on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor Dimitrios Zekkos Department of Civil and Environmental Engineering University of Michigan Vibroflotation Prepared by: Yanet Zepeda Ian McCreery With the Support of:
Transcript
Page 1: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Web-based Class Project

on Ground Improvement

Report prepared as part of course CEE 542: Soil and Site Improvement

Winter 2014 SemesterInstructor: Professor Dimitrios Zekkos

Department of Civil and Environmental Engineering University of Michigan

VibroflotationPrepared by:

Yanet Zepeda Ian McCreery

With the Support of:

Page 2: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Vibroflotation

Ian McCreery & Yanet Zepedahttp://www.cyes.es/images/obras/69/imagenes/max/00105%20AMPLIACION%20DARSENA%20SUR%20PTO%20VLC%201.JPG

Page 3: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Overview

❏ Introduction❏ Applicability❏ Equipment & Construction❏ Design❏ Cost❏ Case Study: Success❏ Case Study: Failure

Page 4: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Introduction

Vibroflotation utilizes horizontal vibrations in conjunction with fluid to reduce the interparticle friction of the surrounding soil.

http://www.polbud-pomorze.ru/en/vibroflotation/

Page 5: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Introduction

During vibration material falls into a denser state.Result: Increase in strength and a reduction in compressibility.

Densification of soil during vibroflotation (Bauer Maschinen GmbH, 2012)

Page 6: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Introduction

Uses:❏ Reduce potential settlement❏ Seismic liquefaction mitigation

Common for:❏ Off-shore projects❏ Land made of reclaimed soil❏ Hydraulic fills

Page 7: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Applicability

Most coarse-grained soils with a fines content of less than 10% are considered acceptable.

Ideally, loose soils below the water table.

Page 8: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Applicability

Problem with Cohesive Soils:Fills voids between larger particles and immobilizes the material

due to positive pore water pressures; this inhibits the ability of the granules to move into a denser state.

http://www.vibromenard.co.uk/techniques/vibro-compaction/

Page 9: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Applicability

The orange area represents the grain size distribution of soils suitable for vibroflotation (Bauer Maschinen GmbH, 2012)

Page 10: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Equipment

❏ Composed of vibroflot and follow-up pipe❏ Capabilities vary by manufacturer❏ About 12 feet in total length❏ Weigh about 10,000 to 20,000 lbs

Page 11: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Equipment

❏ Electric or hydraulically powered motor to rotate a mass

❏ Centrifugal force generated: 43,000 to 70,000 lbs

❏ 2 Jets❏ Bottom❏ Upper

http://i00.i.aliimg.com/photo/v0/240334132/VFA200_Hydraulic_Vibroflot.jpg

Page 12: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Construction Procedures

❏ Reach depths up to 150 feet❏ Densification achieved 5 to 15 radially from vibroflot

Page 13: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Construction Procedures

❏ VF trial❏ Soil penetration❏ Densification at desired

depth❏ Retract probe to next

location❏ Backfill

Page 14: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Construction Procedures

❏ Vibroflot Starving❏ Quality Control

❏ Penetration Depth❏ Penetration Rate❏ Withdrawal Rate❏ Probe Location❏ Power Peak❏ Operating Frequency❏ Post-Operation Density Checks

Page 15: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Design

Density goal set in terms of relative density

Spacing Patterns: Square, Triangular, Line

Page 16: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Cost

Highly Variable

Croton Dam Case Study (1999)

Page 17: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Cost

Page 18: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Success

Seabird Naval Base at Karwar in Indian state of Karnataka.

Construction of 3 mile long breakwater structure.

Project Seabird (Sharma, 2004)

Page 19: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Success

Existing seabed was composed of clay and soft silt, it was dredged to a depth of nearly 20 feet with hydraulic sand fill.

Problem:CPT’s revealed need for compaction of top 13 feet to reduce

settlement and mitigate liquefaction

Page 20: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Success

35 acres selected for compactionFour 49 foot long vibrators suspended from a crane situated on a

barge

Project Seabird setup (Raju et al., 2003)

Page 21: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Success

Results & Conclusion:CPTs performed every 164 feet along the breakwater structure.

The 13 feet of compacted fill achieved a twofold to threefold increase in penetration resistance compared to the uncompacted values.

Vibro flotation densified the hydraulic fill beneath the breakwater structure successfully.

Page 22: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Failure

Thermalito Afterbay in Northern California

8 mile long embankment, 39 foot height

Page 23: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Failure

August of 1975 an earthquake of magnitude 5.7 revealed an active fault that had not been previously detected.

Department of Water Resources evaluated the embankments resistance to liquefaction under a 6.5 magnitude earthquake.

Page 24: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Failure

Analysis predicted that the silty sand layers in the foundation of the embankment would liquefy entirely under these seismic conditions.

Densification of these silty sand layers was necessary to mitigate liquefaction risks.

Page 25: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Failure

Foundation made of layers of different soils including clay, silt, sand and gravel.

Surface layer throughout most of the embankment was composed of a clay and silt layer several feet thick.

Silty sand layers contain a median of 15 percent fines, with 30 percent of the samples containing more than 20 percent fines

Page 26: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Failure

Vibroflotation testing program implemented

Thermalito Bay worksites table (Harder et. al., 1984)

Page 27: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Failure

Vibroflot was not used to penetrate the clay and silt surface layer, here pre-drilling was used until silty sand layer reached then holes were backfilled before vibroflot was inserted.

An equilateral triangular spacing scheme was utilized with spacings ranging from 6.5 feet to 9.5 feet.

Page 28: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Failure

Results for Worksite 2.

No appreciable improvement.

Same for Worksite 1.

Thermalito Bay CPT and SPT results (Harder et. al., 1984)

Page 29: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Case Study: Failure

Conclusion:Vibroflotation is not an effective method for the densification of

silty sands below a cohesive soil cap.

The failure of vibroflotation as a technique in this case is most likely due to the relatively high fines content of 15 percent in the silty sand layer.

Page 30: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Conclusions

Vibroflotation is a successful and cost effective technique used to densify loose coarse-grained soils

Page 31: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

Questions

Page 32: Web-based Class Project on Ground Improvement Report prepared as part of course CEE 542: Soil and Site Improvement Winter 2014 Semester Instructor: Professor.

More Information

More detailed technical information on this project can be found at:

http://www.geoengineer.org/education/web-based-class-projects/select-topics-in-ground-improvement