Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 1
Wed Dec 7
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Beam Stopped at 18:00
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 2
Thu Dec 8
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Magnet ramp down initiated at 06:00
2. Open VAC shielding8:00 Maf + 3 FSU 1h WP:
5. Prepare GIS14:00Gerhard 8h WP:
4. EN-HE: Restart CraneEric + 2Altead 1h WP:
0. Full RP sweepHeinz + 3RPEs 10:30am 2h WP:
3. Open PX56 PlugJP 20’ WP:
6. CV Switch ventilation to shutdown modeG Ducret WP:
8. Check HF jacksHubert /Silverio2h WP:
7. Install collar switchboardsSilverio 20’ WP:
7’. Lower 2 CPs + 1SLE Dugue 3h WP:
1. Take RP water/C6F14 samples Heinz + CV/DC 2h WP:
Request to take data at 0BEE 1h
Install SU bracketsAntje 5h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 3
Fri Dec 9
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
1. Inject Ne8:00 Gerhard 8h WP:
2. Remove shims between collar and RS+ZDmitry + 2 Russian Tecs 1h WP:
3. Open RS+ZPascal /Sandro 30’ WP:
5. Remove 4 X-Stops and Open +Z CollarDmitry/Alex/Maf 2h WP:
3’. RP sweep inside RS+Z AreaAngelito 1h WP:
4. Remove CCTRXP & CCHFPP position sensorsJoao + Alex 15’ WP:
6. Remove HF+Z X stop (with CP)Maf + 2 Russian tecs 1.5h WP:
Disconnect –Z fibre optical sensorsSalvatore 1h WP:
Start of Water cooling maintenance: 08:00
Survey Cavern floorAntje 3h WP:
A. Remove shims between collar and RS-ZDmitry + 2 Russian Tecs 1h WP:
B. Open RS-ZPascal /Sandro 30’ WP: 014
C. Remove 4 X-Stops and Open Collar-ZDmitry/Alex 2h WP:
C’. RP sweep inside RS-ZWolfram1h WP:
D. Remove HF X stop (with CP)Maf + 2 Russian tecs 1.5h WP: 017
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 4
Mon Dec 12
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
AUG tests – CMS underground Facility OFF LIMITS
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 5
Tue Dec 13
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Diesel Test
3. Open HF + flooringMaf/Sandro/Alex + 1VSC 1h WP:
5. Open T2 & BSCDmitry /Alex 30’ WP:
6. Survey BP @ 15mAntje + 1VSC 3h WP:
H. Remove HF X stop (with CP)Maf + 2 Russian tecs 1.5h WP:
4. RP sweep inside HF+2 RPE 20’ WP:
6’. Remove CTZPproximity sensorsJoao 10’ WP:
C. Open HF- + flooringMaf/Sandro/Alex + 1VSC1h WP:
A. Move HF-Z away from IPMaf/Sandro + 1 VSC + 2 Rtecs 10’ WP:
D. Release CASTOR servicesDmitry 1h WP: 020
F. Open CASTORDmitry /Alx 30’ WP: 021
E. Remove CRP proximity sensorsJoao 10’ WP: A5
G. Open T2 & BSCNicola /Alex 30’ WP: 025
D’. RP sweep inside HF-2 RPE 20’ WP: 001
1. Move HF+Z away from IPMaf/Sandro + 1 VSC + 2 Rtecs 10’ WP:
2. Disconnect T1 servicesNicola 2h WP:
B. Disconnect T1 servicesNicola 2h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 6
Wed Dec 14
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
4. Remove access gangway to HF+ZEric + 2Altead 1h WP: 026
5. EN-HE – Remove HF+ I beamsEric + 3 Altead 2h WP:027
3. Remove proximity sensors30’ WP: #
7. Lower HF on 3 risersMarc/Herve + 2 Rtecs 4h WP: 029
6. Remove HF+Z towers reinforcementMarc /Herve + 2RTecs 3h WP: 028
A. Survey BP @ 15mAntje + 1VSC 3h WP:022
A’. Remove CTZPproximity sensorsJoao 10’ WP: #
1. Release BP support @ 13.5m2VSC + Sandro 2h WP:
2. Block BP support @ 13.5m in parking position2VSC + Sandro 30’ WP:
8. EN-HE – lift up 1 riserEric + 2Altead 2h WP:030
B. Perform CASTOR removalDmitry 7h WP:
C. Perform ½ CASTOR Installation-removal Exercise at BP level
Dmitry 1h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 7
Thu Dec 15
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
G. Lower HF on 2 risersMarc/Herve + 2 Rtecs 4h WP: 029
F. Remove HF- towers reinforcementMarc /Herve + 2RTecs 3h WP: 028
1. EN-HE – lift up 1 riserEric + 2Altead 2h WP:030
2. Install tooling for extension beamSandro + 2Vac 5h WP: 031
3. Install extension beam on FIN 3VSC + Sandro + 2 Altead 3h WP:032
D. Remove access gangway to HF-ZEric + 2Altead 1h WP: 026
E. EN-HE – Remove HF- I beamsEric + 3 Altead 2h WP:027
C. Remove proximity sensors30’ WP: #
A. Release BP support @ 13.5m2VSC + Sandro 2h WP:
B. Block BP support @ 13.5m in parking position2VSC + Sandro 30’ WP:
0. Lower HF on 2 risersMarc/Herve + 2 Rtecs 4h WP: 029
H. EN-HE – lift up risersEric + 2Altead 2h WP:030
Survey link Cavern-Su galleriesAntje Andreas 8h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 8
Fri Dec 16
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
1. Perform load transfer on Ext beam3VSC + Sandro + 1Altead 5h WP:
1’. Survey BPAndre + 1VSC 5h WP:
2. Remove HF handrail on IP sideMaf + 2FSU 1h WP:
Remove green support beams
C. Install tooling for extension beamSandro + 2Vac 5h WP: 031
D. Install extension beam on FIN 3VSC + Sandro + 2 Altead 3h WP:032
B. Move collar table out by 60cmDmitry+ 2FSU 2h WP:
A. Install supports for COLLAR tableMaf : 30’ WP:
0. Survey TAS + Fwd BP4h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 9
Mon Dec 19
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
b. Perform load transfer on Ext beam3VSC + Sandro + 1Altead 5h WP:034
b’. Survey BPAndre + 1VSC 5h WP:035
c. Remove HF handrail on IP sideMaf + 2FSU 1h WP: 216
d. Move collar table in by 60cm + remove supportsMaf + 2FSU 2h WP: 216
Start of crane installation in CV room
a Survey TAS + Fwd BP4h
1. Lower HF+Z on floorMarc/Herve + 2 Rtecs 4h WP:
2. EN-HE – lift up risersEric + 2Altead 2h WP:
3. Move HF+Z in garagePascal + 2 Rtecs 4h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 10
Tue Dec 20
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
1. Lower HF-Z on floorMarc/Herve + 2 Rtecs 4h WP:
2. EN-HE – lift up risersEric + 2Altead 2h WP:
3. Move HF-Z in garagePascal + 2 Rtecs 4h WP:
Remove 1/2 BSCA Bell 4h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 11
Wed Dec 21
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Remove 1/2 BSC + install new oneA Bell 4h WP:
Erect scaffolding for BP bake-outErect scaffolding for BP bake-out
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 12
Thu Dec 22
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Erect scaffolding for BP bakeoutErect scaffolding for BP bakeout
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 13
Fri Dec 23
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 14
Mon Dec 26
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 15
Tue Dec 27
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 16
Wed Dec 28
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 17
Thu Dec 29
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 18
Fri Dec 30
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 19
Mon Jan 2
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 20
Tue Jan 3
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 21
Wed Jan 4
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
CERN Closed
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 22
Thu Jan 5
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Install PLTMartin d1/4 WP:
CSC Posts
Remove 1/2 BSCA Bell 4h WP:
1. Open FIN Doors1h
2. Remove FIN plug1h
b. Remove FIN plug1h
3. Prepare for radioscopy6h
c. Prepare for radioscopy6h
a. Open FIN Doors1h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 23
Fri Jan 6
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Install PLTMartin d2/4 WP:
CSC Posts
Install BLMDmitry 1d WP:
Carry out radioscopy8hCarry out radioscopy
8h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 24
Mon Jan 9
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
1. Install PLTMartin d3/4 WP:
CSC Posts
Prepare for bake-out8h
Prepare for bake-out8h
CSC Posts
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 25
Tue Jan 10
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
1. Install PLTMartin d4/4 WP:
CSC Posts
Prepare for bake-out8h
Prepare for bake-out8h
CSC Posts
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 26
Wed Jan 11
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Prepare for bake-out8h
Prepare for bake-out8h
CSC Posts
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 27
Thu Jan 12
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Bake-out -Z8h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 28
Fri Jan 13
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Bake-out -Z8h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 29
Mon Jan 16
