WEEKLY PROJECT PROGRESS RE PROJECT TITLE : SUMMARY PHYSICAL PROGRESS RE Description Previous 09/05/2016 Schedule Progress 30.78% Actual Progress 19.66% Ahead / Delay ( % ) -11.13% Ahead / Delay ( Day ) -45 Date of Completion ( Contract ) 12/18/2016 Estimated Date of Completion 2/1/2017 MANPOWER AT SITE SIT Activities 1ST FLOOR 15 Staircase ROOF 19 Roof Beam 20 RC Flat Roof Slab 21 Roof Column 22 Upper Roof Beam 23 Roof Truss Building Work 25 Brickwall 26 Metal Beam 27 Timber Door Frame & Alumn. Frame M & E Services WEATHER REPORT 29 Electrical Wiring Work 30 Photovoltaic System 31 Security Alarm & CCTV System 32 Smarthome System 33 Air Cond & Mech. Ventilation 34 Central Vacuum System 35 Lift System Installation FINISHING WORK 49 Plumbing/Sanitary Fittings 50 Sewerage piping, manhole and Rain Water Sy 56 Koi pond / Swimming Pool System Installation FROM : 09/05/2016 - 16/05/2016 CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DA PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG 5/9/2016 5/10/2016 5/11/2016 5/12/2016 5/13/2016 5/14/2016 5/16/2016 17 17 17 13 8 8 8 Clear; 36% Cloudy; 21% Slight Rain; 7% Heavy Rain; 36%
Transcript
Page 1: Weekly Progress Report

WEEKLY PROJECT PROGRESS REPORT

PROJECT TITLE :

SUMMARY PHYSICAL PROGRESS REPORT

DescriptionPrevious

09/05/2016 Schedule Progress 30.78%

Actual Progress 19.66%

Ahead / Delay ( % ) -11.13%

Ahead / Delay ( Day ) -45

Date of Completion ( Contract ) 12/18/2016

Estimated Date of Completion 2/1/2017

MANPOWER AT SITE SITE ACTIVITY

Activities

1ST FLOOR

15 Staircase

ROOF

19 Roof Beam

20 RC Flat Roof Slab

21 Roof Column

22 Upper Roof Beam

23 Roof Truss

Building Work

25 Brickwall

26 Metal Beam

27 Timber Door Frame & Alumn. Frame

M & E Services

WEATHER REPORT 29 Electrical Wiring Work

30 Photovoltaic System

31 Security Alarm & CCTV System

32 Smarthome System

33 Air Cond & Mech. Ventilation

34 Central Vacuum System

35 Lift System Installation

FINISHING WORK

49 Plumbing/Sanitary Fittings

50 Sewerage piping, manhole and Rain Water Sy

56 Koi pond / Swimming Pool System Installation

FROM : 09/05/2016 - 16/05/2016

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

5/9/20165/10/20165/11/20165/12/20165/13/20165/14/20165/16/2016

17 17 17

13

8 8 8

Clear; 36%

Cloudy; 21%Slight Rain; 7%

Heavy Rain; 36%

Page 2: Weekly Progress Report

NOTE :

- 1st floor brickworks started at Guest Room, Guest Bath, Bedroom 3, Bath 3, wet kitchen, pantry, Dry Kitchen, Dining Room- All concreting works for structure are completed. The final concreting works done on the 11/05/2016- External fencing work has started.

PREPARED BY : VERIFIED BY :

ABDUL BASIT BIN ABD NASIR

Clear; 36%

Cloudy; 21%Slight Rain; 7%

Heavy Rain; 36%

Page 3: Weekly Progress Report

WEEKLY PROJECT PROGRESS REPORT

FINANCIAL STATEMENT

PROJECT TITLE : Contract Sum RM3,578,347.29

Piling

Variation Order

PC Sum

Revised Contract Sum

SUMMARY PHYSICAL PROGRESS REPORTCurrent

16/05/201633.25%

20.04%

-13.21%

-54

12/18/2016

2/10/2017

SITE ACTIVITYProgress

RemarksActual %Last Week This Week

100% 0% 0% No progress

100% 100% 100% removing sides fwk

100% 100% 100% removing sides fwk

100% 100% 100% removing sides fwk

100% 50% 100% removing sides fwk

100% 0% 0% No progress

100% 55% 55% 1st floor on progress

100% 0% 0% No progress

33% 0% 0% No progress

48% 40% 40% Ducting & conduit

50% 0% 0% No progress

14% 0% 0% No progress

22% 0% 0% No progress

29% 0% 0% No progress

0% 0% 0% No progress

17% 0% 0% No progress

68% 5% 5% No new progress

71% 50% 50% No new progress

33% 0% 0% No progress

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

Scheduled %

Page 4: Weekly Progress Report

- 1st floor brickworks started at Guest Room, Guest Bath, Bedroom 3, Bath 3, wet kitchen, pantry, Dry Kitchen, Dining Room- All concreting works for structure are completed. The final concreting works done on the 11/05/2016

VERIFIED BY :

Page 5: Weekly Progress Report

WEEKLY PROJECT PROGRESS REPORT

FROM : 09/05/2016 - 16/05/2016 PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

