+ All Categories
Home > Documents > Wed Dec 7

Wed Dec 7

Date post: 19-Feb-2016
Category:
Upload: damia
View: 37 times
Download: 0 times
Share this document with a friend
Description:
Wed Dec 7. Availability of Services:. ECAL. CMX. ZEC. CSC RE. DT+ RB. TK FPIX. Survey. HCAL. TE-VSC. EN Dept. GS Dept. Beam Stopped at 18:00. TX54. CP. SL. Thu Dec 8. Availability of Services:. ECAL. CMX. ZEC. CSC RE. DT+ RB. TK FPIX. Survey. HCAL. TE-VSC. EN Dept. - PowerPoint PPT Presentation
Popular Tags:
67
Far side Near side -Z End +Z End 5m 04/11/11 [email protected] 1 Wed Dec 7 ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept SL CP ailability of Services: Crane after 17:30 N Plu g Close TX54 Cryogeni cs EL power Water cool. Databas e IT Magnet C6F14 Gas GS Dept Beam Stopped at 18:00
Transcript
Page 1: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 1

Wed Dec 7

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Beam Stopped at 18:00

Page 2: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 2

Thu Dec 8

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Magnet ramp down initiated at 06:00

2. Open VAC shielding8:00 Maf + 3 FSU 1h WP:

5. Prepare GIS14:00Gerhard 8h WP:

4. EN-HE: Restart CraneEric + 2Altead 1h WP:

0. Full RP sweepHeinz + 3RPEs 10:30am 2h WP:

3. Open PX56 PlugJP 20’ WP:

6. CV Switch ventilation to shutdown modeG Ducret WP:

8. Check HF jacksHubert /Silverio2h WP:

7. Install collar switchboardsSilverio 20’ WP:

7’. Lower 2 CPs + 1SLE Dugue 3h WP:

1. Take RP water/C6F14 samples Heinz + CV/DC 2h WP:

Request to take data at 0BEE 1h

Install SU bracketsAntje 5h WP:

Page 3: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 3

Fri Dec 9

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

1. Inject Ne8:00 Gerhard 8h WP:

2. Remove shims between collar and RS+ZDmitry + 2 Russian Tecs 1h WP:

3. Open RS+ZPascal /Sandro 30’ WP:

5. Remove 4 X-Stops and Open +Z CollarDmitry/Alex/Maf 2h WP:

3’. RP sweep inside RS+Z AreaAngelito 1h WP:

4. Remove CCTRXP & CCHFPP position sensorsJoao + Alex 15’ WP:

6. Remove HF+Z X stop (with CP)Maf + 2 Russian tecs 1.5h WP:

Disconnect –Z fibre optical sensorsSalvatore 1h WP:

Start of Water cooling maintenance: 08:00

Survey Cavern floorAntje 3h WP:

A. Remove shims between collar and RS-ZDmitry + 2 Russian Tecs 1h WP:

B. Open RS-ZPascal /Sandro 30’ WP: 014

C. Remove 4 X-Stops and Open Collar-ZDmitry/Alex 2h WP:

C’. RP sweep inside RS-ZWolfram1h WP:

D. Remove HF X stop (with CP)Maf + 2 Russian tecs 1.5h WP: 017

Page 4: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 4

Mon Dec 12

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

AUG tests – CMS underground Facility OFF LIMITS

Page 5: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 5

Tue Dec 13

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Diesel Test

3. Open HF + flooringMaf/Sandro/Alex + 1VSC 1h WP:

5. Open T2 & BSCDmitry /Alex 30’ WP:

6. Survey BP @ 15mAntje + 1VSC 3h WP:

H. Remove HF X stop (with CP)Maf + 2 Russian tecs 1.5h WP:

4. RP sweep inside HF+2 RPE 20’ WP:

6’. Remove CTZPproximity sensorsJoao 10’ WP:

C. Open HF- + flooringMaf/Sandro/Alex + 1VSC1h WP:

A. Move HF-Z away from IPMaf/Sandro + 1 VSC + 2 Rtecs 10’ WP:

D. Release CASTOR servicesDmitry 1h WP: 020

F. Open CASTORDmitry /Alx 30’ WP: 021

E. Remove CRP proximity sensorsJoao 10’ WP: A5

G. Open T2 & BSCNicola /Alex 30’ WP: 025

D’. RP sweep inside HF-2 RPE 20’ WP: 001

1. Move HF+Z away from IPMaf/Sandro + 1 VSC + 2 Rtecs 10’ WP:

2. Disconnect T1 servicesNicola 2h WP:

B. Disconnect T1 servicesNicola 2h WP:

Page 6: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 6

Wed Dec 14

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

4. Remove access gangway to HF+ZEric + 2Altead 1h WP: 026

5. EN-HE – Remove HF+ I beamsEric + 3 Altead 2h WP:027

3. Remove proximity sensors30’ WP: #

7. Lower HF on 3 risersMarc/Herve + 2 Rtecs 4h WP: 029

6. Remove HF+Z towers reinforcementMarc /Herve + 2RTecs 3h WP: 028

A. Survey BP @ 15mAntje + 1VSC 3h WP:022

A’. Remove CTZPproximity sensorsJoao 10’ WP: #

1. Release BP support @ 13.5m2VSC + Sandro 2h WP:

2. Block BP support @ 13.5m in parking position2VSC + Sandro 30’ WP:

8. EN-HE – lift up 1 riserEric + 2Altead 2h WP:030

B. Perform CASTOR removalDmitry 7h WP:

C. Perform ½ CASTOR Installation-removal Exercise at BP level

Dmitry 1h WP:

Page 7: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 7

Thu Dec 15

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

G. Lower HF on 2 risersMarc/Herve + 2 Rtecs 4h WP: 029

F. Remove HF- towers reinforcementMarc /Herve + 2RTecs 3h WP: 028

1. EN-HE – lift up 1 riserEric + 2Altead 2h WP:030

2. Install tooling for extension beamSandro + 2Vac 5h WP: 031

3. Install extension beam on FIN 3VSC + Sandro + 2 Altead 3h WP:032

D. Remove access gangway to HF-ZEric + 2Altead 1h WP: 026

E. EN-HE – Remove HF- I beamsEric + 3 Altead 2h WP:027

C. Remove proximity sensors30’ WP: #

A. Release BP support @ 13.5m2VSC + Sandro 2h WP:

B. Block BP support @ 13.5m in parking position2VSC + Sandro 30’ WP:

0. Lower HF on 2 risersMarc/Herve + 2 Rtecs 4h WP: 029

H. EN-HE – lift up risersEric + 2Altead 2h WP:030

Survey link Cavern-Su galleriesAntje Andreas 8h WP:

Page 8: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 8

Fri Dec 16

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

1. Perform load transfer on Ext beam3VSC + Sandro + 1Altead 5h WP:

1’. Survey BPAndre + 1VSC 5h WP:

2. Remove HF handrail on IP sideMaf + 2FSU 1h WP:

Remove green support beams

C. Install tooling for extension beamSandro + 2Vac 5h WP: 031

D. Install extension beam on FIN 3VSC + Sandro + 2 Altead 3h WP:032

B. Move collar table out by 60cmDmitry+ 2FSU 2h WP:

A. Install supports for COLLAR tableMaf : 30’ WP:

0. Survey TAS + Fwd BP4h

Page 9: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 9

Mon Dec 19

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

b. Perform load transfer on Ext beam3VSC + Sandro + 1Altead 5h WP:034

b’. Survey BPAndre + 1VSC 5h WP:035

c. Remove HF handrail on IP sideMaf + 2FSU 1h WP: 216

d. Move collar table in by 60cm + remove supportsMaf + 2FSU 2h WP: 216

Start of crane installation in CV room

a Survey TAS + Fwd BP4h

1. Lower HF+Z on floorMarc/Herve + 2 Rtecs 4h WP:

2. EN-HE – lift up risersEric + 2Altead 2h WP:

3. Move HF+Z in garagePascal + 2 Rtecs 4h WP:

Page 10: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 10

Tue Dec 20

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

1. Lower HF-Z on floorMarc/Herve + 2 Rtecs 4h WP:

2. EN-HE – lift up risersEric + 2Altead 2h WP:

3. Move HF-Z in garagePascal + 2 Rtecs 4h WP:

Remove 1/2 BSCA Bell 4h WP:

Page 11: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 11

Wed Dec 21

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Remove 1/2 BSC + install new oneA Bell 4h WP:

Erect scaffolding for BP bake-outErect scaffolding for BP bake-out

Page 12: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 12

Thu Dec 22

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Erect scaffolding for BP bakeoutErect scaffolding for BP bakeout

Page 13: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 13

Fri Dec 23

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Page 14: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 14

Mon Dec 26

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Page 15: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 15

