 20.08.2009 --

Bank’s No-objection to Short List (For

prior review cases only)05.04.2010 -- 04.03.2010 -- Not Obtained -- 25.08.2009 --

Preparation of RFP16.01.2010 -- 04.08.2009 -- Not Done -- Not Done --

Bank’s no-objection to RFP (for prior

review cases)05.04.2010 -- 04.03.2010 -- Not Obtained -- Not Required --

Issuance of RFP to Short-listed Firms09.04.2010 -- 12.03.2010 -- 01.06.2009 -- Not Done --

Receipt of Technical and Financial

Proposals24.05.2010 -- 25.04.2010 -- 20.06.2009 -- Not Applicable --

Completion of Technical Evaluation14.06.2010 -- 14.05.2010 -- 09.07.2009 -- do --

Bank’s No-objection to Technical

Evaluation (for prior review cases)16.06.2010 -- 25.05.2010 -- 07.09.2009 -- Not Required --

Opening of Financial Proposals23.06.2010 -- 04.06.2010 -- Not Required -- Not Required --

Completion of Combined/Final

Evaluation29.06.2010 -- Not Required -- 07.09.2009 -- Not Applicable --

Bank's clearence of Combined/Final

Evaluation (For Prior Review Cases)Not Obtained Not Obtained -- Not Required Not Required --

Negotiations/ Preparation of Draft

Contract23.07.2010 -- 10.08.2010 -- 24.09.2009 -- 16.09.2009 --

Bank’s No-objection to draft Contract

(for prior review cases)29.07.2010 -- 03.09.2010 -- 19.10.2009 -- 22.10.2009 --

Contract Signing 03.08.2010 -- 24.09.2010 -- 20.10.2009 -- 29.10.2009 --

Contract completion15.08.2011 31.08.2012 30.04.2012 03.05.2011 30.10.2011 20.03.2010

30.12.2010 (D) &

31.12.2012 (S) --

Contract has been completed in all

respects.

Additional EOIs were asked after

15.03.2009 for enhancing the

competetion. Proposals were invited from

shortlisted firm through a letter without

issuing any Request for Proposal. The

Desgin (D) part of services was completed

on 30.12.2010 whereas Supervision (S) of

construction ended on 31.12.2012.

Foot Notes for Explanation, if any:

Contract end date has passed, however,

NOL of the World Bank was sought on

which a timebound action plan and

demonstration/proof of the consultant's

enhanced inputs, were asked from

Consultant in September 2012. Reply from

Consultant is still awaited despite

repeated reminders. Retroatve NOL for No

Cost Tme Extension would be solicited

from Bank.

Contract has been completed in all

respects.

Method of Proc.

Activity - 8

Consulting Services for Design &

Construction Supervision of Office

Building for PMPIU

Comp # C

PMPIU

Actual Cost:

Dates

(Prior Review)

Feasibility Study of Underground

Dams

Comp # C

PMPIU

Actual Cost:

(Prior Review)

Activity - 9Activity - 6

Dates

Actual Cost:

QCBS

Actual Cost:

(Prior Review)CQS

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED PROCUREMENT PLAN OF CONSULTANT SERVICES FOR YEAR 2012/13

Method of Proc.

(Prior Review)

Dates Dates

QCBSMethod of Proc.

Capacity Need Assessment of MoPW

& Line Agencies

Comp # C

PMPIU

Activity - 7

Institutional Assessment of IRSA

Comp # C

PMPIU

CONSULTANCIES

CQSMethod of Proc.

PMPIU

Page 8: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agencies: Components: A2, A4 & C

Procurement Steps

Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

Preparation of TORs/Cost

Estimates/EOI20.05.2009 -- 09.05.2012 30.01.2012 01.11.2011 25.11.2011 29.8.2011 29.08.2011 11.10.2012 15.10.2012

Bank’s No-objection to TORs and EOIs

(for prior review cases only)21.11.2009 -- 14.05.2012 07.02.2012 18.11.2011 05.12.2011 30.9.2011 25.09.2011 01.11.2012 05.11.2012

Advertising for Expression of Interests

in National Newspapers. 03.12.2009 -- 17.05.2012 10.02.2012 05.02.2012 08.01.2012 06.10.2011 28.09.2011 06.11.2012 07.11.2012

Receipt of Interests from Firms24.12.2009 -- 17.08.2012 28.03.2012 22.02.2012 23.01.2012 27.10.2011 13.10.2011 -- 25.01.2013

