Welcome to Kerui Wellhead Business Division
Page 3
More Efficient in Oil & Gas Extraction
Catalogue
�Corporate Overview(Shandong Kerui Well Control System Manufacturing Co., Ltd)
�Product Overview
�Product Delivery Proposal
�What can we do
Page 4
More Efficient in Oil & Gas Extraction
Corporate Overview – Manufacturing Plant•Building area: 38,000 M2; More than 200 employees
•More than 100 sets of advanced machining equipment. Max capacity: wellhead& Christmas Tree: 2,000 sets/YEAR
and BOP: 400 sets/YEAR.
•Certified with API 6A, API 16A & API 16C, and Q1, ISO 9001 QMS, ISO 14001 EMS, QHSAS18001 etc.
Page 5
More Efficient in Oil & Gas Extraction
ISO 9001-2008
ISO14001-2004
ISO18001-2007
API 6A
API 6D
API16A
API 16C
API16DCustom Union TR Certificate for wellheadCustom Union TR Certificate for choke manifold
Certificates
Page 7
More Efficient in Oil & Gas Extraction
Corporate Overview—Research &Designing
R&D team of more than 100experienced engineers and
experts with the most Advanced Designing Software to make the
Professional design just for YOU!
&xp
R&R&
Page 8
More Efficient in Oil & Gas Extraction
Kerui Well Head Control Company hasinternational first-class PR2 testingequipment and other more than 50production equipments such as Austriancladding equipment which are able toprovide advanced products with excellentquality for customers.
Corporate Overview—Plant Equipment
Page 9
More Efficient in Oil & Gas Extraction
1. Desktop hydraulic pump,
Pressure gauge verification
2. Length measuring tools
calibration
3. Metallographic analysis
4. Spectrum analysis
5. Universal tool microscope
6. Petroleum Threading Gauges
7. Hardness testing
8. Tension test
9. Pendulum impact test at low
temperature
Corporate Overview—Inspection Device
Page 11
More Efficient in Oil & Gas Extraction
Standard Conventional Wellhead (SCW)
Product – SCW Wellhead
• Nominal Pressure 2,000Psi 20,000Psi
• Performance level PR1 2
• Specific Level PSL1 4
• Temperature Range KU (-60 121
• Applied Medium Oil, natural gas, mud, Gas containing H2S, CO2
• Product Material Level AA HH
• End connecting API standard connection
Page 12
More Efficient in Oil & Gas Extraction
• Nominal Pressure 2,000Psi 20,000Psi
• Nominal Diameter 1-13/16� 7-1/16"
• Performance level PR1 2
• Specific Level PSL1 4
• Temperature Range KX (-60 180)
• Applied Medium Oil, natural gas, mud
• Product Material Level AA HH
• End connecting API standard connection
Product – Valves (API 6A)
Page 13
More Efficient in Oil & Gas Extraction
Low Pressure Valves (AA-BB)
Size Pressure(psi) Forged Casted
2-1/16 2,000 3,000 5,000 Y Y
2-9/16 2,000 3,000 5,000 Y Y
3-1/8 2,000 3,000 5,000 Y Y
4-1/16 2,000 3,000 5,000 Y Y
High Pressure Valves (DD-EE)
Size Pressure(psi) Forged Casted
2-1/16 10,000 15,000 Y -
2-9/16 10,000 15,000 Y -
3-1/8 10,000 15,000 Y -
4-1/16 10,000 15,000 Y -
5-1/8 10,000 15,000 Y
7-1/16 10,000 15,000 Y
Valves Classification
Page 14
More Efficient in Oil & Gas Extraction
Page *
Product – Blow Out Preventer (API 16A)
Single Ram BOP Double Ram BOP Annular BOP
• Working Pressure 2,000Psi 15,000Psi Working Temperature T-75 (-59 ~121 )
• Nominal Diameter 7 1/16” 21 1/4“ Applied Fluid Oil, natural gas, mud, gas containing H2S CO2;
Material Level 45K~75K
Page 15
More Efficient in Oil & Gas Extraction
Product – Choke & Kill Manifold
Page 16
More Efficient in Oil & Gas Extraction
16
Product-Unconventional E&P Equipment
Now the fracturing technology is in the leading position of the innovation of oil and gas exploration
worldwide. The American has become the largest natural gas production countries instead of Russian
is by taking the big step of fracturing technology research and widely application of lowering the cost;
Our company has been studied the marketing requirement in order to catch the trend, and explored
series of equipments which can be used in the high pressure fracturing technology and got excellent
performance. All kinds of fracturing equipment has been realized sales in North America, and Oil fields
in China;
Page 17
More Efficient in Oil & Gas Extraction
17
