W3F1-2017-0080 December 6, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Subject: Technical Requirements Manual Update to the NRG Waterford Steam Electric Station, Unit 3 (Waterford 3) Docket No. 50-382 License No. NPF-38 Dear Sir or Madam: Entergy Operations, Inc. 17265 River Road Killona, lA 70057 -3093 Tel 504-739-6685 Fax 504-739-6698 [email protected] John P. Jarrell Regulatory Assurance Manager Waterford 3 10 CFR 50.71(e) Pursuant to Waterford Steam Electric Station Unit 3 (Waterford 3) Technical Specification (TS) 6.16, Entergy Operations, Inc. (EOI) hereby submits an update of all changes made to the Waterford 3 Technical Requirements Manual (TRM) since the last submittal per letter W3F1-2016-0040 (ADAMS Accession No. ML 16154A863) dated June 2, 2016. Additionally, this update satisfies the submittal frequency required by TS 6.16, which indicates that the TRM will be submitted at a frequency consistent with 10 CFR 50.71(e) and exemptions thereto. Plant changes made under the provisions of 10 CFR 50.59 are reported to the NRG pursuant to the requirements of 10 CFR 50.59(b)(2) by separate submittal. There are no commitments associated with this submittal. Should you have any questions or comments concerning this submittal, please contact the Regulatory Assurance Manager, John Jarrell, at (504) 739-6685. I Attachments: 1. Waterford 3 Technical Requirements Manual (TRM) Change List. 2. Waterford 3 Technical Requirements Manual (TRM) Revised Pages.
Transcript
Page 1: Waterford 3 - Technical Requirements Manual Update to the …1. Waterford 3 Technical Requirements Manual (TRM) Change List. 2. Waterford 3 Technical Requirements Manual (TRM) Revised

W3F1-2017-0080

December 6, 2017

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject: Technical Requirements Manual Update to the NRG Waterford Steam Electric Station, Unit 3 (Waterford 3) Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

Entergy Operations, Inc. 17265 River Road Killona, lA 70057 -3093 Tel 504-739-6685 Fax 504-739-6698 [email protected]

John P. Jarrell Regulatory Assurance Manager Waterford 3

10 CFR 50.71(e)

Pursuant to Waterford Steam Electric Station Unit 3 (Waterford 3) Technical Specification (TS) 6.16, Entergy Operations, Inc. (EOI) hereby submits an update of all changes made to the Waterford 3 Technical Requirements Manual (TRM) since the last submittal per letter W3F1-2016-0040 (ADAMS Accession No. ML 16154A863) dated June 2, 2016. Additionally, this update satisfies the submittal frequency required by TS 6.16, which indicates that the TRM will be submitted at a frequency consistent with 10 CFR 50.71(e) and exemptions thereto.

Plant changes made under the provisions of 10 CFR 50.59 are reported to the NRG pursuant to the requirements of 10 CFR 50.59(b)(2) by separate submittal.

There are no commitments associated with this submittal. Should you have any questions or comments concerning this submittal, please contact the Regulatory Assurance Manager, John Jarrell, at (504) 739-6685.

I

Attachments:

1. Waterford 3 Technical Requirements Manual (TRM) Change List.

2. Waterford 3 Technical Requirements Manual (TRM) Revised Pages.

Page 2: Waterford 3 - Technical Requirements Manual Update to the …1. Waterford 3 Technical Requirements Manual (TRM) Change List. 2. Waterford 3 Technical Requirements Manual (TRM) Revised

W3F1-2017-0080 Page 2 of 2

cc: Mr. Kriss Kennedy Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd. Arlington, TX 76011-4125

NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751

U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

[email protected]

[email protected] [email protected]

April. Pulvirenti. nrc.gov

Page 3: Waterford 3 - Technical Requirements Manual Update to the …1. Waterford 3 Technical Requirements Manual (TRM) Change List. 2. Waterford 3 Technical Requirements Manual (TRM) Revised

Attachment 1 to

W3F1-2017-0080

Waterford 3 Technical Requirements Manual (TRM) Change List

Page 4: Waterford 3 - Technical Requirements Manual Update to the …1. Waterford 3 Technical Requirements Manual (TRM) Change List. 2. Waterford 3 Technical Requirements Manual (TRM) Revised