Preparation of Short List 01.03.2010 -- 04.09.2012 15.04.2012 19.04.2012 05.02.2012 07.12.2011 15.11.2011 -- 10.02.2013

Bank’s No-objection to Short List (For

prior review cases only)05.05.2010 -- 10.09.2012 22.04.2012 Not Required Not Required 11.01.2012 08.01.2012 -- 15.02.2013

Preparation of RFP10.03.2010 -- 04.09.2012 15.04.2012 24.04.2012 08.02.2012 20.12.2011 15.11.2011 -- 10.02.2013

Bank’s no-objection to RFP (for prior

review cases)05.05.2010 -- 10.09.2012 22.04.2012 Not Required Not Required 11.01.2012 08.01.2012 -- 15.02.2013

Issuance of RFP to Short-listed Firms06.05.2010 -- 12.09.2012 25.04.2012 24.04.2012 10.02.2012 17.01.2012 10.01.2012 -- 18.02.2013

Receipt of Technical and Financial

Proposals10.06.2010 -- 15.11.2012 15.11.2012 16.05.2012 10.03.2012 06.03.2012 15.02.2012 -- 04.04.2013

Completion of Technical Evaluation07.09.2010 -- 17.12.2012 05.12.2012 21.05.2012 30.03.2012 02.04.2012 10.03.2012 -- 25.04.2013

Bank’s No-objection to Technical

Evaluation (for prior review cases)16.09.2010 -- 20.12.2012 12.12.2012 Not Required Not Required 17.04.2012 17.03.2012 -- 30.04.2013

Opening of Financial Proposals30.09.2010 -- 03.01.2013 19.12.2012 Not Required Not Required 25.04.2012 22.03.2012 -- 07.05.2013

Completion of Combined/Final

Evaluation04.10.2010 -- 07.01.2013 25.12.2102 21.05.2012 05.04.2012 04.05.2012 28.03.2012 -- 12.05.2013

Bank's clearence of Combined/Final

Evaluation (For Prior Review Cases)N.A. -- -- 25.01.2013 Not Required Not Required Not Required 02.04.2012 -- 16.05.2013

Negotiations/ Preparation of Draft

Contract05.11.2010 -- -- 02.02.2013 29.05.2012 15.04.2012 08.06.2012 12.04.2012 -- 30.05.2013

Bank’s No-objection to draft Contract

(for prior review cases)27.11.2010 -- -- 15.02.2013 Not Required Not Required 13.06.2012 20.04.2012 -- 05.06.2013

Contract Signing 31.12.2010 -- -- 22.02.2013 01.06.2012 20.04.2012 30.08.2012 27.04.2012 -- 12.06.2013

Contract completion-- 31.12.2012 -- 22.02.2014 -- 31.01.2014 -- 30.08.2013 -- 12.04.2014

CQS(Post Review)

Dates

Method of Proc.

Dates Dates

Foot Notes for Explanation, if any:

(1) A Contract Amendment was signed for

releasing payments to sub-consultant due

to non-local establishment of lead firm as

per contract. (2) Contract's completion

date has passed and on request of

extension, a timebound action plan and

demonstration/proof of the consultant's

enhanced inputs have been asked from

Consultant which are pending. Retroactive

NOL of World Bank would be sought

(1) Newly added activity in lieu of Flow

Measurement Study. (2) Due to poor

response, dateline for submission/receipt

of EOIs has been twice extended.

--

Earlier two separate proc. activities were

planned, one for Establishment of GIS/MIS

Lab and other for development &

improvement of Tools & Models for

simulation and optimization of operations

& management of IRSA. Now, both have

been clubbed in one proc. acitivity due to

their overlapping scope of work.

Dates

The dateline for submission of EOI was

extended for enhancing competition,

througg issuance of corrigendum in same

manner in which EOI was published, with

World Bank's concurrence. Dateline for

submission of Proposals was also been

extended with NOL of WB from 07.11.2012

to 15.11.2012

Actual Cost: Estimated Cost:

(Prior Review) (Prior Review)

Method of Proc. Method of Proc.QCBS QCBS

EstimatedCost:Actual Cost:

Activity - 10 Activity - 13

QCBS(Prior Review)

Activity -14

Feasibility Study of Small Dams

Comp # A4

Plg. Comm./PMPIU

CONSULTANCIES Development of GIS Centre &

Decision Support System to Enhanced

the Capacity of IRSA

Comp: A2: Sub-Comp: a & c

IRSA

Improvement of Water Resources

Management of Indus Basin to

Enhance Capacity Building of IRSA

Comp: A2: Sub-Comp: d

IRSA

Activity - 12

System Assurance

Comp # C 1

PMPIU

Activity - 11

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED PROCUREMENT PLAN OF CONSULTANT SERVICES FOR YEAR 2012/13

PMPIU & Indus River System Authority (IRSA)

Dates

(Prior Review)QCBS

Method of Proc.

