PROJECT NAME LOCATION DESCRIPTION CAPITAL VALUE PROJECT START PROJECT FINISH CONTACT DETAILS
Lethabo Contractors – MV Distribution Substation Upgrade at Cresta Mall
Cresta Mall, Johannesburg
Protection Settings and Commissioning of 11kV
Switchgear and 2 x 2.5MVA Power Transformers at Cresta
Mall
R 65,800.00 25 February 2014 07 April 2014 Abrahm KhaloCell: 083 653 6669Tel: 011 494 3211
Email: [email protected]
Mbeu Engineering (for ABB) – Site Investigation
at Shannon (A) and Meriteng Substations
Shannon (A) and Meriteng 132kV Substations
Bloemfontein
Investigate faulty Disconnector control mechanisms at Shannon
(A) and Meriteng 132kV Substations
R 17,663.16 26 August 2014 28 August 2014 Isiah SalaniCell: 082 704 0955
Email: [email protected]
Steve Tshwete Local Municipality – Upgrade of Substation S/G Protection
Schemes
Hendrina 11kV SubstationHendrina
Investigation of inadequately operating substation protection
schemes and Upgrade the schemes with recommended
solution. (Phase 1)
R 46,563.30 16 October 2014 28 October 2014 Ntokozo GubevuCell: 073 813 1331Tel: 013 249 7375
Email: [email protected]
Tsekwane Investments – Consulting Electrical
Engineering Services and Project Management
Various Sites Appointed as a Consulting Company to render Professional Electrical Engineering Services
and Project Management Services, assigned to Seven (7)
Various Sites.
R 890,440.00(Invoiced to Date)
19 November 2014 In Progress Hendrick ThobejaneCell: 082 573 0449Tel: 011 312 1766Email: hendrickt@
tsekwane.co.za
Mayivuthe Contractors – Site Investigation of Faulty
22kV Autorecloser and Repair
Umjindi Local Municipality, Baberton
Fault-finding Investigation and Repair of 4 x 22kV Auto-
reclosers at Umjindi Local Municipality
R 45,538.4418 November 2014 20 November 2014
(Repair Pending)Joel Mahlangu
Cell: 082 490 5030Tel: 013 246 1450
Email: [email protected]
Steve Tshwete Local Municipality –
Investigation of Faulty Line Protection Schemes
Sipres 88kV Substation
Middelburg
Investigation and Repair of Faulty Line Protection Schemes
for the 88kV Substation at Middelburg
R 19,378.86 04 December 2014 10 December 2014 Ntokozo GubevuCell: 073 813 1331Tel: 013 249 7375
Email: [email protected]
REFERENCE LIST
PROJECT NAME LOCATION DESCRIPTION CAPITAL VALUE PROJECT START PROJECT FINISH CONTACT DETAILS
Zest Energy – Design of6.6kV Overhead Line for
Liberia Iron Ore Mine
Project for LiberiaIron Ore Mine
Liberia
Design of a 6.6kV Overhead Line forthe Mining Reticulation
System
R 19,775.58 09 December 2014 6 January 2014 Coenraad VreyCell: 082 578 3740Tel: 011 723 6281
Email: [email protected]
ZAM Automation &Tripping Systems cc. –
Site Supervision work atMajuba Power Station
Majuba Power StationVolkrust
Site Supervision of Cable WorkInstallation at Majuba Power
Station
R 35,629.56 09 January 2015 09 February 2015 Alpheus ZunguCell: 082 349 8867Tel: 011 397 6309
Email: [email protected]
Manyane Electrical CC –Installation and
Commissioning atRustenburg Provincial
Hospital
RustenburgProvincial Hospital
Installation and Commissioning of 11KV Indoor Switchgear
and Cable Termination
R 265,550.00 04 March 2015 05 March 2015 Musaka D MboromaCell: 083 539 0343Tel: 011 767 5100
Email: [email protected]
Zest Energy –Provision of Engineering
Services for variousProjects
Various Projects Provision of Engineering Services as and when required
on various projects.
