1 World Class Manufacturing
Transcript
Page 1: Wcm

1

World Class Manufacturin

g

Page 2: Wcm

2

Core text books.

1. Production & Operation Management by S.N. Chary

2. World Class manufacturing B.S Sahay

Reference Book : Operation Management Jay Heizer & B.Render 8th Edn

National Manufacturing Competitiveness council

report. 2009

Page 3: Wcm

3

World Class Manufacturing is a set of concepts, principles, policies and techniques for managing and operating a manufacturing company. It is driven by the results achieved by the Japanese manufacturing resurgence following World War II, and adapts many of the ideas used by the Japanese in automotive, electronics and steel companies to gain a competitive edge. It primarily focuses on continual improvement in quality, cost, lead time, flexibility and customer service.

Page 4: Wcm

HIGH MORAL & SAFETY

COSTREDUCTION

FLEXIBILITY IN OPERATION & PROCESS

LEAD TIME

REDUCTION

QUALITY

CONTINUAL IMPROVEMENT

WORLD CLASS MANUFACTUING CONCEPT DRIVES :

Page 5: Wcm

5

Companies that are pursuing world-class status may follows four dominant principles of which these companies may choose one or more.

1.Just-in-Time (JIT) - The JIT principle focuses on the elimination of waste, with waste defined as anything other than the minimum amount of equipment, materials, parts, space, and workers' time, that are absolutely essential to add value to the product. 2. Total Quality Control (TQC) Under the TQC principle, everyone in the organization must be involved in improving the product's quality to meet customer needs. The emphasis is placed on defect prevention rather than defect detection and development of an attitude of "do it right the first time."

3. Total Preventive Maintenance (TPM) - With the TPM principle, machines and equipment are maintained so often and so thoroughly that they rarely ever break down, jam, or misperform during a production run. 4. Computer Integrated Manufacturing (CIM) - CIM involves the integration of the company's operations from design, production, and distribution to after-sales service and support in the field through the use of computer and information technologies."

Framework for Continuous Improvement

Page 6: Wcm

6

Transition of manufacturing Sector

Consumer Expectation

Competition

Local Global

Low

High

Traditional Manufacturing Practices

Acceptance issue Image & qualityIssue.

WCMGlobal CompetitivenessLean manufacturing

Uncontested market .Manufacturing Process Excellencefor cost competitiveness & innovation

Page 7: Wcm

7

Time to Market is shortening : Rapid introduction of new products puts pressure on manufacturing facilities to profitably produce a larger variety in smaller volumes. Manufacturing firms have to adopt to new processes, new materials, new vendors, new shop floor layouts, new ways of reducing cycle times, new designs etc. to deliver these products .

The real challenge is therefore to improve substantially on several dimensions viz : quality, technology, shop floor practices, supply chain coordination, and new product introduction over a short period of time.

Page 8: Wcm

8

Manufacturing shift

Cost Focus Quality focus Customization focus

Mass Production lean Production Mass Customization

Scientific CAD/CAM ERPmanagement EDI/ TQM Lean SCMProcess KAIZAN Agile manufacturing MRP Six Sigma Build to order PERT/CPM SCM Lean manufacturing

Page 9: Wcm

9

•Product mix change •Conformance to quality •Volume change •Product customization •On time delivery •Research on New product development•Quick design changes •Price competitiveness

MANTRA FOR GLOBAL COMPETITIVENESS IN

MANAUFACTURING FIRMS ARE :

Page 10: Wcm

10

The Indian Manufacturing sector has traversed a diversified path to industrial development within the country. While its share in the GDP has declined over the years, its growth rate in recent years has been impressive (a CAGR of close to 8 percent in the last eight years). Very few countries in the world can boast of such a diversified industrial base of significance: from textiles & apparel to steel, from chemicals to machine tools, from consumer goods to avionics. And then there is the automobile and the auto-component industry with engineering & service design that has created an industrial dynamics that only a few countries in the world have been able to achieve.

Extract of Report submitted to NMCC by IIM Bangalore March 2009.

A Perspective of Indian Manufacturing sector

Page 11: Wcm

11

Studies have indicated that the productivity of the manufacturing industry in India is approximately 1/5th of the productivity in the manufacturing industry of United States Of America. It is about ½ as compared to the productivity levels in South Korea as well as Taiwan. Labor productivity has escalated only to a small extent in case of India in comparison to United States Of America, on the contrary, labor productivity has increased manifold in Taiwan & Korea .

• While ' Indian Manufacturing Industry ' is competing in the global marketplace and registering growth on YoY basis, in sector areas , large sections of ' Indian manufacturing' sector still suffers from bottlenecks like –

1. Use of primitive technology or under utilization of technology. 2. Poor infrastructure. 3. Over staffed operations & high operation cost 4. Low flexibility in manufacturing process 5. Expensive financing and bureaucracy

Concerns of Indian manufacturing sector

Page 12: Wcm

12

New Competitive Challenges

Today, Indian firms are facing a very different competitive scenario as compared to the past. They are facing competition from imports and from MNCs in the domestic markets. Firms also have to compete as new entrants in global markets. Earlier, firms would segregate these two markets and serve them with different quality products and services, compromising on quality in the home market. This is no longer possible.

Therefore, many strategies that may have worked in the past are not likely to succeed in the future.

The cost structure of Indian manufacturing plants shows that materials constitute 66 percent of total costs, direct labour 10 percent and overheads 24 percent.

This implies that management initiatives to control manufacturing costs need to be focussed to reduce material costs and overheads.

Page 13: Wcm

13

Efforts to control material related costs may need to address several issues including rejects and rework on the shop floor, identifying alternative materials, and better materials management and sourcing.

The new competition is in terms of reduced cost, improved quality, products with higher performance, a wider range of products, and better service - all delivered simultaneously.

Indian firms have quite often followed an opportunistic approach to growth as opposed to a capability driven approach that seeks to strengthen key aspects of manufacturing

Page 14: Wcm

14

Traditional Manufacturing Process. Causal Diagram.

Page 15: Wcm

15

Logistics were organized around the principle of mass production. Low cost was to be achieved through high volume. This led firms to hold large inventories of incoming materials, work-in-progress and finished products, just-in-case anything might go wrong and interrupt the flow of production. Machinery was designed to produce one type of products, and machine changeovers were to minimum.

Quality procedures were designed so as not to get in the way of production-flow. So quality inspection was placed at the end of the production line, and faulty products were reworked before delivery.These principles of mass production were appropriate as long as markets were stable and undemanding. As markets became more heterogeneous and changeable, new principles of production had to be established.

Page 16: Wcm

16

Principles of World Class Manufacturing : WCM is a process driven approach where implementations usually involve the following philosophies and techniques:

1. Make-to-order 2. Streamlined flow 3. Small lot sizes 4. Families of parts 5. Doing it right the first time 6. Cellular manufacturing 7. Total preventive maintenance 8. Quick changeover

Page 17: Wcm

17

9. Zero Defects 10.Just-in-time 11.Variability reduction 12.High employee involvement 13.Cross functional teams 14.Multi-skilled employees 15.Visual signaling 16.Statistical process control

These sixteen practices helps an organization to achieve a position of world class manufacturing.

Page 18: Wcm

18

World class manufacturing

Page 19: Wcm

19

•Logistics are designed so that flexibility can be ensured.

•Producing in small batches to satisfy varied and volatile markets. •Inventories are organized on a "just-in-time" basis, and production flows through the plant as single units rather than in large batches.

•Attention is paid to rapid changeover and simpler and more flexible machinery is often used.

•Instead of checking quality at the end of the line, quality is assured at each stage of the production process, so that no defects are allowed to pass through the plant.

WCM has following inherent advantage

Page 20: Wcm

20

Page 21: Wcm

21

Page 22: Wcm

22

Page 23: Wcm

23

Lean manufacturing Model ( TPS House )

Integrated SCMJust In TimeContinuous flow Pull system Quick change over

People & Team WorkCommon Goal , Cross Trained high morale

Waste reduction Problem solving 5 Why;s

Continuous Improvement

Leveled production Standard manufacturing process

Visual Management

Self triggered stops Process driven Error proofing In station quality Control

Page 24: Wcm

24

Lean manufacturing practices works on the premise of eliminating waste and being flexible and open to change. It is a team based approach to identifying and eliminating waste (non-value adding activities) through continuous improvement by flowing the product at the pull of the customer in pursuit of perfection.

The Toyota Production System is a philosophy of manufacturing that was created by the Toyota Corporation. TPS, has become synonymous with Lean Manufacturing. TPS defined three types of waste: “Muda“( non value-added work), “Muri" (overburden) and “Mura“( unevenness). By eliminating waste, overall quality can be improved and production time as well as cost can be reduced.

Lean Manufacturing & Toyota Production System.

Page 25: Wcm

25

TPS defined three types of waste known as 3 M’s of TPS.

“Muda“( non value-added work), “Muri" (overburden) “Mura“( unevenness).

By eliminating waste, overall quality can be improved and production time as well as cost can be reduced.

Page 26: Wcm

26

Toyota Production System ( TPS) & 3 M’s The Toyota seven wastes are as follows:

The TPS identifies seven wastes specifically and collectively called as “wastes”. 1. Over-production2. Motion (of operator or machine)3. Waiting (of operator or machine)4. Conveyance,5. Processing itself6 .Inventory (raw material) 7. Correction (rework and scrap).

Lean manufacturing aims to improve the manufacturing process by eliminating seven wastes in all their forms.

Page 27: Wcm

27

Page 28: Wcm

28

Page 29: Wcm

29

TPS approach to reduce waste.

1. Reduce setup times - Employees at Toyota were made responsible for their own setups thus reducing the wastefulness of this process .

2. Small-lot production - The process of economically producing a variety of things in small quantities rather than producing things in large batches.

3. Employee involvement and empowerment - Employee are divided into teams and even those in supervisory positions work along side other employees on the production line as part of the team.

4. Quality at the source - Product defects are identified and corrected as soon as they occur or at the source.

Page 30: Wcm

30

5. Equipment maintenance - Operators of the equipment are also assigned to take care of their maintenance since these should be the individuals who know the equipment best.

6. Pull production - The work performed at each stage of the process is dictated solely by demand for materials from the immediate next stage (also known as "Just in Time").

7. Supplier involvement - Suppliers are treated as partners and are also trained in the TPS methods.

Page 31: Wcm

31

Factors affecting Lean Manufacturing

Page 32: Wcm

32

Theory of ConstraintsEli Goldratt is the creator of the Theory of Constraints (TOC)

Theory of Constraints (TOC) is an overall management philosophy that aims to achieve goal of a system by eliminating bottle neck in the process.

TOC focuses on critcal areas which influence the system’s efficency and productivity.

1) The management thinking processes and their implication to execution and human behavior .

2) The constraints in critical business activity & its implication to processes flow in the service operation.

The constraints can be broadly classified as either an internal constraint or a market constraint ( suppler constraint) .

Page 33: Wcm

33

Theory of Constraints is based on the premise that the rate of revenue generation is limited by constraining process (i.e. a bottleneck).

Only by increasing throughput (flow) at the bottleneck process or elminating the bottleneck , can overall throughput be increased.

The key steps to overcome constraint are:

1. Articulate the goal of the organization.

2. Identify the constraint (the thing that prevents the organization from obtaining more of the goal.

Page 34: Wcm

34

3. Decide how to exploit the constraint. Subordinate all other processes to above decision (align all other processes to the decision made above)

The primary methodology used to overcome constraints is refered as Drum-Buffer-Rope (DBR) approach.

Page 35: Wcm

35

1. The drum is the physical constraint of the plant: the work center or machine or operation that limits the ability of the entire system to produce more. The rest of the plant follows the beat of the drum.

2.The buffer protects the drum, so that it always has work flowing to it. Buffers in DBR methodology advocates time as the unit of measure, rather than quantity of material. This makes the priority system operate strictly based on the time .

3. The rope is the work release mechanism for the plant. ( Trigger ). It Pulls work into the system just when required rather than earlier than a buffer time which creates high work-in-process and slows down the entire system.

