r laud Rix'Giub Ceaicr OTiihR: WELCOME ELIZABETH MINE SITE PUBLIC MEETING FEBRUARY 23, 2000 BARRETT HALL
Transcript
Page 1: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

r laud Rix'Giub Ceaicr

O T i i h R :

WELCOME

ELIZABETH MINE SITE

PUBLIC MEETING

FEBRUARY 23, 2000

BARRETT HALL

Page 2: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

AGENDA

I. INTRODUCTION Edward Hathaway, EPA

II. HISTORICAL REVIEW Gwenda Smith, Historical Society

III. COMMUNITY ACTION GROUP (CAG) Tom Essex, Chairperson

IV. EPA CLEANUP PLAN

Non-Time Critical Removal Action

Remedial Investigation/ Feasibility Study

Edward Hathaway

William Lovely

V. HISTORIC PRESERVATION ISSUES Edward Hathaway

VI. COMMUNITY INVOLVEMENT Edward Hathaway/Sarah White

VII. QUESTIONS AND DISCUSSION

Page 3: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

Key Site Contacts:

Site Contacts USEPA toll free number 1-800-372-7341

Project Managers for EPA:

Edward Hathaway ME/VT/CT Superfund Section 1 Congress Street Suite 1100, mailcode: HBT Boston, MA 02114-2023 Phone:(617)918-1372 Fax:(617)918-1291 E-mail: [email protected]

William Lovely ME/VT/CT Superfund Section 1 Congress Street Suite 1100, mailcode: HBT Boston, MA 02114-2023 Phone:(617)918-1240 Fax:(617)918-1291 E-mail: [email protected]

Community Involvement Coordinator:

Sarah White 1 Congress Street Suite 1100, mailcode: RAA Boston, MA 02114-2023 Phone:(617)918-1026 Fax:(617)918-1029 E-mail: [email protected]

EPA NEW ENGLAND WEB SITE: http://www.epa.gov/region01

Page 4: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

add: "/remed" after "regionOl" for the Superfund web site

Site Contacts US Army Corps of Engineers (USACE)

Project Manager:

Scott Acone 696 Virginia Road Concord, MA 01742-2751 Phone:(978)318-8162 Fax:(978)318-8064 E-mail: [email protected]

State of Vermont:

Vermont Project Manager:

Michael Young Waste Management Division 103 South Main Street/West Building Waterbury, VT 05671-0404 Phone:(802)241-3887 Fax:(802)241-3296 E-mail: [email protected]

Other contacts will be identified as the project team is developed. Contract issues still need to be resolved, however, EPA expects Arthur D. Little to be the prime contractor for the initial work. Hartgen Associates is also likely to be the historic preservation expert working for Arthur D. Little.

Page 5: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

•4~

SP^M<

U

UH (U 60 re c re u 2

Q -I fl ^ O sn s §'- 0

> ^ re .£3 O

S

cj reu_

4—' C O O

o Cu

o E p­5

/-/

4)

U 13 a 1 a o ( ^*^

^-MM

ttJr "

> en O u.

— on ffl g

~­ 5 " ^^

> o | <n

cu . -, ^C O •4—> UH

K ^J

^

^Oi

C ._,KflOJOd

W ^v

o O

is 5^O ^^cj^^

SJM

cu 6 0

re ** C rai<­i

^ o

21

c 0 y

<

oO

en

re

^

cu ^ 5 0

Q c

^2 ro -«r -< o ^ ^ o

5 2

Q « w^ ­ o

3 U­

t* o >N O

^ GO

O D

o cu 'o1

a.

g re

on re £H

O

H

oo oo C3O

«

§ ja•*•*

\

^

.S s ^ d t­ '-C ^M -Tj

& -S '& £ tS B$ 5 S •— >> ° ° w "S ^ i

U c^­c^^ o

1 g 1 &pQ C "* 9J W d ^f< ^ « S ^ H § < < ^ U &H OH ^ -<tl C-T-I «N-l p..

p}

— a

Page 6: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

South Strafford Ompompanoosuc River

X . road peras

100 ft contours copper pnp

ui

Copperas Hill decant discharge

decant tower

Page 7: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

EPA CLEANUP PLAN

Two Phase Cleanup Program

Q Early Cleanup Action to address currently identified threats to human health and the environment (Ed Hathaway - Lead Project Manager)

Comprehensive Investigation (Remedial Investigation and Feasibility Study) of all possible human health and ecological hazards and development of long-term cleanup options (William Lovely - Lead Project Manager)

Page 8: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

EARLY CLEANUP PLAN

Basis for Early Cleanup Action:

Q Data collected by Elizabeth Mine Study Group (EMSG), United Stated Geological Survey (USGS), Vermont DEC, and EPA supports a significant ecological threat resulting from the release of heavy metals into Copperas Brook and the West Branch of the Ompompanoosuc River

Page 9: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

EARLY CLEANUP PLAN

EPA can use three types of removal actions to address more immediate concerns:

emergency, time critical, and non-time critical

Non-Time Critical Removal Action or (NTCRA):

EPA may use the NTCRA authority to address the source of contamination at a Site. A NTCRA is the appropriate removal approach when more than six months of planning time is available.

Page 10: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

EARLY CLEANUP PLAN

Key question in deciding to use NTCRA approach:

Is there an environmental problem that should be addressed during the time period required for the comprehensive investigation program (3-7 years)?

Yes, The focus of Early Cleanup or NTCRA at the Elizabeth Mine Site will be the three tailing piles and associated surface water impacts.

