+ All Categories
Home > Documents > Web 072505

Web 072505

Date post: 14-Apr-2018
Category:
Upload: mauro-sousa
View: 215 times
Download: 0 times
Share this document with a friend

of 43

Transcript
  • 7/30/2019 Web 072505

    1/43

    1

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Introduction to ABIand

    Statgraphics Centurion

  • 7/30/2019 Web 072505

    2/43

    2

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Statg

    raphi

    cs

    Centu

    rion

    Enabled Teams

    $

    Statgraphics Centurion includes theframework for Accelerated Six Sigma

    Statgraphics Centurion /ABI the perfectlink for Six Sigma Training & Application

    ABI applies Statgraphics Centurion withproven methods for your business

    ABI applies Over 50 years of combined

    Engineering / Management Expertise

    Nobody gives a hoot about profits. DemingSuccessful Businesses Disagree..

    Statgraphics CenturionTM and ABI can HELP your business

    INCREASE PROFIT

    Six

    Sigma

    Accelerated

    ActiveLeadership

  • 7/30/2019 Web 072505

    3/43

    3

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    What is Six Sigma?

  • 7/30/2019 Web 072505

    4/43

    4

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    What is Six Sigma?

    Sigma represents a unit of measurement that

    designates the distribution or spread about theaverage of a process to represent how well aprocess is performing.

    The higher the sigma value, the less variation andfewer defects will reach the customer

    When a company has achieved a six sigma rate ofimprovement, it has limited defects to 3.4 per million

    opportunities virtual defect-free performance. The DMAIC Six Sigma Process of Problem Solution

    is a natural fit for Statgraphics Centurion

  • 7/30/2019 Web 072505

    5/43

    5

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Six Sigma is .

    .an Improvement System Focusedon Driving Business Success

    Customer focused business strategy

    A disciplined data-driven approach for eliminating defects

    A statistical measurement - 3.4 DPMO

    A dedication to meeting customer requirements

    A philosophy, culture change for greater customer

    satisfaction

  • 7/30/2019 Web 072505

    6/43

    6

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    How does Six Sigma work?

    An approach and set oftools for the Teamto follow when improving/designing a processor product based on Statistical Data from the

    Voice of the Customer

    Key to successful Implementation:Statgraphics Centurion

  • 7/30/2019 Web 072505

    7/43

    7

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    The Customer

    What bothers your

    customer? Will this take time

    away from mycustomer?

    Who really is the

    customer?

    The Team

    Time

    Resources Expertise

    Motivation

    Management

    Buy in

    Genuine buy in

    Payback / Benefit

    To Customer

    To

    management To my Team

    Self actualization

    Culture

    Savings

    Student Growth

    Program designed to reduce

    training doubts & fears Resistance

    Nurturing

    Driving out statistical horror

    Making problem solving fun

    J ob enrichment / advancement

    Savings Calculate following

    Control Phase

    Indirect , Direct

    Productivity

    Opportunity

    Profit

    Applied Learning

    You learn by doing the thingSophocles

    The importance ofThe Project DMAIC: Scientific method 101

    Process Understanding

    Statgraphics Centurion

    Profit = Customer + Process + Employee

  • 7/30/2019 Web 072505

    8/43

    8

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    The Process for Six Sigma Projects (DMAIC)Define -Listening to the Voice of the

    Customer

    Prerequisites

    (Philosophy, Mgmt buy-in)Y=f(X) Concept & Strategy

    ID Team / Key Constituents

    Project Statement (4 Boxer.ppt)

    Process Mapping/ Risk AssessmentQuality Function Deployment (QFD)

    Financial Analysis

    MeasureMeasuring Current Process

    Health

    Define Performance Standards

    The Ys (CTQs) & the Zs7 Basic Tools (Pareto Analysis, Run

    Chart, Scatter Diagrams etc.)Fishbone DiagramsValidate the Measurement SystemEstablish SPC and Process Capability

    Establish Tolerance Limits

    AnalyzeIdentifying important causes of

    the defects

    Multiple Box-Whisker

    Regression Analysis (y vs x)ANOVA / Components of Variance

    Hypothesis (Ho/Ha) Testing

    Chi Square TestingScreening Designs

    ImproveRemoving the causes of the

    defects

    Fishbone Revisited

    Sequential Design of Experiments(DoE)

    Error ProofingRevisit Tolerance Limits

    ControlMaintaining the improvements

    Statistical Process Control(reduced inspection)Capability Monitoring Failure Mode Effects

