Bridge MP 370.7 Pier Replacement Project
WelcomeBridge MP 370.7 Pier Replacement ProjectPublic Open House
Bridge MP 370.7 Pier Replacement ProjectFigure. 1
Ne
na
na
Ri v
er
Ne
na
na
Ri v
er
a
a
a
27272828
3333 3434
ARRC Bridge at FerryARRC Bridge at Ferry(BR 370.7)(BR 370.7)
Contractor Staging Area
Temporary Constrution Only Crossing, No Public Access
Restricted and/orlimited access in this area duringconstruction
0 200
FEET
LEGEND
Section
_̂
Fairbanks
Anchorage
Ferry
Project AreaHealy
E
Figure 1. ARRCBR 370.7
Project Location
Map Projection: NAD 83 ASP 3 FeetData Sources: ARRC, HDRAuthor: HDR Engineering, Inc.Date: 08 Jan 2018
To F
airb
anks
Township 10S, Range 8W, Fairbanks Meridian
a
Flow Direction
Project Location
Ne
na
na
Ri v
er
Ne
na
na
Ri v
er
a
a
a
27272828
3333 3434
ARRC Bridge at FerryARRC Bridge at Ferry(BR 370.7)(BR 370.7)
Contractor Staging Area
Temporary Constrution Only Crossing, No Public Access
Restricted and/orlimited access in this area duringconstruction
0 200
FEET
LEGEND
Section
_̂
Fairbanks
Anchorage
Ferry
Project AreaHealy
E
Figure 1. ARRCBR 370.7
Project Location
Map Projection: NAD 83 ASP 3 FeetData Sources: ARRC, HDRAuthor: HDR Engineering, Inc.Date: 08 Jan 2018
To F
airb
anks
Township 10S, Range 8W, Fairbanks Meridian
a
Flow Direction
Ne
na
na
Ri v
er
Ne
na
na
Ri v
er
a
a
a
27272828
3333 3434
ARRC Bridge at FerryARRC Bridge at Ferry(BR 370.7)(BR 370.7)
Contractor Staging Area
Temporary Constrution Only Crossing, No Public Access
Restricted and/orlimited access in this area duringconstruction
0 200
FEET
LEGEND
Section
_̂
Fairbanks
Anchorage
Ferry
Project AreaHealy
E
Figure 1. ARRCBR 370.7
Project Location
Map Projection: NAD 83 ASP 3 FeetData Sources: ARRC, HDRAuthor: HDR Engineering, Inc.Date: 08 Jan 2018
To F
airb
anks
Township 10S, Range 8W, Fairbanks Meridian
a
Flow Direction
Ne
na
na
Ri v
er
Ne
na
na
Ri v
er
a
a
a
27272828
3333 3434
ARRC Bridge at FerryARRC Bridge at Ferry(BR 370.7)(BR 370.7)
Contractor Staging Area
Temporary Constrution Only Crossing, No Public Access
Restricted and/orlimited access in this area duringconstruction
0 200
FEET
LEGEND
Section
_̂
Fairbanks
Anchorage
Ferry
Project AreaHealy
E
Figure 1. ARRCBR 370.7
Project Location
Map Projection: NAD 83 ASP 3 FeetData Sources: ARRC, HDRAuthor: HDR Engineering, Inc.Date: 08 Jan 2018
To F
airb
anks
Township 10S, Range 8W, Fairbanks Meridian
a
Flow Direction
Bridge MP 370.7 Pier Replacement ProjectFigure. 2
Work Area Detail
Ne
na
na
Ri v
er
Ne
na
na
Ri v
er
a
a
Remove andReplace Pier 3
ØØØØØ
ØØØØØ
ØØØØØØØ
Ø
ØØØØØØ
ØØØØ
Remove OldBridge Pier
Bank ProtectionImprovements atPier 2
RevetmentRepairs
ROW
Lin
e
ROW
Lin
e
0 75
FEET
LEGEND
ARRC ROW (200' total width)
Construction Project Element
ØØØØ
ØØØØØØ
ØØØØ
ØØØØØØ
Demolition Project Element
Figure 2. ARRCBR 370.7
Work Detail
Map Projection: NAD 83 ASP 3 FeetData Sources: ARRC, HDRAuthor: HDR Engineering, Inc.Date: 08 Jan 2018
Township 10S, Range 8W, Fairbanks Meridian
a
Flow Direction E
Ne
na
na
Ri v
er
Ne
na
na
Ri v
er
a
a