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Bake-out -Z8h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 30
Tue Jan 17
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Bake-out +Z8h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 31
Wed Jan 18
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Bake-out +Z8h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 32
Thu Jan 19
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Bake-out +Z8h
Prepare GIS8h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 33
Fri Jan 20
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Inject Ne in BP8h
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 34
Mon Jan 23
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
2. Install FIN plug + close FIN doorsPatrick + HE 2h WP:
3. Remove scaffolding3. Remove scaffolding
1. Install FIN plug + close FIN doorsPatrick + HE 2h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 35
Tue Jan 24
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Restart Cryo
Remove scaffoldingRemove scaffolding
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 36
Wed Jan 25
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
C. Move HF-Z on 2 risersMarc/Herve + 2 Rtecs 4h WP:
B. Move HF-Z out of garageMaf + 2 Rtecs 4h WP:
A. EN-HE – bring down risersEric + 2Altead 2h WP:
D’. Move HF+Z out of garageMaf + 2 Rtecs 4h WP:
C’. EN-HE – bring down risersEric + 2Altead 2h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 37
Thu Jan 26
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
a. Install torsion prevention support3VSC + Sandro + 1Altead 2h WP:034
a’. Survey BPAndre + 1VSC 5h WP:035
b. Remove HF handrail on IP sideMaf + 2FSU 1h WP: 216
c. Move collar table in by 60cm + remove supportsMaf + 2FSU 2h WP: 216
1. Move HF+Z on 2 risersMarc/Herve + 2 Rtecs 4h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 38
Fri Jan 27
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
a. Install torsion prevention support3VSC + Sandro + 1Altead 2h WP:034
a’. Survey BPAndre + 1VSC 5h WP:035
b. Remove HF handrail on IP sideMaf + 2FSU 1h WP: 216
c. Move collar table in by 60cm + remove supportsMaf + 2FSU 2h WP: 216
A. Survey and align BPPatrick + SU2h WP:
B. Install tooling for removal of ext beam2h WP:
C. Perform load transfer4h WP:
C’. Support for load transfer4h WP:
D. Survey TAS and Fwd pipeAntje 4h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 39
Mon Jan 30
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
2. Open HF & T2 30’ WP:
Check position of 13.7 BP support: P Lepeule
0. EN-HE – lower 2 risers through PX562h WP:
3. Move HF-Z on 4 risers 4h WP:
1. Remove extension beam2h WP:
A. Survey and align BPPatrick + SU2h WP:
B. Install tooling for removal of ext beam2h WP:
C. Perform load transfer4h WP:
C’. Support for load transfer4h WP:
D. Survey TAS and Fwd pipeAntje 4h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 40
Tue Jan 31
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
1. Install HF- access gangway2h WP:
1’. Install HF- tower reinforcement3h WP:
3. Engage and survey 13.7m support2h WP:
2. Move HF- towards IPPascal 15’ WP:
2. Open HF & T2 30’ WP:
Check position of 13.7 BP support: P Lepeule
0. EN-HE – lower 2 risers through PX562h WP:
3. Move HF on 4 risers 4h WP:
1. Remove extension beam2h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 41
Wed Feb 1
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
b. Close T2, BSC, HF- & check VSC cables at 13.7 meter 1h WP:
d. Engage HF X stops1h WP:
e. shim Collar1h WP:
c. Install brackets between CASTOR table and Plug1h WP:
a. Check position sensors2h WP:
a’. Survey BP 13.7m3h WP:
1. Install HF+ access gangway2h WP:
1’. Install HF+ tower reinforcement3h WP:
3. Engage and survey 13.7m support2h WP:
2. Move HF+ towards IPPascal 15’ WP:
c’. Survey HF-2h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 42
Thu Feb 2
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
a. Close RS+Z (cheese wedges) Pascal 3h WP:
b. Install wooden shimsDmitry 1h WP:
a. Check position sensors2h WP:
a’. Survey BP 13.7m3h WP: 052
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 43
Fri Feb 3
