CH 21 Downtown Prior Lake Reconstruction
TH 13 ReconstructionDuluth Ave Intersection Improvements
May 16, 2018 - 5:00-7:00 pm
Welcome to the Open House!
!(
!(
!(
!(
#:Qh
O
O
@
@
@
@@
@
@
@ @
@
@
@
@
@
@
@
@
@
@ @
@
@
@
@
Duluth AveIntersection/Village
Dr Roundabout(City)
CH 21 PavementImprovements
(County)
CH 42Reconstruction
(County)
Minnesota TrunkHighway 13
(State)
IntersectionControl Evaluation
(State)
CH 21/TH 13(County)
Minnesota TrunkHighway 13
(State)
CH 21 PavementRepair
(County)
CH 42(County)
Franklin Trl(City)
FishPoint Rd
(City)
Texas Ave(County)
?±A@
?±A@
GuWX
GuWX
G±WX
G|WX
G|WX
G³WX
SÖ
GwWX
GkWX
SÐ
GuWX
GÝWX
GÜWX
GqWX
Legend
Traffic Control Project
O Roundabout
#:Qh Signal
Project Year
20182019
20202021
0 ¼Miles
Source: Scott County, MnDOT, MnGeo
!I
Legend
Traffic Control Project
O Roundabout
#:Qh Signal
Project Year
20182019
20202021
0 ¼Miles
Source: Scott County, MnDOT, MnGeo
!I
#:Qh
Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13 Reconstruction Project (MnDOT).
@@@@@@@@@@@
@@@@@@@@@
MMMiiinnnnnnnnneeesssoootttttaaaaa TTTTTTrruuuuuunnnnnkkkkkHHHHHHiggggggghhhhhhhwwwwwaaaaayyyyyy 111133333
(((((SSStttttaaaaaaattttteeeee)))))
0 ¼Miles
Sourcrr e: Scott Countyt ,yy MnDOT,TT MnGeo
DRAFT 5/16/2018Subject to change
Upcoming Construction Projects
@@@@@@@@@@@
CCCHHH 444222ttioonn
• corrid
or
• • •
Project GOALS
Project PURPOSE
• enviro
nm
ent
• • Pre
serve
and
en
rich th
e ch
aracter o
f D
ow
nto
wn
Prio
r Lake
Pre
limin
ary De
sign
Define WHAT to Build
Final D
esign
Define HOW to Build
Build
You
are h
ere.
JUN
E 29
, 20
17
OP
EN H
OU
SE 1P
roject P
urp
ose &
U
nd
erstand
ing
DEC
5, 2
01
7O
PEN
HO
USE 3
-
OC
T 10
, 20
17
OP
EN H
OU
SE 2 -
Project CONTACTS
Ch
ris Ch
rom
y, Bo
lton
& M
en
k
Project Timeline
Follow Project Process - m
ovin
gforw
ard1
3-2
1.co
m
Project IntroductionC
H 2
1 D
ow
nto
wn
Prio
r Lake Im
pro
vemen
t
Main Ave. SE
Duluth Ave. SE
Arcadia Ave.
Dakota St. SE
Pleasant St. SE
Evanston Ave. SE
Colorado St. SE
Roundabout at Arcadia supports a permeable downtown with vehicular access to both the north and south side of downtown as well as two-stage pedestrian crossings.
Northbound left-turn onto Pleasant St. - access to downtown from the south
Opportunities• Roundabout and median plantings• Streetscape Elements• Wayfinding
Roundabouts frame downtown
Traffic Flow:Slower and more consistent speeds expected leading up to and in between roundabouts
Two-stage enhanced pedestrian crossing at Main Ave
~10-20 seconds, average pedestrian wait time to cross
~80 seconds - estimated travel time from north side of Main Ave to south side via Arcadia roundabout
Facilitate northbound left-turn onto CH 21 from Duluth through a right turn and "u-turn" at Arcadia roundabout
Two-stage pedestrian crossing at roundabouts
Roundabouts frame downtown
Improvements to 13-21 intersection anticipated to reduce "cut-through" traffic on residential side streets
~95 seconds - estimated vehicular travel time from south side of Main Ave to north side via TH13 roundabout
Resurface Scott West Regional Trail to Franklin Trail Intersection
Roundabout at Arcadia supports a permeable downtown with vehicular access to both the north and south side of downtown aswell as two-stage pedestrian crossings.
