+ All Categories
Home > Documents > WEL OME TO THE STATE ROUTE 16/STATE ROUTE 541 … · wel ome to the state route 16/state route 541...

WEL OME TO THE STATE ROUTE 16/STATE ROUTE 541 … · wel ome to the state route 16/state route 541...

Date post: 15-Jul-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
2
WELCOME TO THE STATE ROUTE 16/STATE ROUTE 541 INTERCHANGE IMPROVEMENTS COS-541-19.18/19.30 (PID 93263) THURSDAY SEPTEMBER 15, 2016 PUBLIC MEETING MEETING AGENDA OPEN HOUSE 5:00 PM TO 7:00 PM Feel free to view the exhibits and ask quesons at your leisure. PUBLIC COMMENT OPPORTUNITIES THROUGHOUT Verbal Comments - Ask quesons and provide comments to any ODOT representave at any me during the OPEN HOUSE MEETING. Wrien Comments – Provide wrien comments tonight via the comment sheet by placing them in the comment box. ~OR~ Provide comments via mail or email to contact informaon be- low. NEXT STEPS FRIDAY, SEPTEMBER 30TH, 2016 – PUBLIC COMMENT PERIOD ENDS. Friday, October 14th, 2016 – Review comments and provide re- sponses to comments. Monday, October 31st, 2016 – Environmental document approved and real estate process begins. Spring 2018 – Begin Construcon. PROJECT DESCRIPTION: The proposed project involves the re-configuraon of the State Route (SR) 16/SR 541 interchange in Jackson Township, Coshocton County, Ohio. The current interchange of SR 16/SR 541 is the primary access point that serves the City of Coshocton and Roscoe Village from the SR 16 corridor. The interchange provides direct access to the central business district for the City of Coshocton, Roscoe Village, and the Central Ohio Technical College (COTC) – Coshocton campus. The project will include minor rehabilitaon of the exisng bridge that carries SR 541 over the Muskingum River as well as the replace- ment of the exisng bridge that carries SR 541 over SR 16. PURPOSE AND NEED: The Purpose and Need Statement is the basis for idenfying and analyzing rea- sonable alternaves to solve the idenfied transportaon need and to balance the project against the as- sociated impacts. The PURPOSE AND NEED for the project is to maintain a safe and efficient route of trav- el by addressing deficient bridge condions on the COS-541-19.18 and 19.30 bridge structures. GOALS for the project include migang the substandard geometrics of the current ramp configuraon, improving traffic and pedestrian flow near the interchange area, and supporng long term local planning iniaves. ALTERNATIVES SUMMARY: There were three (3) alternaves evaluated for the COS-541-19.18/19.30 project. Those alternaves included a No-Build opon, a Roundabout opon, and a Tight Diamond inter- change opon. To describe the build alternaves, SR 16 is referred to as the north-south corridor and SR 541 is the east-west corridor. The alternaves considered as part of this project include the following: A NO-BUILD ALTERNATIVE would leave the interchange in its current state. No improvements be- yond roune maintenance would occur. There is not an esmated construcon cost with this alterna- ve. This alternave does not meet the project’s stated Purpose and Need. BUILD ALTERNATIVE 1 (ROUNDABOUT INTERCHANGE) is a modificaon to the current interchange by removing the loop ramps on the southbound termini and replacing the stop-controlled intersec- ons at the ramps with roundabouts. The northbound roundabout would accommodate the ramp and the SR 541 approaches with a single lane roundabout. The southbound roundabout would ser- vice the southbound ramps, SR 541, North Whitewoman Street, and High Street. The diameter of the northbound and southbound roundabouts were esmated to be 140 feet and 320 feet, respecvely. The diameter for the southbound roundabout was increased to accommodate the addional local roadways - North Whitewoman Street and High Street. Esmated total cost is $20.5 Million. BUILD ALTERNATIVE 2 (TIGHT DIAMOND INTERCHANGE) is a ght diamond interchange facility at the exisng interchange locaon of SR 541/SR 16. The northbound ramps would be modified to re- move the slip ramps to and from SR 541. The southbound loop ramps would be removed and recon- figured such that the proposed interchange facility would resemble a ght diamond-shaped inter- change configuraon. The current lane usage on SR 541 through the exisng interchange area would remain in the proposed condion. The ramp intersecons will be signalized and coordinated due to the close proximity of the ramp intersecons. Esmated total cost is $18.1 Million. A map showing Build Alternave 2 is included on the back of this handout. COMMON FEATURES: For both BUILD ALTERNATIVES, the intersecons of SR 16/South Whitewoman Street and SR 16/North Whitewoman Street are assumed to be closed. PLEASE MAIL OR EMAIL ALL PUBLIC COMMENTS TO ODOT DISTRICT 5 BY FRIDAY, September 30th, 2016. PLEASE PROVIDE CONTACT INFORMATION SO WE CAN RESPOND. IF YOU HAVE ADDITIONAL QUESTIONS OR COMMENTS FOLLOWING THE MEETING TONIGHT, PLEASE CONTACT : BRIAN TATMAN ODOT District 5 District Environmental Coordinator [email protected] 740-323-5191 LAURA PHILABAUM ODOT District 5 Real Estate Administrator [email protected] MAILING ADDRESS ODOT DISTRICT 5 P.O. BOX 306 JACKSONTOWN, OH 43030 For meeng informaon and updates: hp://www.dot.state.oh.us/districts/D05/MajorProjects/Pages/Coshocton-SR-16-and-SR-541-Interchange.aspx BUILD ALTERNATIVE 2 (TIGHT DIAMOND INTERCHANGE) is ODOT’s preferred alternave because it best meets the stated Purpose and Need for the project while minimizing the project footprint, right-of-way impacts, and potenal displacements. The Project is following the federal Naonal Environmental Policy Act (NEPA) process which requires evaluaon of project impacts to both human and natural environ- ments. An Environmental Summary document will be prepared that summarizes the evaluaon of these impacts. This document will be *The environmental review, consultaon, and other acons required by applicable Federal environmental laws for this project are being, or have been, carried out by ODOT pursuant to 23 USC 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT.
Transcript
Page 1: WEL OME TO THE STATE ROUTE 16/STATE ROUTE 541 … · wel ome to the state route 16/state route 541 interhange improvements os-541-19.18/19.30 (pid 93263) thursday septemer 15, 2016