Front Elevation

Side Elevation

Side Elevation

Side Elevation

External Fencing: Cantilever beams construction

Page 6: Weekly Progress Report

WEEKLY PROJECT PROGRESS REPORT

FROM : 09/05/2016 - 16/05/2016 PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

1st Flr : Dry Kitchen Area1st Flr : Rumpus Room

1st Flr : Guest Room

2nd Flr : Study Room2nd Flr : Pool Side View

1st Flr : External Garden View

2nd Flr : Bedroom 2 ViewRoof Level : Roof Beam & Upper Roof

Beam

Page 7: Weekly Progress Report

WEEKLY PROJECT PROGRESS REPORT

FROM : 09/05/2016 - 16/05/2016 PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

Page 8: Weekly Progress Report

WEEKLY PROJECT PROGRESS REPORT

FROM : 09/05/2016 - 16/05/2016 PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO

Front Elevation

Side Elevation

Side Elevation

Page 9: Weekly Progress Report

WEEKLY PROJECT PROGRESS REPORT

FROM : 09/05/2016 - 16/05/2016 PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO

1st Flr : Dry Kitchen Area

2nd Flr : Study Room

1st Flr : External Garden View

Roof Level : Roof Beam & Upper Roof Beam

Page 10: Weekly Progress Report

WEEKLY PROJECT PROGRESS REPORT

FROM : 09/05/2016 - 16/05/2016 PROJECT TITLE :

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO

Page 11: Weekly Progress Report

Date

5/9/2016 5/9/2016 5/10/2016 5/10/2016 5/11/2016

Clear 1 1 1

Cloudy 1

Slight Rain 1

Heavy Rain

5/9/2016 5/10/2016 5/11/2016 5/12/2016 5/13/2016

Weather Description

Page 12: Weekly Progress Report

Date

5/11/2016 5/12/2016 5/12/2016 5/13/2016 5/13/2016 5/14/2016

1 1

1

1 1 1

5/14/2016 5/15/2016

Clear; 36%

Cloudy; 21%Slight Rain; 7%

Heavy Rain; 36%

Page 13: Weekly Progress Report

DateTotal

5/14/2016 5/16/2016 5/16/2016

5

1 3

1

1 1 5

Clear; 36%

Cloudy; 21%Slight Rain; 7%

Heavy Rain; 36%

Page 14: Weekly Progress Report

Manpower 5/9/2016 5/10/2016 5/11/2016 5/12/2016 5/13/2016

Project Coordinator

Clerk of Work 1 1 1 1 1

Site Engineer

Safety Supervisor

Supervisor 1 1 1 0 0

Surveyor

Operator

Piler

Carpenter 6 6 6 5 5

Concretor

Barbender 1 1 1

General Worker 3 3 3 2 2

Door & Window Frame Inst.

Brick Layer 5 5 5 5 0

Roofer

Roof covering

Pre-Caster

Ceiling Work Inst.

Aluminium Inst.

Electrician

Plumber

Plasterer

Skim coating

G.I.Work Inst.

M.S.Work Inst.

Floor Screeder

Tiler

Drain Layer

Painter

Fume Cupboard Installer

Gas installer

Sprinkler System Installer

Airconditioning Workers

Emergency Shower Installer

Total Manpower 17 17 17 13 8

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH

PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

Page 15: Weekly Progress Report

5/14/2016 5/16/2016

1 1

0 0

5 5

2 2

0 0

8 8

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH

PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

Page 16: Weekly Progress Report

3/30/2016 4/13/2016 4/18/2016Scheduled Progress 17.16% 18.14%Actual Progress 15.45% 16.39%

3/30/2016 4/6/2016 4/13/20160.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

50.00%

17.16% 18.14%

15.45% 16.39%

Project Performance From January 2012

Scheduled Progress

Actual Progress

% Progress

Page 17: Weekly Progress Report

3/30/2016 4/6/2016 4/13/20160.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

50.00%

17.16% 18.14%

15.45% 16.39%

Project Performance From January 2012

Scheduled Progress

Actual Progress

% Progress

Page 18: Weekly Progress Report

PROPOSED WORK PROGRAMME (Revision # 5) - 4th May 2016CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