Tue Dec 27

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Page 16: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 16

Wed Dec 28

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Page 17: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 17

Thu Dec 29

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Page 18: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 18

Fri Dec 30

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Page 19: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 19

Mon Jan 2

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Page 20: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 20

Tue Jan 3

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Page 21: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 21

Wed Jan 4

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

CERN Closed

Page 22: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 22

Thu Jan 5

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Install PLTMartin d1/4 WP:

CSC Posts

Remove 1/2 BSCA Bell 4h WP:

1. Open FIN Doors1h

2. Remove FIN plug1h

b. Remove FIN plug1h

3. Prepare for radioscopy6h

c. Prepare for radioscopy6h

a. Open FIN Doors1h

Page 23: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 23

Fri Jan 6

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Install PLTMartin d2/4 WP:

CSC Posts

Install BLMDmitry 1d WP:

Carry out radioscopy8hCarry out radioscopy

8h

Page 24: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 24

Mon Jan 9

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

1. Install PLTMartin d3/4 WP:

CSC Posts

Prepare for bake-out8h

Prepare for bake-out8h

CSC Posts

Page 25: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 25

Tue Jan 10

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

1. Install PLTMartin d4/4 WP:

CSC Posts

Prepare for bake-out8h

Prepare for bake-out8h

CSC Posts

Page 26: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 26

Wed Jan 11

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Prepare for bake-out8h

Prepare for bake-out8h

CSC Posts

Page 27: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 27

Thu Jan 12

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Bake-out -Z8h

Page 28: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 28

Fri Jan 13

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Bake-out -Z8h

Page 29: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 29

Mon Jan 16

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Bake-out -Z8h

Page 30: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 30

Tue Jan 17

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Bake-out +Z8h

Page 31: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 31

Wed Jan 18

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Bake-out +Z8h

Page 32: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 32

Thu Jan 19

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Bake-out +Z8h

Prepare GIS8h

Page 33: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 33

Fri Jan 20

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Inject Ne in BP8h

Page 34: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 34

Mon Jan 23

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

2. Install FIN plug + close FIN doorsPatrick + HE 2h WP:

3. Remove scaffolding3. Remove scaffolding

1. Install FIN plug + close FIN doorsPatrick + HE 2h WP:

Page 35: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 35

Tue Jan 24

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Restart Cryo

Remove scaffoldingRemove scaffolding

Page 36: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 36

Wed Jan 25

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

C. Move HF-Z on 2 risersMarc/Herve + 2 Rtecs 4h WP:

B. Move HF-Z out of garageMaf + 2 Rtecs 4h WP:

A. EN-HE – bring down risersEric + 2Altead 2h WP:

D’. Move HF+Z out of garageMaf + 2 Rtecs 4h WP:

C’. EN-HE – bring down risersEric + 2Altead 2h WP:

Page 37: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 37

Thu Jan 26

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

a. Install torsion prevention support3VSC + Sandro + 1Altead 2h WP:034

a’. Survey BPAndre + 1VSC 5h WP:035

b. Remove HF handrail on IP sideMaf + 2FSU 1h WP: 216

c. Move collar table in by 60cm + remove supportsMaf + 2FSU 2h WP: 216

1. Move HF+Z on 2 risersMarc/Herve + 2 Rtecs 4h WP:

Page 38: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 38

Fri Jan 27

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

a. Install torsion prevention support3VSC + Sandro + 1Altead 2h WP:034

a’. Survey BPAndre + 1VSC 5h WP:035

b. Remove HF handrail on IP sideMaf + 2FSU 1h WP: 216

c. Move collar table in by 60cm + remove supportsMaf + 2FSU 2h WP: 216

A. Survey and align BPPatrick + SU2h WP:

B. Install tooling for removal of ext beam2h WP:

C. Perform load transfer4h WP:

C’. Support for load transfer4h WP:

D. Survey TAS and Fwd pipeAntje 4h WP:

Page 39: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 39

Mon Jan 30

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

2. Open HF & T2 30’ WP:

Check position of 13.7 BP support: P Lepeule

0. EN-HE – lower 2 risers through PX562h WP:

3. Move HF-Z on 4 risers 4h WP:

1. Remove extension beam2h WP:

A. Survey and align BPPatrick + SU2h WP:

B. Install tooling for removal of ext beam2h WP:

C. Perform load transfer4h WP:

C’. Support for load transfer4h WP:

D. Survey TAS and Fwd pipeAntje 4h WP:

Page 40: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 40

Tue Jan 31

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

1. Install HF- access gangway2h WP:

1’. Install HF- tower reinforcement3h WP:

3. Engage and survey 13.7m support2h WP:

2. Move HF- towards IPPascal 15’ WP:

2. Open HF & T2 30’ WP:

Check position of 13.7 BP support: P Lepeule

0. EN-HE – lower 2 risers through PX562h WP:

3. Move HF on 4 risers 4h WP:

1. Remove extension beam2h WP:

Page 41: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 41

Wed Feb 1

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

b. Close T2, BSC, HF- & check VSC cables at 13.7 meter 1h WP:

d. Engage HF X stops1h WP:

e. shim Collar1h WP:

c. Install brackets between CASTOR table and Plug1h WP:

a. Check position sensors2h WP:

a’. Survey BP 13.7m3h WP:

1. Install HF+ access gangway2h WP:

1’. Install HF+ tower reinforcement3h WP:

3. Engage and survey 13.7m support2h WP:

2. Move HF+ towards IPPascal 15’ WP:

c’. Survey HF-2h WP:

Page 42: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 42

Thu Feb 2

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

a. Close RS+Z (cheese wedges) Pascal 3h WP:

b. Install wooden shimsDmitry 1h WP:

a. Check position sensors2h WP:

a’. Survey BP 13.7m3h WP: 052

Page 43: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 43

Fri Feb 3

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Install PLT temporary cablesMartin d1/2 WP:

Page 44: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 44

Mon Feb 6

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Install PLT temporary cablesMartin d2/2 WP:

Page 45: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 45

Tue Feb 7

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Commission PLT at beam level8h WP:

Survey and Align PLT4h WP:

Page 46: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 46

Wed Feb 8

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Commission PLT at beam level8h WP:

Page 47: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 47

Thu Feb 9

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Commission PLT at beam level8h WP:

Page 48: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 48

Fri Feb 10

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

a. Close T2, BSC, HF+ & check VSC cables at 13.7 meter 1h WP:

c. Engage HF X stops1h WP:

d. shim Collar1h WP:

b. Install brackets between CASTOR table and Plug1h WP:

e Close Collar1h WP:

b’. Survey HF-2h WP:

Page 49: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 49

Mon Feb 13

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

c. Start Pump down BP:Gerhard 1d WP:

a. Close RS+Z (cheese wedges) Pascal 3h WP:

b. Install wooden shimsDmitry 1h WP:

Page 50: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 50

Tue Feb 14

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Pump down BP:Gerhard 1d WP:

Page 51: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 51

Wed Feb 15

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Pump down BP:Gerhard 1d WP:

Page 52: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 52

Thu Feb 16

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Pump down BP:Gerhard 1d WP:

Page 53: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 53

Fri Feb 17

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Pump down BP:Gerhard 1d WP:

Page 54: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 54

Mon Feb 20

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Pump down BP:Gerhard 1d WP:

Page 55: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 55

Tue Feb 21

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Pump down BP:Gerhard 1d WP:

Page 56: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 56

Wed Feb 22

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Pump down BP:Gerhard 1d WP:

Remove SU bracketsAntje 5h WP:

Page 57: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 57

Thu Feb 23

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Magnet ON

Pump down BP:Gerhard 1d WP:

Page 58: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 58

Fri Feb 24

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Complete Pump down BP:Gerhard 1d WP:

Contingency for magnet restart

Page 59: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 59

Mon Feb 27

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Contingency for magnet restart

Page 60: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 60

Tue Feb 28

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Contingency for magnet restart

Page 61: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 61

Wed Feb 29

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Contingency for magnet restart

Page 62: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 62

Thu Mar 1

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Contingency for magnet restart

Page 63: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 63

Fri Mar 2

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Contingency for magnet restart

Page 64: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 64

Mon Mar 5

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Contingency for magnet restart

Page 65: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 65

Tue Mar 6

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Contingency for magnet restart

Page 66: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 66

Wed Mar 7

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Ready For Beam

Page 67: Wed Dec  7

Far s

ide

Nea

r sid

e

-Z End+Z End5m

04/11/11 [email protected] 67

Thu Mar 8

ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept

SL CP

Availability of Services:

Crane after 17:30 N

Plug Close

TX54

Cryogenics EL power Water cool. Database

IT Magnet C6F14 Gas

GS Dept

Beam ON


Recommended