WELCOME TO THE
STATE ROUTE 16/STATE ROUTE 541 INTERCHANGE IMPROVEMENTS
COS-541-19.18/19.30 (PID 93263)
THURSDAY SEPTEMBER 15, 2016 PUBLIC MEETING
MEETING AGENDA OPEN HOUSE 5:00 PM TO 7:00 PM Feel free to view the exhibits and ask questions at your leisure. PUBLIC COMMENT OPPORTUNITIES THROUGHOUT Verbal Comments - Ask questions and provide comments to any ODOT representative at any time during the OPEN HOUSE MEETING. Written Comments – Provide written comments tonight via the comment sheet by placing them in the comment box.
~OR~ Provide comments via mail or email to contact information be-low.
NEXT STEPS FRIDAY, SEPTEMBER 30TH, 2016 – PUBLIC COMMENT PERIOD ENDS.
Friday, October 14th, 2016 – Review comments and provide re-sponses to comments.
Monday, October 31st, 2016 – Environmental document approved and real estate process begins.
Spring 2018 – Begin Construction.
PROJECT DESCRIPTION: The proposed project involves the re-configuration of the State Route (SR) 16/SR
541 interchange in Jackson Township, Coshocton County, Ohio. The current interchange of SR 16/SR 541 is
the primary access point that serves the City of Coshocton and Roscoe Village from the SR 16 corridor.
The interchange provides direct access to the central business district for the City of Coshocton, Roscoe
Village, and the Central Ohio Technical College (COTC) – Coshocton campus. The project will include minor
rehabilitation of the existing bridge that carries SR 541 over the Muskingum River as well as the replace-
ment of the existing bridge that carries SR 541 over SR 16.
PURPOSE AND NEED: The Purpose and Need Statement is the basis for identifying and analyzing rea-
sonable alternatives to solve the identified transportation need and to balance the project against the as-
sociated impacts. The PURPOSE AND NEED for the project is to maintain a safe and efficient route of trav-
el by addressing deficient bridge conditions on the COS-541-19.18 and 19.30 bridge structures. GOALS for
the project include mitigating the substandard geometrics of the current ramp configuration, improving
traffic and pedestrian flow near the interchange area, and supporting long term local planning initiatives.
ALTERNATIVES SUMMARY: There were three (3) alternatives evaluated for the COS-541-19.18/19.30
project. Those alternatives included a No-Build option, a Roundabout option, and a Tight Diamond inter-
change option. To describe the build alternatives, SR 16 is referred to as the north-south corridor and SR
541 is the east-west corridor. The alternatives considered as part of this project include the following:
A NO-BUILD ALTERNATIVE would leave the interchange in its current state. No improvements be-
yond routine maintenance would occur. There is not an estimated construction cost with this alterna-
tive. This alternative does not meet the project’s stated Purpose and Need.
BUILD ALTERNATIVE 1 (ROUNDABOUT INTERCHANGE) is a modification to the current interchange
by removing the loop ramps on the southbound termini and replacing the stop-controlled intersec-
tions at the ramps with roundabouts. The northbound roundabout would accommodate the ramp
and the SR 541 approaches with a single lane roundabout. The southbound roundabout would ser-
vice the southbound ramps, SR 541, North Whitewoman Street, and High Street. The diameter of the
northbound and southbound roundabouts were estimated to be 140 feet and 320 feet, respectively.
The diameter for the southbound roundabout was increased to accommodate the additional local
roadways - North Whitewoman Street and High Street. Estimated total cost is $20.5 Million.
BUILD ALTERNATIVE 2 (TIGHT DIAMOND INTERCHANGE) is a tight diamond interchange facility at
the existing interchange location of SR 541/SR 16. The northbound ramps would be modified to re-
move the slip ramps to and from SR 541. The southbound loop ramps would be removed and recon-
figured such that the proposed interchange facility would resemble a tight diamond-shaped inter-
change configuration. The current lane usage on SR 541 through the existing interchange area would
remain in the proposed condition. The ramp intersections will be signalized and coordinated due to
the close proximity of the ramp intersections. Estimated total cost is $18.1 Million. A map showing
Build Alternative 2 is included on the back of this handout.
COMMON FEATURES: For both BUILD ALTERNATIVES, the intersections of SR 16/South Whitewoman
Street and SR 16/North Whitewoman Street are assumed to be closed.
PLEASE MAIL OR EMAIL ALL PUBLIC COMMENTS TO ODOT DISTRICT 5 BY FRIDAY, September 30th, 2016.
PLEASE PROVIDE CONTACT INFORMATION SO WE CAN RESPOND.
IF YOU HAVE ADDITIONAL QUESTIONS OR COMMENTS FOLLOWING THE MEETING TONIGHT, PLEASE CONTACT:
BRIAN TATMAN ODOT District 5 District Environmental Coordinator [email protected] 740-323-5191
LAURA PHILABAUM ODOT District 5 Real Estate Administrator [email protected]
MAILING ADDRESS ODOT DISTRICT 5 P.O. BOX 306 JACKSONTOWN, OH 43030
For meeting information and updates: http://www.dot.state.oh.us/districts/D05/MajorProjects/Pages/Coshocton-SR-16-and-SR-541-Interchange.aspx
BUILD ALTERNATIVE 2 (TIGHT DIAMOND INTERCHANGE) is ODOT’s preferred alternative because it best meets the stated
Purpose and Need for the project while minimizing the project footprint, right-of-way impacts, and potential displacements.
The Project is following the federal
National Environmental Policy Act
(NEPA) process which requires
evaluation of project impacts to
both human and natural environ-
ments. An Environmental Summary
document will be prepared that
summarizes the evaluation of these
impacts. This document will be
*The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by ODOT pursuant to 23 USC 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT.
¯
010
020
050
Fe
et
1 in
ch
= 1
00
fe
et
BU
IL
D A
LT
ER
NA
TIV
E 2
BU
IL
D A
LT
ER
NA
TIV
E 2
(P
RE
FE
RR
ED
A
LT
ER
NA
TIV
E)
(P
RE
FE
RR
ED
A
LT
ER
NA
TIV
E)
TIG
HT
D
IA
MO
ND
:
S
R 5
41
&
S
R 1
6T
IG
HT
D
IA
MO
ND
:
S
R 5
41
&
S
R 1
6
CO
SH
OC
TO
N C
OU
NT
YC
OS
HO
CT
ON
C
OU
NT
Y
IN
TE
RC
HA
NG
E IM
PR
OV
EM
EN
TS
IN
TE
RC
HA
NG
E IM
PR
OV
EM
EN
TS
Leg
en
d
Tig
ht
Dia
mo
nd
- P
relim
ina
ry W
ork
Lim
its
Pro
po
se
d P
ave
me
nt
# *P
ote
ntia
l S
pe
cia
l W
aste
Ha
nd
ling
Site
" )E
ligib
le o
r P
ote
ntia
lly E
ligib
le f
or
listin
g o
n t
he
Na
tio
na
l R
eg
iste
r o
f H
isto
ric P
lace
s
Cu
lve
rte
d S
tre
am
Op
en
Ch
an
ne
l S
tre
am
Po
nd
Po
ten
tia
l W
etla
nd
Mu
skin
gu
m R
ive
r N
avig
atio
n H
isto
ric D
istr
ict
Ro
sco
e V
illa
ge
His
tori
c D
istr
ict
No
ise
Se
nsitiv
e A
rea
s