COMMENCEMENT DATE : 16/01/2015 COMPLETION DATE : 15/04/2016

Description

May-15 Jun-15

1 8 18 25 1 8 15 22

Preliminaries

Site Mobilization

Site Clearing

Site Survey

Site Office/Store

Signboard & Hoading

Piling & Earthwork

Setting Out

Piling Work

Site Mobilization / Building Material Order

Earthwork

Ground Floor

Footing/Stump

Ground Beam

* Delayed due to Changes Work

Alteration to Existing Ground Beam, Lift Pit

and underground sewerage pipe

Anti Termite

Ground Floor Slab

Ground Floor Column / Lift Shaft Structure / RC wall

Sub-basement Compartment for Genset and Bal. tank

Koi Pond, Balancing Tank & Pump Room

1 st Floor

1sr Floor Beam

1st Floor Slab

1st Floor Column / Lift Shaft Structure

Staircase

Second Floor

Second Floor Beam / Swimming Pool Structure

Second Floor Slab

Second Floor Column / Lift Shaft Structure

Roof

Roof Beam

RC Flat Roof Slab

Roof Column

Page 19: Weekly Progress Report

Upper Roof Beam

Roof Truss

Roof Covering / Sky Light Cover

Building Work

Brickwall

Metal I-beam

Timber Door Frame & Alumn. Frame

Plastering

M&E Services

Electrical Wiring Work

Photovoltaic System

Security Alarm & CCTV System

Smarthome System

Air Cond & Mech. Ventilation

Central Vacuum System

Lift System Installation

Finishing Work

Install Alum. Door, Window Panel and Fix Glass

Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic

Internal Floor Finishes

Internal ceiling Finishes/Roof EaveTimber Ceiling

Internal Skim coat, External and Internal Painting Work

Metal Grille & Screen

Metal Handrail / Glass Handrail Railing

Metal Spiral Staircase

Timber Door Leaf

Timber Skirting and Architrave

External Wall Timber Cladding

Timber Varnishing Work and R.C Feature Coating

Timber Flooring and Staircase Finishes

Plumbing/Sanitary Fittings Installation

Sewage Piping, Manhole and Rain Water System

R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate

Page 20: Weekly Progress Report

External Wall Finishes

External Floor Finishes and Koi Pond Finishes

Timber Decking Koi Pond and Pump Room

Lighting and Electrical Work Installation

Koi pond / Swimming Pool System Installation

Built-in Furniture and ID Works

Turfing / Lanscape Work

Touch-up and Cleaning

Testing, Commissioning and Hand Over

Note: Otherwise indicated, this revised program is based on the amended Architectural Drawings dated 23 Sept 15, Engineer Drawings dated 16 Oct 15 and Interior Design Drawings dated 2 Nov 15. Any amendment to the above drawings or additional items in future not shows on the drawings are not taking consideration in this program.

Page 21: Weekly Progress Report

PROPOSED WORK PROGRAMME (Revision # 5) - 4th May 2016CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

COMMENCEMENT DATE : 16/01/2015 COMPLETION DATE : 15/04/2016

Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15

29 6 13 20 27 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16

CHANGES ON DESIGN (FROM RC TO STEEL STRUCTURE)

Page 22: Weekly Progress Report
Page 23: Weekly Progress Report

Note: Otherwise indicated, this revised program is based on the amended Architectural Drawings dated 23 Sept 15, Engineer Drawings dated 16 Oct 15 and Interior Design Drawings dated 2 Nov 15. Any amendment to the above drawings or additional items in future not shows on the drawings are not taking consideration in this program.

Page 24: Weekly Progress Report

PROPOSED WORK PROGRAMME (Revision # 5) - 4th May 2016CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

COMMENCEMENT DATE : 16/01/2015 COMPLETION DATE : 15/04/2016 REVISED COMMENCEMENT DATE: 18/05/15 REVISED COMPLETION DATE: 10/12/16

Nov-15 Dec-15 Jan-16 Feb-16

23 30 7 14 21 28 4 11 18 25 1 8 15 22 29

16.67% 33.33% 50.0%

CHANGES ON DESIGN (FROM RC TO STEEL STRUCTURE)

20.00% 40.0% 60.0% 80.0%

33.33%

Page 25: Weekly Progress Report

Change of skirting design and construction method

Page 26: Weekly Progress Report

Note: Otherwise indicated, this revised program is based on the amended Architectural Drawings dated 23 Sept 15, Engineer Drawings dated 16 Oct 15 and Interior Design Drawings dated 2 Nov 15. Any amendment to the above drawings or additional items in future not shows on the drawings are not taking consideration in this program.

Page 27: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

REVISED COMMENCEMENT DATE: 18/05/15 REVISED COMPLETION DATE: 10/12/16

Mar-16 Apr-16 May-16

7 14 21 28 4 11 18 25 2 9 16

66.67% 83.33% 100.00%

100.0%

66.7% 100.0%

50.00% 100.0%

50.00% 100.0%

50.00% 100.0%

50.00% 100.0%

Page 28: Weekly Progress Report

50.00% 100.0%

25.00% 50.0% 75.0% 100.0%

11.11% 22.2% 33.3%

11.11% 22.2% 33.3% 44.4% 55.6% 66.7% 77.8% 88.9% 100.0%

20.00% 40.0% 60.0% 80.0% 100.0%

16.67% 33.3%

Change of skirting design and construction method

Page 29: Weekly Progress Report
Page 30: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

May-16 Schedule Actual Ahead/(Behind) Overall week Week Lapsed Over All %23 30

100% 100% 0% 2 2 0.49% 0.49%

100% 100% 0% 3 3 0.74% 0.74%

100% 100% 0% 3 3 0.74% 0.74%

100% 100% 0% 4 9 0.99% 0.99%

100% 100% 0% 3 2 0.74% 0.74%

100% 100% 0% 1 1 0.25% 0.25%

100% 100% 0% 2 3 0.49% 0.49%

100% 100% 0% 3 3 0.74% 0.74%

100% 100% 0% 5 5 1.23% 1.23%

100% 100% 0% 3 3 0.74% 0.74%

100% 100% 0% 4 4 0.99% 0.99%

100% 100% 0% 2 3 0.49% 0.49%

100% 100% 0% 3 2 0.74% 0.74%

0% 0% 0% 6 0 1.48% 0.00%

100% 100% 0% 5 6 1.23% 1.23%

100% 100% 0% 3 4 0.74% 0.74%

100% 100% 0% 2 2 0.49% 0.49%

100% 90% -10% 2 4 0.49% 0.49%

100% 90% -10% 2 2 0.49% 0.49%

100% 50% -50% 2 1 0.49% 0.49%

Schedule (Overall)