Attachment 1 to W3F1-2017-0080 Page 1 of 3

Waterford 3 Technical Requirements Manual (TRM) Change List

TRM Implementation Affected TRM Topic of Change Amendment Date Pages

No. 137 7/14/2016 Ill Amendment # 137 Turbine over

3/4 3-39 speed protection and its basis which

3/4 3-39a valves must be closed to isolate an

B 3/4 2a affected steam lead if valve is

B 3/4 2b inoperable. License Bases Document

B 3/4 2c Change Request (LBDCR) 16-030

138 9/14/2016 I, II, Ill, IV, Amendment #138 NFPA 805 V,VI Requirements transitioning from

3/4 1-1 Appendix R. License Bases

3/4 1-2 Document Change Request (LBDCR)

3/4 3-15 16-011.

3/4 3-16, 3/4 3-17 3/4 3-18 3/4 3-19 3/4 3-20 3/4 7-1d 3/4 7-1e 3/4 7-2 3/4 7-4 3/4 7-6 3/4 7-7 3/4 7-8 3/4 7-9 3/4 7-10a 3/4 7-12 3/4 7-13 3/4 7-13a 3/4 7-14 3/4 7-14a B 3/41 B 3/4 3g B 3/44 B 3/4 4a

Page 5: Waterford 3 - Technical Requirements Manual Update to the …1. Waterford 3 Technical Requirements Manual (TRM) Change List. 2. Waterford 3 Technical Requirements Manual (TRM) Revised

Attachment 1 to W3F1-2017-0080 Page 2 of 3

TRM Implementation Amendment Date

No. 11/10/2016

139

140 7/12/2016

141 4/11/2017

142 5/9/2017

143 6/7/2017

Affected TRM Pages

5.7-1

3/4 3-39

3/4 8-5 through 3/4 8-62 3/4 8-64 B 3/4 2h

3/4 8-3

3/4 3-7b 3/4 3-7c 3/4 3-7d 3/4 3-18

Topic of Change

Amendment #139 updates Table 5.7-1 "Component Cyclic or Transient Limits to match UFSAR Table 3.9-1. License Bases Document Request (LBDCR) 16-051 Amendment #140 clarifies that the provisions of TRM 4.0.2 (Max allowable extension/grace period of 25% for surveillance intervals is not applicable to the TRM 4.3.4.2. A requirement to cycle valves associated with turbine over speed protection at least once every 184 days. Also removes turbine valve testing late date extension. License Bases Document Request (LBDCR) 16-035 and 16-055 Amendment #141 replaces the 60 Month frequencies for each component with "See SFCP" Surveillance Frequency Control Program. The required testing frequency will be maintained in procedure UNT-006-033. Change to RT Nor of reactor vessel from 22° to 0° determined using ASME Sec. Ill NB-2331 methods. License Basis Document Request (LBDCR) 17-012 and 17-001 Amendment #142 revises section 3.8.3.1 by renaming the SUPS Static Uninterruptible Power Supplies. License Bases Document Request (LBDCR) 16-058 and 16-059 Amendment #143 revises Table 3.3-11 b to properly identify that there are 20 detectors on the +46 and 5 detectors in the S-6 Fan room on the +69 elevation. License Bases Document Request (LBDCR) 17-018 and 17-021

Page 6: Waterford 3 - Technical Requirements Manual Update to the …1. Waterford 3 Technical Requirements Manual (TRM) Change List. 2. Waterford 3 Technical Requirements Manual (TRM) Revised

Attachment 1 to W3F1-2017-0080 Page 3 of 3

TRM Implementation Amendment Date

No. 144 8/15/17

145 10/24/2017

Affected TRM Topic of Change Pages

II, Ila, IV, Iva Amendment #144 adds section to 3/4 7-17 establish controls/actions for

3/4 7-18 addressing the operability of the room

3/4 7-19 coolers servicing equipment in the

3/4 9-5 Control Room Equipment room and

B 3/4 4e1 RAB heating and ventilation room.

B 3/4 Sc License Bases Document Request (LBDCR) 16-0056

3/4 7-1 Amendment #145 changes the term 3/4 7-16 lnservice Testing Program to a

B 3/4 3c defined term indicated in all Caps. License Bases Document Change Reauest (LBDCR) 17-032