Bogie Information
Issue 1
Copyright © 2017 William Cook Rail WCR Bogie Information
William Cook Rail Bogie Information
Issue 1: 16 March 2017
Copyright © 2014-2017 William Cook Rail Ltd. All rights reserved.
This document is protected by copyright and design right owned by William Cook Rail Limited. All rights conferred by the law of copyright conventions are reserved to the copyright owner.
No part of this document may be used, disclosed, transmitted, copied, lent, sold, stored in any retrieval system of any nature or otherwise reproduced or circulated (in any form or by any means including electronically and whether or not transiently) without the express prior written consent of the copyright owner.
General Contact Information:
William Cook Rail Ltd Cross Green Leeds LS9 0DX England Tel. +44 (0) 113 249 6363 Web: www.william-cook.co.uk/rail.html Email: [email protected]
For information about our company, please visit our website.
Copyright © 2017 William Cook Rail Page 1 of 29 WCR Bogie Information
IN-HOUSE CAPABILITIES
• Design and Development
• CAD Modelling
• Solidification Simulation
• CNC Patternmaking
• 3D Rapid Prototyping
• Casting and Fabrication
• Stress-Relieving, Air and Inert Atmosphere Normalising, Tempering and Quenching
• Hot Wash De-Greasing, Shot and Sand Blasting
• Magnetic Particle, Ultrasonic and Radiographic Inspection
• Finite Element Analysis
• Fatigue Testing and Non-Destructive Testing
• Collision Damage Repairs, Fault Finding and Clash Testing
• Tooling Manufacture
• Machining
• CMM Metrology
• Laser Scanning
• Fabrication by qualified welders using the latest MIG and TIG welding equipment
• Dipping, Hand Painting, Spray Painting, Heated Drying
Copyright © 2017 William Cook Rail Page 2 of 29 WCR Bogie Information
PRO-ENGINEER DESIGN SOFTWARE
Copyright © 2017 William Cook Rail Page 3 of 29 WCR Bogie Information
MAGMASOFT
Copyright © 2017 William Cook Rail Page 4 of 29 WCR Bogie Information
CNC PATTERNMAKING
Copyright © 2017 William Cook Rail Page 5 of 29 WCR Bogie Information
IN-HOUSE MACHINING
Correa HVM-50-MG Travelling Column Milling Machine
Correa FOX-50: Machining Bogie Frames
Copyright © 2017 William Cook Rail Page 6 of 29 WCR Bogie Information
CMM METROLOGY
Copyright © 2017 William Cook Rail Page 7 of 29 WCR Bogie Information
ACCREDITATIONS AND APPROVALS
• ISO 9001:2008 Quality Management System Standard
Certificate number: 10008591
• ISO 14001:2004 Environmental Management System Standard
Certificate number: LRQ 4003564/B
• BS OHSAS 18001:2007 Occupational Health & Safety Management System
Certificate number: LRQ 4005915/B
• EN 15085-2, Certification Level CL1
Certificate number: TÜVNORD/15085/CL1/167/0A4/13
• Deutsche Bahn
Certificate number: 3342017
• IRIS
Copyright © 2017 William Cook Rail Page 8 of 29 WCR Bogie Information
CUSTOMERS
Copyright © 2017 William Cook Rail Page 9 of 29 WCR Bogie Information
SERIES 3 ELECTROSTAR BOGIE FRAME
Copyright © 2017 William Cook Rail Page 10 of 29 WCR Bogie Information
ELECTROSTAR FRAME END
Copyright © 2017 William Cook Rail Page 11 of 29 WCR Bogie Information
ELECTROSTAR FRAME END WITHOUT DAMPER BRACKET
Copyright © 2017 William Cook Rail Page 12 of 29 WCR Bogie Information
ELECTROSTAR TRAILER TRANSOM
Copyright © 2017 William Cook Rail Page 13 of 29 WCR Bogie Information
ELECTROSTAR CENTRE SECTION
Copyright © 2017 William Cook Rail Page 14 of 29 WCR Bogie Information
ELECTROSTAR BOGIE FRAME COMPLETE WITH AXLES BOXES AND BRAKE HANGERS
Copyright © 2017 William Cook Rail Page 15 of 29 WCR Bogie Information
METRO LOS TEQUES BOLSTER
Copyright © 2017 William Cook Rail Page 16 of 29 WCR Bogie Information
CONVERSION OF FABRICATION TO MACHINED CASTING
ALSTOM Metro Los Teques Bolster
Original diagram of fabricated plate bolster (highlighted in yellow).