KW-FLS Series Gate ValveAdvantage & Features:�Integrate Forged Diameter, High Pressure Resistance, AbrasionResistance; Simple and effective both sides sealing with Longer life andlower maintenance cost
�Full metal sealing structure between valve body and bonnet, gate andseat, reliable and effective; Double spring accumulating ring assistantsealing between valve seat and body, which can greatly realize lowpressure sealing and prevent the sealing surface from pollution
�Applied rolling screw driving with balanced tail perch, which cangreatly reduce the torque
N.D: 2-1/16� 7-1/16��Working Pressure: 10,000 15,000 PSI Advantage
Product-Unconventional E&P Equipment
Page 18
More Efficient in Oil & Gas Extraction
18
KW-FLS-HYD Series Gate ValveAdvantage & Features:�Integrate Forged Diameter, High Pressure Resistance, Abrasion Resistance;Simple and effective in both sides sealing with Longer life and lowermaintenance cost;
�Full metal sealing structure between valve body and bonnet, gate and seat,reliable and effective; Double spring accumulating ring assistant sealing betweenvalve seat and body, which can greatly realize low pressure sealing and preventthe sealing surface from pollution;
�Applied hydraulic pressure drive with manual structure, piston type doublefunction hydraulic-pressure actuator can realize remote control and fast on-off tovalve; when the hydraulic actuator is broken down, then manual device cansuccessfully shut the valve
Normal Diameter: 2-1/16� 7-1/16��Working Pressure: 10,000 15,000 PSI
Product-Unconventional E&P Equipment
Page 19
More Efficient in Oil & Gas Extraction
19
KW-FC Series Gate ValveAdvantage & Feature:�FC structure gate valve is widely used in present marketbecause of the stable performance;
�FC series gate valve is a kind of integrate HP forged valve oflarge diameter, with High Pressure Resistance, AbrasionResistance;
�Full metal seal, floated double valve seat structure withreliable performance; compact structure and convenientmaintenance;
� Applied rolling screw driving with balanced tail perch, whichcan greatly reduce the torque
Normal Diameter: 2-1/16� 7-1/16��Working Pressure: 10,000 15,000 PSI
Product-Unconventional E&P Equipment
Page 20
More Efficient in Oil & Gas Extraction
20
KW-FC-HYD Series Gate ValveFeature & Advantage:FC hydraulic gate valve is similar with manual type, which hasApplied hydraulic pressure drive with manual structure, pistontype double function hydraulic-pressure actuator can realizeremote control and fast on-off to valve; when the hydraulicactuator is broken down, then manual device can successfullyshut the valve
Normal Diameter: 2-1/16� 7-1/16��Working Pressure: 10,000 15,000 PSI
Product-Unconventional E&P Equipment
Page 21
More Efficient in Oil & Gas Extraction
21
KW Series Pilot Type Pressure Balance Gate ValveFeatures& Advantage:The valve is specially designed and fabricated for American Market,which is the first HP pilot Balanced gate valve
The gate valve of this structure has changed the conventionaldesigning theory of large diameter HP valve, and it is smaller instructure and appearance, the on-off torque is only 1/4 ofconventional valve with same diameter, and same pressure, and theweight is lighter 30%, and lower in cost, which is an importantinnovation in designing of HP large diameter gate valve
Normal Diameter: 4-1/16� 7-1/16��Working Pressure: 10,000 15,000 PSI
Product-Unconventional E&P Equipment
Page 22
More Efficient in Oil & Gas Extraction
22
KW Series Pilot Pressure Balancing Stem Gate ValveFeature & Advantage
This valve has been improved in the manual pilot pressure balancedvalve, which added the balancing stem driving device and greatlyreduced the on-off torque and was applied in the large diameter supperhigh pressure oil & gas well or fracturing well
Normal Diameter: 4-1/16� 7-1/16��Working Pressure: 10,000 15,000 PSI
Product-Unconventional E&P Equipment
Page 23
More Efficient in Oil & Gas Extraction
23
KW Series Pressure Balancing Stem Gate ValveFeature & Advantage:�Our gate valve has combined the balancing stem devicesystem and outer pressure balanced structure, which has the inand outlet pressure balancing structure, and balancing stemdriving system and pressure balancing rod structure;.