Northbound left-turn onto Pleasant St. - access to downtown from the south
Opportunities• Roundabout and median plantings• Streetscape Elements• Wayfinding
Roundabouts frame downtown
Traffic Flow:Slower and more consistent speeds expected leading up to and in between roundabouts
Two-stage enhanced pedestriancrossing at Main Ave
~10-20 seconds, averagepedestrian wait time to cross
~80 seconds - estimated travel time from north side of Main Ave to south side via Arcadia roundabout
Facilitate northbound left-turn onto CH 21 from Duluth through a right turn and "u-turn" at Arcadia roundabout
Two-stage pedestrian crossing at roundabouts
Roundabouts frame downtown
Improvements to 13-21 intersection anticipated to reduce "cut-through" traffic on residential side streets
~95 seconds - estimated vehicular travel time from south side of Main Ave to north side via TH13 roundabout
Resurface Scott West RegionalTrail to Franklin Trail Intersection
Improvements OverviewCH 21 Downtown Prior Lake Improvement
• • •
Inset A
Inset B
Inset C
Project Begins
Project Ends
con
crete
28
0th
St. (TH1
9)
County Trail E (282)
Inset A
Co
nstru
ct righ
t turn
lan
es
Co
nstru
ct
lanes
treatmen
t site #1
treatmen
t site #3
treatmen
t site #2
13
Langfo
rd B
lvd18
0th
St NE
Vergus Ave
Vergus Ave
Sprin
g Lake Ave
Inset B
turn
lanes
treatmen
t site #5
treatmen
t site #4
Sho
uld
er
Langford Blvd
176th St
13
81
Inset C
- Trail Map
Prop
osed
trail
Langford Blvd
Duluth Ave
An
na Tr
13
23nama Ave
Improvem
ents Overview
AREA UNDER CONSTRUCTION
AREA UNDER CONSTRUCTION
AREA UNDER CONSTRUCTION
STAGE 1
STAGE 2
12
Spring Lake
17
Spring Lake Regional
Park
Staging Considerations:
Schedule:•
•
•
•
What is Construction Staging?
•
•
•
•
• services
•
•
•
STAGE 1
DULUTH AVE*
Fair
law
n A
ve
180th St E
Franklin Trail SE
Pleasant St SE
AREA UNDER CONSTRUCTION
AREA UNDER CONSTRUCTION
AREA UNDER CONSTRUCTION
Spring Lake
Spring Lake Regional
Park
Staging Considerations:
Schedule:•
•
•
•
•
•
•
•
•services
•
•
•
DULUTH AVE
CTI
Fair
law
n A
ve
180th St E
Franklin Trail SE
Pleasant St SE
Construction Staging Overview
STA
GE
2
STA
GE
1
12
Upper Prior Lake
Spring Lake
MARSCHALL RD.
17
Spring Lake Regional
Park
14
0T
H S
T. NE
TEXAS AVE.
15
4T
H S
T. NW
16
0T
H S
T. SE
42
Cleary Lake Regional
Park
Cynthia Lake
LANGFORD AVE.
23
8
19
0T
H S
T. E
PANAMA AVE.
