WaterNSW
Water Operations Report
Macquarie - Cudgegong
14 September 2017
Dam Storages
WaterNSW Macquarie-Cudgegong Water Ops Report 14 Sept 2017
0%
20%
40%
60%
80%
100%
120%
140%
160%
Burrendong Dam Storage
2013/14 2014/15 2015/16 2016/17 2017/18
Dam Storages
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
20%
25%
30%
35%
40%
45%
50%
55%
60% Windamere Dam Storage
2013/14 2014/15 2015/16 2016/17 2017/18
Supplementary Access
No supplementary events in the Macquarie - Cudgegong since the
start of 2017/18.
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
2017/18 Water
Availability for Macquarie
A 2% increase in allocation in Aug17 was due to
the final carryover volume from 2016/17 being
slightly less than forecasted (in previous months
resource assessment)and also adjustments from
essential requirements for 2017/18.
General Security Available Water Determination
Date AWD ML/Share Total %
1-Jul-17 0.36 36%
14-Aug-17 0.02 38%
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Licence Category
Water Availability as of 1st
August 2017
Sum of
Share
Component
Sum of
Account
Balance
Sum of
Available
Water
Sum of
AWD Vol
Sum of
Carryove
r
In
Sum of
Allocation
Assignments
In
Sum of
Allocation
Assignments
Out
Sum of
Usage
DOMESTIC AND STOCK 4,307 4,241 4,074 4,307 0 0 0 66
DOMESTIC AND STOCK [DOMESTIC] 785 785 785 785 0 0 0 0
DOMESTIC AND STOCK [STOCK] 170 0 0 0 0 0 0 0
LOCAL WATER UTILITY 16,205 15,746 15,464 16,205 0 0 0 459
REGULATED RIVER (GENERAL SECURITY) 613,181 662,459 661,100 220,744 445,142 4,296 4,296 3,427
REGULATED RIVER (HIGH SECURITY) 8,416 8,363 8,299 8,416 0 25 25 53
REGULATED RIVER (HIGH SECURITY) [RESEARCH] 4,044 3,879 3,879 4,044 0 0 0 165
REGULATED RIVER (HIGH SECURITY) [TOWN WATER SUPPLY] 40 40 40 40 0 0 0 0
SUPPLEMENTARY WATER 48,687 48,685 48,685 48,687 -1 9,080 9,080 0
GRAND TOTAL 695,835 744,199 742,327 303,227 445,141 13,401 13,401 4,170
2017/18 Water
Availability for Cudgegong
General Security Available Water Determination
Date AWD ML/Share Total %
1-Jul-17 0.36 36%
14-Aug-17 0.02 38%
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Licence Category
Water Availability as of 1st August 2017
Sum of
Share
Component
Sum of
Account
Balance
Sum of
Available
Water
Sum of
AWD Vol
Sum of
Carryover
In
Sum of
Allocation
Assignments
In
Sum of
Allocation
Assignments
Out
Sum of
Usage
DOMESTIC AND STOCK 672 565 564 672 0 0 0 107
DOMESTIC AND STOCK [DOMESTIC] 16 16 16 16 0 0 0 0
DOMESTIC AND STOCK [STOCK] 15 0 0 0 0 0 0 0
LOCAL WATER UTILITY 2,600 2,482 2,471 2,600 0 0 0 118
REGULATED RIVER (GENERAL SECURITY) 19,285 35,923 35,875 6,943 29,029 0 0 49
REGULATED RIVER (HIGH SECURITY) 5,412 5,412 5,411 5,412 0 0 0 1
REGULATED RIVER (HIGH SECURITY) [RESEARCH] 1 1 1 1 0 0 0 0
SUPPLEMENTARY WATER 1,312 1,312 1,312 1,248 0 0 0 0
GRAND TOTAL 29,313 45,710 45,651 16,892 29,029 0 0 274
Current Resources
Breakdown
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Environmental General Security,
180
Planned Environmental
Water, 192
High Security, 12
Towns, S&D, 13
Evap from Storage, 55 ops Losses , 160