�Main function is to lower pressure difference and reducetorque and meanwhile it can safely shut or contact transmitmedia and has been applied in HP oil and gas field and fracturingwellhead.
�The features are of in-outlet pressure balance, balancing stemdrive, downstream sealing, double valve seat, balanced valvestem, adjustable back seal.
Normal Diameter: 4-1/16� 7-1/16��Working Pressure: 10,000 15,000 PSI
Product-Unconventional E&P Equipment
7”, 10,000 psi Gate Valve
Page 24
More Efficient in Oil & Gas Extraction
24
Choke Manifold
Product-Unconventional E&P Equipment
Nominal Pressure 15,000Psi
Nominal Diameter 2-1/16� 4-1/16"
Performance level PR1 2
Specific Level PSL3,3G
Temperature Range LU (-114.8 356)
Applied Medium Oil, natural gas, mud
Product Material Level DD,EE
Page 25
More Efficient in Oil & Gas Extraction
25
Fracturing head—6 Sides
Attached Below in the table are the conventional specifications of the fracturing head, customized available upon the customer requirements.
Product-Unconventional E&P Equipment
Page 26
More Efficient in Oil & Gas Extraction
Specification Description Performanceparameter
FS6-43-10 4 1/6", 10M x 4 outlets (3 1/16", 10M) PR-1, PSL-3, L-U
FS6-44-10 4 1/6", 10M x 4 outlets (4 1/16", 10M) PR-1, PSL-3. L-U
FS6-53-10 5 1/8" 10M x 4 outlets (3 1/16", 10M) PR-1, PSL-3; L-U
FS6-54-10 5 1/8" 10M x 4 outlets (4 1/16", 10M) PR-1, PSL-3; L-U
FS6-73-10 7-1/16 10M x 4 outlets (3 1/6", 10M) PR-1, PSL-3; L-U
FS6-43-15 4 1/6", 15M x 4 outlets (3 1/16", 15M) PR-1, PSL-3. L-U
FS6-44-15 4 1/6", 15M x 4 outlets (4 1/16", 15M) PR-1, PSL-3; L-U
FS6-53-15 5 1/8" 15M x 4 outlets (3 1/16", 15M) PR-1, PSL-3; L-U
FS6-54-15 5 1/8" 15M x 4 outlets (4 1/16", 15M) PR-1, PSL-3; L-U
FS6-73-15 7-1/16 15M x 4 outlets (3 1/6", 15M) PR-1, PSL-3, L-U
FS6-74-15 7-1/16 15M x 4 outlets (4 1/16", 15M) PR-1, PSL-3, L-U
Fracturing head—HexagonProduct-Unconventional E&P Equipment
Page 27
More Efficient in Oil & Gas Extraction
27
Fracturing head—8 Sides
Attached Below in the table are the conventional specifications of the fracturing head, customized available upon the customer requirements.