R 38 413.44(Invoiced to
Date)
04 March 2015 In Progress Coenraad VreyCell: 082 578 3740Tel: 011 723 6281
Email: [email protected]
Manyane Electrical CC –Installation and
Commissioning atRahimma Moosa Hospital
Rahimma Moosa HospitalJohannesburg
Upgrade/ Retrofit Protection Relays onthe Main Intake 11kV Substation andServicing and Re-commissioning of existing CDG Relays on other various
Feeder Substations.
R 322,024.26 18 May 2015 23 May 2015 Musaka D MboromaCell: 083 539 0343Tel: 011 767 5100
Email: [email protected]
Rand Water –Issuing of C O C
ZwartkopjiesResidential
HousingJohannesburg
Investigation and Repair of Faulty Line Protection Schemes
for the 88kV Substation at Middelburg
R 280 804.80 01 June 2015 03 July 2015 Sipho MadunaCell: 063 200 0474Tel: 011 682 0911
Email: [email protected]
Rand WaterBG3 Pipeline Gravel
Access Roads
Vaal DamDeneysville
Rehabilitation Works to the BG3Pipeline Gravel Access Roads
from the R549 Provincial Road, Including Replacement of the
Existing Concrete Palisade Fence at the Vaal Dam Site.
R 4,997,478.60 30 September 2015 29 January 2016 Ricardo WhiteTel: 011 682 0553
Email: [email protected]
PROJECT NAME LOCATION DESCRIPTION CAPITAL VALUE PROJECT START PROJECT FINISH CONTACT DETAILS
Rand WaterDesign,Supply and
Installation of UV Unit
Barrage WaterTreatment Plant
The Design, Supply, Installation and Putting into Service of an
additional Ultraviolet Light Disinfection Unit at theBarrage
Water Treatment Plant.
R 815,684.00 11 December 2015 30 June 2016 Rashid JouleyCell: 079 491 5978Tel: 011 682 0483
Email: [email protected]
Rand WaterVGS Lime Plant one Cable Replacement
VereenigingPumping Station
Design, Supply, Install andCommissioning of 11kV
Electrical Reticulation, 11kV Outdoor Switching Station and Control Equipment at
Vereeniging Pump Station (Lime Plant 1).
R 2,977,916.00 22 October 2015 30 June 2016 Bonginkosi MthethwaCell: 082 578 4930Tel: 011 682 0194
Email: [email protected]
Rand WaterCentral Depot
Telemetry Project
Central DepotJohannesburg
Integration of Telemetry Data Between Rand Water and
Municipalities
R 4,031,281.00 28 December 2015 20 June 2016 Chrispen MukaroCell: 083 566 3507Tel: 011 682 0142
Email: [email protected]
Phillip Morris SA400V Change Over-
System
PMI PlantBoksburg
Design, Supply, Install andCommissioning of an
Automated Change-Over System c/w Controls
R 1,375,000.00 18 January 2016 17 June 2016 Abia RakomaCell: 083 348 8836Tel: 011 841 9079
Email: [email protected]
Rand WaterConstruction of the Sewer Reticulation
System
Grootvlei X1Mpumalanga
The Sewer Reticulation of 822 Stands Including Gravity Line at
Grootvlei X1
R 9,795,252.63 08 April 2016 15 December 2016 Nhlanhla ZondoCell: 072 144 7677Tel: 011 682 0975
Email: [email protected]
Rand Water –The Design of Big Sluge
Pipe Line
Vereeniging Design of the Second Phase Sludge Line
R3,322 418.00 19 May 2016 15 December 2016 Ricardo WhiteTel: 011 682 0553
Email: [email protected]
Rand WaterDesign, Manufacture,
Supply, Delivery,Sewage Pumping
System
Barrage WaterTreatment Plant
Design, Manufacture, Supply, Deliver, Sewage Pumping
System