22
0T
H S
T. E
Detour Routes Rules of Thumb
1/3
1/3
1/3
TH 1
3 D
etou
r
deto
ur ro
ute
CH
21
Deto
ur
deto
ur ro
ute
STA
GE
1
Regional Detour RoutesC
H 2
1 D
ow
nto
wn
Prio
r Lake Im
pro
vemen
t
Collective Business Messaging
12
Franklin Trail SE
Du
luth
Ave
SE
Five
Haw
ks A
ve S
E
Village Lake Dr SE
Pleasant St SE
Colorado St SE
We
st A
ve S
E
12
Franklin Trail SE
Du
luth
Ave
SE
Five
Haw
ks A
ve S
E
Village Lake Dr SE
Pleasant St SE
Colorado St SE
We
st A
ve S
E
Local Access Routes
Spring Lake
17
Fair
law
n A
ve
180th St E
Ve
rgu
s A
ve
Sun
ray
Blv
d S
W
Pan
ama
Ave
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
Stage 2A (TH 13)
Stage 2A (CH 21)
Integra Utility Relocation
Stage 2B (TH 13/CH 21)
2019
May June July Aug.April Sept. Oct.
STAGE 1A West project termini to Vergus Ave
STAGE 1B Vergus Ave to CH-81 (Fairlawn Ave)
STAGE 1C CH 81 to CH 12/S. Half of TH 13 from
CH 12 to CH 23 (Panama Ave)
STAGE 1A
East project termini to Duluth Ave
We
st A
ve S
E
Du
luth
Ave
SE
Colorado St SE
See Stage 2 Board
12
Spring Lake
17
Fair
law
n A
ve
180th St E
Ve
rgu
s A
ve
Sun
ray
Blv
d S
W
Pan
ama
Ave
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
2019
May June July Aug.April Sept. Oct.
Stage 2A (TH 13)
Stage 2A (CH 21)
Integra Utility Relocation
Stage 2B (TH 13/CH 21)
West project termini to Vergus Ave
Vergus Ave to CH-81 (Fairlawn Ave)
CH 81 to CH 12/S. Half of TH 13 from CH 12 to CH 23 (Panama Ave)
East project termini to Duluth Ave
We
st A
ve S
E
Du
luth
Avee
SSE
Colorado St SEC l d S SE
See Stage 2 Board
12
Construction Stage 1
Upper Prior Lake
Du
luth
Ave
SE
Village Lake Dr SE
Franklin Trail SE
Pleasant St SE
Five
Haw
ks A
ve S
E
Willowwood St SW
Will
ow
wo
od
Ln
SW
Mai
n A
ve S
E
Lyons Ave SE
Blind Lake Trail SE
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
Stage 2A (TH 13)
Stage 2A (CH 21)
Integra Utility Relocation
Stage 2B (TH 13/CH 21)
2019
May June July Aug.April Sept. Oct.
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
Stage 2A (TH 13), Stage 2A
(CH 21), Stage 2B (CH 21) *Expected 3 week schedule reduction with all downtown work completed at the same time
2019
April May June July Aug. Sept. Oct.
STAGE 2A CH 21/Arcadia Ave roundabout & South leg of TH 13/CH 21 roundabout
STAGE 2B
STAGE 2A N. Half of TH 13 from CH 12 to CH 23 /
See Stage 1 Board
See Stage 1 Board
Du
luth
Ave
SE
Village Lake Dr SE
Franklin Trail SE
Pleasant St SE
Five
Haw
ks A
ve S
E
Willowwood St SW
Will
ow
wo
od
Ln
SW
Mai
n A
ve S
E
Lyons Ave SE
Blind Lake Trail SE
Stage 2A (TH 13)
Stage 2A (CH 21)
Integra Utility Relocation
Stage 2B (TH 13/CH 21)
2019
May June July Aug.April Sept. Oct.
Stage 2A (TH 13), Stage 2A
(CH 21), Stage 2B (CH 21)*Expected 3 week schedule reduction with all downtown work completed at the same time
2019
April May June July Aug. Sept. Oct.