Page 36: Wcm

36

Marching to the Drum Beat of the Drummer

Constraint linked to Market demand

Drum Beat Of the plant

Inventory available toOvercome the constraint

Virtual stock buffer

Buffer time

Proactive Process

Page 37: Wcm

37

Traditional system calls for buffers at several points in the system. Simplified DBR requires only a single buffer at shipping point.

Drum - The constraints, linked to market demand, is the drumbeat for the entire plant.

Buffer - Time/inventory that ensures that the constraint is protected from disturbances occurring in the system.

Rope - Material release is "tied" to the rate of the constraint.

Page 38: Wcm

38

The Simplified- Drum, Buffer Rope ( S-DBR) provide the basis for building a production schedule that is highly immune to disruption, avoids creating excess inventory, and uses small batches to minimize overall lead time.Thus S-DBR is used to mitigate and often prevent those disruption which happens in Production process.

Page 39: Wcm

39

Lean Manufacturing Model

Integrated SCMJust In TimeContinuous flow Pull system Quick change over

People & Team WorkCommon Goal , Cross Trained high morale

Waste reduction Problem solving 5 Why;s

Continuous Improvement

Leveled production Standard manufacturing process

Visual Management

Self triggered stops Process driven Error proofing In station quality Control

Page 40: Wcm

40

7 Essential principles of Lean manufacturing

1. Pull Inventory Control. Work moves based on the needs of the downstream operation starting from the customer need.

2. Automation: Equipment intelligently recognizes & eliminates process variation with human like intervention. Technology support from ERP, CAD/CAM etc

3. JIT Inventory : WIP & supplies arrive at the process location as they are needed.

Page 41: Wcm

41

5. Visual control. : Management by sight of equipment & process Variation.

6. Standardized work process & procedures. All activities are defined in advance & characterizes by process consistency.

7. Pursuit of perfection. There is no end to the process of reducing , waste , time cost & mistake.

8. Continuous work flow : Alignment of machines are such that it drives continuous work flow without interruption.

Page 42: Wcm

A flexible manufacturing system (FMS) is a group of numerically-controlled machine tools, interconnected by a central control system. The various machining cells are interconnected, via loading and unloading stations, by an automated transport system. Operational flexibility is enhanced by the ability to execute all manufacturing tasks on numerous product designs in small quantities and with faster delivery. It has been described as an automated job shop and as a miniature automated factory. It is an automated production system that produces one or more families of parts in a flexible manner. Automation and flexibility presents the possibility of producing nonstandard parts to create a competitive advantage.

Page 43: Wcm

Flexible Manufacturing System

Batch Production or Job production

Dedicated machinery or General-purpose tools

Cost savings but lacks flexibility

Costly, and may not reach full capacity

Page 44: Wcm

FMS is limited to firms involved in batch production or job shop environments. Normally, batch producers have two kinds of equipment from which to choose: dedicated machinery or general-purpose tools. Dedicated machinery results in cost savings but lacks flexibility. General purpose machines such as lathes, milling machines, or drill presses are all costly, and may not reach full capacity. Flexible manufacturing systems provide the batch manufacturer with another option that can make batch manufacturing just as efficient and productive as mass production.

Two kinds of manufacturing systems fall within the FMS spectrum. These are assembly systems, which assemble components into final products and forming systems, which actually form components or final products.

A generic FMS is said to consist of the following components:

A set of work stations containing machine tools that do not require significant set-up time or change-over between successive jobs. Typically, these machines perform milling, boring, drilling, tapping, reaming, turning, and grooving operations.

Page 45: Wcm

An automated and flexible material-handling system ( Guided vehicle ) permits jobs to move between any pair of machines so that any job routing can be done more efficiently .

A network of supervisory computers that perform some or all of the following tasks: 1. Directs the routing of jobs through the system2. Tracks the status of all jobs in progress so it is known where each job is to go next.3. Passes the instructions for the processing of each operation to each station and ensures that the right tools are available for the job.4. Provides essential monitoring of the correct performance of operations and signals problems requiring attention. 5. Storage, locally at the work stations, and/or centrally at the system level.

The jobs to be processed by the system. In operating an FMS, the worker enters the job to be run at the supervisory computer, which then downloads the part programs to the cell control or NC controller.

Page 46: Wcm

Benefits •Less waste •fewer workstations •quicker changes of tools, dies, and stamping machinery •reduced downtime •better control over quality •reduced labor •more efficient use of machinery •work-in-process inventory reduced •increased capacity •increased production flexibility

Page 47: Wcm

LIMITATIONS OF FMS

It can handle a relatively-narrow range of part varieties, so it must be used for similar parts (family of parts) that require similar processing.

Due to increased complexity and cost, an FMS also requires a longer planning and development period than traditional manufacturing equipment.

Equipment utilization for the FMS always is not as high as one would expect.

Page 48: Wcm

Lack of technical literacy, management incompetence, and poor implementation of the FMS process.

If products change ( variation is high ) rapidly, and performance of the firm is measured on the ability to introduce new products fast than minimizing cost, in such scenario, scale is no longer the main concern and size is no longer a barrier to entry.

Page 49: Wcm

Traditional FMS

The traditional flexible manufacturing system (FMS) is based on numerically controlled machines in addition to other value-added, automatic, material handling facilities. A degree of flexibility within FMS serves to satisfy demands for a relatively diverse range of products with a small to medium batch size production.

Page 50: Wcm

Flexible Manufacturing System

Mass Customization

Mass production

Page 51: Wcm

When customer orders come through more randomly with different delivery dates, product mix changes irregularly and drastically, or the product diversification increases, downstream processes require randomly customized parts on flexible schedules to be supplied to their matching predecessor processes on short notice, extra inventory, equipment, and labor are needed to meet order variations. In such a case , traditional FMS is challenged to meet these rapid changes with minimum production cost and satisfaction. This leads to a new concept called Mass Customization . A process which delivers sufficient flexibility and rapid response capability to deal with complex manufacturing situations.

Mass customization system demands a higher degree of flexibility than traditional FMS. It is highly desirable that each component demonstrates prompt response capability in managing demand changes in a FMS with parallel considerations in product costs, quality and reliability to form the flexibility in an agile mass manufacturing system,

Page 52: Wcm

Agile Mass Customized Manufacturing System

Manufacturing process focused on the ability to flexibly and rapidly respond to changing market conditions. As product life cycles get shortened significantly , manufacturers have found that they can no longer capture market share and gain higher profits by producing large volumes of a standard product for a mass market. Success in manufacturing requires the adoption of methods in customer-acquisition and order-fulfillment processes that can manage anticipated change with precision while providing a fast and flexible response to unanticipated changes .

Page 53: Wcm

Form MCM is the simplest MCM implementation strategy, where customization is introduced at the delivery stage.

Optional MCM allows customization to take place at the

manufacturing stage. The essential point of this implementation strategy is to provide a large number of pre-designed, standard options to customers. It produces the configured products. Customers can only select options from a predetermined list and request them to be assembled. ( Dell manufacturing Model )

Core customization integrates customers with the design process.

Goal of MCM is to produce and deliver customized products rapidly while keeping costs at the mass-production level.

MCM implementation strategies can be divided into three different categories according to the different stages when customization is introduced in the value-chain: (1) form MCM, (2) optional MCM, (3) core MCM

Page 54: Wcm

Steps for mass customization lie in two areas: 1. Design For Mass Customization ( DFMC) 2 Mass Customization Manufacturing (MCM) system.

DFMC emphasizes decoupling of the design and manufacturing process to reduce costs. In developing MCM, it is important to take DFMC into consideration in order to reduce the setup time and other volume-related costs drivers. Modification of product shape and size are limited to guarantee that fabrication can be performed on the same production line.

Product design for mass customization ( DFMC) calls for Parameterized products: Parameterized products possess a series of attributes called parameters. These parameters allow customers to change the actual design of the product, for example, by creating new sizes, or modifying performance characteristics. Each parameter can be chosen by customers within a certain scope, and the scope itself can also be defined as one of the parameters

Mass Customized Manufacturing ( MCM )

Page 55: Wcm

Success in mass customization manufacturing( MCM) is achieved by swiftly reconfiguring operations, processes, and business relationships with respect to customers’ individual needs and dynamic manufacturing requirements. MCM system is characterized by four challenging characteristics:

Degrees of flexibility, Production capability adjustments, Modularization methods Dynamic network-control system structure

Modularization methods : Modularization methods in traditional manufacturing systems are often product-oriented, where modules are grouped in teams with intercross functions . In an MCM system, categorization of modules is based on their functionalities: the greater the diversity of module classifications, the better the system’s potential to satisfy different customized demands

Page 56: Wcm

Dynamic-network-control system structure: Control system structures in FMS are often constructed in a hierarchical mode. Modules assigned at various closely interactive layers result in the limitation of the capability for system reconfiguration, reliability, and system expandability. Because of the complexity in ever-changing manufacturing requirements and flexible process routing, fixed and centralized control is almost impossible in a MCM system. Dynamic and flexible network utilizations in MCM functional modules can maximize the strength of each empowered resource, and hence, the overall risk and costs are reduced. The dynamic network connections among functional modules are characterized as :

Instantaneous: Accessing valid resources and reconfiguring functional modules should be instantaneous.

Low cost: Besides the initial capital investment, it is better to reduce the recurring system costs.

Page 57: Wcm

Seamless: A set of system mechanisms needs to be established to ensure seamless data exchange among customized orders, suppliers, services, and production controls.

Frictionless: There should be no resource conflicts when a new network is created. Success in this feature promotes better cost controls and dynamic network operations.

Page 58: Wcm

Integrated design and simulation system to enable MCM

Page 59: Wcm

Evolving of Supply Chain practices for competitive advantage

2001: CPFR

1996: ECR

1992: VMI/Co-Managed

1986: Quick Response (QR)

1960s: Just-In-Time/Total Quality

Page 60: Wcm

The goal of JIT in manufacturing organization is to continuously reduce the cost associated with requirement material resource. Its objective is to achieve cost efficiency through zero inventory. The goal of JIT process is to reduce excess working capital held-up on account of material & minimal inventory at WIP . The constraints of managing RM inventory are due to :

•Unpredictable quality of supply of material •Inability to hold tolerances. •Shortcoming in lead time. ( Erratic delivery ) •Short supply of quantity of material •Inaccurate forecasting •Non standard materials being used ( Increased variety ) •Last minute product changes.

Page 61: Wcm

Steps for implementing JIT in an organization.

1. Do detailed analysis of inventory requirement of all types at every stage of production process.

2. Estimate the market fluctuations on account of price, supply , quality demand etc.

3. Identify reliable source of suppliers who are capable of supplying material as when required.

4. Take supplier in to confidence & sensitize them the importance of JIT inventory & build healthy business relationship with suppliers to have high commitment & ownership . Use Value engineering approach.

Page 62: Wcm

5. Conduct periodic vendor appraisal & follow vendor rating system of evaluation .

6. Give instant feed back on the supply & suggest improvement steps.

7. Sign rate contract .

8. Use IT enabled ordering system , ERP .

Page 63: Wcm

Inventory Control Techniques

Inventory control techniques are used to prevent : 1 financial leakage due o excessive stock & poor demand , 2 2shortage of inventory3. Inventory Obsolescence Plan safety stock for critical & essential items Build selective control on fast & slow moving inventory .

Various Inventory control technique used are : ABC : Always Better Control VED : Vital Essential & Desirable SDE : Scarce Difficulty & Easy FNSD Fast moving , Normal , Slow moving , Dead

Page 64: Wcm

% items 0 10 30 100

ABC Classification

(InventoryValue )

Usage %

70

90

100

CLASS A

CLASS B

CLASS C

High annual consumption value items

Moderate annual Consumption value

Low annual consumption value

Page 65: Wcm

VED analysis : Vital : Without which production process will come to halt. Essential : Non availability of such item will affect the efficiency .Desirable : It is good if it is available , however alternate option can be done.

