Hours spent in each manufacturing process.
• Cutting process used 120 minute• Drilling process used 30 minute • Hammering process used 60 minute• Assembly process used 60 minute
Difficulties and problems
• Plywood is very weight• When the steel is getting weight from
trash. The steel is soft and expanded.