    Analysis Action Plans

  • 7/30/2019 Web 072505

    9/43

    9

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Lets look at a sampling of Six Sigma toolsfound in Statgraphics Centurion

  • 7/30/2019 Web 072505

    10/43

    10

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Cost of Quality for a Six Sigma Project

    Cost of Quality History

    COQ

    Prevention

    Appraisal

    Int. Failure

    Total COQ

    Total Failure

    1993

    1994

    1995

    1996

    1997

    1998

    1999

    2000

    2001

    2002

    2003

    2004

    0

    20

    40

    60

    80

  • 7/30/2019 Web 072505

    11/43

    11

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Quality Function Deployment - The House of QualityListening to the Voice of the Customer

    LowCost

    Reproducible

    FactoryImplementation/Demo.

    Process Verification (Proof)

    High Reliability(>85,000) hrs.

    Small Size - Light Weight

    Performance ExpandableMeets Module Elect. Performance

    SystemMaintainability

    Yield

    49.0

    438.0

    Proc

    ess

    Cap

    ability

    60.0

    504.0

    Rate

    56.0

    500.0

    Mod

    uleCost

    48.0

    428.0

    MTB

    F

    22.0

    123.0

    Fail

    Free

    Op.

    Period

    22.0

    123.0

    Size

    15.0

    113.0

    Weight

    11.0

    88.0

    Proc

    ess

    Flex

    ibility

    16.0

    122.0

    Costto

    Main

    tain

    21.0

    113.0

    Availability

    ofA

    rray

    19.0

    95.0

    Priority

    10.0

    10.0

    10.0

    10.0

    9.0

    8.0

    6.05.0

    1.0

    69.0

    345.0

    Ours

    2.7

    2.9

    2.1

    3.1

    2.6

    2.4

    3.53.6

    3.5

    26.4

    193.1

    Theirs

    4.0

    5.0

    3.2

    3.0

    3.3

    2.8

    1.82.1

    3.5

    28.7

    228.9

    80%

    1.3

    3

    1000/day

    $200

    85,00

    0hrs.

    10,00

    0hrs.

    4"x.4

    6"x0.2

    "

    1OZ.

    TBD

    TBD

    TBD

    Absolute weight

    Relative weight

    InteractionsStrong PositivePositive

    NegativeStrong Negative

    CustomerDemands

    Design Requirements

    RelationshipStrong =9.0Medium =3.0Weak =1.0

  • 7/30/2019 Web 072505

    12/43

    12

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    The Process Map to Understand your ProcessEarly in Six Sigma

    FlowChartProcess

    1

    AuditProcess

    2

    Problems?3Correct

    Problems

    4

    Collect Data5

    Analyze Data6

    In Control?7

    Plot

    Histogram

    8

    Estimate ProcessCapability

    9

    Capable?10

    Sort Product11

    Improve

    Capability

    12

    Meeting13

    No

    Yes

    Yes

    Yes

    No

    No

  • 7/30/2019 Web 072505

    13/43

    13

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Brainstorming over a Fishbone Diagram

    Defects

    Raw card

    Short circuit

    Shroud

    Moisture contentTime

    Temperature

    Solder process

    SplatterChain speed

    Wave pumpHeight

    FlowFlux

    TemperatureSetup

    Control

    Inspection

    Measurement

    Test coverage

    Inspector

    Components

    Wrong part

    Functional failure

    Missing from reelVendor

    Setup

    Component insertion

    Wrong component

    Missing component

    AlignmentAutoposition

    Operator

    Crimp

  • 7/30/2019 Web 072505

    14/43

    14

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Statgraphics & Six Sigma can take failure to meetminimum to a 6 sigma process

    Bad Process Good Process

    LSL Nominal

    0 10 20 30 40 50

    0

    2

    6

    8

    4

    10

    0 10 20 30 40 50

    0

    2

    6

    8

    4

    10

    LSL Nominal

    frequency

    Response Variable

    6 sigma process-3s

    100%Defective(failure to meetminimum)