Developed from fabricated component to 3 piece cast steel assembly,
pre-machined by William Cook ready for welding and final machining.
Copyright © 2017 William Cook Rail Page 17 of 29 WCR Bogie Information
CONVERSION OF FABRICATION TO MACHINED CASTING
ALSTOM Metro Los Teques Bolster
The 3 piece pre-machined assembly ready for welding.
The 3 piece welded assembly at Alstom.
The 3 piece finished assembly at Alstom. The 3 piece welded assembly in position on the train.
Copyright © 2017 William Cook Rail Page 18 of 29 WCR Coupler Information
STADLER - END BEAM
Copyright © 2017 William Cook Rail Page 19 of 29 WCR Coupler Information
CONVERSION OF FABRICATION TO MACHINED CASTING STADLER End Beam
Existing fabricated design showing three separate
components.
One piece casting design. One piece casting, fully machined.
Magmasoft Validation and Simulation
• Predicts potential internal defects.
• Predicts potential contraction and distortion.
CNC Patternmaking
Finished Product
Copyright © 2017 William Cook Rail Page 20 of 29 WCR Coupler Information
CONVERSION OF FABRICATION TO MACHINED CASTING
ALSTOM Suspension Pot
CAD Model
Finished Machined Casting
Copyright © 2017 William Cook Rail Page 21 of 29 WCR Coupler Information
DEVELOPED FROM PRIMARY CONCEPT AS SUGGESTED BY BOMBARDIER
Initial design by Bombardier CAD Modelled by William Cook
William Cook Magmasoft Simulation Un-machined Casting
Finished Machined Casting
Copyright © 2017 William Cook Rail Page 22 of 29 WCR Coupler Information
PRODUCT DEVELOPMENT BOMBARDIER Flexx Eco Frame
Casting Design Proposal - Bogie Frame
7 piece cast steel frame with cast or forged ends
Side Frame – outer view
Copyright © 2017 William Cook Rail Page 23 of 29 WCR Coupler Information
PRODUCT DEVELOPMENT BOMBARDIER Flexx Eco Frame
Casting Design Proposal - Bogie Frame
Flexx Eco Cast Transom
7 piece Frame, pre-machined and ready for fabrication
Copyright © 2017 William Cook Rail Page 24 of 29 WCR Coupler Information
PRODUCT DEVELOPMENT BOMBARDIER Flexx Eco Frame
Hybrid Proposal: Cast Sideframe, Fabricated Transom
Motor Frame Assembly, complete (top)
• Existing, Fabricated, Crossrail, Motor Frame.
• Spring Pots and Fabricated Transom to be retained.
• Minor Brackets and Fittings to be welded on.
Copyright © 2017 William Cook Rail Page 25 of 29 WCR Coupler Information
PRODUCT DEVELOPMENT BOMBARDIER Flexx Eco Frame
Hybrid Proposal: Cast Sideframe, Fabricated Transom
Full Assembly
Copyright © 2017 William Cook Rail Page 26 of 29 WCR Coupler Information
PRODUCT DEVELOPMENT BOMBARDIER Flexx Eco Frame
Gearbox Bracket Detail
Gearbox Bracket
Copyright © 2017 William Cook Rail Page 27 of 29 WCR Coupler Information
BOMBARDIER TRANSPORTATION Crossrail, Gearbox Bracket
Gearbox Bracket
Copyright © 2017 William Cook Rail Page 28 of 29 WCR Coupler Information
STADLER – AXLEBOX BODY
Copyright © 2017 William Cook Rail Page 29 of 29 WCR Coupler Information
FINANCIAL INFORMATION 2015/2016
• Group Sales: £50 Million
• Group Net Assets: £58 Million
• Employees: 450