Welcome OSU IEM to Cameron OKC Surface Systems. OKC SURFACE SYSTEMS. Safety Minute: Safety is a full time job … Don’t make it a part time practice!. HSSE. 3. If you see a Fire or Hear Evacuation Alarm: Report all fires to the nearest supervisor’s office Evacuate the building - PowerPoint PPT Presentation
Popular Tags:
22
Welcome OSU IEM to Cameron OKC Surface Systems
Transcript
Page 1: Welcome OSU IEM to Cameron OKC Surface Systems

Welcome

OSU IEMto

Cameron OKCSurface Systems

Page 2: Welcome OSU IEM to Cameron OKC Surface Systems

2

OKC SURFACE SYSTEMS

Page 3: Welcome OSU IEM to Cameron OKC Surface Systems

Safety Minute:

Safety is a full time job …

Don’t make it a part time practice!

HSSE

3

Page 4: Welcome OSU IEM to Cameron OKC Surface Systems

If you see a Fire or Hear Evacuation Alarm:  Report all fires to the nearest

supervisor’s office

Evacuate the building

Proceed to the Assembly Area at the North East Corner of the Facility

Find your Cameron representative for them to get a head count

 

4

Page 5: Welcome OSU IEM to Cameron OKC Surface Systems

Don’t Touch

Falling Objects Fork Lifts & Cranes

NO Smoking

Watch Your Step NO Cell Phones

Plant Safety Awareness

5

Page 6: Welcome OSU IEM to Cameron OKC Surface Systems

• About Cameron

• Our Divisions

• Markets Served

• Cameron’s Global Network

• Purpose and Core Values

Cameron Overview

6

Page 7: Welcome OSU IEM to Cameron OKC Surface Systems

7

About Cameron

Fortune 500 company with strong balance sheet

$8 billion revenues in 2012

Leadership position in most every market segment served

Leading aftermarket service provider

27,000+ employees in 300+ locations worldwide

Page 8: Welcome OSU IEM to Cameron OKC Surface Systems

8

Our Divisions

Cameron is a leading provider of flow equipment products, systems and services to worldwide oil, gas and process industries…

Cameron

Valves & Measurement

Distributed Valves

Engineered & Process Valves

Measurement System

Valve Automation

Drilling & Production

Systems

Drilling System

Surface Systems

Process & Compression

Systems

Compression Systems

Process Systems

OneSubsea

Integrated Solution

Control Systems

Processing Systems

Production Systems

Subsea Services

Page 9: Welcome OSU IEM to Cameron OKC Surface Systems

9

Markets Served

What business are we in?Cameron is in nine market segments, offering a full suite of products and services to the drilling, production, processing, refining, petrochemical & LNG, transmission & storage and

industrial segments of the industry.

Upstream to Downstream, Onshore to Offshore, Cameron is There.

Page 10: Welcome OSU IEM to Cameron OKC Surface Systems

Cameron’s Global NetworkManufacturing, Sales, Engineering and AftermarketOur worldwide presence of 300+ locations includes 40+ manufacturing plants.

Page 11: Welcome OSU IEM to Cameron OKC Surface Systems

Purpose and Core Values

Core Purpose Core Values

Page 12: Welcome OSU IEM to Cameron OKC Surface Systems

• History

• Capabilities

• Products

Facility Overview

12

Page 13: Welcome OSU IEM to Cameron OKC Surface Systems

13

Plant History

1969 Creation of Gulfco

1979 Moved into current facility

1984 Acquired by Ingram

1986 Merged with Cactus

1996 Acquired by Cameron

Page 14: Welcome OSU IEM to Cameron OKC Surface Systems

Oklahoma City, Oklahoma, USAPrimary Facility Type: ManufacturingEngineeringServiceHeat TreatingManufacturing AssemblyNDE TestingWelding

Plant Size (20 acres)Site 130,000 sq. ft.

Warehouse 25,000 sq. ft. Machine/Weld Shop 60,000 sq. ft. General Workshop 30,000 sq. ft. Office Area 15,000 sq. ft.

Customer Property StorageOutside Space 3 acres

• Immersion UT • Weld Cladding• Hydro Testing• Gas Testing • Inspection• Blast/Paint

14

Office

Page 15: Welcome OSU IEM to Cameron OKC Surface Systems

15

Wellhead Terminology

Page 16: Welcome OSU IEM to Cameron OKC Surface Systems

16

Gate Valve Summary Working Pressures up to 20k psi. Nominal size 1 13/16” to 9 1/16”. API Material Class AA to HH. PSL 1,2 &3 Full clad, HIP Clad Customer specific requirements

Wellhead Summary Working Pressures up to 20k psi. API Material Class AA to HH. API Temp Class range K to X (-75F to 350F). PSL 1, 2 & 3 Full Clad, HIP Clad Customer specific requirements

Conventional and Compact Wellheads

Oklahoma City Center of Excellence: For the manufacture and supply of conventional and compact

wellheads, as well as gate valves of various designs.

FLFLS

Page 17: Welcome OSU IEM to Cameron OKC Surface Systems

Facility includes Weld cladding Horizontal & vertical boring

machines Assemble & gas testing Immersion Ultrasonic Testing

Oklahoma City Center of Excellence:For the manufacture of Hi-Spec block trees,

bonnets, tubing hangers and slip type hangers.

FH Style

FHY Style

FFY Style

Tubing Hangers

Single Unit Blocks

Slip type Hangers

17

Page 18: Welcome OSU IEM to Cameron OKC Surface Systems

SURFACE SYSTEMS

Current Situation

OKC Surface Plant manufactures products to support NSAM field locations and customers

18

Page 19: Welcome OSU IEM to Cameron OKC Surface Systems

Required PPE

• Safety glasses

• Closed toe shoes (stay within the yellow lines)

• Hearing protection

Plant Tour

19

Page 20: Welcome OSU IEM to Cameron OKC Surface Systems

20

Small Vlv A&Tcell

Large Vlv A&T cell

WH A&TGas Test

Stack-up (FAT)

Hgr Assy

Gen Mill

Hgrcell

Mill/Turn Gen

Lathe

S WH cell

SVlvcell

Gen Mill/

Lathe

M WH cell

WHcell

Gen Mill

M WH cell

Turn cell

MVlvcell

LargeVlv Cell HBM

HBM

LargeVTC Weld shopPaint

Booth

QCReceiving

QCNDE

QCWIP

Manual Lathes

X&T Mill

LargeMill

Warehouse

Plant LayoutN

Conference Room

Page 21: Welcome OSU IEM to Cameron OKC Surface Systems

21

Safety Pete’s Tip:

Think positive an accident is only an attitude away.

Please remember to be safe… not only for you, but for your co-workers and your family!

Expect the unexpected. Gear up for safety. Please remember in order to be safe…

not only for you, but for your co-worker and your family.

Page 22: Welcome OSU IEM to Cameron OKC Surface Systems

Contact Information

22

Ryan CharlesGRDP, 2nd Shift Assembly [email protected]

William BakerSr. [email protected]

Visit the Careers page at www.c-a-m.com

Visit our Facebook page at www.facebook.com/CameronCareers


Recommended