Inaccessible Storage, 38
Irrigation general Security, 484
Resource Dsitribution August 2017 to May 2018 Macquarie
Total general Security (AWD+ carryover 664 GL)
Total = 1,134 GL
Bulk Water
Transfer
81GL
Burrendong
Dam Storage
at 1 August,
1,035 GL
Tota
l = 1
,13
4 G
L
Supply Distribution
Minimum
forecast
dam inflows
18GL
Resource Assessment
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Macq Cudge Resource Assessment -
Burrendong Dam
1-Jul-16 1-Aug-16 1-Sep-16 1-Oct-16 1-Feb-17 1-May-17 1-Jun-17 1-Aug-17 1-Aug-17
Planning Horizon (drought sequence) Aug 16 –
Apr 17
Sep 16 –
Jun 18
Sept 16 –
Jun 18
Oct 16 –
Jun 18
Feb 17 –
May 18
May 17- May
18
Jun 17- May
18
Aug 17-
May 18
Aug 17- May
19
AWD Announcement Date 1-Sep-16 1-Oct-16 1-Jul-17 1-Jul-17 1-Aug-17 1-Sep-17
Min Inflow Sequence Oct 16 –
Jun 18
Oct 16 –
Jun 18
Feb 17 –
May 18
Jul 17- May
18
Jul 17- May
18
Aug 17-
May 18
Sep 17- May
19
GL
Opening storage volume 345.4 759.2 967 1501 1125 1044 1042 1035 1035
Plus volume available through Bulk Water
Transfer
47 39 39 0 71 81 81 81 62
Plus minimum expected inflow sequence
over planning horizon
9.9 140+134.6 443+101 101 26 21 21 18 130
Less amount of dead storage -34 -34 -34 -34 -34 -34 -34 -34 -34
Less evaporation allowance -26 -89.5 -147.6 -128 - 94 -57 -53 -55 -103
Less remaining essential requirements -153.7GL -328 -314 -304 - 215 -199 -199 -187 -346
Less unallocated storage volume -3 -3 -220 -364 - 192 -266 -285 -4 -4
Less volume remaining in irrigator
accounts
-18.5 -109.4 -433.4 -439 - 376 -330 -313 -472 -480
Less volume remaining in environmental
accounts
-7.6 -77.9 -215 -333 - 311 -260 -260 -365 -370
Amount available for allocation (+ve) /
Amount of inflow required before new
allocation can be made (-ve)
159.5 431 186 0 16 -110
Allocation % =21% alloc =56% alloc = ~23%
alloc
Alloc Reset 2 % alloc
6 Month Rainfall and Inflow
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
24 Month Rainfall and Inflow
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Inflows are consistent with rainfall
over the past 6 month period. Actual
inflows for the 6 months were 56GL
which is slightly better than 80th
percentile inflows.
Inflows are consistent with rainfall over
the past 12 months. Actual inflows for
the last12 months were 1,500GL which
is wetter than 10th percentile until Nov
2016, however turned out to be drier
than 80th percentile for rest of the year.
Rainfall and Inflow (dam)
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
0
100
200
300
400
500
600
Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17
Infl
ow
Vo
lum
e (
GL
)
Burrendong Dam - 6 month inflows/statistical inflows
99 percentie
80 percentile
50 percentile
20 percentile
Actual Inflow
0
200
400
600
800
1000
1200
1400
1600
Infl
ow
Vo
lum
e (
GL
)
Burrendong Dam - 12 month inflows/statistical inflows
99 percentie
80 percentile
50 percentile
20 percentile
Actual Inflow
Inflows are consistent with rainfall
over the past 6 months. Actual
inflows for the last 6 months were
0.3GL which is less than 90% inflow
conditions.