SDE : Scarce ( Short supply ) Difficult ( Imported components ) easily ( Short lead time )

Page 66: Wcm

Purchase Inventory review system :

Review process is administered on the basis of Fixed order quantity ( Q system ) and fixed period quantity system . ( P system )

In Q system , whenever the stock level reaches the RoL , order is placed for a fixed quantity of material . RoL is calculated as a sum of demand during the lead time & variation in demand during lead time ( safety stock ) and average demand during delivery delays. ( reserve stock )

In p system , stock position is reviewed after every fixed period & order is placed according to stock position & demand .

Page 67: Wcm

Value Engineering or Value Analysis

It is a technique of cost reduction and cost prevention. It focuses on building necessary functions at minimum cost with out compromising on quality, reliability ,performance & appearance. It helps in identifying unnecessary costs associated with any material , part components or service by analysis of function and efficiently eliminating them with out impairing the quality functional reliability or its capacity to provide service. It is a preventive process.

Page 68: Wcm

When to apply VE 1. Raw material cost increases suddenly .

2. Vendors are unreliable & organization is highly dependent on a few select vendor .

3. Cost of manufacturing is disproportionate to volume of production .

Value analysis is done w.r.t cost associated at: • Cost Value (Labour , Material & overhead).• Use Value • Esteem Value ( Look & finish ) • Performance Value ( Reliability , Safety , Service &

Maintenance )

Page 69: Wcm

Value = Performance ( Utility) Cost

Vendor analysis is done to minimize the cost incurred due to a supplier Inefficiency or inability .

Vendor cost to be considered are :

•Opportunity loss due to poor quality ( High rejection cost ) •leading to machine & labour idle time. •High re-work cost •Inconsistent lead time •Inability to meet the demand of the manufacturer•Poor Credit terms

Page 70: Wcm

Value engineering procedure: Constantly evaluate the inventory costs associated & benchmark against the best in practice.

As & when the cost of manufacturing increases disproportionately, identify an alternate source for contract manufacturing & monitor the quality & standards.

Use more standard parts which can be sourced easily

Develop more suppliers ( at least 4 to5 for one part.) & minimize dependency on one supplier.

Audit the supplier’s work premise & rate them on the performance . Conduct quarterly vendor meet & share the highlights & concerns .

Page 71: Wcm

Manufacturing Requirement Planning

Page 72: Wcm

MRP MRP1 ERP

Material requirement planningin manufacturing organization.

Manufacturing resource Planning in manufacturing organization

Enterprise resourcePlanning

Inventory planning Production planning & control

Business planning & control

Material planning Material, Machine Method Man

Man Machine Material, Method & Money

The essence of the progress was based on seamless integration and analysis of information on various resources required by a manager to make an effective decision.

Page 73: Wcm

Prior to the concept of ERP systems, a manufacturing organization faced tremendous difficulty in planning & controlling of resources like people , finance WIP inventory at plant , machine status etc due to lack of integrated & updated information about resources.

MRP vs. ERP — Manufacturing management systems have evolved in stages over the past three plus decades, from a simple means of calculating materials requirements to the automation of an entire enterprise.

As frequent changes in sales forecasts happened entailing continual readjustments in production, as well as inflexible fixed system parameters, MRP (Material Requirement Planning) evolved into a new concept : Manufacturing Resource Planning (or MRPII ) and finally the generic concept Enterprise Resource Planning (ERP)

Page 74: Wcm
Page 75: Wcm

Advantage of ERP in a manufacturing organization.

Integration among different functional areas to ensure proper communication, productivity and efficiency Integration of Design engineering & collaboration. (CAD & CAM ) Order tracking, from acceptance through fulfillment The revenue cycle, from invoice through cash receipt Managing inter-dependencies of complex processes BOM . Tracking the three-way match between purchase orders (what was ordered), inventory receipts (what arrived), and costing (what the vendor invoiced)

The accounting for all of these tasks: tracking the revenue , cost and profit at a granular level.

Page 76: Wcm

Disadvantages

Customization of the ERP software is limited. Re-engineering of business processes to fit the "industry standard" prescribed by the ERP system may lead to a loss of competitive advantage. ERP systems can be very expensive (This has led to a new category of "ERP light" solutions) ERPs are often seen as too rigid and too difficult to adapt to the specific workflow and business process of some companies, cited as one of the main causes of their failure. Many of the integrated links need high accuracy in other applications to work effectively. A company can achieve minimum standards, then over time "dirty data" will reduce the reliability of some applications.

Page 77: Wcm

The Next Competitive Advantage:Collaborative Commerce

2004: Collaborative

Commerce

2001: CPFR

1996: ECR

1992: VMI/Co-Managed

1986: Quick Response (QR)

1960s: Just-In-Time/Total Quality

Page 78: Wcm

Software solution for collaborative commerce

SAP/R3

manugisticsleveraged Intelligence

i2

LOGILITYVOYAGER

SOLUTIONS

Eqos

Page 79: Wcm

A shared process of creation between two or more parties with diverse skills and knowledge delivering a unified approach that provides the optimal framework for customer satisfaction.

Voluntary Inter Industry Commercial Standards (VICS)

•A set of guidelines supported and published by the Voluntary Inter industry Commerce Standards (VICS) Association ,Trading partners to share their plans for future events, and then use an exception-based process to deal with changes or deviations from plans.

The CPFR® ( Collaborative planning , forecasting & replenishment

Page 80: Wcm

CPFR is a business practice that combines the intelligence of multiple trading partners in the planning and fulfillment of customer demand.

CPFR is a strategy for improving supply chain efficiency and effectiveness by making demand transparency, drive the execution of the supply chain participants to maximize value for the end-customer.

Fundamentally, the aim of CPFR is to convert the supply chain from a disjointed, ineffective and inefficient “push” system to a coordinated “pull” system based upon end customer demand.

Page 81: Wcm
Page 82: Wcm
Page 83: Wcm

CPFR Process Model.The driving premise of CPFR is that all supply chain participants develop a synchronized forecast. Every participant in a CPFR process — supplier, manufacturer, distributor, retailer — can view and amend forecast data to optimize the process from end to end. Essentially, CPFR puts an end to guesswork in forecasting. It means that manufacturers and retailers share their plans, with detailed knowledge of each others’ assumptions and constraints.

The target objectives for CPFR process include the following:• Increased in-stock at shelf • Reduce average transit inventory • Increased sales • Reduce operating expense • Reduce cost of goods • Reduced lead time/cycle time • Decreased account receivables • Reduced forecast error +/- 10% (Source: University of Denver Supply Chain Round table: “CPFR Overview.” Value Chain Collaboration Associates, Inc

Page 84: Wcm

FRONT END AGREEMENT

JOINT BUSINESS PLAN

CollaborativePlanning

CREATE SALES FORECAST

IDENTIFY EXCEPTIONS

RESOLVE EXCEPTIONS

CollaborativeForecasting

CREATE ORDER FORECAST

IDENTIFY EXCEPTIONS

RESOLVE EXCEPTIONS

GENERATE ORDER

Buyer

The CPFR® Process Model Seller

Page 85: Wcm

Phase I — PlanningThis phase relates to people, processes, and developing of trust. Partners must

break down cultural barriers and company-centric perceptions so they can view the bigger picture. Partners have to share a unified vision to make the process work. First, partners must define their relationships and identify what processes need to be changed to allow stronger collaboration. Next, “trigger” points for alerts must be identified and assignment charts developed that designate who responds to the alerts and in what time frame. Overall,

suppliers may have to change compensation plans and move away from “push” plans, so that shared forecasts can “pull” information through the processes. Specific benchmarks and key performance indicators (KPIs) must then be established to determine the efficacy of the shared plan.

The two major steps in this plan are :

1. Developing a front-end agreement

2. Creating a joint business plan.

Page 86: Wcm

Phase II — ForecastingCollaborative forecast of end-user demand continues through all aspects of supply chain planning, providing support for both long-term and day-to-day decisions.

Analysis like “what-if ” , forecasting planners can quickly and easily determine the financial and operational effects of any action throughout the supply chain.

In Phase II, an organization creates the sales forecast, which then feeds into the order forecast. A large quantity of information rapidly permeates the entire process. A single, collaborative forecast is created with dynamic capability to address the complexities in the business environment.

Using advanced demand planner ( software modules ) , organizations can buildmulti-dimensional models, which may include product hierarchies, geographies, channels, and specific customers. Causal variables such as pricing, promotions, and new store openings can also be completely integrated. In addition, historical data can be combined with near real-time variations in the channel to get the most accurate forecast.

Page 87: Wcm

Phase III — Executing

During 3rd phase of CPFR , front-end planning and forecasting come together with supply chain execution. Using Order Promising software module , companies can instantly determine where orders can best be satisfied — from inventory at any location, planned production orders, or purchase receipts. When there is a promotion (such as a new store opening or product launch), Order Promising allows companies to quote future delivery dates or other key information related to the event. Order Promising provides the real-time information essential to good customer service.Manufacturing, warehousing, order fulfillment, and transportation plans are completely synchronized into an integrated package to monitor and ensure on-time execution of the order delivery process.

Page 88: Wcm

Collaborative commerce in Retail

PLANSOURCE DELIVER

SUPPLY CHAINSUPPLIERSUPPLIER

CATEGORY

Management

Procurement

In sourcing/out sourcing

Relationship

Management

Supply chain design

Demand forecasting

Inventory planning

Distribution planning

Allocation

Transportation Planning

Delivery scheduling

& coordination Warehouse Management Inventory Management Transportation

management

Order Fulfillment

Visibility, Event Management & Track & Trace

Reverse Logistics

Trade Management

Process view of Supply Chain in collaborative commerce .

CUSTOMER Retail Store

Page 89: Wcm
Page 90: Wcm

90

Managing Manufacturing Lead time ( MLT ) is an essential task in any organization to deliver the goods as per the customer order lead time.MLT depends on the nature of manufacturing process. The four types of manufacturing process are :

ETO ( Engineer to Order)

MTO ( Manufacture to Order )

ATO ( Assemble to Order )

MTS (Made to Stock )

Design Procure Manufacture Assemble Ship

Lead Time

ETO

Page 91: Wcm

91

Types of Production System

Page 92: Wcm

92

Production Process.

Standardization Non standardization

Flow (Mass) Batch Job Project/ TurnProduction production production key production

MTS ETO

Plant Layout

Standard parts & Non standard low volumeHigh Volume

Plant location

Production process

Variation

Page 93: Wcm

93

Flow or mass production employs special types of machines specially designed for mass scale productions . It involves decomposition of the production task in to minute details & are grouped them according to the norms of production. An assembly line consisting of workstations in a sequence meant to do a portion of the work , feed the parts and components machined to assembly line .Material moves continuously at a uniform average rate through the sequence of workstations .

When to deploy mass production .

•When production quantities are large & variations are small .

•Demand for a single product is very high .

•It must justify economy of scale.

Mass or Flow production

Page 94: Wcm

94

Advantages of Flow production :

•Smooth flow of material from one station to next in a logical order.

•Result in small WIP inventory due to well connected process.

•Effective production time can be short if the processes in the production is not in efficient .

•Low labour skill is required and can be automated easily .

•Low labour training is required.

•Material movement is less & less WIP inventory storage space required.

Page 95: Wcm

95

Disadvantages : 1.Complete line stoppage if a machine breakdown.

2.High preventive maintenance cost

3.Plant layout is dictated by the product . Any change in the product design will call for a major change in plant layout .

4.Line balancing is essential in the assembly line to attain line efficiency . ( Grouping of task to ensure that sum of the time of the work elements performed at a work station ( station time ) does not exceed the cycle time LE = STi

K x ( CT)ST = Station time for i stationK = total no of work station CT= cycle time

5.Low degree of manual supervision .

Page 96: Wcm

96

Batch production : When a variety of products to be made & volumes are not large , batch production is followed.

•It uses general purpose machines or flexible machine system which can be used to produce variety of products.

•Material flow is more complex than mass production.