Page 11: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

EPA EARLY CLEANUP PLAN

Key Components of a NTCRA:

• Approval Memorandum: A document summarizing Site conditions that authorizes EPA to expend federal dollars for an Engineering Evaluation/Cost Analysis (EE/CA);

• EE/CA: A document which better defines the environmental threats, identifies the goals of the response action, and evaluates different options for controlling the source of contamination at the Site;

• Proposed Plan: A fact sheet that summarizes the EE/CA and presents the EPA proposed early cleanup action to the public for comment;

• Action Memorandum: Following at least 30 days of public comment on the EE/CA and Proposed Plan, EPA will formalize the selection of the early cleanup plan in an Action Memorandum. A response to comment will be attached;

• Request for federal funding or PRP negotiation;

• Design and Implementation of the Cleanup.

Page 12: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

EARLY CLEANUP SCHEDULE

Approval Memorandum Signed February 9, 2000

EE/CA Begins with Approval Memo, 1st draft expected in May 2000

Proposed Plan Estimated to be released July, August, or September 2000

Action Memorandum September or October 2000

Request for funding or negotiations Upon signature of Action Memorandum

NTCRA Design October 2000 - May 2001

NTCRA Cleanup Implementation Summer 2001

Notes:

Community involvement activities will occur throughout the entire process.

Historical Preservation issues will be addressed in the EE/CA, Action Memorandum, and NTCRA Design. A Memorandum of Agreement (MOA) will be developed between EPA and State of Vermont Historic Preservation Office

NTCRA Cleanup is dependent upon receipt of federal funding or PRP agreement

Page 13: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

REMEDIAL INVESTIGATION/FEASIBILITY STUDY

The goals of the RI/FS are to:

• characterize the nature and extent of the contamination at the Site;

• identify current and future potential threats to public health and the environment;

• develop a set of cleanup options that will address any unacceptable threats;

• involve the public in the selection of a long-term cleanup program; and

• sign a Record of Decision (ROD) to select the long-term cleanup action.

Page 14: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

REMEDIAL INVESTIGATION/FEASIBILITY STUDY

The major Reports that are prepared during an RI/FS include:

• Remedial Investigation Work Plan;

• Remedial Investigation Report;

• Human Health Risk Assessment;

• Ecological Risk Assessment; and

• Feasibility Study.

10

Page 15: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

REMEDIAL INVESTIGATION/FEASIBILITY STUDY

• A Record of Decision is the final output of the RI/FS

• After the Record of Decision, EPA must again seek funding for the selected cleanup action

• Design and implementation of the long-term cleanup action

• Long-term monitoring, operation, and maintenance

• RI/FS typically require 2-4 years from initial funding to Record of Decision

• Design may require 1 -3 years

11

Page 16: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

HISTORIC PRESERVATION ISSUES

EPA is aware that the Elizabeth Mine is a significant part of the local history

EPA is bound by the National Historic Preservation Act (NHPA) to minimize the adverse affect of any cleanup action on historic properties

Pursuant to NHPA, EPA will have a qualified consultant provide technical expertise to identify the historic "Site"

12

Page 17: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

HISTORIC PRESERVATION ISSUES

Initial NHPA Site meeting was held February 4, 2000

EPA, USAGE and their consultants will work closely with Vermont Historic Preservation Office contact (Giovanna Peebles) and local Historical Society

Current expectation is that NTCRA will not impact any of the buildings on-Site

13

Page 18: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

HISTORIC PRESERVATION ISSUES

Initial historical assessment is part of EE/CA

EE/CA evaluates: applicability of National Historic Preservation Act; identification of potential adverse impacts to historic; and documentation that impacts are unavoidable based upon need for cleanup

If an adverse impact will occur (this is likely) then EPA will enter into an Memorandum of Agreement (MOA) with the State Historic Preservation Office. Other parties may be included as consulting parties to the MOA (Town Governments, Historical Societies, Landowners, key interest groups)

Actual mitigation activities, if any, would be identified in a MOA ( most likely to be completed during design phase)

14

Page 19: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

COMMUNITY INVOLVEMENT

Formal opportunities for community involvement are the public comment periods

EPA prefers ongoing and frequent communication with community to better identify concerns and provide information

Community Action Group (CAG) is a good vehicle to centralize community concerns and to provide a forum for discussions with EPA

EPA will prepare a Community Relations Plan. Interviews with local officials, residents, CAG, and others will serve as the basis for this plan

15

Page 20: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

COMMUNITY INVOLVEMENT

EPA will issue periodic fact sheets to update the community

EPA will hold public meetings as appropriate (based upon community interest)

Technical Assistance Grants (TAG) are available to provide financial resources to the community for technical support

16

Page 21: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

COMMUNITY INVOLVEMENT

Community opinion is critical in the NHPA assessment

Site owners and the community provide valuable input regarding future land use issues

Feel free to contact EPA is you have any questions

EPA is looking for feedback tonight and from the CAG regarding the location, time, and frequency of public information meetings

17

Page 22: WELCOME ELIZABETH MINE SITE PUBLIC MEETING …Project Manager fos r EPA: Edward Hathaway . ME/VT/CT Superfund Section 1 Congress Street . Suite 1100 mailcode, : HBT . Boston, MA 02114-2023

SUMMARY

EPA has begun the planning work for the EE/CA portion of an early cleanup

Funding is a major limitation and could extend the schedule for the EE/CA, Cleanup Implementation, and RI/FS

EPA has committed to early and substantial community involvement

Historic Preservation issues will be seriously considered in EPA cleanup evaluations

Project Team is being assembled and community outreach has begun