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
Stage 1A (TH 13)
Stage 1B (TH 13)
Stage 1A (CH 21)
Stage 1C (TH 13)
CH 21/Arcadia Ave roundabout & South leg of TH 13/CH 21 roundabout
N. Half of TH 13 from CH 12 to CH 23 /
See Stage 1 Board
See Stage 1 Board
Construction Stage 2
12
SCENE
Scott County will be responsible for regional detour signage during the project. Updates regarding closures, and detours will be shared through their email notification system, Notify Me. Their bi-monthly publication SCENE will provide project updates throughout construction.
Sign up here!
The WavelengthPrior Lake:
A Wonderful Place To Live, Work and Play for a Lifetime.
June/July ‘18
In addition to active social media pages, the weekly e-mail, City Newswire, and the bi-monthly publication, The Wavelength, will
contain project updates throughout construction. Sign up to receive these updates on the City website.
Several communication outlets will be utilized during construction to share current activities, impacts, and milestones with the public. The project team will provide content to all agencies so that messaging is clear, consistent, and timely.
movingforward13-21.com SOUTHVIEW BLVDRECONSTRUCTION
HOTLINE612-619-6284
EMERGENCY651-322-2323
Community Liaison (CL)The CL will act as the central point of contact for the community and will relay any concerns to the project team and agencies.
Contact CardsThese will be distributed to residents, businesses, and stakeholders as construction nears and will include pertinent contact information.
A short video will be released as construction staging details are finalized in order to share construction details and timeline with the community. This graphic timeline will be used with written project updates (shared electronically) to track progress.
Keep watching the project
Facebook page and website
for updates!
Example contact cards
Scott County will be responsible for regionaldetour signage during the project. Updatesregarding closures, and detours will be shared through their email notification system, Notify Me. Their bi-monthly publication SCENE will provide project updates throughout construction.
Sign nup here!
Newsletter of the City of Prior Lake www.cityofpriorlake.comwww cityofpriorlake com
Prior Lake:AA f y f fA Wonderful Place To Live, Work and Play for a Lifetime.A Wonderful Place To Live, Work and Play for a Lifet
June/July ‘18
In addition to active social media pages, the weekly e-mail, City Newswire, and the bi-monthlypublication, The Wavelength, will
contain project updates throughout construction. Sign up to receive these updates on the City website.
Several communication outlets will be utilized during construction to share current activities, impacts, and milestones with the public. The project team will provide content to all agencies so that messaging is clear, consistent, and timely.
SOUTHVIEW BLVDRECONSTRUCTION
HOTLINE612-619-6284
EMERGENCY651-322-2323
Community Liaison (CL)The CL will act as the centralpoint of contact for thecommunity and will relay any concerns to the project team andagencies.
Contact CardsThese will be distributed to residents, businesses, and stakeholders as construction nears and will include pertinent contact information.
A short video will be released as construction staging details are finalized in order to share construction details and timelinewith the community. This graphic timeline will be used withwritten project updates (sharedelectronically) to track progress.
Keep watching the project
Facebook page and website
for updates!
Example contact cardsExample contact cards
Construction Communications - What to Expect
Roundabout RodeoSt. James, MN
Brought to you by the
...By Engineer/Contractor
...By Communities!
Construction Communications!
Business Wayfinding Signage
Community Events
Guiding Documents
The events below are Community organized events from other Minnesota cities that brought visitors downtown during construction.
The Main EventRedwing, Minnesota
On the Road AgainSouth St. Paul, Minnesota
Branded communication tools can rally the community during construction and clearly
communicate what is part of the project. Two examples from Buffalo and Hopkins are shown here.
Preparing for construction is key. St. James developed a "Business Survival Guide” with their Chamber of Commerce to prepare downtown businesses and unify the downtown as one big destination rather than individual business owners.