    -3s

    Response Variable

  • 7/30/2019 Web 072505

    15/43

    15

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Plot of Fitted Model

    Diastolic80

    Systolic1

    40

    Systolic140 = 3.97694 + 1.57601*Diastolic80

    R^2 = 66% fair-good correlation

    Systolic140 = -0.663584 + 1.6165*Diastolic80 Outlier removed

    82 86 90 94 98 102 106

    120

    130

    140

    150

    160

    170

    Control Ellipse

    Diastolic80

    Systolic140

    72 82 92 102 112

    100

    120

    140

    160

    180

    200Alpha = 0.1 %

    Statgraphics & Six Sigma enable understanding

    Cause & Effect Relationships Y=f(x)

    1 2 3 4 5 6

    Box-and-Whisker Plot

    17

    18

    19

    20

    21

    22

    MPG_

    20_

    1

    Driver

    Plot of Fitted Model

    weeks

    chlorine

    0 10 20 30 40 50

    0.38

    0.4

    0.42

    0.44

    0.46

    0.48

    0.5

  • 7/30/2019 Web 072505

    16/43

    16

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    SnapStat: Capability Assessment (Individuals)

    Data variable: strengthSample size =100 Mean =254.64

    Specifications Beyond Spec. Z-ScoreUSL =300 0.000000% 4.25Nom =250LSL =200 0.000000% -5.12

    Long-Term Capability Short-Term CapabilitySigma =10.6823 Sigma =10.1637Pp =1.56 Cp =1.64

    Ppk =1.42 Cpk =1.49DPM =11.03 DPM =4.08

    X Chart

    Observation

    strength

    0 20 40 60 80 100220

    240

    260

    280

    300

    254.64

    285.13

    224.15

    Capability Histogram

    strength

    frequency

    200.00 250.00 300.00

    200 220 240 260 280 3000

    5

    10

    15

    20

    25

    Range Chart

    Observation

    MR(2)

    0 20 40 60 80 1000

    10

    20

    30

    40

    50

    11.46

    37.46

    0.00

    Probability Plot

    strength

    Norma

    lDistribution

    200 220 240 260 280 300200

    220

    240

    260

    280

    300

    Tolerance Chart

    Observation

    strength

    0 20 40 60 80 100200

    220

    240

    260

    280

    300

    250.00

    300.00

    200.00

    Snapstats:A Special Feature in

    Statgraphics Centurion forQuick Process Capability

  • 7/30/2019 Web 072505

    17/43

    17

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Process Development Using

    Sequential Experimentation

    0

    10

    20

    30

    1 2 3 4 5 6 7

    Experiment No.

    Response

    Variable

    ResponseSurface

    Factorials

    Screening Designs

    Climbing to the peak of themountain in the fewest

    number of trials

  • 7/30/2019 Web 072505

    18/43

    18

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    0 5 10 15 20 25 30 35 40 45

    1

    2

    3

    4

    Fat (gms) UGH!

    Cost/Volu

    me(cents)

    Orville

    Pillsbury

    Betty Crocker

    Kohls

    Regular (plain)

    Reg+1 tbspReg+2 tbsp

    Reg+3 tbsp

    Reg+4 tbsp

    Regular =Non-Microwave Old Capitol Popcorn

    Six Sigma Enters the World of a Science Project Maybe Microwave Popcorn aint so Hot !

    X2-

    X1X3

  • 7/30/2019 Web 072505

    19/43

    19

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Class Exercise

    To Demo DoE

    Class Exercise

    To Demo DoE

  • 7/30/2019 Web 072505

    20/43

    20

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    You are put in Charge ofthis Six Sigma Project

    Customers of OTI (Optimum Travel, Inc.) have beencomplaining about the limited Travel Distance of itsmain Product, the 6 Sigma Golf Ball.

    Management wants to increase the travel distance to

    improve customer satisfaction and beat the competition.

    How Would Your Team Begin ?

  • 7/30/2019 Web 072505

    21/43

    21

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Course Offerings

  • 7/30/2019 Web 072505

    22/43

    22

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    ABI Six Sigma Company Offeringsusing Statgraphics CenturionTM

    Executive Overview (1/2 Day)Six Sigma Overview (1 Day or 2 Day)Six Sigma Accelerated (6 Day)

    (2 Day and 3 Day Sessions with Project/ Mentoring)Six Sigma Green Belt (10 Day)(Four 2 Day Sessions with Project/ Mentoring)

    Six Sigma Black Belt (14 Day)

    (Five 2-3 Day Sessions with Project/ Mentoring)

  • 7/30/2019 Web 072505

    23/43

    ABI Six Sigma Overview.ppt

    _________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2003

    Six Sigma Executive Overview

    Outline

    What is Six Sigma?