Strengthening the Capacity of FFC in

Developing & Implementing a

Comprehensive Flood Management

Plan

Comp # C

PMPIU

Estimated Cost:

Method of Proc.

Page 9: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency: Components:

Procurement Steps

Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

Preparation of TORs/Cost

Estimates/EOI22.12.2009 25.12.2009 28.04.2009 28.04.2009 12.03.2009 25.12.2009 13.02.2009 13.02.2009 16.04.2010 16.04.2010

Bank’s No-objection to TORs and EOIs

(for prior review cases only)19.01.2010 15.01.2010 31.08.2009 31.08.2009 03.06.2010 15.01.2010 23.02.2009 23.02.2009 28.04.2010 28.04.2010

Advertising for Expression of Interests

in National Newspapers. 27.01.2010 31.01.2010 12.09.2009 12.09.2009 16.02.2009 31.01.2010 27.02.2009 27.02.2009 30.05.2010 01.05.2010

Receipt of Interests from Firms28.02.2010 01.03.2010 30.09.2009 30.09.2009 02.03.2009 01.03.2010 24.03.2009 24.03.2009 19.06.2010 29.05.2010

Preparation of Short List 05.04.2010 05.04.2010 28.10.2009 28.10.2009 20.03.2010 05.04.2010 11.04.2009 11.04.2009 27.08.2010 12.06.2010

Bank’s No-objection to Short List (For

prior review cases only)05.04.2010 05.04.2010 18.12.2009 17.12.2009 03.06.2010 05.04.2010 16.07.2009 16.07.2009 15.10.2010 30.06.2010

Preparation of RFP03.06.2010 14.05.2010 28.10.2009 15.11.2009 30.01.2010 14.05.2010 11.07.2009 11.07.2009 09.06.2010 29.05.2010

Bank’s no-objection to RFP (for prior

review cases)03.06.2010 14.05.2010 18.12.2009 17.12.2009 03.06.2010 14.05.2010 16.07.2009 16.07.2009 23.11.2010 19.06.2010

Issuance of RFP to Short-listed Firms08.06.2010 31.05.2010 22.12.2009 07.01.2010 07.06.2010 31.05.2010 18.07.2009 18.07.2009 25.11.2010 03.07.2010

Receipt of Technical and Financial

Proposals22.07.2010 15.07.2010 08.02.2010 08.02.2010 05.10.2010 15.07.2010 29.10.2009 15.10.2009 07.03.2011 02.09.2010

Completion of Technical Evaluation01.10.2010 30.07.2010 29.03.2010 29.03.2010 12.11.2010 30.07.2010 20.11.2009 14.11.2009 26.03.2011 10.09.2010

Bank’s No-objection to Technical

Evaluation (for prior review cases)21.10.2010 16.08.2010 03.05.2010 03.05.2010 22.11.2010 16.08.2010 22.12.2009 21.11.2009 30.06.2011 05.10.2010

Opening of Financial Proposals27.10.2010 23.08.2010 01.06.2010 26.05.2010 27.11.2010 23.08.2010 12.01.2010 22.11.2009 06.07.2011 08.10.2010

Completion of Combined/Final

Evaluation08.12.2010 23.09.2010 01.07.2010 18.06.2010 30.01.2011 23.09.2010 31.01.2010 31.01.2010 16.07.2011 16.10.2010

Bank's clearence of Combined/Final

Evaluation (For Prior Review Cases)01.01.2011 15.10.2010 23.07.2010 09.07.2010 17.05.2011 15.10.2010 02.04.2010 07.02.2010 25.08.2011 29.11.2010

Negotiations/ Preparation of Draft

Contract19.01.2011 30.09.2010 23.08.2010 25.06.2010 13.04.2011 20.10.2010 07.05.2010 15.02.2010 17.08.2011 23.10.2010

Bank’s No-objection to draft Contract

(for prior review cases)19.01.2011 22.10.2010 23.08.2010 16.07.2010 12.05.2011 22.10.2010 17.05.2010 14.05.2010 25.08.2011 29.11.2010

Contract Signing 22.01.2011 30.10.2010 24.08.2010 30.07.2010 17.05.2011 30.10.2010 10.06.2010 31.05.2010 19.09.2011 07.12.2010

Contract completion-- 30.04.2013 -- 30.11.2011 -- 31.01.2013 -- 31.03.2012 -- 19.02.2014

For Activities # 19 & 20, US $ 14.00

million (Rs. 1,134 million) have been

earmarked from credit of WCAP.