Page 31: Weekly Progress Report

100% 50% -50% 2 1 0.49% 0.49%

25% 0% -25% 4 0 0.99% 0.25%

44.4% 55.6% 0% 0% 0% 9 0 2.22% 0.00%

70% 30% -40% 9 7 2.22% 1.55%

0% 0% 0% 5 0 1.23% 0.00%

50.0% 66.7% 0% 0% 0% 6 0 1.48% 0.00%

0% 0% 0% 10 0 2.46% 0.00%

38% 38% 0% 27 11 6.65% 2.53%

0% 0% 0% 6 0 1.48% 0.00%

0% 0% 0% 14 0 3.45% 0.00%

0% 0% 0% 9 0 2.22% 0.00%

0% 0% 0% 7 0 1.72% 0.00%

0% 0% 0% 4 0 0.99% 0.00%

0% 0% 0% 6 0 1.48% 0.00%

0% 0% 0% 8 0 1.97% 0.00%

0% 0% 0% 11 0 2.71% 0.00%

0% 0% 0% 10 0 2.46% 0.00%

0% 0% 0% 11 0 2.71% 0.00%

0% 0% 0% 17 0 4.19% 0.00%

0% 0% 0% 8 0 1.97% 0.00%

0% 0% 0% 16 0 3.94% 0.00%

0% 0% 0% 5 0 1.23% 0.00%

0% 0% 0% 4 0 0.99% 0.00%

0% 0% 0% 3 0 0.74% 0.00%

0% 0% 0% 6 0 1.48% 0.00%

0% 0% 0% 11 0 2.71% 0.00%

0% 0% 0% 9 0 2.22% 0.00%

45% 5% -40% 22 1 5.42% 2.44%

60% 50% -10% 17 7 4.19% 2.51%

0% 0% 0% 11 0 2.71% 0.00%

Page 32: Weekly Progress Report

0% 0% 0% 10 0 2.46% 0.00%

0% 0% 0% 6 0 1.48% 0.00%

0% 0% 0% 5 0 1.23% 0.00%

0% 0% 0% 5 0 1.23% 0.00%

0% 0% 0% 9 0 2.22% 0.00%

0% 0% 0% 15 0 3.69% 0.00%

0% 0% 0% 4 0 0.99% 0.00%

0% 0% 0% 3 0 0.74% 0.00%

0% 0% 0% 2 0 0.49% 0.00%

406 89 100.00% 23.07%

Proposed

Actual

Ahead / Behi

Page 33: Weekly Progress Report

Actual W/Done

0.49%

0.74%

0.74%

0.99%

0.74%

0.25%

0.49%

0.74%

1.23%

0.74%

0.99%

0.49%

0.74%

0.00%

1.23%

0.74%

0.49%

0.44%

0.44%

0.25%

Page 34: Weekly Progress Report

0.25%

0.00%

0.00%

0.67%

0.00%

0.00%

0.00%

2.53%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.27%

2.09%

0.00%

Page 35: Weekly Progress Report

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

18.76%

Page 36: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

No. Description May-15 Jun-15

1 8 18 25 1 8 15

Preliminaries

A Site Mobilization

B Site Clearing

C Site Survey

D Site Office/Store

E Signboard & Hoading

Piling & Earthwork

F Setting Out

G Piling Work

1 Site Mobilization / Building Material Order

2 Earthwork

Ground Floor

3 Footing/Stump

4 Ground Beam

* Delayed due to Changes Work

5 Alteration to Existing Ground Beam, Lift Pit

and underground sewerage pipe

6 Anti Termite

7 Ground Floor Slab

8 Ground Floor Column / Lift Shaft Structure / RC wall

10 Sub-basement Compartment for Genset and Bal. tank

11 Koi Pond, Balancing Tank & Pump Room

1 st Floor

12 1sr Floor Beam

13 1st Floor Slab

14 1st Floor Column / Lift Shaft Structure

15 Staircase

Second Floor

16 Second Floor Beam / Swimming Pool Structure

17 Second Floor Slab

18 Second Floor Column / Lift Shaft Structure

Roof

19 Roof Beam

20 RC Flat Roof Slab

21 Roof Column

22 Upper Roof Beam

Page 37: Weekly Progress Report

No. Description May-15 Jun-15

1 8 18 25 1 8 15

23 Roof Truss

24 Roof Covering / Sky Light Cover

Building Work

25 Brickwall

26 Metal I-beam

27 Timber Door Frame & Alumn. Frame

28 Plastering

M&E Services

29 Electrical Wiring Work

30 Photovoltaic System

31 Security Alarm & CCTV System

32 Smarthome System

33 Air Cond & Mech. Ventilation

34 Central Vacuum System

35 Lift System Installation

Finishing Work

36 Install Alum. Door, Window Panel and Fix Glass

37 Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic

38 Internal Floor Finishes

39 Internal ceiling Finishes/Roof EaveTimber Ceiling

40 Internal Skim coat, External and Internal Painting Work

41 Metal Grille & Screen

