Page 1: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA
Page 2: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA
Page 3: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

We believe…• No one gets hurt• No environmental damage is

acceptable• Nothing is more valuable than our

employee’s health and safety

Safety RecordsCompany Name Service

Provided Safety Information

Javeler Marine Services LLC Metrology

YearTotal

Recordable Incident Rate

Lost Time Injury Rate

Experience Modification

Rate

2017 0.00 0.00 0.71

2016 0.00 0.00 0.64

2015 0.00 0.00 0.69

Page 4: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

• Safe Gulf, Safe Land, Rig Pass• Core Class (Day 1,2 and 3)• Water Survival, Swing Rope

(HUET)• Drug and Alcohol Supervisor Training• Marine Debris• Skills and Varication Testing• MSHA• Basic Plus• SEMS 2• Incipient Fire Fighter

• Bloodborne Pathogens• First Aid/CPR/AED• Fall Protection• Confined Space• Basic Crane and Rigging• NCCCO• TWIC Card• Passport• ISNET• DISA Program• Fork Lift Safety

Safety Certifications

Page 5: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Previous Customers

Page 6: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Previous Job Sites

Scotland Beaufort Sea

Page 7: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Specialized Dredging Services Offshore Environmental Wetland restoration Industrial Civil Pipeline Geotube utilization Salvage (Marine)

Page 8: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Shelf & Deep Water Operations Decommissioning Platform removal/installation Marine salvage/heavy lift Internal pile excavation Pipeline & cable installations Jack up leg excavation Cofferdam excavation Marine construction Environmental

Page 9: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

JAWS (Javeler Advanced Water Jetting System) 6.14 inch orifice 3000 GPM 1150 feet of head 150 CY per hour JMS 3000 Jet Pump Up to 2000 feet

Page 10: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Decommissioning 50 feet deep Non-invasive Stiff soil (2500 psf) Phase 1 complete 190’ wide 35’ deep Discovered unidentified pipelines

Platform removal Location WD117, GOM Excavate two 4 leg platforms 25’BML Total depth 265’

Page 11: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Location ST311, GOM Internal pile cleaning Total depth 821’

Location South Timbalier 283 Internal pile cleaning Total depth 572’

Platform installation

Page 12: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Marine salvage Location GI 102, GOM Internal pile excavations Total depth 277’

Marine salvage Location Ivunik, Canada Dewatering vessels Total depth 50’

Page 13: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Deep Water Internal Pile Excavations Garden Banks 783 & 784 Total Depth 4750’ Excavated internal pile for

anchoring of a deep water structure

Page 14: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Industrial Excavated drilling mud from sediment pond Location Muldoon, TX

Excavate material within caustic pond Location Ingleside,TX

Liquefy and pump settled dry powdered limestone to the intake of the raw mix agitation tank.

Location Selkirk, NY

Page 15: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Pipeline System

Page 16: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Pipeline Systems Ranger Offshore Inc. Jamaica Install 24” pipeline

Chet Morrison Batement Island Capping Executed from land with excavators

Commerce Williams Delaware River Located a pipeline cluster to

deepen channel

Page 17: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Pipeline Systems Genesis Energy Services Matagorda Bay Lowered 13,000’ of 20” pipeline

Chet Morrison Main Pass GOM Locate and assist/repair pipeline

Genesisi Energy Ser vices Matagorda Bay Emergency callout for

ruptured line

Page 18: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Pipeline WYE skid installations Brutus

80’ x 60’ x 16’ Total depth over area range of 350.0’-350.4

Amberjack 120’ x 80’ x 16’ Total depth over area range from

350.2’- 350.8’ Genesis

80’ x 60’ x 16’ Total depth over area range 350.0’ – 350.6’

Location ST301B Total depth 350’

Page 19: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Civil construction/specialty dredging applications

Dock dredging Water intake structure Marsh & coastal restoration Environmental remediation Pipeline Geotubes

Page 20: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Marsh Restoration & Environmental Remediation

Environmental Remediation• Removal of poisons from

Commencement Bay• Location: Tacoma, Washington

Wetland Restoration• Pumped sand through pipeline to

restore banks along Ronald Reagan Airport

• Location: Washington, D.C.

Page 21: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Geotubes• Pumped sand from slurry box to geotube for

land restoration and environmental benefits• Location: Flowery, GA

• Filled 4,600’ of geotubes 6’ tall for coastal protection of NASA’s launch pad.

• Location: Wallops Island, VA

Page 22: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Maintenance Dredging

American Bridge Atlantic Ocean 40,000 CY discharge

100,000 yd3 Port Aransas, TX 7,400’ discharge pipeline

Page 23: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Electric Toyo Dredge PumpsPump Model DP-15 DP-20 DP-75B DP-150BDischarge (in) 4 4 6 or 8 10

Weight (lbs.) 1124 1200 2500 8000

Motor HP 15 20 75 250

Capacity (us g.p.m.)

880 400 1600 3200

Head (ft.) 24 65 95 72

Production (yd3/hr.)

15-35 25-50 75-150+ 150-300+

GeneratorRequired (kW)

40 40 150 300

Operating Ampswith Water

15-20 20-25 90-100 180-200

Operating Amps with Slurry

20-30 25-35 100-130 200-230

Page 24: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Hydraulic Toyo Dredge PumpsPump Model TO-15 TO-75 TO-150 TO-400 To-81 Series

Discharge (in) 4 6 or 8 10 16 4,6 or 8

Weight (lbs) 1100 3500 10,000 w/ rigging

25,000 w/ rigging

8,000 in pile cleaner

assembly

Motor HP 15 178 cc 500 cc 1000 cc 178 cc

Capacity (usgpm) 480 1600 3200 7200 1200

Head (ft) 70 95 75 65 132

Production (yd3/hr) 20-45 50-150 150-300 300-600 50-70

Hydraulic Flow Rate 15 55 85 110 45

HydraulicPower Unit

14 gpm @ 3000 psi

55 gpm @ 3000 psi

85-115 gpm @ 3000 psi

100-160 gpm@ 3000 psi

45 gpm @ 2500 psi

Page 25: We believe… - Javeler Marine Services LLC · 2018. 5. 31. · • Pumped sand from slurry box to geotube for land restoration and environmental benefits • Location: Flowery, GA

Javeler Marine Services LLC ContactsEric Wingate

PresidentP: (337)257-9071

O: (337) [email protected]

Jose VindeolaTexas & Offshore Sales

P: (832) [email protected]

Jared VigeSales Admin

P: (337) 224-7336O: (337) [email protected]

Ron LepineEstimating

O: (337) [email protected]