+ All Categories
Home > Documents > We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including...

We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including...

Date post: 28-Oct-2020
Category:
Upload: others
View: 7 times
Download: 0 times
Share this document with a friend
13
We Bring Power… www.cbbsgroup.com Mustafa Kemal Mah. 2138. Sok. No:6 Daire:1 Çankaya/Ankara Tel (pbx): +90 (312) 502 18 90 [email protected]
Transcript
Page 1: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

[Metni yazın]

We Bring Power…

www.cbbsgroup.com

Mustafa Kemal Mah. 2138. Sok. No:6 Daire:1 Çankaya/Ankara

Tel (pbx): +90 (312) 502 18 90

[email protected]

Page 2: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

OUR SPECIALTIES

1. Equipment and Instrumentation of Power Plants and Industrial Facilities

• Detail Design

• Supply and Manufacturing

• Erection and Commissioning

2. Boiler and Steam Turbine Parts Maintenance and Modernization • Steam Turbine Feasibility Workout

• Disassembly and Precision Assembly

• Commissioning and Supervision

3. Electrical and I&C Works in Industrial Facilities • Electrical and I&C Design

• Power and Signal Cabling

• Modernization Works

• Supply and Manufacturing

CBBS Inc.

2016

We Bring Power…

Page 3: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

OUR REFERENCES

COMPLETED PROJECTS

1. SOMA KOLİN 2x255 MW COAL FIRED POWER PLANT

1.1. Erection 2 units of Rotary Air Preheaters

Subcontractor: CBBS Mühendislik Makina İnşaat ve Ticaret A.Ş.

Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.

Client: Kolin İnşaat A.Ş.

Project Start: 17.04.2017

Project Completion: 31.08.2017

Amount of Work: 1000 tons, 22.000 man-hours

Page 4: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

Page 5: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

Page 6: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

Page 7: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

COMPLETED PROJECTS (Individual References Belong

to Shareholders)

1. YUNUS EMRE 2x145 MW COAL FIRED POWER PLANT

1.1. Erection of Turbine Island Equipment, Piping and

Instrumentation including tests and cold commissioning

Yunus Emre Power Plant 2 units of Steam Turbine and its related equipment were supplied by Doosan Škoda Power. Turbine was single shaft MTD40CR type with total gross weight of 250 tons. Condenser was supplied by MICo, spol. s.r.o, with total gross weight of 140 tons. Condenser shell and tube parts were delivered as preassembled, i.e. no tube expansion was applied on site. Generator was supplied by SIEMENS AG, Plant Erfurt. Generator was single part with total gross weight of 230 tons. Design and EPC delivery of Turbine Island Equipment, Piping and Instrumentation was carried out by CKD Praha DIZ, Czech Republic.

Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.

Client: CKD Praha DIZ

Amount of Work: Approximately 200.000 man-hours

Dates: 10.2013 – 2.2015

Page 8: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

Page 9: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

1.2. Erection and Commissioning of CFB Boiler, FGD, Electrostatic

Precipitator and Auxiliary Systems

Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.

Client: Vitkovice Power Engineering s.a

Supplier of Equipment: Andritz Energy Environment Gmbh

Amount of Work: Approximately 2 million man-hours, 15.000 tons of erection

Dates: 11.2012 – 7.2016 (First Unit commissioned, Second Unit suspended at stage of steam blow-out)

Page 10: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

Page 11: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

1.3. EPC Delivery of Auxiliary Boiler, Heat Exchanger System and

Fuel Oil Pumping Station – Design, Manufacturing, Erection,

Commissioning and Performance Tests

EPC Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.

Client: Vitkovice Power Engineering s.a

Dates: 7.2014 – 1.2016

1.4. Lifting of 560 ton Economizer using Hydraulic Jacking System

Page 12: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

2. MERSİN SODA SANAYİ A.Ş. 320 t/h CAPACITY CFB BOILER

2.1. EPC Delivery of CFB Boiler, Bag Filter and Material Handling

Systems – Design, Manufacturing, Erection, Commissioning,

Performance Tests and Optimization

A CFB Boiler with 320 t/h steam generation capacity was delivered to Soda Sanayi A.Ş. who is a subsidiary

of Şişecam group companies. Boiler, Bag Filter, Coal Preparation, Ash Handling and other auxiliary systems

were delivered by EFOR-RAFAKO consortium. The boiler is operated by using import coal. The project was

completed in 26 months from contract signature to commissioning finished.

EPC Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.

Client: Soda Sanayi A.Ş.

Dates: 9.2014 – 11.2016

Page 13: We Bring Power… · Erection of Turbine Island Equipment, Piping and Instrumentation including tests and cold commissioning Yunus Emre Power Plant 2 units of Steam Turbine and its

CBBS INCORPORATION COMPANY REFERENCES

2.2. Heat Balance Calculation of the Boiler including Design of Boiler

and its Components’ Insulation

2.3. Design, Manufacturing and Commissioning of Venturi Type

Flowmeters according to EN ISO 5167

END OF DOCUMENT