•Plant Layout is designed keeping in mind the variety & their flow pattern .

•Production cycle time are larger as compared to mass production.

•Production scheduling follows a particular sequence in which jobs should be done at the work center.

•Optimal batch size determination for economy is essential.

Batch production

Page 97: Wcm

97

Manufacturing Economic batch Quantity Items are produced & consumed simultaneously for a portion of the cycle time. The rate of consumption is uniform through out the year & cost of production remains same irrespective of production lot .

PD

tp

P = production rate D= consumption rate P – D = inventory build up rate Q = Inventory at t1

Q

Q = Pxtp , tp = Q/P

2 DXCs Ci

=EBQ

I max = t p x ( P-D)

Cycle PP-D( )

Page 98: Wcm

98

I max = t p x ( P-D)

= Q/P x ( P-D) = Q x (1- D/P)

Av annual Inv = Q/2 x ( 1- D/P)

Av Annual Inv Cost = Q/2 x (1- D/P) Ci

Annual set up cost = D/Q x C s

Q/2 x(1-D/P) Ci = D/Q x Cs

Q2 = 2 x D x Cs (P-D )Ci

P

Q = 2x Dx Cs x P Ci P-D

Economic Batch Qty

Page 99: Wcm

99

A manufacturing unit has annual demand of 10000 valves. Each valve costs Rs 32. The product engineering department estimates the setup cost as Rs 55 & holding cost as 12.5 % of the valve. The production rate is uniform at 120 valve/day. Production happens for 250 days in a year.

Calculate optimal batch size & total inventory cost on the basis of optimal policy.

Find the number of set ups on the basis of optimal batch .

Ci= 12.5% of 32 = Rs 4 , D= 10000/250 = 40 units /day

EBQ = 2 x 10000 x 55 ( 120/120-40) = 642 valves. 4

(10000/642)x 55 + 642/2 ( 120-40/120) x 4 856.8 + 856.35 = Rs 1713.15 /yr

No of setups = 10000/ 642= 16 Approx

Page 100: Wcm

100

Disadvantages :

Longer and irregular flow lines result in expensive material handling process.

Larger WIP inventory High grade skilled workers & operators are required.

Total production time required is relatively larger.

Job Production :

In job production, similar machines are used to produce variety of jobs of smaller quantity . As nature of demand is unpredictable, & each job order being unique, it requires varying processing time & distinct routing process through a number of machines in the factory.

Job shop consists of general purpose machine clubbed in different production centers.

Each job requires a unique scheduling as there are n jobs to be processed by m machines so as to meet the due date.

Page 101: Wcm

101

•Managing total processing time ( make Span)

•Minimizing idle machine time

•The make span depends on number of jobs to be processed & number of machine available, their due date, job shop layout , the manner in which the jobs arrive at the factory.

•Planning for the job shop involves deciding the order of priority for the jobs waiting to be processed in a queue to achieve the desired objective.

•Attaining Shortest processing time( SPT sequencing rule ) is key to job work.

•It helps to minimize lateness of the job . ( Job completion time - Due date)

•Other approaches are first come first serve ( FCFS)

•Prioritize the job with earliest due date.

Page 102: Wcm

102

Managing Large & complex production work Project Work ).

A large complex task comprising of multiple activities to be performed from manufacturing to delivery, installation & commissioning requires tight scheduling coordination & monitoring of activities from start to end for timely completion of work to avoid monetary loss & high customer satisfaction. Cost ,Time & Performance are the basis of such project activity. Interrelationships between the activities need to be understood by the operation team.Erection of a manufacturing plant. Manufacturing of ships , airbus etc.

Page 103: Wcm

103

•It requires a specific layout ( project layout ) to handle each part of the project.

•Heavy machinery and material handling equipments are required to manage the projects. •Tight control and monitoring of resource are the essence of the project.

•All such production activities are done using project techniques called CPM ( Critical Path Method ) & PERT ( Project Evaluation & Review Technique)

CPM deals with project management involving deterministic time estimates .

When activity durations of the project are not deterministic & probabilistic, PERT is used.

Page 104: Wcm

104

Page 105: Wcm

105

PLANT LAYOUT

Plant layout is a floor plan of the physical facilities used for ease in production system. It is an spatial arrangement of physical facilities to increase the productivity in the shop floor.

An economic layout decision helps to achieve long run efficiency in operation . It creates competitive advantageous in terms of capacity, processes , flexibility, cost and quality of work life

Page 106: Wcm

106

If the operational system suffers from :

1. Poor on-time performance 2. Long production lead-times 3. High WIP and/or finished goods inventory 4. High overtime 5. Lots of expediting and rescheduling 6. Wandering or stationary bottlenecks 7. Reluctance to take on new business

. . . then it implies that organization's production layout has constraints.

Page 107: Wcm

107

Layout decisions . .

Key benefits are : Higher utilization of people , equipment and space, Improved flow of information , & material Improved Employee morale & safer working condition, Minimize material handling cost .

Types of layout are : • Fixed position layout • Process layout, • Work cell layout, ( Group Layout )• Product layout.

Page 108: Wcm

108

Fully automated Plant layout

WIP Inventory

Page 109: Wcm

109

Assembly Line in a Car Factory

Page 110: Wcm

110

Page 111: Wcm

111

Page 112: Wcm

112

Product layout : Machines & auxiliary service are located according to the processing sequence of the product . This is also called line layout. Material flows in a uniform rate & operations are carried out in a balanced way.

RM

FG

Sawing Turing bending drilling Grinding

Painting Inspection Quality approval

Packing

Page 113: Wcm

113

Page 114: Wcm

114

Advantages product layout 1.Simple production Planning & control . 2.For high volume standard outputs, machine & work force

utilization is high. 3.Operator skill can be relatively low as he is trained for one kind

of operation.

1. Limitation : Breakdown of one machine will cause stoppage of work in down /up stream level.

2. Last minute change in product design will require major alteration in layout .

3. Heavy investment is required in material handling equipments , machinery etc.

Page 115: Wcm

115

Process layout : Deals with low volume high variety production activity ( intermittent production ) . The product manufactured undergoes different sequence of operation. It provides flexibility in equipment and labour assignments . The break down of one machine will not halt the processes. It is good for wide variety of product production in different size.

Sub Assembly

Grinding

Milling

Bending Wielding shop

Drilling

Dispatch

Turning

Sawing &Shearing

Job Process

Heat Treatment

RM

Page 116: Wcm

116

1. A high degree of flexibility in terms of task allocation to machines exists.

2. Relatively low investment in machines .3. Operators are multi skilled. 4. Handles diversity in task better.

Limitation

1. High care in PP&C required. 2. WIP inventory will be large. 3. High grades of skilled work force will be required. 4. Material handling cost will be high

Process layout

Page 117: Wcm

117

Manufacturing system based on Cellular layout A manufacturing system wherein the equipment and workstations are arranged in an efficient sequence that allows a continuous and smooth movement of inventories and materials to produce products from start to finish in a single process flow, while incurring minimal transport or waiting time .

In order to set up a single process flow (or single product flow) line, it is necessary to locate all the different equipment needed to manufacture the product together in the same production area. This calls for a improved production layout.

Page 118: Wcm

118

A work cell is defined as a collection of equipment and workstations arranged in a single area that allows a product or group of similar products to be processed completely from start to finish. It is, in essence, a self-contained mini-production line that caters to a group of products that undergo the same production process. Cellular manufacturing involves the use of work 'cells.

Page 119: Wcm

119

Work cell layout : A combination of product & process layout. It provides the benefits of both layout to the business.

Unit 1 Unit II

Unit iii

Unit IVUnit V

Job A

Job B

Work cell

Assembly line

Page 120: Wcm

120

Work Cell layout will provide standardization & rationalization of products , good estimates , effective machine operation , high productivity , reduce set up time, less down time , better through put etc.

Work cell / Group layout will not be feasible for all kinds of operations. However the layout can meet the requirements of batch production system . When the product mix manufactured is very dissimilar it will not be advisable to have group layout.

Page 121: Wcm

121

Benefits of Cellular layout

1. Cellular layout helps to eliminate over production and reduce waste.

2. Cellular manufacturing helps reduce waste by reducing defects that result from processing and product changeovers. Since products or components move through a cell one piece at a time, operators can quickly identify and address defects.

3. Allowing operators to stop production when defects occur prevents wasted material and time.

Page 122: Wcm

122

4. In a conventional queue process, it is difficult to identify and respond to defects until the entire batch is produced or numerous pieces are processed.

5.Reducing defects has several benefits such as :

•Fewer defects decreases the number of products that must be scrapped.•Fewer defects also means that the raw materials, energy, and resulting waste associated with the scrap are eliminated.•Fewer defects decreases the amount of energy, raw material, and waste used or generated to fix defective products that can be re-worked.

Page 123: Wcm

123

6.Cellular layouts typically require less floor space for equal levels of production. Reductions in square footage can reduce energy use for heating, air conditioning and lighting. It can also reduce the resource consumption and waste associated with maintaining the unneeded space (e.g., fluorescent bulbs, cleaning supplies).

7.Cellular manufacturing layouts and automation can free workers to focus more closely on equipment maintenance and pollution prevention, reducing the likelihood of spills and accidents.

Page 124: Wcm

124

Fixed position layout : The space required is very large , meant for large bulky products . Heavy engineering equipments. Ship yard , Air repair base. Equipment and people are fixed to an operation area.

Ship Repair base Boiler manufacturing

Page 125: Wcm

125

Layout Design tools.

A) Manual Method : 1.Travel chart 2. Systematic Layout planning

B) Computerized Method. ( Using algorithms )

1Automated Layout Design Algorithm ( ALDEP)

2.Computerized Relationship Layout Planning (CORELAP)

3.Computerized Relative Allocation of Facilities Technique.( CRAFT)

Page 126: Wcm

126

Plant layout variables

1.Flow of material 2.Process flow

Relationship of 1&2

Space Requirement

Space Available

Practical Constraints

Develop layout alternatives

Page 127: Wcm

127

Production Planning & Control

Sales & Marketing

Production work

Production Planning & control function

Staff function Line function

Physical

•Planning, coordinating and controlling fulfillment or OTD cycle. •Plan & control material , material cost & Vendor •Plan & control machine schedule, maintenance &productivity.•Plan & control plant productivity, safety , hygiene •Production incentive etc. •Set quality standard .

Page 128: Wcm

128

Production Planning and Control (PPC) is a process that comprises of managing the performance of critical functions during planning as well as control of production activity to deliver quality output within the stipulated time frame at minimum cost of production.

Production Planning & Control

Page 129: Wcm

129

Production Planning & Control

Production planning function is responsible for planning of resources like Material , Machine , Manpower , Method & Money for production activity. Production planning function deals with two levels of planning :

Prior Planning : All activities such as product development & design , production cost estimation , vendor identification , sourcing mechanism , Material planning , Order writing etc.

Active planning includes Process scheduling , & routing, work force allocation , machine scheduling , Capacity scheduling, Finite capacity scheduling , Tool planning Material handling & movement etc.

Page 130: Wcm

130

PP&C function is responsible for managing the overall cycle time during production process since Cycle time is directly related to production rate .

CT ( Cycle Time ) = Productive time / Demand per period

If the output per day from a manufacturing shop is 24 cylinders operatign in a single shift , = 8 X60/24 = 20 Min is cycle time for one cylinder.Since the actual time available would be less than the ideal time ie 8hrs on account of various delays viz operator efficiency , break etc, set up , the effective cycle time would be less than 20 min . As demand increases & lead time need to be minimized to be competitive in the market , PP&C has to manage Effective cycle time.

Page 131: Wcm

131

OTD cycle time = production time + delivery time (MTS)

= order time + Production time + delivery time ( MTO)

= order time + Supplier lead time + integration time + delivery time ( ATO )

= Order time + Supplier lead time ( ETO) + subcontractor’s lead time + Production time + Delivery time + Installation &commissioning time

PP&C owns the prime responsibility in a manufacturing organization to ensure that OTD cycle is in accordance with the realistic customer’s acceptation of delivery time.