R2,682 296.00 26 May 2016 09 December 2016 Stanley GovenderTel: 011 682 0410
Email:[email protected]
PROJECT NAME LOCATION DESCRIPTION CAPITAL VALUE PROJECT START PROJECT FINISH CONTACT DETAILS
Evander Gold Mine Evander GoldMine (Shaft 8)
Repair of the 6.6KV Mini Substation LV Compartment
R 87 129.00 22 April 2016 15 June 2016 Fanuel MathenjwaCell: 082 847 1523Tel: 017 620 1602
Email: [email protected]
Denel IndustrialProperties
Kempton Park Supply of 26 x 12VDC, 7Ah Batteries and Maintenance
of the UPS
R 17 493.00 03 June 2016 13 June 2016 Joseph NamanyaneTel: 012 671 2812
Email: [email protected]
Izinyosi Trading CCRepairing and Cleaning
of the ExistingSwitchgear
Bethal In StandertonSubstation Under
Govan MbekiMunicipality
Repair and Cleaning of 11kVSwitchboard at Standerton Substation and upgrade of
Protection Schemes
R 398 395.80 02 June 2016 08 July 2016 Mandla NdlovuCell: 083 564 5192Tel: 017 811 2288
Email: [email protected]
Rand WaterSupply and Installation
of AC Cabling,Eelectrical Kiosks and
Solar Power Units
Vereeniging Supply and Installation of AC Cabling, Electrical Kiosks and Solar Power Units to the ICCP Units for Rand Water Pipeline
Network in the South RandRegion
R 4,04 9991.50 11 August 2016 31 March 2017 Chrispen MukaroCell: 083 566 3507Tel: 011 682 0142
Email:[email protected]
AngloAmericanSupply and Installation
of Medium VoltagePower
RBMR OperationsCondo Separation
Unit
Supply and Installation of Medium Voltage Power Supply
to the RBMR Operations at Condor Separation Unit (CSU)
R 1,150 270.00 29 August 2016 In Progress Melvinia ChidiCell: 079 970 7969Tel: 011 373 6694Email: melvinia.
chidiangloamerican.com
Rand Water –Sludge SpillageRehabilitation
Panfontein Sludge Splillage Rehabilitation at Panfontein
R 4,916 200.00 14 July 2016 9 December 2016 Nada MdanyelwaCell: 076 264 5479Tel: 011 682 0142
Email: [email protected]
Rand WaterInfrared and Ultrasound
Testing
ZwartkopjesPumping Station
Infrared and Ultrasound Testing of HT & LV Board at Zwartkopjes
R 33 400.00 21 October 2016 In Progress Andries LewaakCell: 084 395 9260Tel: 011 724 9401
Email:[email protected]
PROJECT NAME LOCATION DESCRIPTION CAPITAL VALUE PROJECT START PROJECT FINISH CONTACT DETAILS
Rand WaterTransformer Testing
ZwartkopjesPumping Station
Transformers Testing R 150 808.00 20 October 2016 In Progress Marcel PoonawaCell: 083 263 9144Tel: 011 724 9533
Email: [email protected]
AngloAmericanSupply and Installationof New Overhead Line
Condo SeparationUnit
Supply, Delivery, Installation and Commissioning of New
Overhead Line and Cables for the Condor Separation
Unit
R1,701 151.00 12 December 2016 In Progress Dirk FourieCell: 072 414 4753Email: dirk.fourie@
angloamerican.com
Exxaro CoalMpumalanga
High Tension ElectricalUpgrade
Matla Coal Miney Supply and Delivery of MinatureSubstations (Mini-Sub)
R7,892 669.00 03 March 2016 In Progress Johan BothaCell: 083 457 5190Tel: 017 616 7379
Email:[email protected]
Mowana PropertiesSupply and intall of the
Generator
10 WaterfordOffice Park
Supply, Install and Commissioning of
the 100 Kva Generator
R1,023 439.90 25 January 2017 In Progress Archie PitsoCell: 082 411 1779Tel: 012 771 7172