Amongst these two activities, Activity

# 19 is being fully funded whereas

Activity # 20, is being funded upto the

tone of US $ 7.8 million (Rs. 631.8

million) out of WCAP Credit.

Contract period extended with cost

through retoractive NOL of the

World Bank to obtain benefit from

the consultant's services in tendering

process for Extension of Tarbela's

4th Hydropower Project. However,

retification from WCAP's Project

Steering Committee is pending.

Dates Dates

Contract completed with approval

of final deliverable.--Foot Notes for Explanation, if any: --

(Prior Review) (Prior Review)

Method of Proc.

(Prior Review)(Prior Review)

Dates Dates Dates

Water & Power Development Authority (WAPDA)

Sediment Management Study

(SMS) of Tarbela Reservoir

Comp: B2

WAPDA

Preparation of Detailed Engineering

Design, Tender Doc & PC - I for

Tarbela 4th HPP

Comp: B4 : Activity - I

WAPDA

Preparation of Detailed Engineering

Design, Tender Doc & PC - I for DASU

HPP

Comp: B4 : Activity - II

WAPDA

Actual Cost: Actual Cost: Actual Cost:

B2, B3 & B4

Activity -19Activity - 17

Method of Proc.QCBS

Method of Proc.QCBS

(Prior Review)QCBS

Activity - 18

QCBS QCBS

Upgrading of Tools, Water

Resources Database, Management

System & Models (IBMR)

Comp: B1 : Activity - I

WAPDA

Agro - Economic Farm Survey for

Indus Basin

Comp: B1 : Activity - II

WAPDA

Actual Cost: Actual Cost:

Method of Proc.Method of Proc.

Activity - 16

CONSULTANCIES

Activity - 15

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED PROCUREMENT PLAN OF CONSULTANT SERVICES FOR YEAR 2012/13

Page 10: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency:

Procurement Steps for

GOODS

Actual Planned Actual Planned Actual Planned Actual Planned

Preparation of Bidding Documents/ Request for

Quotations in case of shoppingNot Done 26.06.2008 11.03.2010 26.06.2008 18.12.2009 -- 02.11.2010 --

Bank's No objection to Bidding Documents (for

prior review cases)Not Required 10.07.2008 Not Required 10.07.2008 Not Required -- Not Required --

Advertisement of Invitation for Bids/Request for

Quotations in case of shoppingNot Required 15.07.2008 25.04.2010 15.07.2008 18.12.2009 -- 02.11.2010 --

Bid submission/opening date Not Required 15.08.2008 20.05.2010 15.08.2008 19.12.2009 -- 03.11.2010 --

Completion of Evaluation recommendations 01.03.2009 31.08.2008 27.05.2010 31.08.2008 21.12.2009 -- 03.11.2010 --

Bank's No objection to evaluation and contract

award (for prior review cases only)Not Required 10.09.2008 Not Required 10.09.2008 Not Required -- Not Required --

Award of Contract Not Required 15.09.2008 05.06.2010 15.09.2008 21.12.2009 -- 03.11.2010 --

Copy of signed contract sent to Bank (for Prior

review cases)Not Required 20.09.2008 Not Required 20.09.2008 Not Required -- Not Required --

Completion of contract 27.03.2009 20.10.2008 22.06.2010 20.10.2008 29.12.2009 -- 05.11.2010 --

--Foot Notes for Explanation, if any: -- -- --

Shopping

(Post Review)

Dates

ShoppingShopping

(Post Review)

Activity - 4

Software (Antivirus) = 01

PMPIU

Actual Cost:

Method of Proc.

Activity - 2 Activity - 3

Operational Vehicle = 02

PMPIU

Actual Cost:Actual Cost:

Est. Cost: N.A.

Activity - 1

Office Equipment (Fax Machine

01, Laptops 08, Colour Printer 01,

Laser Printer 02, Colour Copier

01, Scanner 01 etc)

PMPIU

Actual Cost:

Est. Cost: N.A. Est. Cost: Rs. 2.5 M

Generator (Diseal) = 01

PMPIU

Dates Dates

(Post Review)

Dates

REVISED/UPDATED PROCUREMENT PLAN FOR GOODS FOR YEAR 2012/13

Project Management & Policy Implementation Unit (PMPIU) - WCAP

Est. Cost: N.A.