Page 132: Wcm

132

Responsibilities of PP&C function 1.Material Planning •Forecasting inventory •Preparing material budget •Make or buy decision analysis•Estimating individual requirements of parts ( BOM ) •Raising material indent

•2.Inventory Control •ABC analysis •SDE& VED inventory analysis •Fix Economic Batch Order •Building safety stock & re-order level.

3.Subcontract Activity Vendor evaluation ( value engineering ) Monitor out source activity Outsource to subcontractors Make vendor inspection schedules Handling & movement of materials Disposal of scrap inventory

Page 133: Wcm

133

4.Maintenance Planning & Scheduling•Preventive & corrective maintenance schedule•Spares planning

5 Machine scheduling • Job Scheduling • Work Scheduling ( Loading ) • Progress reporting •Productivity study ( Method study )

6. Quality control •Inspection schedule •TQM •Kaizan •Kanban

7 .Work & Job Design •Method study•Productivity norms •Work environment

Page 134: Wcm

134

RM demand estimation According to sales order

Develop Aggregate Production plan

Master Production Schedule

Create MRP/BOM

Capacity requirement plan Execution

Inform sales Sales dept.the expected delivery schedule

Material Requirement Planning process : When a production system operates through dependent demand , technique used to determine the requirement of RM for production is called MRP.

Machine & operator schedule

Raise work order

Monitor Schedule & take corrective Action

Page 135: Wcm

135

Material requirement planning MRP process.

Demand aggregation

Explode Demand into bill of material ( BOM)

Check InventoryStock(Stocking Policy )

Raise production . Raise subcontract work order contract

Analyze Make or Buy decision

Make Buy

Stockavailability

YNRaise Purchase Indent

Page 136: Wcm

136

Q/2Q

Time

EOQ Assumption : Demand Constant & No lead time

Lead time

D Lt = Av demand x LT

ROP

Stock level = EOQ + DLt ( When supplier lead time not constant )

Stock level = EOQ + Dlt + variation in demand ( when demand fluctuates )

Page 137: Wcm

137

Make or Buy decision .

Criteria of make : 1. Finished goods can be made cheaper by the firm. 2.Quality standardization can not be met by out side party. ( strict quality control. ) 3.Supply of the parts are unsteady ( Long lead time) 4.Capacity of production can be used for manufacturing some other part. ( Fixed cost)

Buy : 1.Heavy investment in the facility 2.Parts are standard and available easily.

3.Demand of the components are seasonal . 4.Patent of some legal implications exists. 5.Cost of buying is less than manufacturing.

Page 138: Wcm

138

A firm has extra capacity which can be used for production of gears, which they have been buying form the market at Rs 300 per unit. If the firm makes gears , it incurs the following cost. Mat cost Rs 90/unit. Lab cost 120/unit Overhead Rs 30/unit . The annual fixed cost of production estimated is Rs 240,000. Projected demand for next 24 months is 4000 units.

Will it be profitable for the firm to manufacturer?The same capacity can be utilized for producing agri-equipment. In such case there will be a saving of s 90,000. What should be the decision.

Making /Buying gears VC/unit = ( Rs 90 + 120+ 30) = Rs 240Total VC = 4000 X 240 = 9,60,000 Fixed cost = 2,40,000Total cost = 12,00,000

Purchase cost = ( 4000 x Rs 300/unit ) = 12,00,000 Fixed cost = 2,40,000 Total cost = 14,40,000

Make gears Make Gears and Agri Equipment Rs 12,00,000 12,00,000 – 90,000 = 11,10,000

Page 139: Wcm

139

There are two processes to manufacture a particular product in a firm . Alternatively , they can also buy it from local market. The cost associated areas follows. The annual demand for the product is 10000 units. When would it be feasible for the firm to use process A & B .

Cost ( Rs ) process A Processes B Buy FC/ Year 1,00,000 3,00,000 -----VC/ unit 75 70 -----Buy price / unit 80

Cost of Process A = 1,00,000 + 75 x 10000 = Rs 8,50,000Cost of process B = 3,00,000 + 70 x 10000 = Rs 10,00,000Cost of buying = 80 x 10000 = 8,00,000

Le t Q be the vol of production. For Process A 100000 + 75 Q =< 80 Q

100000 =< 5 Q 20000 units

TC A >= TC B

100000 +75Q >= 300000 + 70Q Q>= 40000

When demand exceeds 20000 units , use process A & beyond 40000, use process B

Page 140: Wcm

140

Determining Economic production quantity ( batch size )

As volume reduces , the total cost of production becomes unviable unless the optimum batch quantity is not produced. Total cost comprises of two conflicting costs Setup cost ( favors large batch size ) and inventory holding cost ( favors small batch size )

There are three possible situations Demand rate > production rate ( shortage will occur ) Demand rate = production rate ( N need of holding inventory )

Demand rate < production rate ( Inventory stock will go on increasing )

Page 141: Wcm

141

Cost trade off. When orders are placed more frequently, the ordering cost is high but carrying cost lost is low , on the other hand if less frequent orders are placed ordering cost will be low but carrying cost will be high.

Cost

Order Qty

Total cost

Total cost

Ordering cost

Carrying cost

Page 142: Wcm

142

An item has yearly consumption of 1000 units . The cost related to sourcing & Making are as under: Decide which option would be better for the organization.

Source Make Item cost /unit Rs 6.00 Rs 5.9 Ordering cost 10.00 --Set up cost -- 50.00Annual ICC/item 1.32 1.3Production rate ---- 6000

BUY : EOQ = 123 units TC = 1000 x 6 + 1000 x 10 + 123 X1.32 _______ _________

123 2 = 6162.48

Make : EBQ = 304 units . TC = 6229.14

Page 143: Wcm

143

Inventory Control TechniquesInventory control techniques are used to prevent : 1 financial leakage due o excessive stock & poor demand , 2 2shortage of inventory3. Inventory Obsolescence Plan safety stock for critical & essential items Build selective control on fast & slow moving inventory .

Various Inventory control technique used are : ABC : Always Better Control VED : Vital Essential & Desirable SDE : Scarce Difficulty & Easy FNSD Fast moving , Normal , Slow moving , Dead

Page 144: Wcm

144% items

0 10 30 100

ABC Classification

(InventoryValue )

Usage %

70

90

100

CLASS A

CLASS B

CLASS C

High annual consumption value items

Moderate annual Consumption value

Low annual consumption value

Page 145: Wcm

145

VED analysis : Vital : Without which production process will come to halt. Essential : Non availability of such item will affect the efficiency .Desirable : It is good if it is available , however alternate option can be done.

SDE : Scarce ( Short supply ) Difficult ( Imported components ) easily ( Short lead time )

Page 146: Wcm

146

Purchase Inventory review system :

Review process is administered on the basis of Fixed order quantity ( Q system ) and fixed period quantity system . ( P system )In Q system , whenever the stock level reaches the RoL , order is placed for a fixed quantity of material . RoL is calculated as a sum of demand during the lead time & variation in demand during lead time ( safety stock ) and average demand during delivery delays. ( reserve stock ) In p system , stock position is reviewed after every fixed period & order is placed according to stock position .

Page 147: Wcm

147

The goal of JIT in manufacturing organization is to continuously reduce the cost associated with requirement material resource. Its objective is to achieve zero ( minimal ) inventory through out the supply chain, hence implement good material control. The goal of JIT process is to reduce excess working capital held-up on account of material , minimal inventory at WIP . The constraints for implementing JIT are :

•Unpredictable quality of supply of material •Inability to hold tolerances. •Shortcoming in lead time. ( Erratic delivery ) •Short supply of quantity of material •Inaccurate forecasting •Non standard materials being used ( Increased variety ) •Last minute product changes.

Page 148: Wcm

148

Steps for implementing JIT in an organization. 1.Symptoms : Identify the symptoms leading to inventory issue. Frequent Stock out 2.Causes : Poor demand forecast & inconsistent supply

Schedule by supplier . 3.Remedy Pull inventory system .

•Do detailed analysis of inventory requirement of all types at every stage of production process.

•Estimate the market fluctuations on account of price, supply , quality demand etc.

•Identify reliable source of suppliers who are capable of supplying material as when required.

Page 149: Wcm

149

•Take supplier in to confidence & sensitize them the importance of JIT inventory & build healthy business relationship with suppliers to have high commitment & ownership . Use Value engineering approach.

•Conduct periodic vendor appraisal & follow vendor rating system of evaluation .

•Give instant feed back on the supply & suggest improvement steps.

•Sign rate contract .

• Use IT enabled ordering system , ERP .

Page 150: Wcm

150

Value Engineering or Value Analysis

It is a technique of cost reduction and cost prevention. It focuses on building necessary functions at minimum cost with out compromising on quality, reliability ,performance & appearance. It helps in identifying unnecessary costs associated with any material , part components or service by analysis of function and efficiently eliminating them with out impairing the quality functional reliability or its capacity to provide service. It is a preventive process.

Page 151: Wcm

151

When to apply VE 1. Raw material cost increases suddenly .

2. Vendors are unreliable & organization is highly dependent on a few select vendor .

3. Cost of manufacturing is disproportionate to volume of production .

Value analysis is done w.r.t cost associated at: • Cost Value (Labour , Material & overhead).• Use Value • Esteem Value ( Look & finish ) • Performance Value ( Reliability , Safety , Service &

Maintenance )

Page 152: Wcm

152

Value = Performance ( Utility) Cost

Vendor analysis is done to minimize the cost incurred due to a supplier Inefficiency or inability .

Vendor cost to be considered are :

•Opportunity loss due to poor quality ( High rejection cost ) •leading to machine & labour idle time. •High re-work cost •Inconsistent lead time •Inability to meet the demand of the manufacturer•Poor Credit terms

Page 153: Wcm

153

Value engineering procedure: Constantly evaluate the inventory costs associated & benchmark against the best in practice.

As & when the cost of manufacturing increases disproportionately, identify an alternate source for contract manufacturing & monitor the quality & standards.

Use more standard parts which can be sourced easily

Develop more suppliers ( atleast 4 to5 for one part.) & minimize dependency on one supplier.

Audit the supplier’s work premise & rate them on the performance . Conduct quarterly vendor meet & share the highlights & concerns .

Page 154: Wcm

154

Prior to the concept of ERP systems, a manufacturing organization faced tremendous difficulty in planning & controlling of resources like people , finance WIP inventory at plant , machine status etc due to lack of integrated & updated information about resources.

MRP vs. ERP — Manufacturing management systems have evolved in stages over the past three plus decades, from a simple means of calculating materials requirements to the automation of an entire enterprise.

As frequent changes in sales forecasts happened entailing continual readjustments in production, as well as inflexible fixed system parameters, MRP (Material Requirement Planning) evolved into a new concept : Manufacturing Resource Planning (or MRPII ) and finally the generic concept Enterprise Resource Planning (ERP)

Page 155: Wcm

155

MRP MRP1 ERP

Material requirement planningin manufacturing organization.

Manufacturing resource Planning in manufacturing organization

Enterprise resourcePlanning

Inventory planning Production planning & control

Business planning & control

Material planning Material, Machine Method Man

Man Machine Material, Method & Money

The essence of the progress was based on seamless integration and analysis of information on various resources required by a manager to make an effective decision.

Page 156: Wcm

156

Advantage of ERP in a manufacturing organization.

Integration among different functional areas to ensure proper communication, productivity and efficiency Integration of Design engineering & collaboration. (CAD & CAM ) Order tracking, from acceptance through fulfillment The revenue cycle, from invoice through cash receipt Managing inter-dependencies of complex processes BOM . Tracking the three-way match between purchase orders (what was ordered), inventory receipts (what arrived), and costing (what the vendor invoiced)

The accounting for all of these tasks: tracking the revenue , cost and profit at a granular level.