    - Definition and Organization Infrastructure

    How Does Six Sigma Improve Business Performance?

    Who is Using Six Sigma? What have been the Benefits?

    Where can Six Sigma be Used? (In My Business?)

    Six Sigma Methods and Tools using Statgraphics

    How do I Implement Six Sigma?

  • 7/30/2019 Web 072505

    24/43

    24

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Six Sigma Overview

    Define / Measure / Analyze (Day 1)

    What is Six Sigma?DMAIC Model

    Project SelectionProject CharterTeam Roles and ResponsibilitiesVoice of the Customer

    Concept EngineeringQuality Function DeploymentUsing SIPOC for Process Identif icationProcess MappingMeasurement System Analysis

    Data Collection MethodsUnderstanding VariationFundamentals of Statistical Process Control (SPC)Defining Process Capability

    Calculating Sigma Levels /DPMO

  • 7/30/2019 Web 072505

    25/43

    25

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Six Sigma Overview

    Analyze / Improve / Control (Day 2)

    Seven Basic Quality Tools for Analyzing Data

    Basic Regression

    Design of Experiments (DoE)

    Analysis of Variance (ANOVA)

    Failure Mode & Effects Analysis (FMEA) Error Proofing

    SPC for Process Control

    Piloting and Implementing a Solution Process Control Plan

    Reporting Project Benefits / Financial Impact

    Leveraging Best Practices

    Summary and Lessons Learned

  • 7/30/2019 Web 072505

    26/43

    A li d B i I t

  • 7/30/2019 Web 072505

    27/43

    27

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Session 1 Define (1 Day)1.1 Six Sigma Overview

    1.2 DMAIC Model

    1.3 Project Selection / Charter

    1.4 Team Roles and Responsibilities

    1.5 Voice of the Customer / Concept Engineering

    1.6 Quality Function Deployment (QFD) STATGRAPHICS Centurion TM

    1.7 Process Map STATGRAPHICS Centurion TM

    1.8 Cause & Effect STATGRAPHICS Centurion TM

    1.9 Cost of Quality Trend Analysis STATGRAPHICS Centurion TM

    1.10 StatReporter STATGRAPHICS Centurion TM

    Session 2 - Measure (1 Day)

    2.1 Data Collection Methods2.2 Understanding Variation

    2.3 Calculating Sigma Levels/ dpu/ DPMO STATGRAPHICS Centurion TM (Tools)

    2.4 Sample Size Determination STATGRAPHICS Centurion TM

    2.5 Scatter plots/ Exploritory Plots /Time Sequence Plots STATGRAPHICS Centurion TM

    2.6 Gage Studies STATGRAPHICS Centurion TM

    2.7 Basic Statistical Process Control (SPC) STATGRAPHICS Centurion TM

    2.8 Process Capability STATGRAPHICS Centurion TM

    2.9 SnapStats/ StatAdvisorSTATGRAPHICS Centurion TM

    Session 3 - Analyze (1 Day)

    3.1 Variable Data STATGRAPHICS Centurion TM

    3.2 Att ribute Data STATGRAPHICS Centurion TM

    3.3 Hypothesis Tests STATGRAPHICS Centurion TM

    3.4 Reliability Analysis STATGRAPHICS Centurion TM

    3.5 SnapStats STATGRAPHICS Centurion TM

    Six Sigma Accelerated (SSA) Course Outline

    A li d B i I t

  • 7/30/2019 Web 072505

    28/43

    28

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Session 4 - Improve (1 Day)

    4.1 Analys is of Variance (ANOVA) STATGRAPHICS Centurion TM

    4.2 Curve Fitt ing Made Easy STATGRAPHICS Centurion TM

    4.3 Regression STATGRAPHICS CenturionTM

    4.4 Experimental Design Creation / Analysis STATGRAPHICS Centurion TM

    4.5 ix Sigma Golf Exercise

    Session 5 - Control (1 Day)

    5.1 Variable / Att ribute Control Charts STATGRAPHICS Centurion TM

    5.2 Acceptance Sampling STATGRAPHICS Centurion TM

    5.3 Classification Methods (optional) STATGRAPHICS CenturionTM

    5.4 Pilot ing / Implementing Process Improvement / Assessment

    5.5 Process Control Plan / Documentation

    5.6 Report ing Project Benefits / Financial Impact

    Session 6 Project Presentations (1 Day)

    6.1 Team Project Presentations

    6.2 Leveraging Best Practices / Lessons Learned6.3 Celebration

    SSA Outline

    Statgraph

    icsCe

    nturio

    nPe

    rmits

    Learning

    Six

    Sig

    main5

    Day

    s

    Applied Business Improvement

  • 7/30/2019 Web 072505

    29/43

    29

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Six Sigma Green Belt Training

    Session 1Define/Measure

    2 Days

    Six Sigma Overview

    Whats In It for Me?