42 Metal Handrail / Glass Handrail Railing

43 Metal Spiral Staircase

44 Timber Door Leaf

45 Timber Skirting and Architrave

46 External Wall Timber Cladding

47 Timber Varnishing Work and R.C Feature Coating

48 Timber Flooring and Staircase Finishes

49 Plumbing/Sanitary Fittings Installation

Page 38: Weekly Progress Report

No. Description May-15 Jun-15

1 8 18 25 1 8 15

50 Sewage Piping, Manhole and Rain Water System

51 R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate

52 External Wall Finishes

53 External Floor Finishes and Koi Pond Finishes

54 Timber Decking Koi Pond and Pump Room

55 Lighting and Electrical Work Installation

56 Koi pond / Swimming Pool System Installation

57 Built-in Furniture and ID Works

58 Turfing / Lanscape Work

59 Touch-up and Cleaning

60 Testing, Commissioning and Hand Over

Page 39: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

Jun-15 Jul-15 Aug-15 Sep-15

22 29 6 13 20 27 3 10 17 24 31 7

Page 40: Weekly Progress Report

Jun-15 Jul-15 Aug-15 Sep-15

22 29 6 13 20 27 3 10 17 24 31 7

3.7% 7.4%

Page 41: Weekly Progress Report

Jun-15 Jul-15 Aug-15 Sep-15

22 29 6 13 20 27 3 10 17 24 31 7

Page 42: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

Sep-15 Oct-15 Nov-15

14 21 28 5 12 19 26 2 9 16 23 30

Page 43: Weekly Progress Report

Sep-15 Oct-15 Nov-15

14 21 28 5 12 19 26 2 9 16 23 30

4.5% 9.1% 13.6% 18.2%

Page 44: Weekly Progress Report

Sep-15 Oct-15 Nov-15

14 21 28 5 12 19 26 2 9 16 23 30

5.9% 11.8%

Page 45: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

Dec-15 Jan-16 Feb-16

7 14 21 28 4 11 18 25 1 8 15 22

16.7% 33.3%

CHANGES ON DESIGN (FROM RC TO STEEL STRUCTURE)

20.0% 40.0% 60.0%

Page 46: Weekly Progress Report

Dec-15 Jan-16 Feb-16

7 14 21 28 4 11 18 25 1 8 15 22

11.1% 14.8% 18.5% 22.2%

Change of skirting design and construction method

22.7% 27.3%

Page 47: Weekly Progress Report

Dec-15 Jan-16 Feb-16

7 14 21 28 4 11 18 25 1 8 15 22

17.6% 23.5% 29.4% 35.3% 41.2% 47.1% 52.9%

11.1% 22.2%

Page 48: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

Feb-16 Mar-16 Apr-16 May-16

29 7 14 21 28 4 11 18 25 2 9 16

50.0% 66.7% 83.3% 100.0%

80.0% 100.0%

33.3% 66.7% 100.0%

50.0% 100.0%

50.0% 100.0%

50.0% 100.0%

50.0% 100.0%

50.0% 100.0%

Page 49: Weekly Progress Report

Feb-16 Mar-16 Apr-16 May-16

29 7 14 21 28 4 11 18 25 2 9 16

25.0% 50.0% 75.0% 100.0%

11.1% 22.2% 33.3%

11.1% 22.2% 33.3% 44.4% 55.6% 66.7% 77.8% 88.9% 100.0%

20.0% 40.0% 60.0% 80.0% 100.0%

16.7% 33.3%

25.9% 29.6% 33.3% 37.0% 40.7% 44.4% 48.1%

16.7% 33.3% 50.0%

7.1% 14.3%

11.1% 22.2%

14.3% 28.6%

25.0% 50.0%

16.7%

Change of skirting design and construction method

31.8% 36.4% 40.9% 45.5% 50.0% 54.5% 59.1% 63.6% 68.2%

Page 50: Weekly Progress Report

Feb-16 Mar-16 Apr-16 May-16

29 7 14 21 28 4 11 18 25 2 9 16

58.8% 64.7% 70.6%

33.3%

Page 51: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

May-16 Jun-16 Jul-16 Aug-16

23 30 6 13 20 27 4 11 18 25 1 8

Page 52: Weekly Progress Report

May-16 Jun-16 Jul-16 Aug-16

23 30 6 13 20 27 4 11 18 25 1 8

44.4% 55.6% 66.7% 77.8% 88.9% 100.0%

50.0% 66.7% 83.3% 100.0% Timber Door Frame confirmed on 14/4/16, 3 weeks required for manufacture, Alumn no confirmation yet

10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% Plastering cannot proceed due to concealed smarthome/alarm wiring not confirmed