Page 157: Wcm

157

Disadvantages

Customization of the ERP software is limited. Re-engineering of business processes to fit the "industry standard" prescribed by the ERP system may lead to a loss of competitive advantage. ERP systems can be very expensive (This has led to a new category of "ERP light" solutions) ERPs are often seen as too rigid and too difficult to adapt to the specific workflow and business process of some companies, cited as one of the main causes of their failure. Many of the integrated links need high accuracy in other applications to work effectively. A company can achieve minimum standards, then over time "dirty data" will reduce the reliability of some applications.

Page 158: Wcm

158

Page 159: Wcm

159

Production Control . It involves work scheduling Reporting & corrective action. Production Planning Work order Scheduling

Reporting Corrective Action

Objective : Manufacture & deliver the work order within the committed time within the resource constraints provided. •Effective utilization of time . •Eliminate stress during the production activity •Cent percent plant capacity utilization •Minimize cost on waste like overtime, scrap , down time etc. •Proactive reporting of issues at shop floor , like absenteeism of workers , non availability of material on account of rejection , unplanned breakdown , daily reporting of production status as per the target plan.

Page 160: Wcm

160

Scheduling: It deals with working out of optimal time required to perform each operation and also the time necessary to perform the entire series as routed,making allowances for all factors concerned. It mainly concerns with time element and priorities of a job. The pattern of scheduling differs from one job to another .

Master Schedule: Weekly or monthly Schedule prepared by breaking -down of the production requirement for each product for a definite time period. By having this as a running record of total production requirements, production manager is in better position to shift the production from one product to another as per the changed production requirements. This forms a base for all subsequent scheduling activities.

Page 161: Wcm

161

Master schedule ChartMaster schedule chart communicates the following

information related to production schedule.

1. Operator schedule : This schedule informs the shop manager about the operator detail who is supposed be reporting for the work in a given shift.

2. Machine schedule : This schedule informs the shop manager about the type of machine to be used for doing a job in a given time.

Page 162: Wcm

162

Reporting of the production progress in the plant.

•Load chart

•Gantt Chart

•Process Chart

Page 163: Wcm

163

Work orderProduct A

Work orderProduct B

Work orderProduct C

Gantt chart

Page 164: Wcm

164

    Date & shift            

 Type of Work

19.03 S1

19.03 S2

19.03 S3

20.03 S1

20.03 S2

20.03 S3

21.03 S1  

  Sawing            

  M/c Type: A  

     

  Bending            

  M/c Type: B  

     

  Grinding      

  M/c Type: C  

     

  Wielding  

  M/c Type: D          

     

     

     

                   

Page 165: Wcm

165

A master schedule is followed by operator schedule which fixes total time required to do a piece of work with a given machine or which shows the time required to do each detailed operation of a given job with a given machine or process.

Page 166: Wcm

166

1 a ) Machine scheduling : A process created for effective utilization of machine in the shop floor on the basis of actual available time for processing . It involves Set up time required . Startup time Routine maintenance time ( Cooling time, Tool

trail ) Operator efficiency Total Machine Hr – Delay = Actual Hrs 1 b ) Process scheduling : A method of establishing most economic & shortest path for production . Process scheduling requires an understanding the flow of the work process & create a process sheet or route sheet to optimize the time.

Page 167: Wcm

167

Process sheet : It gives the optimum method to do a job , thereby fixing the sequence of the operation , link the ancillary or parallel process to be accomplished . It gives the details & specification of the machines tools , operator to be deployed for the job. Delays on account of set up maintenance etc is communicated to the operator.

Routing: Under this, the operations, their path and sequence are established. To perform these operations, the proper class of machines and personnel required are also worked out. The main aim of routing is to determine the best and cheapest sequence of operations and to ensure that this sequence is strictly followed.

Page 168: Wcm

168

Preparing process sheet (Routing procedure) involves following activities.

(1) An analysis of the article to determine what to make and what to buy.(2) To determine the quality and type of material(3) Determining the manufacturing operations and their sequence.(4) A determination of lot sizes(5) Determination of scrap factors(6) An analysis of cost of the article(7) Organization of production control forms.

Page 169: Wcm

169

Process sheet includes the following details of a process.

• Part name to be machined & its engineering drawing & specification .•Sequence of the operation to be performed .•Specify the the machine & tools to be used. ( cutting tools ,jigs, fixtures )•Operating machine details like Speed , ,load , cooling time set up time ) •Operating skill required •Productivity norm •Maintenance schedule of the machine •Subsequent operations

Page 170: Wcm

170

Process scheduling differs depending upon the nature of production .

Continuous or mass production : It is done by industrial engineers at the plant layout stage. It is difficult to alter the plan & incurs heavy expenditure.

Batch production : In this case a master process sheet is created & is communicated to the shop floor . As & when the product line changes it is altered.

Job order. In this case the process sheet is created more often as the nature of operation varies .

Process schedule acts as a standard operating manual for process engineers to refer incase of any emergency or accidents.

Page 171: Wcm

171

Managing project based manufacturing work.

A large complex manufacturing task comprising of multiple activities to be performed from design to manufacture, deliver, installation & commissioning requires tight scheduling coordination & monitoring of activities from start to end for timely completion of work to avoid monetary loss & have high customer satisfaction. Tight cost control ,Timely completion of work & Performance are the basis of such manufacturing project. An understanding of Interrelationships between the activities of task is essential by the operation team.

Page 172: Wcm

172

Steps involved in managing manufacturing projects.

•Project planning ( Drawing the network )

•Time estimation of the project ( Network analysis . Identifying activity time and critical path)

•Scheduling : ( identifying the amount of slack in the activities and in the project )

•Time- cost trade off : ( Arriving at a time where the overall cost of executing the project is minimum with out compromising on any activity.

•Resource allocation : ( Checking the feasibility for doing each activity at most optimistic schedule )

Page 173: Wcm

173

Guide lines for managing project based network manufacturing work.

• Break the task in to detailed activities.

• Identify the start & end of each activity. (Node ).

• Estimate the time required to perform each activity.

• Establish dummy activities to show logical relationship between the activities .

• All activities of the network should terminate in to final destination .

• Establish relationship between activities such as preceding , concurrent , succeeding etc.

Page 174: Wcm

174

Critical Path of a Project : Critical path of a project network is the longest path in the network . It is identified by listing all possible path of the network & selecting the path having maximum sum of the critical activity time.

Total Floats of the project: Total time that a project completion time of an activity can be delayed without affecting the actual project completion time.

Free Floats : Total time that an activity can be delayed with out affecting earliest start time. Of immediate successor activity .

When time of the activities are given in three different time estimates like a = Pessimistic time m= Most likely time b = Optimistic Time mean time has to be calculated.

Page 175: Wcm

175

Optimistic time is the time when the execution goes extremely good.

Pessimistic time is when the execution goes very badly. Most likely time is when execution is with in normal

expectation.

µ = Mean time = ( a+ 4m+b) / 6

² ² (Variance ) = [(b-a)/6]

Page 176: Wcm

176

Following activities are involved in doing a production work. Activity time & relation ship is indicated. Draw a network

Sr no Activity Time Predecessor

1 A 2 days _

2 B 5 A

3 C 3 A

4 D 4 A

5

6

E

F

6

7

B,C,

E,D

A

B

CD

E F

Page 177: Wcm

177

Page 178: Wcm

178

Project Flow

Start

Task 1 Task 3

Task Task Precedence relationship

Task 2 Task 4

End

Activities Relationship Time A - 2dayB - 3C A 5D B 3E C,B 5F D 4

2

A

B3

5C

3D

E5

F4

Critical path = Longest path which accommodates all critical activities.

0/0

2/2

3/5

7/7

6/8

12/12

Task 1 & 3 are non critical .

CP = A-C-E = 12 days

Page 179: Wcm

179

Page 180: Wcm

180

Objective : Less than

Manufacturing time

Customer Required Lead Time

Efficiency, Effectiveness, Cycle time reduction in manufacturing operation

Key Drivers MinimalInventory

Faster ResponseTime

High Quality

Reduced over head

OutcomeLow Faster High No waste , sustained High cost delivery flexibility quality morale

Exceed customerexpectation

Increase market share & profitability

Page 181: Wcm

181

In today’s business world, competitiveness defines an industry leader. The drivetoward maximum efficiency is constantly at the forefront of all organization. Global competitiveness is key success factor .

Organizations across the country are striving to adopt lean manufacturing practices to help address worries about their bottom line. Cellular Manufacturing is one staple of lean manufacturing.

Page 182: Wcm

182

•In a lean manufacturing processes all non value adding processes are squeezed out.

•In a lean manufacturing process a cell consists of close arrangements of people, machines , or workstation in a processing sequence.

•A one piece flow of product or service through various operations with a least amount of delay & waste.

Page 183: Wcm

183

Toyota, the foremost lean manufacturer in business today (Toyota Production System –TPS ) views value as a combination of cost; quality, and time. Cost is the total expense involved in the delivery of the product. Quality is any deviation from standard. Time is best captured as the total elapsed process time from the start of a part, or transaction, to its delivery.

(If this process is the order fulfillment process or cash-to-cash process then executives have a complete picture of where time is being effectively spent, or wasted, in the organization) .

It is the key fundamental differentiator between lean and traditional practices.

Page 184: Wcm

184

Waste Reduction Process.

RM FG

Value Added time

Value added time

Value added time

Staging

Assembly

Inspection

machining

Casting

Waiting time

Transport

Staging Set up

Value added time is only a small % of the total time . Lean thinking focuses on the value stream to eliminate non value adding items.

Page 185: Wcm

185

Waste caused in Manufacturing Process.

According to Toyota ‘s production system , seven important causes of waste in manufacturing are :

1. The Process : Wrong process create high quantity of scrap . Wrong type or size of the machines are used or if the process is not being operated correctly it causes waste.

2. Methods : Unnecessary motions of operator, machine & tool or material creates in efficiency & leads to waste .

3. Movement. Poorly planned production plan layout creates back tracking of the process looses efficiency.

Page 186: Wcm

186

4. Re work due to product defect , sorting process due to scrap not being identified, leads to interruption in the smooth flow of work leading to waste.

5. Waiting Time: Operator waiting & material waiting time in the shop floor / work center on account of no material , no work etc is a waste.

6. Over Production : It increases the cost of carrying inventory , locks the capital creates quality problem.

7. Inventory : Excess stocking of RM & WIP inventory brings down cost efficiency of the organization thereby reducing its competitive bargaining power . Puts the organization in stress to liquidate the inventory at lower price .

Page 187: Wcm

187

Continuous production: - It refers to the production of standardizedproducts with a standard set of process and operation sequence in anticipation of demand. It is also known as mass flow production or assembly line production. This system ensures less work in process inventory and high product quality but involves large investment in machinery and equipment. The system is suitable in plants involving large volume and small variety of output e.g. oil refineries reformcement manufacturing etc.

Job or batch production: - It involves production as per customer's specification each batch or order consists of a small lot of identical products and is different from other batches. The system requires comparatively smaller investment in machines and equipment. It is flexible and can be adapted to changes in product design and order size without much inconvenience. This system is most suitable where heterogeneous products are produced against specific orders.

Page 188: Wcm

188

Page 189: Wcm

189

Production Process.

Standardization Variation

Mass Batch Job Project/ TurnProduction production production key production

MTS ATO MTO/ BTO ETO

Plant Layout

Page 190: Wcm

190

Managing Manufacturing Lead time ( MLT ) is an essential task in any organization to deliver the goods as per the customer order lead time.MLT depends on the nature of manufacturing process. The four types of manufacturing process are :

ETO ( Engineer to Order)

MTO ( Manufacture to Order )

ATO ( Assemble to Order )

MTS (Made to Stock )

Design Procure Manufacture Assemble Ship

Lead Time

ETO

Page 191: Wcm

191

Inventory WIP(RM) inventory Ship

Shorter delivery Lead Time

MTO

ATO Inventory as Per order

No WIP Inventory

Stock as per demand

No MLT, more variety

Long MLT no variety

MTS High WIPInventory High FG Stock

High RM Inventory

Short MLT & variety

Shorter delivery Lead Time

Longer delivery Lead Time

Page 192: Wcm

192

CRANKSHAFT MANUFACTURING PROCESS

Page 193: Wcm

193

Page 194: Wcm

194

PRODUCTION PROCESS OF CRANK SHAFT

Page 195: Wcm

195

HEAT TREATMENT PLANT

Page 196: Wcm

196

Maintenance Planning &

Control

Page 197: Wcm

197

Continuous use of machinery causes wear & tear leading to disruption production process.

