Classroom Building at Charlottetowne & 5th
Weekly Update June 28, 2019
Central Campus
Meetings & Milestones
• This Week:
• Continued Level 1 and 2 Overhead MEP Rough-In
• Continued Level 1 Interior Framing
• Continued Level 1 Air Barrier
• Begin Level 2 and 4 Interior Framing
• Continued West Elevation Framing and Sheathing
• Continued Installing CMU Walls
• Completed Penthouse Framing and Sheathing
• Completed Penthouse Air Barrier
• Placed Auditorium Concrete Steps
• Completed Penthouse Roof
• Began Brick Ties on Penthouse
Meetings & Milestones
• Next Week:
• Continue West and South Exterior Framing and Sheathing
• Continue Level 1, 2 and 4 Interior Framing and Sheathing
• Continue Level 1 and 2 Overhead MEP Rough-In
• Continue Below Grade CMU
• Continue Brick Ties Installation on Penthouse
• Continue Electrical Duck Bank
• Continue Storm Line
• Continue 4-Pipe System
• Install Penthouse Spray Foam Insulation
• Install Brick Veneer at Penthouse
Progress Photos
West Elevation
Exterior Framing &
Sheathing
Progress Photos
Level 2 Interior
Framing
Progress Photos
Level 2 Exterior
Framing &
Sheathing
Progress Photos
Level 4 Interior
Framing
Progress Photos
Parapet Framing
Progress Photos
Installed
Penthouse Roof
Insulation
Progress Photos
Installed Penthouse
Roofing System
Progress Photos
Began Penthouse
Brick Ties
Progress Photos
Continued Level 1
Duct Work
Progress Photos
Level 2 Overhead
Electrical
Progress Photos
Level 1 Air Barrier
Progress Photos
Continued
Exterior CMU
Progress Photos
Poured Auditorium
Steps
Progress Photos
Continued 4-Pipe
System
Progress Photos
Continued Storm
Line
Picture of the Week
Conclusion of Weekly Update 06/28/2019