51.9% 55.6% 59.3% 63.0% 66.7% 70.4% 74.1% 77.8%

21.4% 28.6% No confirmation 35.7% 42.9% 50.0%

33.3% 44.4% 55.6% No confirmation

42.9% 57.1% No confirmation

33.3% 50.0%

12.5% 25.0% 37.5% 50.0% 62.5%

9.1% 18.2% 27.3% 36.4% 45.5% 54.5% 63.6%

10.0% 20.0% 30.0%

9.1% 18.2%

5.9% 11.8% 17.6% 23.5% 29.4% 35.3%

6.3% 12.5% 18.8% 25.0% 31.3% 37.5%

20.0% 40.0% 60.0% 80.0% 100.0%

16.7% 33.3% 50.0% 66.7% 83.3%

9.1% 18.2% 27.3% 36.4% 45.5%

72.7% 77.3% 81.8%

Page 53: Weekly Progress Report

May-16 Jun-16 Jul-16 Aug-16

23 30 6 13 20 27 4 11 18 25 1 8

76.5% 82.4% 88.2%

10.0% 20.0% 30.0%

44.4%

Page 54: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

Aug-16 Sep-16 Oct-16

15 22 29 5 12 19 26 3 10 17 24 31

Page 55: Weekly Progress Report

Aug-16 Sep-16 Oct-16

15 22 29 5 12 19 26 3 10 17 24 31

Timber Door Frame confirmed on 14/4/16, 3 weeks required for manufacture, Alumn no confirmation yet