Remove andReplace Pier 3
ØØØØØ
ØØØØØ
ØØØØØØØ
Ø
ØØØØØØ
ØØØØ
Remove OldBridge Pier
Bank ProtectionImprovements atPier 2
RevetmentRepairs
ROW
Lin
e
ROW
Lin
e
0 75
FEET
LEGEND
ARRC ROW (200' total width)
Construction Project Element
ØØØØ
ØØØØØØ
ØØØØ
ØØØØØØ
Demolition Project Element
Figure 2. ARRCBR 370.7
Work Detail
Map Projection: NAD 83 ASP 3 FeetData Sources: ARRC, HDRAuthor: HDR Engineering, Inc.Date: 08 Jan 2018
Township 10S, Range 8W, Fairbanks Meridian
a
Flow Direction E
Ne
na
na
Ri v
er
Ne
na
na
Ri v
er
a
a
Remove andReplace Pier 3
ØØØØØ
ØØØØØ
ØØØØØØØ
Ø
ØØØØØØ
ØØØØ
Remove OldBridge Pier
Bank ProtectionImprovements atPier 2
RevetmentRepairs
ROW
Lin
e
ROW
Lin
e
0 75
FEET
LEGEND
ARRC ROW (200' total width)
Construction Project Element
ØØØØ
ØØØØØØ
ØØØØ
ØØØØØØ
Demolition Project Element
Figure 2. ARRCBR 370.7
Work Detail
Map Projection: NAD 83 ASP 3 FeetData Sources: ARRC, HDRAuthor: HDR Engineering, Inc.Date: 08 Jan 2018
Township 10S, Range 8W, Fairbanks Meridian
a
Flow Direction E
Bridge MP 370.7 Pier Replacement ProjectFigure. 3
Bridge Plan & Elevation
ALASKA RAILROAD CORPORATION
ALA
SKA
RAILROAD CORPORATION
E S T . 1 9 1 4
BRIDGE 370.7
AL
ASK
A R
A I L R OAD COR P ORA
TI O
N
E S T . 1 9 14
Bridge MP 370.7 Pier Replacement ProjectFigure. 4
Revetment Repairs
Bridge MP 370.7 Pier Replacement ProjectFigure. 5
Temporary Trestle
Bridge MP 370.7 Pier Replacement ProjectFigure. 6
Pedestrian Access Detail
DECK PANEL SCHEDULE
6www.pndengineers.com
1506 West 36th Avenue
Anchorage, Alaska 99503
Phone: 907.561.1011
AK. LIC# AECC250
TRESTLE PLAN
01/05/2018
Trainman Walk Trainman WalkTrainman Walk
Route #2 - Temp. Pedestrian Access
Route #1 - Temp. Pedestrian Access
Temp. Pedestrian Access RouteRoute #1 - Utilized during drilled shaft construction work on west trestleRoute #2 - Utilized during drilled construction work on east trestleOnly one temporary pedestrian access route will be "open" at a time during construction and will be clearly identified.
Temp. Pedestrian Access Barrier
Comment:A100-ft section of trainman walk will be removed prior to drilledshaft construction activities in March 2018. Temporary constructionwith guardrail will provided as a temporary access point to northsection of the existing trainman walk. Trainman walk will be restoredin June 2018. Temp. Const. Stairs
Area of Work:New Drilled Shaft Foundation
PEDESTRIAN ACCESS DETAIL
Bridge MP 370.7 Pier Replacement ProjectFigure. 7
Preliminary Work Schedule
Temporary Trestle
Temporary Trestle Double Shift
Temporary Trestle Removal
Drilled Shaft
Cast in Place Concrete
Structural Steel
Bearing Replacement
Demolish Abandonded Pier
Demolish Pier #3
Temporary Access Road Construction
Rip Rap Bank Stabilization
Site & ROW Reclamation
20192018Preliminary ScheduleJan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
1/12 - 3/23
5/23 -
6/4
5/18 - 6/7 9/17 - 11/21
11/24-
12/5
9/26 -
10/12
10/12-
11/5
12/31-
1/16
8/15-
8/30
1/12-
1/27
4/9-
4/24
3/22-
4/25
6/5 - 8/14
3/2 - 3/23NIght ShiftMon-Sat
3/14 - 5/17Night Shift
Mon - Sun 12hrs