+ All Categories
Home > Documents > Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group...

Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group...

Date post: 13-Jun-2020
Category:
Upload: others
View: 6 times
Download: 0 times
Share this document with a friend
10
Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017
Transcript
Page 1: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

Welcome to the

Wheelabrator Parc Adfer

Community Liaison Group

June 21, 2017

Page 2: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

Wheelabrator Parc Adfer

2

New artist’s impression

Page 3: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

Wheelabrator Parc Adfer

March• Land

stripping /

site

leveling

completed

• Excavation

of the

bunker

ongoing

• Piling

design

progressed

3

Progress since our last meeting

Page 4: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

Wheelabrator Parc Adfer

April

• Approximately 20 –

25 workers on site

• All temporary

office cabins

installed

• Waste bunker

excavation

complete

• Bunker floor

prepared for piling

4

Progress since our last meeting

Page 5: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

Wheelabrator Parc Adfer

May• 55 contractors on

site

• Piling work started

– 40 per cent of

piles completed

• Boiler fabrication

order placed

• Steam turbine

provider selected

5

Progress since our last meeting

Page 6: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

Wheelabrator Parc Adfer

June• More than 70% of

piles completed

• Bunker floor and

rear wall slab

pouring

commenced

• New site entrance

and car park

tarmacked

6

Progress since our last meeting

Page 7: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

Project news

7

Jobs fair – construction phase

• Around 250 jobs during three year construction

• Jobs fair held by CNIM and Clugston on May 23, 2017

• Hosted by Coleg Cambria

• Approximately 150 candidates attended

• Event supported by GMB and Unite, Hays, Fortel, Jobcentre Plus, Futureworks Flintshire and Communities First

• Further information from: www.parcadferconstruction.co.uk

• CVs and enquiries to: [email protected]

Page 8: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

Project news

8

Community Benefit Funding

• Construction phase funding worth £50,000 over three years

• Grants awarded in three lots, one in each of the three years of the construction project

• Focused on Flintshire with priority given to Deeside / Connah’s Quay

• Guidance now finalised which:

• Sets qualification criteria

• Explains application process

• Outlines conditions

Page 9: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

Project news

9

Community Benefit Funding cont.

▪ Awards might be made to one or many applicants, depending on the suitability of individual applications

▪ Criteria:

• Environmental benefits

• Clean energy, waste reduction and/or

recycling

• Increase standards in health, safety

and wellbeing

• Demonstrate a clear and tangible

community need and benefit

▪ More information available in coming weeks via the next Parc Adfer newsletter (July) and at www.parcadfer.com

Page 10: Welcome to the - Parc Adfer€¦ · Welcome to the Wheelabrator Parc Adfer Community Liaison Group June 21, 2017. Wheelabrator Parc Adfer 2 New artist’s impression. Wheelabrator

THANK YOU

QUESTIONS?

www.parcadfer.com

[email protected]


Recommended