Plastering cannot proceed due to concealed smarthome/alarm wiring not confirmed

81.5% 85.2% 88.9% 92.6% 96.3% 100.0%

57.1% 64.3% 71.4%

75.00% 100.0%

75.0% 87.5% 100.0%

72.7% 81.8% 90.9% 100.0%

40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0%

27.3% 36.4% 45.5% 54.5% 63.6% 72.7% 81.8% 90.9% 100.0%

41.2% 47.1% 52.9% 58.8% 64.7% 70.6% 76.5% 82.4% 88.2%

12.5% 25.0% 37.5% 50.0% 62.5% 75.0% 87.5% 100.0%

43.8% 50.0% 56.3% 62.5% 68.8% 75.0% 81.3% 87.5%

25.0% 50.0% 75.0% 100.0%

100.0%

54.5% 63.6% 72.7%

11.1% 22.2% 33.3% 44.4% 55.6% 66.7%

Page 56: Weekly Progress Report

Aug-16 Sep-16 Oct-16

15 22 29 5 12 19 26 3 10 17 24 31

9.1% 18.2% 27.3% 36.4% 45.5% 54.5% 63.6%

40.0% 50.0% 60.0% 70.0% 80.0%

16.7%

20.0% 40.0% 60.0% 80.0%

20.0% 40.0% 60.0%

55.6% 66.7%

6.7% 13.3% 20.0% 26.7% 33.3% 40.0% 46.7% 53.3% 60.0% 66.7% 73.3%

Page 57: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

Nov-16 Dec-16 Jan-17

7 14 21 28 5 12 19 26 2 9 16 23

Page 58: Weekly Progress Report

Nov-16 Dec-16 Jan-17

7 14 21 28 5 12 19 26 2 9 16 23

66.7% 83.3% 100.0%

78.6% 85.7% 92.9% 100.0%

66.7% 77.8% 88.9% 100.0%

71.4% 85.7% 100.0%

66.67% 83.3% 100.0%

94.1% 100.0%

93.8% 100.0%

81.8% 90.9% 100.0%

77.8% 88.9% 100.0%

86.4% 90.9% 95.5% 100.0%

Page 59: Weekly Progress Report

Nov-16 Dec-16 Jan-17

7 14 21 28 5 12 19 26 2 9 16 23

94.1% 100.0%

72.7% 81.8% 90.9% 100.0%

90.0% 100.0%

33.3% 50.0% 66.7% 83.3% 100.0%

100.0%

80.0% 100.0%

77.8% 88.9% 100.0%

80.0% 86.7% 93.3% 100.0%

25.0% 50.0% 75.0% 100.0%

33.3% 66.7% 100.0%

50.0% 100.0%

Page 60: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

Jan-17 Schedule Actual Ahead/(Behind) Overall week Week Lapsed Over All %30

0% 0% 0% 0 0.00%

0% 0% 0% 0 0.00%

0% 0% 0% 0 0.00%

0% 0% 0% 0 0.00%

0% 0% 0% 0 0.00%

0% 0% 0% 0 0.00%

0% 0% 0% 0 0.00%

100% 100% 0% 2 2 0.66%

100% 100% 0% 3 3 0.99%

100% 100% 0% 3 3 0.99%

100% 95% -5% 9 5 2.98%

0% 0% 0% 1 0 0.33%

0% 0% 0% 2 0 0.66%

0% 0% 0% 2 0 0.66%

0% 0% 0% 8 0 2.65%

0% 0% 0% 4 0 1.32%

0% 0% 0% 2 0 0.66%

0% 0% 0% 2 0 0.66%

0% 0% 0% 1 0 0.33%

0% 0% 0% 5 0 1.66%

0% 0% 0% 3 0 0.99%

0% 0% 0% 2 0 0.66%

0% 0% 0% 2 0 0.66%

0% 0% 0% 2 0 0.66%

0% 0% 0% 2 0 0.66%

0% 0% 0% 2 0 0.66%

Page 61: Weekly Progress Report

Jan-17 Schedule Actual Ahead/(Behind) Overall week Week Lapsed Over All %30

0% 0% 0% 4 0 1.32%

0% 0% 0% 6 0 1.99%

0% 0% 0% 2 0 0.66%

0% 0% 0% 5 0 1.66%

0% 0% 0% 6 0 1.99%

0% 0% 0% 6 0 1.99%

0% 0% 0% 29 0 9.60%

0% 0% 0% 6 0 1.99%

0% 0% 0% 6 0 1.99%

0% 0% 0% 6 0 1.99%

0% 0% 0% 6 0 1.99%

0% 0% 0% 4 0 1.32%

0% 0% 0% 4 0 1.32%

0% 0% 0% 5 0 1.66%

0% 0% 0% 12 0 3.97%

0% 0% 0% 7 0 2.32%

0% 0% 0% 11 0 3.64%

0% 0% 0% 5 0 1.66%

0% 0% 0% 6 0 1.99%

0% 0% 0% 10 0 3.31%

0% 0% 0% 24 0 7.95%

0% 0% 0% 5 0 1.66%

0% 0% 0% 3 0 0.99%

0% 0% 0% 15 0 4.97%

Page 62: Weekly Progress Report

Jan-17 Schedule Actual Ahead/(Behind) Overall week Week Lapsed Over All %30

0% 0% 0% 6 0 1.99%

0% 0% 0% 6 0 1.99%

0% 0% 0% 6 0 1.99%

0% 0% 0% 11 0 3.64%

0% 0% 0% 3 0 0.99%

0% 0% 0% 11 0 3.64%

0% 0% 0% 5 0 1.66%

0% 0% 0% 4 0 1.32%

302 13 100.00%

Page 63: Weekly Progress Report

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG

WORK PROGRAM AS PER REVISED ON 18 APRIL 2016

Propose Schedule Actual

0.00% ###

0.00% ###

0.00% ###

0.00% ###

0.00% ###

0.00% ###

0.00% ###

0.66% ### 100% 100% 0% 0.49% 0.49%

0.99% ### 100% 100% 0% 0.74% 0.74%

0.99% ### 100% 100% 0% 0.74% 0.74%

1.66% ### 100% 100% 0% 0.99% 0.99%

100% 100% 0% 0.74% 0.74%

0.00% ### 100% 100% 0% 0.25% 0.25%

0.00% ### 100% 100% 0% 0.49% 0.49%

0.00% ### 100% 100% 0% 0.74% 0.74%

100% 100% 0% 1.23% 1.23%

0.00% ### 100% 100% 0% 0.74% 0.74%

0.00% ### 100% 100% 0% 0.99% 0.99%

0.00% ### 100% 100% 0% 0.49% 0.49%

0.00% ### 100% 100% 0% 0.74% 0.74%

0.00% ### 100% 0% -100% 1.48% 0.00%

0.00% ### 100% 100% 0% 1.23% 1.23%

0.00% ### 100% 100% 0% 0.74% 0.74%

0.00% ### 100% 100% 0% 0.49% 0.49%

0.00% ### 100% 100% 0% 0.49% 0.49%

0.00% ### 100% 100% 0% 0.49% 0.49%

0.00% ### 100% 100% 0% 0.49% 0.49%

0.00% ### 100% 50% -50% 0.49% 0.25%

Actual W/Done

Ahead/Behind

Schedule (Overall)

Actual W/Done

Page 64: Weekly Progress Report

Propose Schedule Actual

Actual W/Done

Ahead/Behind

Schedule (Overall)

Actual W/Done

0.00% ### 75% 0% -75% 0.74% 0.00%

0.00% ### 11% 0% -11% 0.25% 0.00%

0.00% ### 100% 55% -45% 2.22% 1.22%

0.00% ### 60% 0% -60% 0.74% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 48% 38% -10% 3.20% 2.53%

0.00% ### 50% 0% -50% 0.74% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 50% 0% -50% 0.49% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0% 0% 0% 0.00% 0.00%

0% 0% 0% 0.00% 0.00%

0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 64% 5% -59% 3.45% 0.27%

Page 65: Weekly Progress Report

Propose Schedule Actual

Actual W/Done

Ahead/Behind

Schedule (Overall)

Actual W/Done

71% 50% -21% 2.96% 2.09%

0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 33% 0% -33% 0.74% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