Method of Proc.

Shopping

(Prior Review)

Method of Proc. Method of Proc.

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]

Page 11: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agencies:

Procurement Steps for Activity - 8

GOODS Purchase & Installation of

Passenger Lift for Office Building

= 01

PMPIU

Estimated Cost:

Method of Proc.

Shopping

(Post Review)

Dates

Actual Planned Actual Planned Actual Planned Planned

Preparation of Bidding Documents/ Request for

Quotations in case of shopping4.11.2010 -- 23.06.2011 -- 16.01.2010 -- 30.01.2013

Bank's No objection to Bidding Documents (for

prior review cases)Not Required -- Not Required -- Not Required -- Not Required

Advertisement of Invitation for Bids/Request for

Quotations in case of shopping4.11.2010 -- 23.06.2011 -- 16.01.2010 -- 03.02.2013

Bid submission/opening date 5.11.2010 -- 24.06.2011 -- 18.01.2010 -- 18.02.2013

Completion of Evaluation recommendations 5.11.2010 -- 24.06.2011 -- 19.01.2010 -- 22.02.2013

Bank's No objection to evaluation and contract

award (for prior review cases only)Not Required -- Not Required -- Not Required -- Not Required

Award of Contract 5.11.2010 -- 25.06.2011 -- 19.01.2010 -- 27.02.2013

Copy of signed contract sent to Bank (for Prior

review cases)Not Required -- Not Required -- Not Required -- Not Required

Completion of contract 5.11.2010 -- 08.07.2011 -- 24.01.2010 -- 30.05.2013

-- -- --

The procurement cycle of the

activity had to be initiated in Dec.

2012, however, due to other

important assignments, re-

planned.

Foot Notes for Explanation, if any:

Dates

Shopping

(Post Review)

Dates

Method of Proc.

Activity - 6

Printers = 02

PMPIU

Actual Cost:

Method of Proc.

Shopping

Dates

(Post Review)

Activity - 5

Café Machine = 01

PMPIU

Actual Cost:

(Post Review)

Method of Proc.

Shopping

Activity - 7

Sofa Set = 01

PMPIU

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN FOR GOODS FOR YEAR 2012/13

Actual Cost:

PMPIU

Est. Cost: N.A. Est. Cost: N.A. Est. Cost: N.A.

Page 12: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency: PMPIU

Procurement Steps for Activity - 10 Activity - 12 Activity - 13

GOODS Almirah = 10

PMPIU

Purchase & Installation of

Equipment for Audio/Video

Conference with LED/Smart

TVs = 01

PMPIU

Purchase & Installation of

A.Cs = 05

PMPIU

Estimated Cost: Estimated Cost: Estimated Cost:

Method of Proc. Method of Proc. Method of Proc.

Shopping Shopping Shopping

(Post Review) (Post Review) (Post Review)

Dates Dates Dates

Actual Planned Planned Actual Planned Planned Planned

Preparation of Bidding Documents/ Request for

Quotations in case of shopping20.12.2012 30.11.2012 30.01.2013 20.12.2012 30.11.2012 30.01.2013 30.01.2013

Bank's No objection to Bidding Documents (for

prior review cases)Not Required Not Required Not Required Not Required Not Required Not Required Not Required

Advertisement of Invitation for Bids/Request for

Quotations in case of shopping31.12.2012 03.12.2012 03.02.2013 31.12.2012 03.12.2012 03.02.2013 03.02.2013

Bid submission/opening date 08.01.2013 03.01.2013 18.02.2013 08.01.2013 03.01.2013 18.02.2013 18.02.2013

Completion of Evaluation recommendations 10.01.2013 15.01.2013 22.02.2013 10.01.2013 15.01.2013 22.02.2013 22.02.2013

Bank's No objection to evaluation and contract

award (for prior review cases only)Not Required Not Required Not Required Not Required Not Required Not Required Not Required

Award of Contract 17.01.2013 25.01.2013 27.02.2013 17.01.2013 25.01.2013 27.02.2013 27.02.2013

Copy of signed contract sent to Bank (for Prior

review cases)Not Required Not Required Not Required Not Required Not Required Not Required Not Required

Completion of contract 17.02.2013 25.4.2013 15.03.2013 17.02.2013 25.4.2013 15.03.2013 15.03.2013

The procurement cycle of the

activity had to be initiated in

Dec. 2012, however, due to

other important assignments,

re-planned.