WELCOME TO THE

STATE ROUTE 16/STATE ROUTE 541 INTERCHANGE IMPROVEMENTS

COS-541-19.18/19.30 (PID 93263)

THURSDAY SEPTEMBER 15, 2016 PUBLIC MEETING

MEETING AGENDA OPEN HOUSE 5:00 PM TO 7:00 PM Feel free to view the exhibits and ask questions at your leisure. PUBLIC COMMENT OPPORTUNITIES THROUGHOUT Verbal Comments - Ask questions and provide comments to any ODOT representative at any time during the OPEN HOUSE MEETING. Written Comments – Provide written comments tonight via the comment sheet by placing them in the comment box.

~OR~ Provide comments via mail or email to contact information be-low.

NEXT STEPS FRIDAY, SEPTEMBER 30TH, 2016 – PUBLIC COMMENT PERIOD ENDS.

Friday, October 14th, 2016 – Review comments and provide re-sponses to comments.

Monday, October 31st, 2016 – Environmental document approved and real estate process begins.

Spring 2018 – Begin Construction.

PROJECT DESCRIPTION: The proposed project involves the re-configuration of the State Route (SR) 16/SR

541 interchange in Jackson Township, Coshocton County, Ohio. The current interchange of SR 16/SR 541 is

the primary access point that serves the City of Coshocton and Roscoe Village from the SR 16 corridor.

The interchange provides direct access to the central business district for the City of Coshocton, Roscoe

Village, and the Central Ohio Technical College (COTC) – Coshocton campus. The project will include minor

rehabilitation of the existing bridge that carries SR 541 over the Muskingum River as well as the replace-

ment of the existing bridge that carries SR 541 over SR 16.

PURPOSE AND NEED: The Purpose and Need Statement is the basis for identifying and analyzing rea-

sonable alternatives to solve the identified transportation need and to balance the project against the as-

sociated impacts. The PURPOSE AND NEED for the project is to maintain a safe and efficient route of trav-

el by addressing deficient bridge conditions on the COS-541-19.18 and 19.30 bridge structures. GOALS for

the project include mitigating the substandard geometrics of the current ramp configuration, improving

traffic and pedestrian flow near the interchange area, and supporting long term local planning initiatives.

ALTERNATIVES SUMMARY: There were three (3) alternatives evaluated for the COS-541-19.18/19.30

project. Those alternatives included a No-Build option, a Roundabout option, and a Tight Diamond inter-

change option. To describe the build alternatives, SR 16 is referred to as the north-south corridor and SR

541 is the east-west corridor. The alternatives considered as part of this project include the following:

A NO-BUILD ALTERNATIVE would leave the interchange in its current state. No improvements be-

yond routine maintenance would occur. There is not an estimated construction cost with this alterna-

tive. This alternative does not meet the project’s stated Purpose and Need.

