Project Second Prototype SATO Group
Transcript

Project Second Prototype

SATO Group

Provide the problems that need to be solved based on the first prototype.

• Trash is heavy. it use pedal force the very heavy

• Trash does not close completely to make the smell o

• Pedal bin is small. The pedal hard.f garbage.

Improve the following aspects of

your products

Quality

• We think there are better quality than a week ago.

Weight

• Reduce the size of the trash. by changing the type of plywood to be thin the parts on the side area of the trash to be weigh less.

Ease of use • The pedal to be longer and more

will cause force in the pedal down.

• Therefore ,trash broader and change black bag can change easily.

Manufacturing time

• Take the time to do just 3 hours 30 minutes from 4 hours 30 minutes.

Manufacturing cost

• The manufacturing cost is same as last week

Compare the second prototype with the CAD model

• We use prototype dimension and function are the same