+ All Categories
Home > Documents > Web Based Automation for UC670 - Esri

Web Based Automation for UC670 - Esri

Date post: 25-Dec-2021
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
23
Transcript
Page 1: Web Based Automation for UC670 - Esri
Page 2: Web Based Automation for UC670 - Esri

Web Based Automation for Network Inventory Creation

UC670 Presenter: Yestha Bhatt

Date: 15-07-2014 Event : ESRI UC, 2014

Page 3: Web Based Automation for UC670 - Esri

Agenda

Confidential Reliance Jio Infocomm Limited 3

Usage of GIS in RJIL 2

1 Introduction

3 Need of Web Based Automation for Network Inventory Creation

High Level Workflow 4

Detailed Process flow with use cases and Output 6

5 Implementation Approach

7 Conclusion

Challenges and Forward Path 8

Page 4: Web Based Automation for UC670 - Esri

Reliance Jio Infocomm Limited

Confidential Reliance Jio Infocomm Limited 4

Only Telecom Company having Pan-India

high speed wireless broadband Service

Provider license and spectrum

Services through : 4G LTE, WiFi and FTTx

850 towns + 50% of rural India

Current Stage : LTE network rollout in next

2 months & FTTx rollout about to start

Page 5: Web Based Automation for UC670 - Esri

GIS Implementation in RJIL

Confidential Reliance Jio Infocomm Limited 5

Approx. 3,000+

Planning

Landbase

Network Engineer

ArcGIS Suite

Ericsson Network Engineer

Landbase available for 400+ cities

170K+ OFC route 100K+ Sites

Numbers indicate the total users in each functional group as per the locations assigned

Page 6: Web Based Automation for UC670 - Esri

GIS in Network Plan and Build phase

Confidential Reliance Jio Infocomm Limited 6

P

R

O

G

R

E

S

S

M

O

N

I

T

O

R

I

N

G

Planned

Inventory Creation in

NE

NDD Generation In

terc

ity

/ In

trac

ity

OFC Route Planning on Desktop &

Web

Automated IFC Map

Generation

Change Management

As-Built Generation

OSP Data Creation &

Migration to NE

WorkFlow Manager Planning – Acquisition – Construction – Installation –

Ready for service

Wir

ele

ss

FTTx

Market Planning

Building Survey

High Level Design

FTTx Engineering

As-Built Generation

Network Inventory Capture

Page 7: Web Based Automation for UC670 - Esri

Need of Automation for Network Inventory Creation

No additional GIS skilled resources required

Develop a paperless and automated way of capturing network inventory

Reduce the time gap between the execution and updation of inventory database

Improve the accuracy of As-Built data capture

Facilitate the construction progress monitoring on GIS

Confidential Reliance Jio Infocomm Limited 7

Page 8: Web Based Automation for UC670 - Esri

High Level Workflow

Confidential Reliance Jio Infocomm Limited 8

Route Planning

Assignment of Trench/Link Id

ITP Form Updation

Model Creation

Quality Check

Work-Order Generation

Migration to NE

T&D Generation

DIT Generation

OFC Blowing Generation

NPE

Construction

Construction

Construction

Construction

GIS

GIS

GIS

OSP

N/W

inve

nto

ry C

reat

ion

Pro

gress M

on

itorin

g

ITP : Inspection Test Progress Report T&D: Trenching and Ducting DIT: Duct Integrity Test

Page 9: Web Based Automation for UC670 - Esri

User Groups

Confidential Reliance Jio Infocomm Limited 9

Construction Engineer

Construction Manager

GIS User

System Administrator

Operations and

Maintenance

Network Planning &

Engineering

Business

Page 10: Web Based Automation for UC670 - Esri

View unassigned Links /Spans

Confidential Reliance Jio Infocomm Limited 10

Page 11: Web Based Automation for UC670 - Esri

View Link on Map

Confidential Reliance Jio Infocomm Limited 11

Page 12: Web Based Automation for UC670 - Esri

Assignment to Next User

Confidential Reliance Jio Infocomm Limited 12

Page 13: Web Based Automation for UC670 - Esri

ITP Form Updation

Confidential Reliance Jio Infocomm Limited 13

Page 14: Web Based Automation for UC670 - Esri

Types of ITP Forms

Trenching and Ducting

Trenching ITP-030 & HDD ITP-001

Ducting-ITP-031

Rail & Road Crossing-ITP-034

Bridge/Culvert Crossing-ITP-036

Manhole/Handhole-ITP-033

Duct Integrity Test

DIT ITP-042

OFC Blowing

Blowing ITP-011

Confidential Reliance Jio Infocomm Limited 14

Page 15: Web Based Automation for UC670 - Esri

Hardcopy

Confidential Reliance Jio Infocomm Limited 15

Page 16: Web Based Automation for UC670 - Esri

Sample Trenching ITP-030

Confidential Reliance Jio Infocomm Limited 16

Page 17: Web Based Automation for UC670 - Esri

Sample Ducting-ITP-031

Confidential Reliance Jio Infocomm Limited 17

Page 18: Web Based Automation for UC670 - Esri

Generated OSP Network Inventory

Confidential Reliance Jio Infocomm Limited 18

Page 19: Web Based Automation for UC670 - Esri

Features

Adjustment of the T&D distance within the defined ‘From’ & ‘To’ latitude-longitude

Splitting the trench on placement of structure at the exact spatial location

Creation of point features with reference to 3 point distance

Model selection based on inventory models built in NE model builder

Re-work made easy for change in location of inventory

Compared to earlier manual method of inventory capture

- Per Km : 6 to 8 hours (Paper based mark-up + Digitization + Standardization + Migration)

- Per Km : 3 to 4 hours (ITP updation + Feature Generation)

Confidential Reliance Jio Infocomm Limited 19

Page 20: Web Based Automation for UC670 - Esri

Conclusion

Confidential Reliance Jio Infocomm Limited 20

Track and manage a dispersed workforce on a common platform in a disciplined and organized manner

Standardization and consistency across operations by centralizing As-Built management on central GIS database.

Paperless form of ITP updation and physical inventory creation

Increased user productivity by automation of common activities and reducing repetition of manual updation activities.

Improved quality of physical inventory data

Effortlessly track newly created inventory status and work progress using reports.

Page 21: Web Based Automation for UC670 - Esri

Challenges

Confidential Reliance Jio Infocomm Limited 21

An algorithm is defined and executed at client side to

move along the interval as defined in the ITP form to calculate the increase the

performance

Same inventory feature cannot be edited by two or more users simultaneously

To capture the data in ArcGIS and to make it compatible

with Network Engineer data model to avoid development

of complex data migration tools

Auto-snapping & split of line feature on availability of point

feature within the defined buffer distance

Web Based Automation for

Physical Network Inventory Creation

Page 22: Web Based Automation for UC670 - Esri

Path Ahead

• Development of native app on Mobile for physical inventory data capture

• Auto-snapping & split of line feature on availability of point feature within the defined buffer distance to capture cable splice data

Confidential Reliance Jio Infocomm Limited 22

Page 23: Web Based Automation for UC670 - Esri

Thank You

Confidential


Recommended