    DMAIC Model

    Project Selection

    Project Charter

    Team Roles and Responsibili ties

    Voice of the Customer

    Quality Function Deployment (QFD)

    Cost Benefit Analysis

    SIPOC for Process Identification

    Process Mapping

    Basic Statist ics Summary

    Statgraphics Tutorial

    Applied Business Improvement

  • 7/30/2019 Web 072505

    30/43

    30

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Six Sigma Green Belt TrainingSession 2

    Measure/Analyze

    2 Days

    Project Presentation - Define/Measure

    Measurement System Analysis

    Data Collection Methods

    Understanding Variation

    Using Statistical Process Control (SPC)

    Defining Process Capability

    Calculating Sigma Levels/DPMO

    Seven Basic Quality Tools for Analyzing Data

    Regression Made Easy

    Applied Business Improvement

  • 7/30/2019 Web 072505

    31/43

    31

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Six Sigma Green Belt Training

    Session 3Analyze/Improve

    2 DaysProject Presentation - Measure/Analyze

    Hypothesis Testing

    Design of Experiments (DoE)

    Six Sigma Golf Exercise

    Analysis of Variance (ANOVA)

    Failure Modes and Effects Analysis FMEA)

    Error ProofingSPC for Process Control

    Applied Business Improvement

  • 7/30/2019 Web 072505

    32/43

    32

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Six Sigma Green Belt Training

    Session 4Improve/Control

    2 DaysProject Presentation - Analyze/Improve

    Piloting Process Improvement

    Process Improvement Assessment

    Implementing a Process Improvement

    Process Control Plan

    Process Documentation

    Reporting Project Benefits/Financial Impact

    Leveraging Best Practices

    Summary and Lessons Learned

    Green Belt Knowledge Assessment (Optional)

    Applied Business Improvement

  • 7/30/2019 Web 072505

    33/43

    33

    _________________________________________________Applied Business Improvement

    All Rights Reserved , ABI Associates, 2005

    Six Sigma Black Belt Training

    Session 1Define

    2 Days

    Six Sigma Overview

    Whats In It for Me?

    DMAIC ModelProject Selection

    Project Charter

    Team Roles and ResponsibilitiesSIPOC for Process Identi fication

    Voice of the Customer

    Quality Function Deployment (QFD)

    Cost Benefit Analysis

    Basic Statistics Summary

    Statgraphics Training

    Appl ied Business Improvement

  • 7/30/2019 Web 072505

    34/43

    34

    _________________________________________________ pp p

    All Rights Reserved , ABI Associates, 2005

    Six Sigma Black Belt Training

    Session 2Measure

    2 Days

    Project Reviews

    Process Mapping

    Measurement System Analysis

    Data Collection Methods

    Understanding Variation

    Statistical Process Control (SPC)

    Process Capability

    Calculating Sigma Levels / DPMO

    Measure Statistics

    Statgraphics Training

    Appl ied Business Improvement

  • 7/30/2019 Web 072505

    35/43

    35

    _________________________________________________ pp p

    All Rights Reserved , ABI Associates, 2005

    Six Sigma Black Belt TrainingSession 3

    Analyze

    3 Days

    Project Reviews

    Seven Basic Quality Tools for Analyzing DataLinear and Multiple Regression

    Hypothesis Testing

    Design of Experiments (DoE)Six Sigma Golf Exercise

    Analysis of Variance (ANOVA)

    Analyze Statistics

    Statgraphics Training

    _________________________________________________Applied Business Improvement

  • 7/30/2019 Web 072505

    36/43

    36All Rights Reserved , ABI Associates, 2005

    Six Sigma Black Belt Training

    Session 4

    Improve3 Days

    Project Reviews

    Failure Modes and Effects Analysis (FMEA)

    Error Proofing

    Design for Six Sigma (DFSS)