BUILD ALTERNATIVE 1 (ROUNDABOUT INTERCHANGE) is a modification to the current interchange

by removing the loop ramps on the southbound termini and replacing the stop-controlled intersec-

tions at the ramps with roundabouts. The northbound roundabout would accommodate the ramp

and the SR 541 approaches with a single lane roundabout. The southbound roundabout would ser-

vice the southbound ramps, SR 541, North Whitewoman Street, and High Street. The diameter of the

northbound and southbound roundabouts were estimated to be 140 feet and 320 feet, respectively.

The diameter for the southbound roundabout was increased to accommodate the additional local

roadways - North Whitewoman Street and High Street. Estimated total cost is $20.5 Million.

BUILD ALTERNATIVE 2 (TIGHT DIAMOND INTERCHANGE) is a tight diamond interchange facility at

the existing interchange location of SR 541/SR 16. The northbound ramps would be modified to re-

move the slip ramps to and from SR 541. The southbound loop ramps would be removed and recon-

figured such that the proposed interchange facility would resemble a tight diamond-shaped inter-

change configuration. The current lane usage on SR 541 through the existing interchange area would

remain in the proposed condition. The ramp intersections will be signalized and coordinated due to

the close proximity of the ramp intersections. Estimated total cost is $18.1 Million. A map showing

Build Alternative 2 is included on the back of this handout.

COMMON FEATURES: For both BUILD ALTERNATIVES, the intersections of SR 16/South Whitewoman

Street and SR 16/North Whitewoman Street are assumed to be closed.

PLEASE MAIL OR EMAIL ALL PUBLIC COMMENTS TO ODOT DISTRICT 5 BY FRIDAY, September 30th, 2016.

PLEASE PROVIDE CONTACT INFORMATION SO WE CAN RESPOND.

IF YOU HAVE ADDITIONAL QUESTIONS OR COMMENTS FOLLOWING THE MEETING TONIGHT, PLEASE CONTACT:

BRIAN TATMAN ODOT District 5 District Environmental Coordinator [email protected] 740-323-5191

LAURA PHILABAUM ODOT District 5 Real Estate Administrator [email protected]

MAILING ADDRESS ODOT DISTRICT 5 P.O. BOX 306 JACKSONTOWN, OH 43030

For meeting information and updates: http://www.dot.state.oh.us/districts/D05/MajorProjects/Pages/Coshocton-SR-16-and-SR-541-Interchange.aspx

BUILD ALTERNATIVE 2 (TIGHT DIAMOND INTERCHANGE) is ODOT’s preferred alternative because it best meets the stated

Purpose and Need for the project while minimizing the project footprint, right-of-way impacts, and potential displacements.

The Project is following the federal

National Environmental Policy Act

(NEPA) process which requires

evaluation of project impacts to

both human and natural environ-

ments. An Environmental Summary

document will be prepared that

summarizes the evaluation of these

impacts. This document will be

*The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by ODOT pursuant to 23 USC 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT.

Page 2: WEL OME TO THE STATE ROUTE 16/STATE ROUTE 541 … · wel ome to the state route 16/state route 541 interhange improvements os-541-19.18/19.30 (pid 93263) thursday septemer 15, 2016

¯

010

020

050

Fe

et

1 in

ch

= 1

00

fe

et

BU

IL

D A

LT

ER

NA

TIV

E 2

BU

IL

D A

LT

ER

NA

TIV

E 2

(P

RE

FE

RR

ED

A

LT

ER

NA

TIV

E)

(P

RE

FE

RR

ED

A

LT

ER

NA

TIV

E)

TIG

HT

D

IA

MO

ND

:

S

R 5

41

&

S

R 1

6T

IG

HT

D

IA

MO

ND

:

S

R 5

41

&

S

R 1

6

CO

SH

OC

TO

N C

OU

NT

YC

OS

HO

CT

ON

C

OU

NT

Y

IN

TE

RC

HA

NG

E IM

PR

OV

EM

EN

TS

IN

TE

RC

HA

NG

E IM

PR

OV

EM

EN

TS

Leg

en

d

Tig

ht

Dia

mo

nd

- P

relim

ina

ry W

ork

Lim

its

Pro

po

se

d P

ave

me

nt

# *P

ote

ntia

l S

pe

cia

l W

aste

Ha

nd

ling

Site

" )E

ligib

le o

r P

ote

ntia

lly E

ligib

le f

or

listin

g o

n t

he

Na

tio

na

l R

eg

iste

r o

f H

isto

ric P

lace

s

Cu

lve

rte

d S

tre

am

Op

en

Ch

an

ne

l S

tre

am

Po

nd

Po

ten

tia

l W

etla

nd

Mu

skin

gu

m R

ive

r N

avig

atio

n H

isto

ric D

istr

ict

Ro

sco

e V

illa

ge

His

tori

c D

istr

ict

No

ise

Se

nsitiv

e A

rea

s


Recommended