0.00% ### 0% 0% 0% 0.00% 0.00%

4.30% ### 30.78% 19.66%

Page 66: Weekly Progress Report

No. Description

May-16 Schedule Actual16

Preliminaries

A Site Mobilization

B Site Clearing

C Site Survey

D Site Office/Store

E Signboard & Hoading

Piling & Earthwork

F Setting Out

G Piling Work

1 Site Mobilization / Building Material Order 100% 100% 0%

2 Earthwork 100% 100% 0%

Ground Floor

3 Footing/Stump 100% 100% 0%

4 Ground Beam 100% 100% 0%

* Delayed due to Changes Work

5 Alteration to Existing Ground Beam, Lift Pit 100% 100% 0%

and underground sewerage pipe

6 Anti Termite 100% 100% 0%

7 Ground Floor Slab 100% 100% 0%

8 Ground Floor Column / Lift Shaft Structure / RC wall 100% 100% 0%

10 Sub-basement Compartment for Genset and Bal. tank 100% 100% 0%

11 Koi Pond, Balancing Tank & Pump Room 100% 100% 0%

1 st Floor

12 1sr Floor Beam 100% 100% 0%

13 1st Floor Slab 100% 100% 0%

14 1st Floor Column / Lift Shaft Structure 100% 100% 0%

15 Staircase 100% 0% -100%

Second Floor

16 Second Floor Beam / Swimming Pool Structure 100% 100% 0%

17 Second Floor Slab 100% 100% 0%

18 Second Floor Column / Lift Shaft Structure 100% 100% 0%

Roof

19 Roof Beam 100% 100% 0%

20 RC Flat Roof Slab 100% 100% 0%

21 Roof Column 100% 100% 0%

22 Upper Roof Beam 100% 100% 0%

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING

YEW TONG

Ahead/(Behind)

Page 67: Weekly Progress Report

No. Description

May-16 Schedule Actual16

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING

YEW TONG

Ahead/(Behind)

23 Roof Truss 100% 0% -100%

24 Roof Covering / Sky Light Cover 33% 33% 0% -33%

Building Work

25 Brickwall 100% 55% -45%

26 Metal I-beam 100% 100% 0% -100%

27 Timber Door Frame & Alumn. Frame 33% 33% 0% -33%

28 Plastering 0% 0% 0%

M&E Services

29 Electrical Wiring Work 48% 40% -8%

30 Photovoltaic System 0% 0% 0%

31 Security Alarm & CCTV System 14% 14% 0% -14%

32 Smarthome System 22% 22% 0% -22%

33 Air Cond & Mech. Ventilation 29% 29% 0% -29%

34 Central Vacuum System 0% 0% 0%

35 Lift System Installation 17% 17% 0% -17%

Finishing Work

36 Install Alum. Door, Window Panel and Fix Glass 0% 0% 0%

37 Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic 0% 0% 0%

38 Internal Floor Finishes 0% 0% 0%

39 Internal ceiling Finishes/Roof EaveTimber Ceiling 0% 0% 0%

40 Internal Skim coat, External and Internal Painting Work 0% 0% 0%

41 Metal Grille & Screen 0% 0% 0%

42 Metal Handrail / Glass Handrail Railing 0% 0% 0%

43 Metal Spiral Staircase 0% 0% 0%

44 Timber Door Leaf 0% 0% 0%

45 Timber Skirting and Architrave 0% 0% 0%

46 External Wall Timber Cladding 0% 0% 0%

47 Timber Varnishing Work and R.C Feature Coating 0% 0% 0%

48 Timber Flooring and Staircase Finishes 0% 0% 0%

Page 68: Weekly Progress Report

No. Description

May-16 Schedule Actual16

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING

YEW TONG

Ahead/(Behind)

49 Plumbing/Sanitary Fittings Installation 68% 68% 5% -63%

50 Sewage Piping, Manhole and Rain Water System 71% 50% -21%

51 R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate 0% 0% 0%

52 External Wall Finishes 0% 0% 0%

53 External Floor Finishes and Koi Pond Finishes 0% 0% 0%

54 Timber Decking Koi Pond and Pump Room 0% 0% 0%

55 Lighting and Electrical Work Installation 0% 0% 0%

56 Koi pond / Swimming Pool System Installation 33% 0% -33%

57 Built-in Furniture and ID Works 0% 0% 0%

58 Turfing / Lanscape Work 0% 0% 0%

59 Touch-up and Cleaning 0% 0% 0%

60 Testing, Commissioning and Hand Over 0% 0% 0%

* : Delayed items

Page 69: Weekly Progress Report

Actual W/Done

0.49% 0.49%

0.74% 0.74%

0.74% 0.74%

0.99% 0.99%

0.74% 0.74%

0.25% 0.25%

0.49% 0.49%

0.74% 0.74%

1.23% 1.23%

0.74% 0.74%

0.99% 0.99%

0.49% 0.49%

0.74% 0.74%

1.48% 0.00%

1.23% 1.23%

0.74% 0.74%

0.49% 0.49%

0.49% 0.49%

0.49% 0.49%

0.49% 0.49%

0.49% 0.49%

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING

Overall Scheduled

Page 70: Weekly Progress Report

Actual W/Done

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING

Overall Scheduled

0.99% 0.00%

0.74% 0.00%

2.22% 1.22%

1.23% 0.00%

0.49% 0.00%

0.00% 0.00%

3.20% 2.66%

0.00% 0.00%

0.49% 0.00%

0.49% 0.00%

0.49% 0.00%

0.00% 0.00%

0.25% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

Page 71: Weekly Progress Report

Actual W/Done

CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING

Overall Scheduled

3.69% 0.27%

2.96% 2.09%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.74% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

33.25% 20.04%