The procurement cycle of the

activity had to be initiated in

Dec. 2012, however, due to

other important assignments,

re-planned.

Foot Notes for Explanation, if any:

The procurement cycle of the

activity had to be initiated in

Dec. 2012, however, due to

other important assignments,

re-planned.

Dates

The procurement cycle of the

activity had to be initiated in

Dec. 2012, however, due to

other important assignments,

re-planned.

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN FOR GOODS FOR YEAR 2012/13

Method of Proc.

Shopping

Activity - 9 Activity - 11

Method of Proc.

Shopping

Actual Cost:

(Post Review)

Purchase of IT Equipment

(Laptops = 07, Desktops = 07)

PMPIU

Estimated Cost: Rs. 1.40 M

Softwares (Windows, Office,

Antivirus) = 03

PMPIU

Estimated Cost: Rs. 1.00 M

Actual Cost:

Dates

The procurement cycle of the

activity had to be initiated in

Dec. 2012, however, due to

other important assignments,

re-planned.

(Post Review)

Page 13: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency: PMPIU & IRSA

Procurement Steps for Activity - 14 Activity - 15 Activity - 16 Activity - 17 Activity - 18

GOODS Purchase & Installation of

Backup Generator for Lift

(150 KVA) = 01

PMPIU

Purchase of Office Furniture

Set = 10 & Customization of

Conference Room (Tables,

Chairs, Fixed wall mounted

cabnet, etc.)

PMPIU

Hardware for GIS/MIS & DSS

(Servers, Computers,

printers, GIS equipment etc)

Component = A2

(Activity : a & c)

IRSA

Software for Satellite

Imagery (GIS/RS)

Component = A2

(Activity : a & c)

IRSA

Lab Furnishing (GIS/RS)

Component = A2

(Activity : a & c)

IRSA

Estimated Cost: Estimated Cost: Estimated Cost: Estimated Cost: Estimated Cost:

Method of Proc. Method of Proc. Method of Proc. Method of Proc. Method of Proc.

Shopping Shopping NCB Shopping Shopping

(Post Review) (Post Review) (Post Review) (Post Review) (Post Review)

Dates Dates Dates Dates Dates

Planned Planned Planned Planned Planned

Preparation of Bidding Documents/ Request for

Quotations in case of shopping30.01.2013 30.01.2013 01.02.2013 01.02.2013 01.02.2013

Bank's No objection to Bidding Documents (for

prior review cases)Not Required Not Required Not Required Not Required Not Required

Advertisement of Invitation for Bids/Request for

Quotations in case of shopping03.02.2013 03.02.2013 05.02.2013 05.02.2013 05.02.2013

Bid submission/opening date 18.02.2013 18.02.2013 08.03.2013 08.03.2013 08.03.2013

Completion of Evaluation recommendations 22.02.2013 22.02.2013 20.03.2013 20.03.2013 20.03.2013

Bank's No objection to evaluation and contract

award (for prior review cases only)Not Required Not Required Not Required Not Required Not Required

Award of Contract 27.02.2013 27.02.2013 28.03.2013 28.03.2013 28.03.2013

Copy of signed contract sent to Bank (for Prior

review cases)Not Required Not Required Not Required Not Required Not Required

Completion of contract 15.03.2013 15.03.2013 28.05.2013 28.05.2013 28.05.2013

Foot Notes for Explanation, if any:

The procurement cycle of

the activity had to be

initiated in Dec. 2012,

however, due to other

important assignments, re-

planned.

The procurements are relient upon need analysis report & preparation of specifications &

bidding documents of the Consultant whose service have been hired for GIS/MIS & DSS

Project under consulting services.

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN FOR GOODS FOR YEAR 2012/13

The procurement cycle of

the activity had to be

initiated in Dec. 2012,

however, due to other

important assignments, re-

planned.

Page 14: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agencies: IRSA & WAPDA

Procurement Steps for Activity -19 Activity - 20 Activity - 21

GOODS Data Acquisition (Satellite

Images)

Component = A2

(Activity : a & c)

IRSA

Hardware for Flow

Measurement (Servers,

Computers, Printers,

Measurement Equipment

etc)

Component = A2

(Activity : d)

IRSA

Software for Flow

Measurement

Component = A2

(Activity : d)

IRSA

Estimated Cost: Estimated Cost: Estimated Cost:

Method of Proc. Method of Proc. Method of Proc.