1. Maintenance function’s objective is to keep the machines in best operating conditions with economical cost.

2. Maintenance function has to take a timely decision to repair or replace the equipment to avoid the excessive cost incurred in the maintenance. (Maintenance Plan & cost control )

3. Overcome accidents & unsafe work conditions in the shop floor.

4. Enhance machine utilization & productivity .

5. Maxim mum availability of machines ( UP TIME) for production.

Page 198: Wcm

198

Impact of poor maintenance function in a manufacturing organization.

1. High down time cost. Incurred loss due to the inability of the machine to produce the goods.

2. Down time cost = cost /unit X no. of units X total idle Hrs

3. If the manufacturing processes are interdependent activities , the financial loss goes exponential as all other dependent activities come to a halt.

4. Idle wage : Wages to be paid to the work force & loss of productivity , leading to the in efficiencies of the machine shop .

5. High wastage & scrap due to poor performance of the machine leading to high input material cost.

Page 199: Wcm

199

6. High cost of rework due to inferior quality of finish . Loss of customer confidence.

7 Expediting cost to meet the dead line in the form of

overtime, hiring of equipment , shifting of work to another plant. etc.

8 Accident cost incurred due to partial disability or or loss of life.

9 Opportunity cost of the business

Page 200: Wcm

200

Performance measure of machines for maintenance decision

Overall Equipment Efficiency ( OEE) : It is the combination of uptime ( availability of the machine for production ) , cycle time efficiency ( production efficiency ) & quality of the equipment.

OEE% = Uptime % X Speed % X Quality %

( MTBF – MTTR ) Where Uptime % = ______________

MTBF X 100MTBF= Meantime between Failure MTTR = Mean time to repair

MTBF = Total Running Time Number of Failure Actual Cycle Time

Speed % ( Efficiency) = Design Cycle Time

X 100

Page 201: Wcm

201

Quality ( %) efficiency =Good Parts Produced __________________

Total parts produced X 100

Page 202: Wcm

202

Reliability of Machines .

Reliability is the probability that an equipment will satisfactorily perform the function for which it is designed when operated under a specified condition for a given period.

1. Reliability is a function of time .

2. It is function of condition of use .

λ = Failure rate is defined as the number of times a part fails in a given interval of time.

λ = No of Failures

Total units of Operating Hours

Page 203: Wcm

203

Reliability of Machines.

Weibull Distribution Graph

Rate Of Failure

Time

Reliability Zone EOL Zone

( Aging out of Machinery)

Infant Morality Zone

It helps to decide an appropriate maintenance strategy for high productivity in the shop floor.

Page 204: Wcm

204

Reliability of the equipments depends on the design parameters , operating conditions , Probability of performance ( Mean time between failure MTBF & MTTR ( Mean time to repair )

Infant mortality : failure rate at the beginning is high & reduces with passage of time exponentially .

Reliability zone : Failure rate reduces drastically & predictable to some extend

EOL : Failure rate increases due to aging of the equipments & increases un predictability .

Page 205: Wcm

205

Maintenance required at infant mortality stage is high due to poor set-up of the machine , idea ling of the machine, non trained users etc even tough the machine is new.

During the reliability stage, the failure rate is minimum as the workers are now trained to operate it efficiently, machine set up issues & idea ling problems have been handled by the maintenance team.

As the machine starts aging , the failure rate increases due to high failure rate of the parts & components. At this stage, the reliability of the machine is low.

Page 206: Wcm

206

Reliability of an equipment under infant mortality stage can be measured as:

R = e_ T/ MTBF

Where T = Length of service before failure , e = Natural log value ( 2.71 )MTBF = Mean time between failure

λ = 1/ MTBF, Hence R = -T e λ Substituting

Product will last for a period of time “T” with out break down .

Page 207: Wcm

207

Types of Maintenance followed in a plant 1. Preventive maintenance( PM) : It involves cleaning ,

inspection, oiling & retightening of parts after equal interval of time in anticipation of the condition of the machine , irrespective of the problem. Hence PM is further classified in to Predictive( Condition based ) & periodic ( Time based ) maintenance.

2 Corrective Maintenance (CM) . Two types of corrective maintenance are : Design in maintenance , where Equipment with design weakness are redesigned to improve reliability & maintainability .

Page 208: Wcm

208

Design out maintenance to install new equipments of superior technology or scrapping of aged out machines, replacing manual to fully automatic machines.

3 . Break Down Maintenance : Repair of machines due to sudden or unforeseen breakdown.

4. Total Productive Maintenance( TPM ) : Systematic equipment maintenance process in the shop floor for high productivity , High employee morale & high job satisfaction.It is based on the premise that maintenance is not just the responsibility of a single department but a collective responsibility of top management to lower level operators.

Page 209: Wcm

209

Objectives of TPM : Make the plant operation maintenance- free , working on maintainability & improvement .

TPM

Preventive Maint

Predictive Maint

Maintainability Improvement

Maintenance Free Service

Page 210: Wcm

210

The objectives of TPM are to:

Maximize equipment effectiveness and productivity and eliminate all machine losses

Create a sense of ownership in equipment operators through a program of training and involvement

Promote continuous improvement through small-group activities involving production, engineering, and maintenance personnel

The definition and vision for TPM, in most cases there are common elements in any organization. These have been summarized in the TPM wheel.

Page 211: Wcm

211

ThemesThemes

• TrainingTraining

• DecentralizationDecentralization

• Maintenance Maintenance preventionprevention

• Multi-skillingMulti-skilling

ElementsElements

Figure 8-1 The TPM WheelFigure 8-1 The TPM Wheel

Asset Asset

StrategyStrategy

Continuous Continuous

ImprovementImprovement

TeamTeam

ProcessesProcesses

Resources Resources

Planning andPlanning and

SchedulingScheduling

Systems andSystems and

ProceduresProcedures

EmpowermentEmpowerment

MeasurementMeasurement

Page 212: Wcm

212

Page 213: Wcm

213

Objective of TPM : 1. Build a collective culture of maintenance to attain maximum efficiency through out the production process.

2. Create Zero accident, Zero defect & Zero Breakdown manufacturing process.

3. Make Problems visible

Benefits : Increased equipment productivity

• Lower Maintenance cost

• Reduced accident & waste

• High employee commitments

Page 214: Wcm

214

Pillars of TPM to enhance the success are : 5 S strategy of maintenance : Seri ( Sort ) Seiton ( Systematic ) Seiso ( Sweep. Keep the place clean ) Seiketsu ( Standardize ) Shitsuke ( Self Discipline )

Kaizan [ Plan, Do Check , Act ] ( PDCA ) Autonomous Maintenance : Prepare operators for routine maintenance so that core maintenance team can focus on High end maintenance activities. It aims to achieve OEE & OPE ( Overall production efficiency ) .Planned & Quality maintenance

Training , Safety & Environment

Page 215: Wcm

215

Tradeoff Between Repairs and PM

• At minimum level of PM, it is a remedial policy– fix machines only when they break– the cost of breakdowns, interruptions to

production, and repairs is high• As the PM effort is increased, breakdown and

repair cost is reduced • At some point, the total maintenance cost (PM,

breakdown, and repair) reach a minimum

Page 216: Wcm

216

Tradeoff Between Repairs and PMAnnual Cost (Rs)Annual Cost (Rs)

Degree of Preventive MaintenanceDegree of Preventive Maintenance

Minimum TotalMinimum TotalMaintenance CostMaintenance Cost

PreventivePreventiveMaintenanceMaintenance

CostCost

BreakdownBreakdownand Repairand Repair

CostCost

Total Total MaintenanceMaintenance

CostsCostsMinimumMinimumLevel ofLevel of

PreventivePreventiveMaintenanceMaintenance

Page 217: Wcm

217

How Speedy Should Repairs Be

Cost (Rs)Cost (Rs)

Speed of Making RepairsSpeed of Making Repairs00

MinimumMinimumTotal CostTotal Costof Repairsof Repairs

Cost of RepairCost of RepairCrews & Shops,Crews & Shops,Spare Parts, andSpare Parts, and

Standby MachinesStandby Machines

Cost ofCost of Interruptions toInterruptions to

ProductionProduction

Total CostsTotal Costsof Repairsof Repairs

SlowSlow FastFast

Page 218: Wcm

218

• Determining the Number of Spares Machines requirement .

In a shop floor a stock of standard parts are available to replace parts that malfunction .If a standby part is not available when needed, it costs Rs300 for employee idle time and subsequent overtime. An idle standby part costs Rs 180 per week (opportunity, obsolescence, and storage costs).

Determine the number of parts to be stocked based on the past data given to minimize total spare stocking costs?

.

Page 219: Wcm

219

Based on the last 25 weeks, the demand pattern for standby parts are :

Weekly Demand Occurrence 5 15 10 25 15 35 20 30

Page 220: Wcm

220

Step -1

First, compute the probability of occurrence for each level of demand.

Weekly Demand Occurrence Probability

5 15 15/105 = .14310 25 .23815 35 .33320 30 .286

105 1.000

Page 221: Wcm

221

• Determining the Number of Spare parts Step –II Create Payoff Table (Cij values in box)

SNi

Sj

Standby parts Needed EC=

P(SNi)(Cij)]5 10 15 20

5

10

15

20

P(SNi) .143 .238 .333 .286

StandbyStandbyParts Parts stockedstocked

Page 222: Wcm

222

• Determining the Number of Spare parts Step –II Create Payoff Table (Cij values in box)

SNi

Sj

Standby Computers Needed EC=

P(SNi)(Cij)]5 10 15 20

5 0 1500 3000 4500

10 900 0 1500 3000

15 1800 900 0 1500

20 2700 1800 900 0

P(SNi) .143 .238 .333 .286

StandbyStandbyParts Parts stockedstocked

Page 223: Wcm

223

• Determining the Number of Spare parts Step –II Create Payoff Table (Cij values in box)

SNi

Sj

Standby Computers Needed EC=

P(SNi)(Cij)]5 10 15 20

5 0 1500 3000 4500 Rs2,643.00

10 900 0 1500 3000 Rs1,486.20

15 1800 900 0 1500 Rs 900.60

20 2700 1800 900 0 Rs1,114.20

P(SNi) .143 .238 .333 .286

StandbyStandbyParts Parts stockedstocked

Page 224: Wcm

224

• Determining the Size of Repair Crews.

A machines break down at an average rate of 12 per hour and the average repair time is .75 hours. The plant policy specifies that a malfunctioning machine should be out of production for no more than 2 hours as an average. How many maintenance staff should the plant have on duty? (Assume that the breakdown rate is Poisson distributed and the repair times are exponentially distributed.)

Ts

MTTR = .75 Hrs

Breakdown rate = 12 machine /hr

= 2 Hrs

Page 225: Wcm

225

Step -1

1) Compute the necessary average service rate for the plant (entire crew).

2 = 1/( – ) = 12.5 machines per hour

1 ( )st 1 ( )st

12Given

Page 226: Wcm

226

2) Compute the implied average service rate per repair specialist.

= 1/(Hours per machine per engineer )= 1/.75 = 1.333 machines per hour/ engineer

3) Compute the necessary number of maintenance specialists.

= /(Machines per hour per engineer)= 12.5/1.333= 9.375 or 10 specialists

Page 227: Wcm

227

Optimum cost decision needs to be achieved if the maintenance function has to be profitable to the organization. In other words it is an optimum mix of planed & un planned maintenance decision . Beyond the optimum cost a machine replacement decisions have to be taken.