Though there was some good rainfall in the catchment, Inflows were not as large as Burrendong over the past 12 month period. Actual inflow for the 12 months is 50GL which is wetter than 10th percentile until Nov 2016, however turned out to be drier than 80th percentile for rest of the year.
Rainfall and Inflow (dam)
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
0
5
10
15
20
25
30
35
40
Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17
Infl
ow
Vo
lum
e (
GL
)
Windamere Dam - 6 month inflows/statistical inflows
99 percentie
80 percentile
50 percentile
20 percentile
Actual Inflow
0
20
40
60
80
100
120
140
Infl
ow
Vo
lum
e (
GL
)
Windamere Dam - 12 month inflows/statistical inflows
99 percentie
80 percentile
50 percentile
20 percentile
Actual Inflow
Operational Loss
Operational loss is water above that which could reasonably be expected to pass the
last extraction point on each given river/creek being supplied with regulated flow
(dam releases and controlled tributary inflows – not supplementary flows)
Macquarie
Sales +
Environm
ental
delivery
Operation
al Surplus
Actual Target
July 7,170 705 10% 5%
July-Aug 0% 5%
July-Sep 0% 5%
July-Oct 0% 5%
July-Nov 0% 5%
July-Dec 0% 5%
July-Jan 0% 5%
July-Feb 0% 5%
July-Mar 0% 5%
July-Apr 0% 5%
July-May 0% 5%
July-Jun 0% 5%
Cumulative Totals
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Storage Forecast
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
0%
20%
40%
60%
80%
100%
120%
140%
Jul-
15
Jul-
15
Au
g-1
5
Sep
-15
Oct
-15
No
v-1
5
De
c-1
5
Jan
-16
Feb
-16
Mar
-16
Ap
r-1
6
May
-16
Jun
-16
Jul-
16
Au
g-1
6
Sep
-16
Oct
-16
No
v-1
6
De
c-1
6
Jan
-17
Feb
-17
Mar
-17
Ap
r-1
7
May
-17
Jun
-17
Jul-
17
Au
g-1
7
Sep
-17
Oct
-17
No
v-1
7
De
c-1
7
Jan
-18
Feb
-18
Mar
-18
Ap
r-1
8
May
-18
Jun
-18
End
of
Mo
nth
Sto
rage
Lev
el i
n %
Period
Burrendong Dam Forecast Storage Levels (assessment done end of July 2017)
Actual
Dry 80% COE
Median 50% COE
Wet 20% COE
Minimum 99% COE
• Plan to deliver about 400GL of
Licenced water in 2017-18
• Irrigation water orders are expected to
commence end of Oct 2017
• About 135GL will be delivered to
Marshes from both licenced and EWA
allocations in 2017-18.
• Next Delivery of S&D flows will likely
to be in Autumn 2018
• Minimal operational shortfalls and
Ops losses planned
• Water Order Debiting will be applied
to licence holders with a history of
over-ordering. Please see fact sheet
14 Sept 2017
WaterNSW Macquarie-Cudgegong Water Ops Report
System Operations Plan
System Outage Plan
Dam maintenance impacting supply
• Planned outage – none.
• Fluctuations in river flows due to investigation works for
reinstating Cold Water Pollution temperature curtain.
Weirs
• Planned outage – none.
Regulators
• Planned outage – none.
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Prognosis
Chances Of Improvement
The chances of improved General Security allocation, based on different
inflow scenarios are as follows:
Potential Inflow Conditions Macquarie
Total General Security AWD (%)
1-Nov-17 1-Feb-18
Dry
(80% inflows: 4
chances in 5)
38% and carry over
from 2016-17
38% and carry over from
2016-17
Average (50% inflows: 1
chances in 2)
44% and carry over
from 2016-17
56% and carry over from
2016-17
Wet (20% inflows: 1
chances in 5)
96% and remaining
carryover from 2016-17
after some spill
100% and remaining
carryover from 2016-17
after some spill
14 Sept 2017 WaterNSW Macquarie-Cudgegong Water Ops Report