Shopping ICB NCB

(Post Review) (Post Review) (Post Review)

Dates Dates Dates

Planned Planned Planned Actual Planned Actual Planned

Preparation of Bidding Documents/ Request for

Quotations in case of shopping01.02.2013 15.07.2013 15.07.2013 Not Done 31.07.2008 Not Done 26.06.2008

Bank's No objection to Bidding Documents (for

prior review cases)Not Required 25.07.2013 Not Required Not Required 15.08.2008 Not Required 10.07.2008

Advertisement of Invitation for Bids/Request for

Quotations in case of shopping05.02.2013 28.07.2013 20.07.2013 Not Done 25.08.2009 Not Done 15.07.2008

Bid submission/opening date 08.03.2013 13.09.2013 20.08.2013 02.02.2010 15.08.2008 01.04.2010 15.08.2008

Completion of Evaluation recommendations 20.03.2013 30.09.2013 10.09.2013 12.02.2010 22.08.2008 24.05.2010 22.08.2008

Bank's No objection to evaluation and contract

award (for prior review cases only)Not Required 10.10.2013 Not Required Not Required 31.08.2008 Not Required 31.08.2008

Award of Contract 28.03.2013 17.10.2013 15.09.2013 29.03.2010 07.09.2008 24.05.2010 07.09.2008

Copy of signed contract sent to Bank (for Prior

review cases)Not Required 20.10.2013 Not Required Not Required 15.09.2008 Not Required 15.09.2008

Completion of contract 28.05.2013 20.12.2013 15.11.2013 22.04.2010 07.10.2008 24.05.2010 07.10.2008

Foot Notes for Explanation, if any: -- --

Dates

(Post Review)

Shopping

Method of Proc.

(Post Review)

Method of Proc.

Shopping

Dates

Est. Cost: N.A.

Actual Cost:Actual Cost:

Est. Cost: N.A.

Office Equipment (Printer,

Laptop, Desptop, UPS,

Copier, Fax Machine etc)

IRSA

Activity - 22

Office furniture (Cabinet,

Sofa, Tables, Chairs etc)

IRSA

The procurement activities are relient upon hiring of consulting services for

Improvement of Water Resources Management of Indus Basin to Enhance

Capacity Building of IRSA

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN FOR GOODS FOR YEAR 2012/13

Activity - 23

Page 15: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency:

Procurement Steps for

GOODS

Actual Planned Actual Planned Actual Planned Actual Planned

Preparation of Bidding Documents/ Request for

Quotations in case of shopping22.12.2009 22.12.2009 23.12.2009 23.12.2009 Not Required -- 31.01.2011 31.01.2011

Bank's No objection to Bidding Documents (for

prior review cases)24.01.2010 24.01.2010 07.01.2010 07.01.2010 Not Required -- 11.02.2011 11.02.2011

Advertisement of Invitation for Bids/Request for

Quotations in case of shopping31.01.2010 31.01.2010 14.03.2010 14.03.2010 Not Required -- 18.02.2011 18.02.2011

Bid submission/opening date 03.03.2010 03.03.2010 31.03.2010 31.03.2010 Not Required -- 08.04.2011 08.04.2011

Completion of Evaluation recommendations 27.03.2010 27.03.2010 05.04.2010 05.04.2010 Not Required -- 23.04.2011 01.05.2011

Bank's No objection to evaluation and contract

award (for prior review cases only)21.04.2010 21.04.2010 03.06.2010 20.05.2010 30.04.2009 -- 09.05.2011 01.06.2011

Award of Contract 26.07.2010 15.06.2010 18.06.2010 07.07.2010 30.05.2009 -- 03.06.2011 01.07.2011

Copy of signed contract sent to Bank (for Prior

review cases)26.07.2010 16.06.2010 02.07.2010 08.07.2010 Not Done -- 25.07.2011 15.08.2011

Completion of contract 30.11.2010 30.07.2010 10.11.2010 15.08.2010 20.03.2010 30.10.2009 30.09.2012 30.03.2012

Time period for supply of

equipment & training was

extended beyond 30.03.2012

obtaining NOL of the World

Bank.

--Foot Notes for Explanation, if any:

Equipment for upgradation of

Rock Mechanics Section of

CMTL Lab under Phase-I

Comp: B 3

WAPDA

Actual Cost:

Est. Cost: N.A.

(Prior Review)

Dates

(Prior Review)(Prior Review)

Dates

Method of Proc.

NCB

Method of Proc.

ICB

Actual Cost:

(Prior Review)

Est. Cost: Rs. 13.90 M Est. Cost: N.A.

Dates Dates

--

Est. Cost: N.A.

--

Actual Cost: Actual Cost:

Method of Proc.