Replacement decisions are to be taken when the parts are deteriorating at the faster rate leading to poor efficiency , high frequency of failure , high maintenance cost etc.

Deteriorating efficiency of the machine can be either gradual ( mechanical parts) or abrupt ( Electrical & electronic parts.)

Economic replacement policy decision: when equipment deteriorate with time & fail suddenly.

Page 228: Wcm

228

Let C = Capital cost of equipment , n = No of years equipment is in use. S= Scrap value f(t) = Maint cost function A(n) = Average total annual cost

When time is a continuous variable ,Total cost = Cap cost – Scrap value + Maintenance cost

Prob;1

A firm is considering of replacement of machine whose cost is Rs 1750& the scrap value is negligible. The running maint cost is as follow: Yr - 1 2 3 4 5 6 7 8 R cost 0 100 200 300 400 500 600 700 800

When should the equipment be replaced ?

Page 229: Wcm

229

Yr Maint Cost Cumm Av Maint Av M/c Av Total maint Cost cost cost cost

1 o 0 0 1750 1750

2 100 100 50 875 925

3 200 300 100 583 683

4 300 600 150 438 588

5 400 1000 200 350 550

6 500 1500 250 292 542

7 600 2100 300 250 550

8 700 2800 350 219 569

9 800 3600 400 194

10 900 4500 450 175

Page 230: Wcm

230

In case of probabilistic model replacement policy used are : Individual replacement Policy & Group replacement policy

Page 231: Wcm

231

Spares Management

Spares management has to be done by the organization to ensure that maintenance job can be conducted smoothly with out any down time on the machine on account of spares non availability.

However the challenge is to ensure that the maintenance department keeps minimum level of spares so that the holding cost, obsolesce cost etc can be reduced . In order to decide the spares requirement planning , organization should know the reliability factor of the installed machine( failure rate of the components of the machine. )

Page 232: Wcm

232

Classification of Spares Parts

1. Maintenance & breakdown spares ( Critical spares parts )

2. Insurance Spares

3. Capital investment spares ( High value spares)

4. Rotable spares ( Reusable & standard parts )

5 Consumable spares

Page 233: Wcm

233

Factors used to decide the criticality of spares in an organization are :Availability of Spares in the shortest possible of time. Cost of spares Failure rate .

Stock on the Basis of failure Rate.

Buy as when required

Stock sufficient qty

Build relationship With supplier to Provide as when Necessary.

Availability

Low

High

Low High Cost

Failure Rate

Low

High

Page 234: Wcm

234

Quality Management

Quality is a measure of how closely a goods or service confirms to specified standards. The standards can be a combinations of one or more attributes or variables of product or service being manufacture delivered .

Page 235: Wcm

235

Quality Management

Variable data are continuous in nature are measured on a sliding scale , ie deviation from standard. The data can have range in terms of upper & lower limit within which the samples of acceptance are supposed to be lying.

Attributes : Attributes are the data discrete in nature & are binary . Attribute data samples are accepted or rejected.

Page 236: Wcm

April 7, 2023 236

Types of Measures

• Measures where the metric is composed of a classification in one of two (or more) categories is called Attribute data.

_ Good/Bad

– Yes/No

• Measures where the metric consists of a number which indicates a precise value is called Variable data.

– Time

– Miles/Hr

Page 237: Wcm

237

Strategic Areas of Quality Control in manufacturing

Area Quality Control

Material Planning

Procurement

SUPPLIER

Incoming Material

Manufacturing Process

Final Assembly , Testing & dispatch

Incoming RM Inspection

Process Control

Final Inspection

Page 238: Wcm

238

Quality Assurance : Design optimum quality standards, which a manufacturing function at design stage , incoming material stage production stage ,FG dispatch stage after sales are to be followed in a manufacturing firm. Quality Control: The process of measuring defects ( quality ) in the product & process beyond acceptable level of defined standard.

Statistical Quality control technique. 1 Acceptance sampling

2 Control charts

Page 239: Wcm

239

Acceptance Sampling: Objective of Acceptance sampling is to accept or reject a lot on the basis of sample characteristics.

Accurate method is 100% inspection. However in large manufacturing firms this approach could lead to time consumption, delay, money ( Destructive testing methods ) , manpower etc. Hence it is necessary to take decision based on the characteristics of a sample size picked from a given lot of material . This is known as acceptance sampling . In this process there are chances of two types of error.

Type 1 Error( α) . ( Supplier or producer risk) : If the lot sample picked is bad ,but the lot size is good , it get rejected.

Page 240: Wcm

240

Type II Error ( β) or manufacturer’s/ buyer’s risk : If the lot sample picked is good , but the lot size is bad , when such lot is accepted , then manufacturer incurs great loss .Hence both parties are expected to jointly agree at a level where the risk level is minimal . This is explained using Operating Characteristic Curve .

Probability of Acceptance Of a lot for a given percent defective .

α

β

The value for percent defective Indicates the quality level of the lot inspected .AQL = Accepted Quality Level. LTPD: Lot tolerance percent defective (Quality level of the lot submitted for inspection)

AQL LTPD

Bad lotGood lot

Indifference zone Percent defective

Page 241: Wcm

241

If the quality level is equal to or less than AQL , it is considered to be good quality. On the other hand , if the quality level is more than AQL , it is considered to be inferior. The probability of getting defective or good part from a large lot follows binomial distribution model. In order to design a acceptance plan , quality team should decide AQL , LTPD . Based on this data , one can determine the value of C( acceptable no to consider the lot is good ) from the number of sample taken .

Page 242: Wcm

242

Functions of a Process Control System are

To signal the presence of assignable causes of variation

To give evidence if a process is operating in a state of statistical control

CONTROL CHART

Page 243: Wcm

243

Essential features of a control chart

Time

Var

iab

le V

alu

es Upper Control Limit

Central Line

Lower Control Limit

CONTROL CHART

Page 244: Wcm

244

ControlCharts

RChart

VariablesCharts

AttributesCharts

`XChart

PChart

CChart

Control Chart Types

Page 245: Wcm

245

Control charts show the performance of a process from two pints of view . Overall process variation & process trend as time progress. It helps to identify the out of control status within the process & variation outside the operational limits to identify the cause of variation.

Mean chart gives the idea of the central tendency of the observations . It gives the Variation between the sample observations.

Range Chart : It gives the spread ( dispersion ) of observation . It shows variation within the samples.

Page 246: Wcm

246

To make control charts, data required are control limits

A) For X Chart

UCL = X + 3 σ

LCL = X - 3 σ

Where X = Mean of the sample

X = Mean of the sample means σ = sample standard error = σ /

Mean

LCL

UCL

Time/ Sample No.

Variable

X

X

n

Page 247: Wcm

247

In practical situation , calculation of standard deviation are tedious process ,hence they are found from standard tables. Thus the formula can be :

UCL X = X + AR

Control Limits for R Chart LCL x = X - AR

UCLR = R + 3 σ R

LCLR = R - 3 σ R

Where R = Range of sample observation σR = Standard deviation of R In practical situation , calculation of standard deviation are tedious process ,hence they are found from standard tables. Thus the formula for control limits for R =

UCL = BR

LCL = CR

Page 248: Wcm

248

From Tables

X Chart Control Limits

RAxxLCL

RAxxUCL

2

2

Sub group average X = x1 + x2 +x3 +x4 +x5 / 5

Sub group range R = Max Value – Min value

Page 249: Wcm

249

From Tables

R Chart Control Limits

RC LCL

RB UCL

3R

4R

Page 250: Wcm

The following data were obtained over a five day period from a single machine to study the process variations & take necessary control. Two samples were taken per day . Comment on the process variation.

Sample Observation

No 1 2 3 4 5--------------------------------------------------------------------------------- 1 10 12 13 8 92 7 10 8 11 93 11 12 9 12 10 4 10 9 8 13 115 8 11 11 7 76 11 8 8 11 107 10 12 13 13 98 10 12 12 10 129 12 13 11 12 1010 10 13 7 9 12

X

10.4 9.0

R

54

X103.2/10= 10.32

39/10

R=3.9

Page 251: Wcm

251

From standard table , For Sample size = 5 Given the values of Mean factor A = .58

Upper range factor B = 2.11

Lower range C = 0 factor

UCL x = 10.32 + .58X 3.9 = 12.586

LCL x = 10.32 - .58X 3.9 = 8.058

UCL R = 2.11 X 3.98 = 8 .229

LCL R = 0 X 3.99 = 0

Page 252: Wcm

252

Mean Chart

0 1 2 3 4 5 6 7 8 9 10

8.05

10.32

12.58

x

x x

x

x x xx

98.8

11.6

R -Chart

LCL

UCL

0

3.9

8.22

While process is under control, there is a dominant up trend towards the end of the Process. Hence the cause for such variation need to be traced. Reasons could be due to tool wear, over heating etc.

The variation with in the sample are fairly in control.

LCL

UCL

0 1 2 3 4 5 6 7 8 9 10

Page 253: Wcm

253

Total Quality is a description of the culture & attitude of an organization that strives to provide customers with products and services that delight them. The culture requires quality in all aspects of the company's operations, with processes being done right the first time and defects and waste eradicated from operations.

1. TQM is a management philosophy that seeks to integrate all organizational functions (marketing, finance, design, engineering, and production, customer service, etc.) to focus on meeting customer needs and organizational objectives.

2. The objective of TQM is "Do the right things, right the first time, every time".

Total Quality Management

Page 254: Wcm

254

. TQM activities include:

1. Commitment by senior management and all employees2. Meeting customer requirements 3. Reducing development cycle times 4. Just In Time/Demand Flow Manufacturing5. Improvement teams 6. Reducing product and service costs 7. Systems to facilitate improvement 8. Line Management ownership 9. Employee involvement and empowerment 10. Recognition and celebration 11. Challenging quantified goals and benchmarking 12. Focus on processes / improvement plans 13. Specific incorporation in strategic planning

Page 255: Wcm

255

Principles of TQM

1. Plan (drive, direct)

2. Do (deploy, support, participate)

3. Check (review)

4. Act (recognize, communicate, revise)• Employee Empowerment

• Training • Suggestion scheme • Measurement and recognition 5. Create Excellence teams

6 Make Fact Based Decision

7. Use SPC (statistical process control)

Page 256: Wcm

256

8. TOPS (FORD 8D - Team Oriented Problem Solving)

9. Continuous Improvement

10 Systematic measurement

11. Excellence teams

12 Cross-functional process management 13 Attain, maintain, improve standards

14 Customer Focus

15 Supplier partnership

16 Service relationship with internal customers

17 Never compromise quality

18 Customer driven standards

Page 257: Wcm

257

TQM encourages participation amongst shop floor workers and managers. There is no single theoretical formalization of total quality, but Deming, Juran and Ishikawa provide the core assumptions, as a "...discipline and philosophy of management which institutionalizes planned and continuous... improvement ... and assumes that quality is the outcome of all activities that take place within an organization; that all functions and all employees have to participate in the improvement process; that organizations need both quality systems and a quality culture.".

Page 258: Wcm

258

Attributes

Percent Defective Defective Chart per sample area P- Chart C - Chart

To identify the average proportion of non confirming part submitted for inspectionOver a period of time. ( P Chart )

Page 259: Wcm

259

It identifies the number of non confirming parts in a given sample of constant size. C – Chart It is used to control the final defects in a final assembly .

Acceptance sampling is used for taking decision to accept or reject a lot on the basis of a lot’s sample characteristics. Identify the supplier’s risk or customer’s risk in acceptance sampling & decide the mutually acceptable level .

Sampling technique can be single sampling , double sampling.

Page 260: Wcm

260

Factors need to be considered before making a choice of manufacturingprocess.a) Effect of volume/variety: This is one of the major considerations in selection ofmanufacturing process. When the volume is low and variety is high, intermittentprocess is most suitable and with increase in volume and reduction in varietycontinuous process become suitable.

Continuous Production Intermittent Production

Manufacturing Process

Mass or flow Production

Batch production

Job Production

Project / Turnkey production

High volume & Low variety Low volume and high variety