    Piloting Process Improvement

    Process Improvement Assessment

    Implementing Process Improvement

    Improve Statistics

    Statgraphics Training

    _________________________________________________Applied Business Improvement

  • 7/30/2019 Web 072505

    37/43

    37All Rights Reserved , ABI Associates, 2005

    Six Sigma Black Belt Training

    Session 5Control

    2 Days

    Project Reviews

    Lean Enterprise

    SPC for Process Control

    Process Control Plan

    Process Documentation

    Reporting Project Benefits/Financial Impact

    Leveraging Best Practices

    Summary and Lessons Learned

    Black Belt Knowledge Assessment (Optional)

    Statgraphics Training

    _________________________________________________Applied Business Improvement

  • 7/30/2019 Web 072505

    38/43

    38All Rights Reserved , ABI Associates, 2005

    ABI Six Sigma Company Offerings using

    Statgraphics CenturionTM

    Six Sigma Executive Overview (1/2 Day) $ 2,500Six Sigma Overview (2 Day) (1 Day also available) $ 5,000Six Sigma Accelerated (6 Day) (Under Development) $ 15,000

    (2 Day and 3 Day sessions with Project/Mentoring)Six Sigma Green Belt (10 Day) $ 25,000

    (Four 2 Day sessions with Project/Mentoring)Six Sigma Black Belt (14 Day) $ 35,000

    (Five 2-3 Day sessions with Project/Mentoring)

    Design for Six Sigma (DFSS) (Under Development)(3 Days following Six Sigma Training)

    Add T&L plus course material / books to each course cost(assuming meeting room / meals/ refreshments provided)

    Maximum Class size 25Additional Consulting Available

    Public and Private Courses available. ABI willing to customize training to specificcustomer needs based on Needs Assessment with sponsoring management.

    _________________________________________________Applied Business Improvement

  • 7/30/2019 Web 072505

    39/43

    39All Rights Reserved , ABI Associates, 2005

    Process Understanding and Improvement

    Course Objective: Provide a working knowledge of Statistical

    Process Control (SPC) and Process Capabili ty and introduce

    the Basic Quality Tools for Process Improvement

    PAGES DELIVERABLES

    3-8 Working with Data

    9-14 Understanding Variation

    15-35 Principles of SPC 36-42 Introduction to Control Charts

    43-72 Variables Control Charts (X-MR ; Xbar-R)

    73-98 Attributes Control Charts (c ; u ; np ; p)

    99-110 Process Capability - Variables 111-115 Process Capability Discrete

    116-122 Tolerance Intervals (optional)

    123-137 Tools to Understand and Improve the Process

    _________________________________________________Applied Business Improvement

  • 7/30/2019 Web 072505

    40/43

    40All Rights Reserved , ABI Associates, 2005

    Introduction to Design of Experiments

    Session Topics

    Common Approaches to ExperimentationWhat is Design of Experiments (DoE)?Factorial DesignsThe Process of ExperimentationDemo: Catapult Experiment Using Statgraphics

    - Analysis of Variance (ANOVA)Detectable EffectsFractional Factorial DesignsConfounding

    Screening DesignsResponse Surface OptimizationTaguchi Methods

    _________________________________________________Applied Business Improvement

  • 7/30/2019 Web 072505

    41/43

    41All Rights Reserved , ABI Associates, 2005

    Introduction to Design of Experiments

    Process of Experimentation

    Define Project- Identify Response Variables

    Understand Current SituationPerform Designed Experiment

    - Identify Factors

    - Choose Factor Levels

    - Select Design (Replication)- Randomize Experiment Runs

    - Collect Data

    - Analyze Data

    - Form Conclusions

    - Verify ResultsDefine and Implement SolutionsRecord ResultsStandardize ResultsDetermine Future Plans

    _________________________________________________Applied Business Improvement

  • 7/30/2019 Web 072505

    42/43

    42All Rights Reserved , ABI Associates, 2005

    ABI Introductory Company Offerings usingStatgraphics CenturionTM

    Process Understanding and Improvement (1/2 Day) $ 2,500(1 Day also available)

    Design of Experiment Executive Overview (1/2 Day) $ 2,500(1 Day also available)

    Design of Experiments Introduction (1 Day) $ 2,500

    Add Travel & Living Expense plus course material / books to each course cost(assuming meeting room / meals/ refreshments provided)

    Maximum Class size 25Additional Consulting Available

    Public and Private Courses available. ABI willing to customize training to specificcustomer needs based on Needs Assessment with sponsoring management.

  • 7/30/2019 Web 072505

    43/43


Recommended