SSS

Activity - 25

Method of Proc.

NCB

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN FOR GOODS FOR YEAR 2012/13

Vehicles for Agro-Economic

Farm Survey for IMBR &

Database Strengthening Flow

Forecasting System

WAPDA

Antelope Software

Comp: B 3

WAPDA

Activity - 24

Micro-computer related

equipment & software for

installation of GIS/RS System

WAPDA

Activity - 26 Activity - 27

WAPDA

Page 16: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Implementing Agency:

Procurement Steps for Activity - 29

GOODS Storage Device, Oracle 11G, Server

Rack & Antivirus, LapTop Computer

& Colour Printer & Scanner

Comp: A3

WAPDA

Estimated Cost:

Method of Proc.

NCB

(Post Review)

Dates

Actual Re-planned Planned Planned

Preparation of Bidding Documents/ Request for

Quotations in case of shopping06.08.2012 06.08.2012 15.12.2011 21.01.2013

Bank's No objection to Bidding Documents (for prior

review cases)30.08.2012 13.08.2012 30.12.2011 Not Required

Advertisement of Invitation for Bids/Request for

Quotations in case of shopping28.09.2012 28.08.2012 03.01.2012 25.01.2013

Bid submission/opening date 13.11.2012 16.10.2012 18.02.2012 10.02.2013

Completion of Evaluation recommendations 02.01.2013 05.11.2012 30.03.2012 25.02.2013

Bank's No objection to evaluation and contract award

(for prior review cases only)-- 15.11.2012 10.04.2012 Not Required

Award of Contract -- 19.11.2012 15.04.2012 02.03.2013

Copy of signed contract sent to Bank (for Prior review

cases)-- 17.12.2012 20.04.2012 Not Required

Completion of contract -- 30.05.2013 30.07.2012 02.04.2013

WAPDA

Newly added activity.

Estimated Cost:

Method of Proc.

ICB

(Prior Review)

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN FOR GOODS FOR YEAR 2012/13

Dates

Despite repeated reminders, WAPDA has not shared bidding

& other documents with PMPIU. It would be difficult for

PMPIU to proceed with payments subsequent to award of

contract(s) if documents are not shared.--

Equipments for Establishment of Roller Compacted

Concrete RCC Laboratory in CMTL and Training under

Phase-I Comp: B 3

WAPDA

Activity - 28

Page 17: WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES …documents.worldbank.org/curated/en/... · Evaluation of CV’s of at least 3 candidates / Recommendation for ... Legal Expert

Procurement Steps for

Works

Actual Planned

Preparation of Cost Estimates/Pre-qualification Notice 31.05.2010 Not Foreseen

Bank's No-objection to Pre-qualification Notice (For prior review

cases only)Not Obtained do

Advertisement of Pre-qualification Notice 03.06.2010 do

Receipt of Interests from Firms 18.06.2010 do

Preparation of Short List 30.06.2010 do

Bank’s No-objection to Short List (For prior review cases only) 08.11.2010 do

Preparation of Bidding Documents 10.12.2010 31.07.2008

Bank’s No-objection to Bidding Documents (for prior review

cases)13.12.2010 05.08.2008

Issuance of Bidding Documents 14.12.2010 10.08.2008

Bid submission/opening date 13.01.2011 10.09.2008

Completion of Evaluation recommendations 18.01.2011 20.09.2008

Bank's No objection to evaluation and contract award (for prior

review cases only)04.02.2011 25.09.2008

Award of Contract 14.02.2011 30.09.2008

Copy of signed contract sent to Bank (for Prior review cases) Not Done 05.10.2008

Completion of contract 31.12.2012 14.02.2012

Foot Notes for Explanation, if any:

Work Completed. (1) NOL of the World Bank on extension of time was

duly sought. (2) Pursuant to the provisions of the World Bank's

Guidelines for Procurement of Goods & Works at Appendix 1: clause: 3;

cost of the contract was esclated upto 15% (Rs. 4.562 million) without

obtaining NOL of WB. Orginal amount of Contract Rs. 31.496 million.

Dates

(Prior Review)

WATER SECTOR CAPACITY BUILDING & ADVISORY SERVICES PROJECT (WCAP) - [Cr. 4437-PAK]REVISED/UPDATED PROCUREMENT PLAN FOR WORKS FOR YEAR 2012/13 (WITH PRE-QUALIFICATION)

Activity - 1

Office Building = 01 Floor

PMPIU

Method of Proc.

NCB

Actual Cost:


Recommended