LHC status 1
Wednesday 13th February - last 24 hours
13-02-2013
07:41 Programmed dump of fill 3556 (510 bunches) after 5h 26min 09:01 Start injection of fill 3557 (1347 bunches) 10:30 Stable beams, initial lumi ~90E30 11:32 Beam dump
BLM spurious trigger on a BLM optical board in R1
14:07 Stable beams fill 3558, initial lumi above 100E30 15:15 Beam dump
RF fault
16:25 LHC in access mode (RF + MQK) 20:25 Patrol started in PM45 (lost during access) 21:39 Ready for injection
dump test for XPOC data collection test
22:40 Stable beams fill 3559 – initial lumi ~120E30 07:00 Beams dumped by OP
~2 pb-1 in 8h30m
Thanks to Matteo Solfaroli
for the slides!
LHC status 2
Total integrated luminosity at 1.38 TeV
13-02-2013
3557 3558
35593556(500b)
ATLAS total now ~3.5 pb-1
LHC status 3
Last 24 hours
13-02-2013
3557 3558 3559
Abort gap high cleaning
effect
LHC status 4
Fill 3557
13-02-2013
Intensity ~ 1.2E11 p/bunch
Injection B1 then B2
Big losses on B1 at start of collisions
Peak lumi ~95E30
Improvement on lifetime (~5h) when trimming the octupoles down from 3.0 to 2.6 units in collisions
LHC status 5
Fill 3557
13-02-2013
Strong excitation visible on B1 and B2 around 0.29 (8 kHz line?) which becomes more pronounced when going into collision. The line is visible already
before and seems to be most pronounced in the vertical plane.
B1H B1V
B2H B2V
0.29 0.29
0.290.29
LHC status 6
Fill 3558
13-02-2013
Lifetime dip and losses improvedchanges wrt previous fill
• Some time spent at flat-top to wait for the tunes to stabilise• Alternating injection B1 and B2• Reduced landau octupoles strength on the second part of the
collision BP from 3 to 2.6 (~120 A to 100A)
Peak lumi ~140E30
LHC status 7
Fill 3558 - dump
13-02-2013
Alarms on RF: ACSModuleM1B1 : Crowbar Grid current (LV side) out of range. Else HV-RF specialist intervention required to check and in case replace crowbar.
ACSLine4B1: Main HV Power not at NominalACSLine1B1: Main HV Power not at NominalACSLine3B1: Main HV Power not at NominalACSLine2B1: Main HV Power not at Nominal-> The power converter is not delivering a minimal nominal voltage (set to 40kV). Power converter off or wrong voltage output. Measurement system faulty. Check power converter settings and acquisition with expert interface. In case call power converter piquet or access required.
At 15:15 beam dump due to trip of RF module M1B1
LHC status 8
Access – Tuesday evening
13-02-2013
Access was given to RF zone to fix the fault on M1B1 In parallel access for the MQK – a test was performed to
check the MKQ functionality During the access the patrol on PM45 sector 1 was lost – had
to be redone
LHC status 9
Fill 3559
13-02-2013
Octupoles strength further lowered while in stable beams down to 1 unit, then
trimmed back to 1.2
Big improvement on lifetime
Octupoles to 2 units
Abort gap cleaning ON
Octupoles to 1.2 units
AGC had to be switched ON continuously during the fill
Peak lumi ~155E30
LHC status 10
Plans
Refill for physics (beam unavailable from Booster this morning for 4
hours) This afternoon – VdM – INDIVs
Plus loss map Operational development Fill overnight to finish – RPs in to 13 sigma 06:00 Thursday – start quench test program
No ions
13-02-2013
LHC status 11
Roman pots - request
At the end of the upcoming 1400 bunch fill we briefly insert the pots to the validated position of 22 sigma, just as a necessary condition for proceeding further in the plan. I remind that last night's insertion to 22 sigma from the 500 bunch fill was without any problem.
At the end of a low-intensity fill, possibly the VdM fill, we insert the pots to 13 sigma (where we would have physics acceptance) and do a quick loss map at dumping time.
If this loss map is ok, we insert to 13 sigma in the remaining fills.
13-02-2013
Mario Deile
LHC status 12
Accesses
Accesses for quench test: Scope installation in IP6 (12L6). 2 hours. It has priority over Q6L8 scope
installation Fast measurement system on RQ6.L8 (30 min in the UA83 by Jaromir
Ludwig). Ramp to 300 A afterwards. Access for circuit tests – in the shadow
Change hardware limits on all Individual Powered Quads EPC, 2 hours during working hours
13-02-2013