Roundabout RodeoSt. James, MN
Brought to you by the
The events below are Community organized events from other Minnesota cities that brought visitors downtown during construction.
he Main EventThedwing, MinnesotaR
On the Road AgainSouth St. Paul, Minnesota
ed communication tools can rally the Brandemmunity during construction and clearly comccommunicate what is part of the project. Two cc
examples from Buffalo and Hopkins areeshown here.shown here.s
Preparing for construction is key. St. James developed a "Business Survival Guide” with their Chamber of Commerce to prepare downtown businesses and unify the downtown as one big destination rather than individual business owners.
Construction Communications - What can the community do?
What is a RRFB?
• • • • •
•
Typical Street Sections
"Typical" Streetscape Treatment
•
•
•
•
•
•
•
Section across CH 21 at Prior Lake Library
Section across CH 21 at Main Ave
Du
luth
Ave
SE
Colorado St SE
Mai
n A
ve S
E
•••••
•
•
~15’(VARIES)
11’LANE
13’ BUS BAY 5’
LOA
DING
ZON
E
10’TRAIL
11’LANE
11’LANE
10’ BOULEVARD
BBBBBBBBBBBUIUIUIUIUIUIUIUIIILLLLLD
IDIIDIDINGNGNGNGNGN
FFFFACACACCCACAA
EEEE
BBBBBBBBUIUIUIUIULLLLLLLLD
IDIDIDIDIIIDDNGNGNGNGNGNN
FFFFFFFFFFFFFFFFFFFFACACAA
E
11’LANE
29’ MEDIAN
11’LANE
5’ B
OULE
VARD
10’ TRAIL
12.5’ LANE
12.5’LANE
12’AMENITYTT ZY ONE
11’LANE
5’ B
OULE
VARD
6’WALK
•
•
•
•
•
•
•
Section across CH 21 at Prior Lake Library
Section across CH 21 at Main Ave
Du
luth
Ave
SE
Colorado St SE
Mai
n A
ve S
E
Streetscape ElementsCH 21 Downtown Prior Lake Improvement
Dakota St. SE
Pleasant St. SE
Colorado St. SE
Main Ave. SE
Arcadia Ave.
Duluth Ave. SE
Planter Curb Planter Wall Landscape Boulder Details
Planters & Plant Material
Decorative Pavement
Downtown Wayfinding Kiosk
Roundabout Lighting Decorative Lighting
Lighting
Plant Materials
Common Considerations•
•
•
•
•
•
•
•
•
DRAFT
D kkkDDakoDakDakot SSSta SSta Sta Sa SSt. St. S. St. Stt. St. S.ttt EEE
PleaPleasantsansantsant St.tSt.SSttt.. SESESESE SE
CoColColllColCCCC oraararaoradoddododdo St.St.SSt.St.S SESESESESE
Main
Main
Main
Main
Main
AveAveAveAveAve. SE
. SE. SE. SE. SESSSSS
ArcaArcaArcaArcaArcaArcaArcaArcaadia
dddia dia diadia diadiadiad
Ave.Ave.Ave.AAveAveAve.
DuluDulu
uluDuluDulu
uluululuuluuuth A
th Ath Ath Ath Ath
Ath Ath
Ath AAAAAve.
ve.vve.vve.vv
.e.. SESESESESESESESESESESSESESE
Planter Curb Planter Wall Landscape Boulder Details
Roundabout LightingRoRo Decorative LightingDeDe
Plant Materials
Common Considerations•
•
•
•
•
•
•
•
•
DRAFT
Streetscape ElementsCH 21 Downtown Prior Lake Improvement
• •
Bollards
Decorative Rail
Nautical Details Concept (Recommended Approach)
Wave Concept
Intermittent Plaques
Median Feature - Sail Boat Mast Lighting Feature
Banner Across CH 21
• •
•
•
•
DRAFT
••
Nautical Details Concept (Recommended Approach)
Wave Concept
Intermittent Plaques
••
•
•
•
DRAFT
Streetscape ElementsCH 21 Downtown Prior Lake Improvement