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Install PLT temporary cablesMartin d1/2 WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 44
Mon Feb 6
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Install PLT temporary cablesMartin d2/2 WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 45
Tue Feb 7
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Commission PLT at beam level8h WP:
Survey and Align PLT4h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 46
Wed Feb 8
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Commission PLT at beam level8h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 47
Thu Feb 9
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Commission PLT at beam level8h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 48
Fri Feb 10
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
a. Close T2, BSC, HF+ & check VSC cables at 13.7 meter 1h WP:
c. Engage HF X stops1h WP:
d. shim Collar1h WP:
b. Install brackets between CASTOR table and Plug1h WP:
e Close Collar1h WP:
b’. Survey HF-2h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 49
Mon Feb 13
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
c. Start Pump down BP:Gerhard 1d WP:
a. Close RS+Z (cheese wedges) Pascal 3h WP:
b. Install wooden shimsDmitry 1h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 50
Tue Feb 14
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Pump down BP:Gerhard 1d WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 51
Wed Feb 15
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Pump down BP:Gerhard 1d WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 52
Thu Feb 16
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Pump down BP:Gerhard 1d WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 53
Fri Feb 17
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Pump down BP:Gerhard 1d WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 54
Mon Feb 20
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Pump down BP:Gerhard 1d WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 55
Tue Feb 21
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Pump down BP:Gerhard 1d WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 56
Wed Feb 22
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Pump down BP:Gerhard 1d WP:
Remove SU bracketsAntje 5h WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 57
Thu Feb 23
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Magnet ON
Pump down BP:Gerhard 1d WP:
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 58
Fri Feb 24
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Complete Pump down BP:Gerhard 1d WP:
Contingency for magnet restart
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 59
Mon Feb 27
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Contingency for magnet restart
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 60
Tue Feb 28
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Contingency for magnet restart
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 61
Wed Feb 29
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Contingency for magnet restart
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 62
Thu Mar 1
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Contingency for magnet restart
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 63
Fri Mar 2
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Contingency for magnet restart
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 64
Mon Mar 5
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Contingency for magnet restart
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 65
Tue Mar 6
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Contingency for magnet restart
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 66
Wed Mar 7
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Ready For Beam
Far s
ide
Nea
r sid
e
-Z End+Z End5m
04/11/11 [email protected] 67
Thu Mar 8
ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept
SL CP
Availability of Services:
Crane after 17:30 N
Plug Close
TX54
Cryogenics EL power Water cool. Database
IT Magnet C6F14 Gas
GS Dept
Beam ON