Product-Unconventional E&P Equipment
Page 28
More Efficient in Oil & Gas Extraction
Specification Description Performance parameterFS8-43-10 4 1/6", 10M x 6 outlets (3 1/16", 10M) PR-1, PSL-3, L-U
FS8-44-10 4 1/6", 10M x 6 outlets (4 1/16", 10M) PR-1, PSL-3. L-U
FS8-53-10 5 1/8" 10M x 6 outlets (3 1/16", 10M) PR-1, PSL-3; L-U
FS8-54-10 5 1/8" 10M x 6 outlets (4 1/16", 10M) PR-1, PSL-3; L-U
FS8-73-10 7-1/16 10M x 6 outlets (3 1/6", 10M) PR-1, PSL-3; L-U
FS8-74-10 7-1/16 10M x 6 outlets (4 1/16", 10M) PR-1, PSL-3, L-U
FS8-43-15 4 1/6", 15M x 6 outlets (3 1/16", 15M) PR-1, PSL-3. L-U
FS8-44-15 4 1/6", 15M x 6 outlets (4 1/16", 15M) PR-1, PSL-3; L-U
FS8-53-15 5 1/8" 15M x 6 outlets (3 1/16", 15M) PR-1, PSL-3; L-U
FS8-54-15 5 1/8" 15M x 6 outlets (4 1/16", 15M) PR-1, PSL-3; L-U
FS8-73-15 7-1/16 15M x 6 outlets (3 1/6", 15M) PR-1, PSL-3, L-U
FS8-74-15 7-1/16 15M x 6 outlets (4 1/16", 15M) PR-1, PSL-3, L-U
Fracturing head—OctagonProduct-Unconventional E&P Equipment
Page 29
More Efficient in Oil & Gas Extraction
29
Fracturing tree
Nominal Pressure 10,000-15,000Psi
Nominal Diameter 4-1/16� 5-1/8”,
7-1/16"
Performance level PR1 2
Specific Level PSL3,3G
Temperature Range LU (-114.8 356)
Applied Medium Oil, natural gas, mud
Product Material Level DD,EE
Product-Unconventional E&P Equipment
7-1/16”15,000PSI EE-1.5, U, PSL 3,PR 1
Page 30
More Efficient in Oil & Gas Extraction
Product – Offshore Equipment
Page 31
More Efficient in Oil & Gas Extraction
Product – Offshore Equipment
Page 32
More Efficient in Oil & Gas Extraction
Product – Mudline & Subsea Systems
Page 33
More Efficient in Oil & Gas Extraction
Product Delivery Proposal
The producing Period for Normally the standard wellhead and X-MAS tree,
valves, BOPs, Manifolds, and etc products is 45-60 days
The producing Period for other Customized Products should be depended by the Specifications
required by Clients
Fabricating Period
pre p
Page 34
More Efficient in Oil & Gas Extraction
Marking and Package Proposal
Finished Product Marking Packing Ready to be delivered
Product Delivery Proposal
Page 35
More Efficient in Oil & Gas Extraction
Shipping Proposal
�4 hours to the nearest Loading Port from the Factory;
�55 days from Loading Port, China to Destination Port, Argentina;
� Voyage: Every Week
Loading in Container
Custom Declare
Loading to Ship
Ocean Transport
Days 1 2 3 58
Product Delivery Proposal
Page 36
More Efficient in Oil & Gas Extraction
Project Experiences
LP Wellhead and Christmas Trees for Colombia Market
Page 37
More Efficient in Oil & Gas Extraction
Project Experiences
BOP product for Venezuela Market
Page 38
More Efficient in Oil & Gas Extraction
Project Experiences
BOP products for Argentina Market
Page 39
More Efficient in Oil & Gas Extraction
39
Project Experiences
Before Delivery to North America Market Clients
Page 40
More Efficient in Oil & Gas Extraction
Project Experiences
Products for Canada Clients
Page 41
More Efficient in Oil & Gas Extraction
Uzbekistan ProjectCasing Program: 20" 13-3/8" 9-5/8" 7 Conventional Wellhead with 3-1/16” 5k tree
Project Experiences
Page 42
More Efficient in Oil & Gas Extraction
42
Project Experiences
Working Site of North America
Client
Page 43
More Efficient in Oil & Gas Extraction
43
Proposals for Sinopec
Spec:6A-DD-PU-PSL3-PR1
Rated Working Pressure 15,000
PSI
Project Experiences
Page 44
More Efficient in Oil & Gas Extraction
44
Project Experiences
Working Site in Sinopec LiaoHe oilfield
Page 45
More Efficient in Oil & Gas Extraction
Project Experiences
Kazakhstan and Middle East ProjectsWellhead Control Panel
China Onshore and Offshore ProjectsWellhead Control Panel
Page 46
More Efficient in Oil & Gas Extraction
Page *
Global Service Station and Spare Parts Warehouse
Page 47
More Efficient in Oil & Gas Extraction
What can we do for our clients
�Designing and Fabricating according to Oilfield Real Working Conditions to make the Customized Technical Proposal.
�Professional Project Management Teams to support every business running from the inquiry to order delivery (Weekly report of production, detailed report of Inspection and etc).
�Experienced Installation Team to provide installation service and instruction in well site.
�We will build long term after-sale station to provide not only sufficient spare parts but also equipment operation guarantee service and ready to give solutions after we sale our equipments.
�Product Trial Proposal to enhance mutual trust in using our product quality.